HomeMy WebLinkAboutMinutes - February 26, 2019 SSLODI CITY COUNCIL
SHIRTSLEEVE SESSION
CARNEGIE FORUM, 305 WEST PINE STREET
TUESDAY, FEBRUARY 26, 2019
A. Roll Call by City Clerk
An Informal Informational Meeting ("Shirtsleeve" Session) of the Lodi City Council was held
Tuesday, February 26, 2019, commencing at 7:01 a.m.
Present: Council Member Johnson, Council Member Mounce, Council Member Nakanishi,
Mayor Pro Tempore Kuehne, and Mayor Chandler
Absent: None
Also Present: City Manager Schwabauer, City Attorney Magdich, and City Clerk Ferraiolo
NOTE: Council Member Johnson participated in the meeting via teleconference.
NOTE: Council Member Nakanishi arrived at 7:03 a.m.
NOTE: Council Member Mounce left at 7:42 a.m.
B. Topic(s)
B-1 First and Second Quarters Fiscal Year 2018/29 Water, Wastewater, and Electric Utility
Department Financial Reports (CM)
Electric Utility Interim Director Melissa Price provided a PowerPoint presentation regarding the
Electric Utility Department quarterly update for the period ending December 31, 2018. Specific
topics of discussion included Electric Utility cash flow summary, cash balances, reserve policy,
five-year spending plan, power sales, ECA revenue, operating results, power supply costs, load
coverage, Risk Oversight Committee report highlights, and City Council strategic areas of focus.
Public Works Utilities Manager Lance Roberts provided a PowerPoint presentation regarding the
Water/Wastewater quarterly update for the period ending December 31, 2018. Specific topics of
discussion included Wastewater cash flow summary, operating results, cash balances, and
planned Capital projects; Water cash flow summary, operating results, cash balances, and
planned Capital projects; and Water/Wastewater Utility activities.
B-2 Receive Update on City of Lodi Customer Service Division (CM)
Revenue Manager Tarra Sumner provided a PowerPoint presentation regarding the Customer
Service Division update. Specific topics of discussion included current status, teamwork,
processes, process documentation, technology, process improvement plan, and technology
improvement plan.
In response to Council Member Nakanishi, Electric Utility Interim Director Melissa Price stated
staff will provide Council with information relating to the percentage of total revenue from solar
because it falls across different rate classes.
In response to Mayor Chandler, Ms. Price stated there are roughly 750 to 800 solar customers in
the City and the State dictates how solar customers are to be billed under net metering. Solar
customers receive a bill every month, which shows a charge or credit that rolls over month to
month, and at the end of 12 months the customer either receives a credit or a bill. The City's new
system does not have the ability to track late charges for solar customers because of the year-
long billing system. Deputy City Manager Andrew Keys assured Council that the solar true -up is
not a shock to solar customers because that is the agreement they entered into when they
1
installed their solar system. The $47,000 in bad debt for solar customers is a large number
because it covers a number of years. These customers will have more gracious terms in order to
get caught up before shutting off power.
C. Comments by Public on Non -Agenda Items
None.
D. Adjournment
No action was taken by the City Council. The meeting was adjourned at 8:12 a.m.
ATTEST:
Jennifer M. Ferraiolo
City Clerk
2
TM
CITY OF LODI
COUNCIL COMMUNICATION
AGENDA ITEM
Bwi1
AGENDA TITLE: First and Second Quarters Fiscal Year 2018/19 Water, Wastewater and Electric
Utility Department Financial Reports
MEETING DATE: February 26, 2019
PREPARED BY: Deputy City Manager
RECOMMENDED ACTION Receive utility financial reports for the first and second quarters of
Fiscal Year 2018/19.
BACKGROUND INFORMATION: In accordance with the Lodi Municipal Code, quarterly financial
reports are to be prepared for the Water, Wastewater, and Electric
Utilities. Highlights of the operations and financial performance of
each utility will be presented at the meeting of February 26, 2019.
FISCAL IMPACT: There is no fiscal impact from the preparation of this report.
FUNDING AVAILABLE: Adequate funding is available in the Fiscal Year 2018-19 budget for the
items on this report.
Andrew Keys
Deputy City Manager/Internal Services Director
APPROVED:
City Manager
Public Works Department
Water/Wastewater
FY 19 Quarterly Update
(Ending December 31, 2018)
City Council Shirtsleeve Session
February 26, 2019
1
Wastewater Fund
Cash Flow Summary
(Ending December 31, 2018)
2
Budget
Actuals
% of Budget
Revenue
Sales
15,208,130
7,638,337
50%
Development Impact Mitigation Fees
1,062,470
884,954
83%
Other (interest, septic, misc.)
