Loading...
HomeMy WebLinkAboutAgenda Report - February 6, 2019 C-06TM CITY OF LODI COUNCIL COMMUNICATION AGENDA ITEM C -b AGENDA TITLE: Adopt Resolution Awarding Contract for Granular Activated Carbon Replacement, Well No. 4R and Well No. 22, to Calgon Carbon Corporation, of Moon Township, Pennsylvania ($230,222), Authorizing City Manager to Execute Change Orders ($50,000), and Appropriating Funds ($280,222) MEETING DATE: February 6, 2019 PREPARED BY: Public Works Director RECOMMENDED ACTION: Adopt resolution awarding contract for Granular Activated Carbon Replacement, Well No. 4R and Well No. 22, to Calgon Carbon Corporation, of Moon Township, Pennsylvania in the amount of $230,222, authorizing City Manager to execute change orders in an amount not -to -exceed $50,000, and appropriating funds in the amount of $280,222. BACKGROUND INFORMATION: Granular activated carbon (GAC) is utilized at certain well sites to adsorb dibromochloropropane (DBCP) and other contaminates in the drinking water. Over time, the carbon loses its adsorptive capacity and must be replaced. Recent test results indicate that while the current GAC in the vessels at Well No. 4R and Well No. 22 have reduced adsorptive capacity and are ready for replacement, the water quality being delivered to our customers meets or exceeds all State and Federal requirements. Well No. 4R is located at 1215 Thurman Street and has three vessels with 30,000 pounds of GAC each. Well No. 22 is located at 2001 South Cherokee Lane and has two vessels with 30,000 pounds of GAC each. The GAC filter systems at these locations have been in service since 1997, with the most recent GAC replacement in 2008. The current GAC has treated 2.13 billion gallons of water at Well No. 4R and 1.34 billion gallons at Well No. 22. The total amount of GAC to be replaced with this project is 150,000 pounds. The well site locations are graphically shown on Exhibit A. Plans and specifications for this project were approved on December 10, 2018. The City received the following two bids for this project on January 9, 2019: Bidder Location Above/(Below) Bid Engineer's Estimate Engineer's Estimate $258,000.00 Calgon Carbon Corporation Moon Township, PA $230,222.00 Diede Construction Woodbridge $327,375.00 ($27,778.00) $69,375.00 The requested change order approval amount is established based on the unknown condition of the GAC vessel interior coatings, which must be repaired (as needed) during the GAC change out procedure at additional cost. APPROVED: teph4n Schwabau-r, City Manager K:\WP\PROJECTS\WATER\GAC4R22\CAward.doc 1/28/2019 Adopt Resolution Awarding Contract for Granular Activated Carbon Replacement, Well No. 4R and Well No. 22, to Calgon Carbon Corporation, of Moon Township, Pennsylvania ($230,222), Authorizing City Manager to Execute Change Orders ($50,000), and Appropriating Funds ($280,222) February 6, 2019 Page 2 Staff recommends awarding the contract for Granular Activated Carbon Replacement, Well No. 4R and Well No. 22, to Calgon Carbon Corporation, of Moon Township, Pennsylvania, in the amount of $230,222, authorizing City Manager to execute change orders in an amount not -to -exceed $50.000, and appropriating funds in the mount of $280,222. FISCAL IMPACT: Funds for this project will be coming from the Water Utility Fund's DBCP Operations and Maintenance account, which is funded under the terms of the DBCP settlement. This project will not impact the General Fund. FUNDING AVAILABLE: Requested Appropriation: Water Capital (56199000.77020) - $280,222 6(/‘,•kr Andrew Keys Deputy City Manager/Internal Services Director (I -j? Charles E. Swimley, Jr. Public Works Director Prepared by Sean Nathan, Senior Civil Engineer CES/SN/tdb Attachments Cc: Utility Superintendent Calgon Carbon Corporation Rebecca Areida-Yadav/Management Analyst K:\WP\PROJECTS\WATER\GAC4R22\CAward doc 1/28/2019 Exhibit A Vicinity Map Legend Project Locations ._ 1 1 - 1 A m 'City Limits II....r s 0 0.25 0.5 1 Miles GAC REPLACEMENT WELL NO. 4R AND NO. 22 CONTRACT CITY OF LODI, CALIFORNIA THIS CONTRACT made by and between the CITY OF LODI, State of California, herein referred to as the "City," and CALGON CARBON CORPORATION, a Delaware corporation, qualified to do business in California, herein referred to as the "Contractor." WITNESSETH: That the parties hereto have mutually covenanted and agreed, and by these presents do covenant and agree with each other, as follows: The complete Contract consists of the following documents