HomeMy WebLinkAboutMinutes - October 16, 2018 SSLODI CITY COUNCIL SHIRTSLEEVE SESSION CARNEGIE FORUM, 305 WEST PINE STREET TUESDAY, OCTOBER 16, 2018 A. Roll Call by City Clerk An Informal Informational Meeting ("Shirtsleeve" Session) of the Lodi City Council was held Tuesday, October 16, 2018, commencing at 7:03 a.m. Present: Council Member Chandler, Council Member Kuehne, and Mayor Nakanishi Absent: Council Member Johnson, and Mayor Pro Tempore Mounce Also Present: City Manager Schwabauer, City Attorney Magdich, and City Clerk Ferraiolo B. Topic(s) B-1 Provide an Overview of Impact Mitigation Fee Program Update (PW) Public Works Director Charlie Swimley provided a brief update on the 2018 Impact Mitigation Fee Program (IMFP) update, stating this is the five-year update of the 2012 IMFP. He introduced the consultants from Harris & Associates - Allison Bouley, Senior Director, and Adam Marston, Senior Project Analyst. Ms. Bouley provided a PowerPoint presentation covering the project team; IMFP history; changes to the program; and City contributions. Mr. Marston provided a PowerPoint presentation explaining the project review and updated fees for transportation, police, fire, community park, neighborhood parks, general City facilities, Art in Public Places, non -potable water, storm drainage, electrical utility, water, wastewater, and South Wastewater Trunk Line; 2018 proposed Fee Summary (excluding electrical, water and wastewater); 2018 IMFP proposed Water and Wastewater Fee Summary; 2018 IMFP proposed Electrical Utility Fee Summary; and surrounding agency comparison. John Beckman, representing the Building Industry Association, expressed support for the majority of the fee update and provided the following comments/concerns: 1) requested an analysis be done on the new non -potable water fee, which may create greater capacity at the treatment facility since less water would be filtered through due to the use of recycled water, thereby, possibly warranting a decrease in the charge developers are paying in water connection fees; 2) suggested it would be too expensive to run a line for non -potable water from the White Slough Water Pollution Control Facility to Lodi and that it may be better to emulate Stockton by putting water into the Delta and pulling it back out for credit, adding that the Mokelumne River could be an option; and 3) with regard to the Art in Public Places fee, he requested that the nexus justifying the fee be eliminated from the final report because it may cause other cities to follow suit without researching the legalities of implementing such a fee in their communities. City Manager Schwabuer responded that the City has not determined whether or not the non - potable line to White Slough makes sense, especially in light of the high construction cost to complete such a project; however, it may get to a point when the project will have to be pushed forward when water becomes valuable enough. With regard to the Delta, Mr. Schwabauer stated he believes the City would likely not receive credit for putting water back into the Mokelumne River. Mike Lusk stated he has not thoroughly digested the report, but posed questions and concerns regarding the following: 1) why there is a difference in the water versus wastewater fee considering the pond upgrade and other wastewater projects; 2) what the difference is between neighborhood park and community park fees; 3) why the non -potable fee is not shown separately 1 in the water or wastewater fee, adding that the cost for the project will only get more expensive further down the road and the City should be more proactive in charging recycling fees; 4) that other locations with recycled water systems in place charge roughly 100 to 150 percent and that several grand jury reports have ruled in favor of citizen impact fees on new development to pay for those things; 5) why the fire fee did not increase much despite the new Fire Station 2 and the outstanding loan on Fire Station 4; 6) why various street projects were not included in the impact fees to handle those costs; 7) lack of consideration in the report for Government Code section 66001(g) relating to upgrades to existing facilities attributable to new development being included in the impact fees so as not to place the burden on rate payers to absorb the cost; and 8) what happened to the lost fee issue in the electric utility budget and whether rate payers will be paying double on those loans that the building industry did not pay. Myrna Wetzel questioned if this issue is connected in any way with residents who remodel their homes, to which Mr. Schwabauer responded it only does when homeowners increase the square footage of their home or increase the water, wastewater, or electric capacity, which is also true for commercial buildings that increase their square footage. C. Comments by Public on Non -Agenda Items None. D. Adjournment No action was taken by the City Council. The meeting was adjourned at 7:50 a.m. ATTEST: Jennifer M. Ferraiolo City Clerk 2 TM CITY OF LODI COUNCIL COMMUNICATION AGENDA ITEM AGENDA TITLE: Provide an Overview of the Impact Mitigation Fee Program Update MEETING DATE: October 16, 2018 (Shirtsleeve Session) PREPARED BY: Public Works Director RECOMMENDED ACTION: Provide an overview of the Impact Mitigation Fee Program update. BACKGROUND INFORMATION: The Impact Mitigation Fee Program was adopted by the City Council August 15, 2012. Additional storm drainage and neighborhood parks Impact Mitigation Fees for commercial properties