3,550,000
149,611
4%
Total Revenues
19,820,600
8,672,902
44%
Expenses
Operating
8,064,710
3,794,982
47%
Capital
14,856,800
5,065,373
34%
Debt Service
3,343,510
2,345,083
70%
Cost of Services Payment To General Fund
1,083,710
541,855
50%
Total Expenses
27,348,730
11,747,293
43%
Beginning Cash (Operations Only)
15,365,403
Ending Cash (Operations Only)
13,972,708
Days Cash (Excluding Capital)
376
of Target — 90 Days Cash on Hand
418%
2
Wastewater
Operating Results
(Ending December 31, 2018)
3
Budget
Actuals
% of Budget
Personnel
$ 3,920,820
$ 2,231,916
57%
Supplies, Materials, Services
$ 2,670,360
$ 814,637
31%
Equipment, Land, Structures
$ 300,000
$ 57,541
19%
Other Payments
$ 406,160
$ 281,576
69%
Utilities
$ 739,060
$ 409,312
55%
Work for Others
$ 28,310
$ -
0%
Total Operating Expenses
$ 8,064,710
$ 3,794,982
47%
3
Wastewater Funds
Cash Balances
(Ending December 31, 2018)
18,000,000
16,000,000
14,000,000
12,000,000
10,000..000
Actual Reserves vs. Target
534%
429%
326%
8,000,000
206%
6,000,000
4,000,000
2,000,000
0
418%
111
14/15 15/16 16/17 17/18 18/19
rae-
Amounts above
reserve target are
held for scheduled
capital maintenance
4
Operating (530)
13,972,708
Utility Capital / Infrastructure Replacement (531)
34,573
Capital Reserve (532) (Fund used to pay White Slough COP Debt Service)
18,579
Wastewater IMF (533)
1,423,071
Rate Stabilization Reserve (534)
500,000
Storm Drain IMF (535)
1,199,583
Total
17,148,514
18,000,000
16,000,000
14,000,000
12,000,000
10,000..000
Actual Reserves vs. Target
534%
429%
326%
8,000,000
206%
6,000,000
4,000,000
2,000,000
0
418%
111
14/15 15/16 16/17 17/18 18/19
rae-
Amounts above
reserve target are
held for scheduled
capital maintenance
4
Wastewater
Planned Capital Projects
Villa Fiore Reimbursement
Lockeford Street Improvements
Storm Drain Trash Handling
MSC Security Improvements
Misc. System Relocations
Misc. Wastewater Taps
Collection System Capacity Enhancement Projects
Pipeline Condition Assessment
Main Replacement Project #7
Northeast Sewer Lift Pipe Repl.
Sewer Lift Station Wet Well Rehab
Kofu Storm Water Pump Rehab
Salas Storm Water Pump Rehab
Vinewood Storm Water Pump Rehab
Lincoln Storm Pump Rehab
Vehicles/Equipment
Upgrade Blowers
Irrigation Improvements
Plant Maintenance Improvements
Compliance Studies and Reports
Aeration Difuser Replacement
Digester #4 Cleaning
Pump & Equipment Upgrades
Electrical/Screen/SCADA Design
Electrical Upgrades/SCADA Construction
White Slough Recycled Water Storage
Field #5 Road Repair
Miscellaneous Future Projects
Totals
FY 18-19
FY 19-20
FY 20-21
FY 21-22
FY 22-23
930,000
100,000
750,000
750,000
35000
35,000
35,000
35,000
35,000
35,000
40,000
40,000
40,000
40,000
40,000
20,000
200,000
500,000
2,000,000
2,600,000
2,000,000
60,000
250,000
200,000
200,000
100,000
75,000
135,000
150,000
150,000
75,000
75,000
750,000
1,300,000
750,000
235,000
265,000
320,000
250,000
260,000
200,000
200,000
200,000
200,000
200,000
500,000
220,000
345,000
200,000
900,000
600,000
1,000,000
7,000,000
4,000,000
150,000
100,000
100,000
$11,455,000 $4,565,000 $2,095,000 $5,550,000 $8,310,000
5
Water Fund
Cash Flow Summary
(Ending December 31, 2018)
6
Budget
Actuals
% of Budget
Revenue
Sales
12,872,190
7,412,881
58%
Development Impact Mitigation Fees
476,310
444,319
93%
Other (interest, tap fees, water meters, misc.)