which are incorporated herein by this reference, to -wit: Notice Inviting Bids Information to Bidders General Provisions Special Provisions Bid Proposal Contract Contract Bonds Plans The July 1992 Edition, Standard Specifications, State of California, Business and Transportation Agency, Department of Transportation All of the above documents, sometimes hereinafter referred to as the "Contract Documents," are intended to cooperate so that any work called for in one and not mentioned in the other is to be executed the same as if mentioned in all said documents. ARTICLE I - That for and in consideration of the payments and agreements hereinafter mentioned, to be made and performed by the City and under the condition expressed in the two bonds bearing even date with these presents and hereunto annexed, the Contractor agrees with the City, at Contractor's cost and expense, to do all the work and furnish all the materials except such as are mentioned in the specifications to be furnished by the City, necessary to construct and complete in a good workmanlike and substantial manner and to the satisfaction of the City the proposed improvements as shown and described in the Contract Documents which are hereby made a part of the Contract. ARTICLE II - The City hereby promises and agrees with the Contractor to employ, and does hereby employ, the Contractor to provide all materials and services not supplied by the City and to do the work according to the terms and conditions for the price herein, and hereby contracts to pay the same as set forth in Section 5.600, "Measurement, Acceptance and Payment," of the General Provisions, in the manner and upon the conditions above set forth; and the said parties for themselves, their heirs, executors, administrators, successors and assigns, do hereby agree to the full performance of the covenants herein contained. ARTICLE III - The Contractor agrees to conform to the provisions of Chapter 1, Part 7, Division 2 of the Labor Code. The Contractor and any Subcontractor will pay the CONTRACT.doc 4.1 01/09/19 general prevailing wage rate and other employer payments for health and welfare, pension, vacation, travel time, and subsistence pay, apprenticeship or other training programs. The responsibility for compliance with these Labor Code requirements is on the prime contractor. ARTICLE IV - And the Contractor agrees to receive and accept the following prices as full compensation for furnishing all materials and for doing all the work contemplated and embraced in this agreement; also for all loss or damage arising out of the nature of the work aforesaid or from the action of the elements, or from any unforeseen difficulties or obstructions which may arise or be encountered in the prosecution of the work until its acceptance by the City, and for all risks of every description connected with the work; also for all expenses incurred by or in consequence of the suspension or discontinuance of work and for well and faithfully completing the work, and the whole thereof, in the manner and according to the Plans and Contract Documents and the requirements of the Engineer under them, to -wit: Perform the work necessary to remove the spent granular activated carbon (GAC) from well sites 4R and 22 and inspect the vessels. After repairs are made by others (if needed), the contractor/supplier will furnish and install domestic virgin GAC into the vessels and provide other incidental and related work, all as described in the specifications for the above project. See Section 6-07 Description of Bid Items for additional information. Item CONTRACT ITEMS Description Quantity 1 Removal of Spent Carbon 1 2 GAC Vessel Inspection 3 Supply of Virgin GAC 4 Unit LS $25,361.00 Unit Price Total Price $25,361.00 1 LS $5,500.00 $5,500.00 150,000 Pounds $1.16/Ib $174,000.00 Installation of Virgin GAC 1 LS $25,361.00 $25,361.00 TOTAL $230,222.00 ARTICLE V - By my signature hereunder, as Contractor, I certify that I am aware of the provisions of Section 3700 of the Labor Code, which requires every employer to be insured against liability for workers' compensation or to undertake self-insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the work of this contract. ARTICLE VI - It is further expressly agreed by and between the parties hereto that, should there be any conflict between the terms of this instrument and the Bid Proposal of the Contractor, then this instrument shall control and nothing herein shall be considered as an acceptance