1,100,040
54,844
5%
Total Revenues
14,448,540
7,912,044
55%
Expenses
Operating
7,139,150
3,218,906
45%
Capital
3,840,895
352,832
9%
Debt Service
2,969,160
951,138
32%
Cost of Services Payment To General Fund
821,900
410,950
50%
Total Expenses
14,771,105
4,933,826
33%
Beginning Cash (Operations Only)
3,226,256
Ending Cash (Operations Only)
6,549,796
Days Cash (Excluding Capital)
257
% of Target — 90 Days Cash on Hand
286%
6
Water
Operating Results
(Ending December 31, 2018)
7
Budget
Actuals
% of Budget
Personnel
$ 3,239,320
$ 1,331,438
41%
Supplies, Materials, Services
$ 1,563,660
$ 452,686
29%
Equipment, Land, Structures
$ 105,000
$ 2,585
2%
Other Payments
$ 1,647,500
$ 1,106,626
67%
Utilities
$ 483,670
$ 325,571
67%
Work for Others
$ 100,000
$ -
0%
Total Operating Expenses
$ 7,139,150
$ 3,218,906
45%
7
Water Funds
Cash Balances
(Ending December 31, 2018)
7,000,000
6,000,000
5,000,000
4,000,000
3,000,000
2,000,000
1,000, 000
0
Actual Reserves vs. Target
264%
238%
286%
1
145%
209%
111
14/15 15/16 16/17 17/18 18/19
■ Target
Actual
Amounts above
reserve target are
held for scheduled
capital maintenance
8
Operating (560)
6,549,796
Utility Capital / Infrastructure Replacement (561)
68,850
IMF (562)
1,521,952
PCE/TCE Settlements
9,155,068
PCE/TCE Rates (565)
4,024,722
Total
21, 320, 388
7,000,000
6,000,000
5,000,000
4,000,000
3,000,000
2,000,000
1,000, 000
0
Actual Reserves vs. Target
264%
238%
286%
1
145%
209%
111
14/15 15/16 16/17 17/18 18/19
■ Target
Actual
Amounts above
reserve target are
held for scheduled
capital maintenance
8
Water
Planned Capital Projects
Water Meter Program
Lockeford Street Imprv.
Water Taps
Misc. Water Mains
Water Meter Replacement Program
GAC Replacement
Meter Shop Design/Construction
Water Plant Generator
MSC Security Improvements
Well 7 Pump Rehab
Well 14 Pump Rehab
Well 16 Pump Rehab
Well 17 Pump Rehab
Well 21 Pump Rehab
Well 22 Pump Rehab
Well 23 Pump Rehab
Well 24 Rehab Rehab
Well 25 Pump Rehab
Well 27 GAC Treatment & Standby Generator
Well 28 GAC Treatment
Vehicles/Equipment
FY 18-19
FY 19-20
FY 20-21
FY 21-22
FY 22-23
5,980,000
1,000,000
1,000,000
400,000
75,000
75,000
75,000
75,000
75,000
50,000
50,000
50,000
50,000
50,000
75,000
75,000
300,000
300,000
300,000
300,000
200,000
300,000
35,000
175,000
170,000
166,000
185,000
200,000
166,000
80,000
165,000
200,000
70000
750,000
70,000
950,000
120,000
80,000
40,000
50,000
50,000
Totals 1,370,000
7,471,000
2,081,000 1,905,000 1,750,000
9
Water / Wastewater Utility
Activities
Operational
• Water Distribution
• Water Production
• Collection System
• Wastewater Treatment
Regulatory
• SSO's
• Discharge Violations
• Monitoring and Reporting
10
Electric Utility Department
FY 19 Quarterly Update
(Ending December 31, 2018)
City Council Shirtsleeve Session
February 26, 2019
Electric Utility Fund
Cash Flow Summary
(December 31, 2018)
Beginning Cash Balance (6/30/18)
Budget
Actual
% of Budget
Revenue
40,422,848
Reserve Policy Target
% of Target
Sales Revenues
69,708,150
39,061,245
56%
Development Impact Fees
178,820
199,430
112%
Other Revenues (interest, misc)
3,728,120
1,666,669
45%
Total Revenues
73,615,090
40,927,344
56%
Expenses
Purchase Power
40,699,940
21,179,405
52%
Non Power
14,986,240
5,484,956
37%
Capital Projects
4,324,000
783,234
18%
Debt Service
5,522,890
237,105
4%
Cost of Service/Capital Xfer
2,399,040
1,199,520
50%
In -lieu Transfer to General Fund*
7,197,380
0
0%
Total Expenses
75,129,490
28,884,220
38%
Beginning Cash Balance (6/30/18)
26,573,007
Ending Cash Balance (12/31/18)
40,422,848
Reserve Policy Target
% of Target
23,714,000
170%
*Reflects delayed journal entry. Will be updated for next report.
2
Electric Utility Funds
Cash Balances
(Ending December 31, 2018)
3
Operating Funds
$ 27,514,218
Utility Outlay Reserve Fund
$ 875,000
Public Benefits Fund
$ 3,346,229
Impact Fee Fund
$ 834,069
Solar Surcharge Fund
$ 316,539
Greenhouse Gas Fund
$ 7,536,793
Total
$ 40, 422, 848
3
Electric Utility Reserve Policy
(December 31, 2018)
Purpose
Target
Actual*
Operating Reserves
$ 22,714,000
$ 39,547,848
Capital Reserve
$ 1,000,000
$ 875,000
Total Target
$ 23,714,000
$ 40,422,848
*Includes cash held locally and at NCPA
Actual Reserves vs. Target
$45,000
$40,000
$35,000
$30,000
c $25,000 98`46
0
$20,000
in
$15,000
$10,000
$5,000
FY 14/15 FY 15/16 FY 16/17 FY 17/18 FY 1S/19
■ Actual
❑ Target
Cash balances
support City Council
approved reserve
requirements and
provide funds for pay
as you go Capital
Improvement
Projects.
4
Capital Improvement Project
5 -Year Spending Plan
Project
FY 18-19
FY 19-20
FY 20-21
FY 21-22
FY 22-23
Distribution Capacity Program
$960,000
$250,000
$250,000
$250,000
$250,000
Underground / Overhead Maint*
$1,300,000
$1,400,000
$1,400,000
$1,400,000
$1,400,000
Streetlight Maintenance / Repair
$90,000
$50,000
$50,000
$50,000
$50,000
LED Streetlight Improvements
$90,000
$200,000
$200,000
$200,000
$200,000
230 kV Interconnection Project
$60,000
$60,000
$60,000
$0
$0
Substation Maint / Improvements
$525,000
$350,000
$650,000
$1,500,000
$150,000
Building & Security Improvements
$1,035,000
$50,000
$50,000
$50,000
$50,000
Vehicles & Equipment
$264,000
$350,000
$250,000
$370,000
$403,000
Total Projects
$4,324,000
$2,710,000
$2,910,000
$3,820,000
$2,503,000
*Includes work for others.
5
Power Sales
(Ending December 31, 2018)
Power Sales
Customer Class
(kWh)
Budget
Actual
Residential
157,969,253
83,966,417
Small Commercial
158,823,735
84,609,786
Large Commercial/Small Industrial
49,847,066
25,500,323
Industrial
68,408,946
30,519,065
Total
435,049,000
224,595,591
Revenue ($)
Customer Class Budget
Actual
Average Ran
Residential
$ 27,288,494
$ 15,768,225
$ 0.1878
Small Commercial
$ 26,883,003
$ 15,195,157
$ 0.1796
Large Commercial/Small Industrial
$ 7,717,784
$ 4,269,279
$ 0.1674
Industrial
$ 7,818,869
$ 3,828,584
$ 0.1254
Total
$ 69,708,150
$39,061,245
$ 0.1739
6
ECA Revenue
(Ending December 31, 2018)
Customer Class
Total ($)
Residential
$ 1,060,465
Small Commercial
$ 1,085,939
Large Commercial / Small Industrial
$ 335,636
Industrial
$ 365,515
Total Revenue
$ 2,847,555
7
Electric Utility Fund
Operating Results
(Ending December 31, 2018)
8
Budget
Actual
% of Budget
Personnel
$ 9,457,360
$ 4,448,683
47%
Supplies, Materials, Services
$ 3,874,880
$ 857,370
22%
Other Payments
$ 1,575,100
$ 148,703
9%
Utilities
$ 78,900
$ 30,200
38%
Total Operating Expenses
$ 14,986,240
$ 5,484,956
37%
8
Power Supply Costs
(Ending December 31, 2018)
9
Budget
Actual
% of Budget
Generation
$ 28,723,770
$ 15,111,812
53%
Transmission
$ 10,591,000
$ 5,236,445
49%
Management Services
$ 1,385,170
$ 831,148
60%
Total Power Supply Costs
$ 40,699,940
$ 21,179,405
52%
9
Load Coverage
Pr
MWh Load
ROC Matrix
Target
Load Coverage
(Including Purchases)
Q2 — 2019
111,084
80.0%
81.2%
Q3 — 2019
134,843
76.7%
76.9%
Q4 — 2019
99,605
66.7%
66.8%
Q1 — 2020
93,740
60.0%
64.2%
160,000
140,000
120,000
100,000
t
g80,000
60,000