of the said terms of said proposal conflicting herewith. ARTICLE VII - The City is to furnish the necessary rights-of-way and easements and to establish lines and grades for the work as specified under the Special Provisions. All labor or materials not mentioned specifically as being done by the City will be supplied by the Contractor to accomplish the work as outlined in the specifications. CONTRACT.doc 4.2 01/09/19 ARTICLE VIII - The Contractor agrees to commence work pursuant to this contract within 15 calendar days after the City Manager has executed the contract and to diligently prosecute to completion within 40 Calendar days. Day count will stop once the inspection of all vessels has been completed and will start again once any repairs have been completed and/or the vessels have been deemed ready for the new carbon. ARTICLE IX - State of California Senate Bill 854 requires the following. • No contractor or subcontractor may be listed on a bid proposal for a public works project unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)]. • No contractor or subcontractor may be awarded a contract for public work on a public works project unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5. • This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. WHEN SIGNING THIS CONTRACT, THE CONTRACTOR AGREES THAT THE TIME OF COMPLETION FOR THIS CONTRACT IS REASONABLE AND THE CONTRACTOR AGREES TO PAY THE CITY LIQUIDATED DAMAGES AS SET FORTH IN SECTION 6-04.03 OF THE SPECIAL PROVISIONS. CONTRACTOR AGREES THAT THIS AMOUNT MAY BE DEDUCTED FROM THE AMOUNT DUE THE CONTRACTOR UNDER THE CONTRACT. IN WITNESS WHEREOF, the parties to these presents have hereunto set their hands the year and date written below. CONTRACTOR: CITY OF LODI, a municipal corporation By: STEPHEN SCHWABAUER City Manager By: Date: Title (CORPORATE SEAL) CONTRACT.doc Attest: JENNIFER M. FERRAIOLO City Clerk Approved As To Form: JANICE D. MAGDICH City Attorney 4.3 01/09/19 RESOLUTION NO. 2019-08 A RESOLUTION OF THE LODI CITY COUNCIL AWARDING THE CONTRACT FOR GRANULAR ACTIVATED CARBON REPLACEMENT, WELL NO. 4R AND WELL NO. 22, TO CALGON CARBON CORPORATION, OF MOON TOWNSHIP, PENNSYLVANIA; AUTHORIZING THE CITY MANAGER TO EXECUTE CHANGE ORDERS; AND FURTHER APPROPRIATING FUNDS WHEREAS, in answer to notice duly published in accordance with law and the order of this City Council, sealed bids were received and publicly opened on January 9, 2019, at 11:00 a.m., for Granular Activated Carbon Replacement, Well No. 4R and Well No. 22, described in the plans and specifications therefore approved by the City Council on December 10, 2018; and WHEREAS, said bids have been checked and tabulated and a report thereof filed with the City Manager as follows: Above/(Below) Bidder Bid Engineer's Estimate Calgon Carbon Corporation $230,222 ($27,778) Diede Construction $327,375 $69,375 WHEREAS, staff recommends that the City Council award the contract for Granular Activated Carbon Replacement, Well No. 4R and Well No. 22, to Calgon Carbon Corporation, of Moon Township, Pennsylvania, in the amount of $230,222; and WHEREAS, staff also recommends that the City Council authorize the City Manager to execute change orders in an amount not -to -exceed $50.000; and WHERAS, staff also recommends the City Council appropriate funds in the amounts of $280,222, from the fund balance of Water Capital (56199000.77020) for Fiscal Year 2018/19. NOW, THEREFORE, BE IT RESOLVED that the Lodi City Council does hereby award the contract for Granular Activated Carbon Replacement, Well No. 4R and Well No, 22, to Calgon Carbon Corporation, of Moon Township, Pennsylvania, in the amount of $230,222; and BE IT FURTHER RESOLVED that the Lodi City Council does hereby authorize the City Manager to execute the contract on behalf of the City of Lodi and change orders in an amount not -to -exceed $50,000; and BE IT FURTHER RESOLVED that the Lodi City Council does hereby authorize an appropriation for the Granular Activated Carbon Replacement, Well No. 4R and Well No. 22, in the amount of $280,222, as set forth above. Dated: February 6, 2019 hereby certify that Resolution No. 2019-08 was passed and adopted by the City Council of the City of Lodi in a regular meeting held February 6, 2019 by the following vote: AYES: COUNCIL MEMBERS — Johnson, Kuehne, Nakanishi, and Mayor Chandler NOES: COUNCIL MEMBERS — None ABSENT: COUNCIL MEMBERS — Mounce ABSTAIN: COUNCIL MEMBERS — None linr\?1:2Axzw4 NIFER !1FERRAIOLO ity Clerk 2019-08