40,000
20,000
1
1
Q2-2019 Q3-2019 Q4-2019 Q1-2020
M Cove rage
Target
—•—Load
Includes energy purchases through January 2019 as approved by the Risk Oversight Committee (ROC)
10
Risk Oversight Committee
Report Highlights
• Forward Energy Purchases
• Cap and Trade Activities
• NCPA Solar Project
• 2017 Power Content Label
• ECA Update/Review
• SB 100 Impact(s)
City Council Strategic Areas of Focus
• Customer
• Technology
• Financial
• Reliability
• Workforce
CITY OF LODI
COUNCIL COMMUNICATION
AGENDA ITEM
AGENDA TITLE: Receive Update on the City of Lodi Customer Service Division
MEETING DATE: February 26, 2019
PREPARED BY: Revenue Manager
6-2
RECOMMENDED ACTION: Receive an update on the City of Lodi Customer Service Division.
BACKGROUND INFORMATION
The City's Customer Service (CS) Division strives to provide top of
the line service. As such, the department seeks continuous
improvement.
This discussion continues an ongoing dialogue with the City Council on the challenges the customer
service division faces that began in May of 2017. Today's presentation discusses the recent setbacks the
department has faced and continues to update on progress to ensure continuous improvement in line
with the People, Process, Technology framework introduced at the May 2017 Shirtsleeve. That
framework is summarized here and will be used to guide the presentation.
People: It is essential to have the right people, with the right training and the right mentality to
succeed in all business endeavors, including the CS division. Employees must buy into the
philosophy of the division and any proposed changes.
Process: The appropriate business rules (policy and procedures) must be in place in order to
successfully administer existing programs, provide services and implement new programs.
Business rules also establish the parameters of each position's duties, responsibilities, authority
level and set clear performance expectations.
Technology: Technology is an essential asset to modern organizations. However, technology will
never overcome people and processes. Successful technology implementations are contingent on
the existence of best practices that pre -date the technology and are widely known (through
thorough and consistent training) by high quality employees moving in the same direction at all
staff levels.
FISCAL IMPACT: There is no impact from this informational presentation.
FUNDING AVAILABLE: Not applicable.
Andrew Keys, Dep,(ty City Manager
APPROVED:
elf g" =.°5 --Tal I_ I MI
- + en Schwan --r Cit Manager
Y g
Customer Service Division Update
Presented By: Tarra Sumner, Revenue Manager
City Council Shirtsleeve Session
February 26, 2019
Agenda
• Current status
— Process
— Process Documentation
— Technology
• Improvement Plan
Teamwork
"The strength of the team is each individual
member. The strength of each member is the
team."
--Phil Jackson
PROCESS
Processes
• Continued evaluation of route consolidation
— Lack of staffing resources has delayed this project
• Lock Box Services RFP
— Meet and confer with Bargaining Unit scheduled
for February 22, 2019
• Citywide Cash Handling Policy
— Change the process of City Departments day to
day processes of money handling and delivering
deposits to Revenue.
Processes
• Change in Cash Handling Practices
— Decreased overtime
— Increased customer service efficiency
— Decreased wait times at front counter
• Considering leveraging of HDL Professional
Services for customer improvement
— Ability to pay business licenses online
— Audit TOT and business licenses
— Business License tax revenue discovery
Processes
• Solar bad debt
— Sent out 18 ten day notices equivalent to
approximately $47,000 in bad debt
• Bad Debt to CB Merchants
— Approximately $700,000
— $7,101 paid in the month of February
— Working with Fire for their bad debt
Process Documentation
• Business processes and workflows are not
always clearly documented or understood
— Standard Operating Procedures (SOPS) underway
• Payment Agreement
• Bankruptcy
• Best practices hampered by technology
limitations
— Two staff heading to Tyler conference in April for
intensive training on ERP and best practices
— Considering further leveraging of outside
technology resources to improve service
TECHNOLOGY
Technology
• Phone system upgrades
— Contract approved 11-7-18 for RFP management
— Will provide management data to monitor customer
needs and help set customer expectations
• Review underway to move parking permits online
• Queuing system RFP has been drafted
• Check scanner/printer
— Give the ability for cashiers to run checks at front
counter
• Kiosk
— $3.1 million revenue collected
— 14.9 thousand user transactions
IMPROVEMENT PLAN
Improvement Plan
PEOPLE
• Secure additional training on ERP system
— Sending Utility Billing Agent to Tyler Conference
• Train in advance of all technology rollouts
• Offer and encourage training
— Purchased on demand customer service training
• Each employee assigned weekly assignments
• 150 courses including
— Improve Customer Satisfaction
— Reduce Conflict Between Coworkers
— Defuse & Retain Irate Customers
— Build Awareness Around Diversity, Inclusion, and Bullying
• Improve and maintain positive work
culture
Process Improvement Plan
Winter 2
Spring 201
Summer 2019
Fall 2019/
Winter 2020
• Queuing RFP
• Lockbox RFP
• Standard Operating Procedures (SOP's)
• HDL Contracting of Business License and TOT
administration
• Bill route consolidation
• Bad debt being sent to collections from all
departments
Process Improvement Plan
IMPLEMENTED/
MONITORING
4
ONGOING
• Rotating task list
• Bad debt collections
• CSR schedule change
• Develop clearly defined processing/understanding
expectations for all types of services provided
• Significant testing of software/hardware rollouts
Technology Improvement Plan
WI TER
2019
• Checking Scanners at front counter
SPRING 2019
• Queuing System
• Increase employee efficiency/customer satisfaction
• Advertising: important news/announcements
• Reporting: number of customers/CSR's total
number of customers served
Technology Improvement Plan
SPRING/
SUMMER 2019
ONGOING
• Interactive Voice Response (IVR) phone system
• Set customer expectations
• Provide management tools to review/manage
workload in real time
• Continued dispersion of internal knowledge
• Creation of SOPs
QUESTIONS?
DECLARATION OF POSTING
On Friday, February 22, 2019 in the City of Lodi, San Joaquin County, California,
a copy of the February 26, 2019 Shirtsleeve Meeting Agenda (attached and
marked as Exhibit A) was posted on the door 1311 Midvale Road, Lodi,
California.
I declare under penalty of perjury that the foregoing is true and correct.
Executed on February 22, 2019 at Lodi, California.
ORDERED BY:
Posted by:
JENNIFER M. FERRAIOLO
CITY CLERK
2/22/19
(Date)
LODI CITY COUNCIL
Rick Cromwell Community Room
215 West Elm Street, Lodi
*and via conference call:
1311 Midvale Road
Lodi, CA 95240
"SHIRTSLEEVE" SESSION
Date: February 26, 2019
Time: 7:00 a.m.
eFor information regarding this Agenda please contact:
Jennifer M. Ferraiolo
City Clerk
Telephone: (209) 333-6702
EXHIBIT it
Informal Informational Meeting
A. Roll CaII by City Clerk
B. Topic(s)
B-1 First and Second Quarters Fiscal Year 2018/29 Water, Wastewater, and Electric Utility
Department Financial Reports (CM)
B-2 Receive Update on City of Lodi Customer Service Division (CM)
C. Comments by Public on Non -Agenda Items
D. Adjournment
Pursuant to Section 54954.2(a) of the Government Code of the State of California, this agenda was
posted at least 72 hours in advance of the scheduled meeting at a public place freely accessible to the
public 24 hours a day.
nnifer M.
City Clerk
100
All staff reports or other written documentation relating to each item of business referred to on the agenda are on file
in the Office of the City Clerk, located at 221 W. Pine Street, Lodi, and are available for public inspection. If
requested, the agenda shall be made available in appropriate alternative formats to persons with a disability, as
required by Section 202 of the Americans with Disabilities Act of 1990 (42 U.S.C. Sec. 12132), and the federal rules
and regulations adopted in implementation thereof. To make a request for disability -related modification or
accommodation contact the City Clerk's Office as soon as possible and at least 72 hours prior to the meeting date.
Language interpreter requests must be received at least 72 hours in advance of the meeting to help ensure
availability. Contact Jennifer M. Ferraiolo at (209) 333-6702. Solicitudes de interpretacion de idiomas deben ser
recibidas por lo menos con 72 horas de anticipacion a la reunion para ayudar a asegurar la disponibilidad. Llame a
Jennifer M. Ferraiolo (209) 333-6702.
J:\CITYCLRK\AGENDA\SHIRTSLV\SHRTSLV2 doc