located in the previous development agreement areas were added to the program September 4, 2013. In October 2016, Council passed Resolution 2016-188, eliminating the initial 60 percent reduction in impact fees for low and medium -density zoning designations and infill projects of more than 10 lots. To conform to State law, the City must perform an update to the program every five years demonstrating a reasonable relationship between the current impact fees and the purpose for which they are charged. In May 2017, Council authorized a Professional Services Agreement with Harris and Associates, Inc., for preparing the 2017 IMFP update. The Shirtsleeve presentation will discuss the proposed changes to each of the Impact Mitigation Fees within the City's program. Staff is recommending the addition of Recycled Water to capture new development's share of the cost of constructing the pump stations and service mains designed to facilitate the distribution of recycled water to the end user. The focus of the presentation will be on the proposed changes to each fee as it relates to low, medium, and high-density development and commercial developments. The typical, current, low-density impact fee, where the developer constructs the storm drain facilities and neighborhood park (outside of the Southwest Wastewater Truckline Service Area) are $14,450 per unit. The proposed fee would increase approximately 12 percent to $16,345 per unit. FISCAL IMPACT: Not applicable. FUNDING AVAILABLE: Not applicable. CES/CES/tdb Charles E. Swimley`Jr. Public Works Director APPROVED: c="/AJ/ V` Stephen Schwabauer, City Manager K:\WP\IMFees\2017 IMF Update\Council\Shirtsleeve IMF Update 10-16-2018.doc 10/9/2018 2018 IMFP UPDATE CITY COUNCIL SHIRT SLEEVE 10/16/18 Harris & Associates HHarris & Associates AGENDA • Project Team • IMFP History • Changes to Fee Program • Project Review & Updated Fees • Fee Summary • Surrounding Agency Comparison • Set Public Hearing • Public Hearing .---� —1•••--� -, 4••%P• more —r— s -• ti• P.m- — ••• •mi- -m—aPP a Pte— — Tr — — it "n-L9-0. LY PF i•- 7- w J r it71. rr — L • r•101 I�tr . ♦++.•-- 1. } ' • 1• PROJECT TEAM Alison Bouley, PE Senior Director, Public Finance Harris & Associates Adam Marston Senior Project Analyst, Public Finance 3 IMFP HISTORY • IMFP Study adopted in 2012. (Resolution 2012-142) • Adopted residential fees were reduced by approximately 60% • IMFP Amendment in 2013. (Resolution 2013-184) • Expanded Storm Drainage Zone 2 • Adopted a Neighborhood Park Fee • Fee Reduction Eliminated in 2016 for Low and Medium Density Residential (Resolution 2016-88) Harris & Associates HHarris & Associates .,,t.e;''"' RANGES T HE FEE PROGRAM R • Addition of Recycled Water IMF Updated Project Costs Based on: • Recent Bids and Project Costs • Engineering News Record Construction Cost Index (18%) • Consumer Price Index (13%) • Removal of Land Entitled by DA's • Wastewater COP Refinancing • Accounting for Required City Contributions 5 CITY CONTRIBUTIONS Fee Component City Contributions due to 2012 City Contributions Fee Reduction to Date City Contributions Remaining Water Treatment $ 1,317,624.00 $ - $ 1,317,624.00 Water Supply 393,576.00 393,576.00 Wastewater' 2,329,650.00 1,732,788.44 596,861.56 Transportation 291,714.00 291,714.00 Police 359,466.00 359,466.00 Fire2 Community Park3 1,858,318.00 881,339.20 976,978.80 Neighborhood Park General City Facilities4 294,906.00 274,509.00 20,397.00 Art in Public Places 37,970.00 37,970.00 South Wastewater Trunk Line 89,242.62 89,242.62 Non -Potable Water Storm Drainage Electrical Utilities 455,700.00 455,700.00 Total $ 7,428,166.62 $ 2,888,636.64 $ 4,539,529.98 ' Accounts for the $3.7M Wastewater Storage Pond Project split to existing and new development (46.7% based on the allocation of wastewater costs between existing development and additional capacity for new development. See Table 6-1) The City funded the expansion of Fire Station #2 with general fund monies, new developments is reimbursing their fair share of the expansion through the IMFP. 3 Accounts for the $881,339.20 Lodi Lake Boat Dock Improvements and DeBenedetti Park Improvements 4Accounts for the $274,509.00 Childrens Section Expansion of the Library Harris & Associates PROJECT REVIEW TRANSPORTATION FEE Traffic Signals Total Project Cost Outside Funding Expenditures to Sources 1 Date Net Cost Included in Fee Program Mills Ave and Elm St $400,000.00 $320,000.00 $80,000.00 Turner Rd and California St $400,000.00 $320,000.00 $80,000.00 Turner Rd and Sacramento St $400,000.00 $280,000.00 $120,000.00 Cherokee Ln and Elm St $400,000.00 $280,000.00 $120,000.00 Guild Ave and Victor Rd $785,000.00 $35,484.00 $749,516.00 Subtotal $2,385,000.00 Roadway Improvements Total Project Cost Guild Ave and Victor Rd (Striping 2 to 4 lane! $51,068.78 Victor Rd (4 lanes, SR99 to Guild) $6,930,763.00 West Lane (1/2 miles) Harney Lane 2 $668,836.28 $ 31,084,431.00 $1,200,000.00 $35,484.00 $1,149,516.00 1 Outside Funding Expenditures to Sources 1 Date $4,153,751.00 $28,619,066.16 Net Cost Included in Fee Program $51,068.78 $2,777,012.00 $668,836.28 $2,465,364.84 Subtotal $38,735,099.06 $32,772,817.16 $5,962,281.90 Total Cost of Traffic Signal and Roadway Improvements Transportation Fund Balance $7,111,797.90 ($583,534.07) City Contributions 3 ($291,714.00) Total Cost Allocated to Future Development $6,236,549.83 1 Includes RTI F, RSTP, SJCOG, and Measure K funding. 2 Lower Sacramento Road to Highway 99 including Highway 99 and Harney Lane Interchange 3 City Contributions is the cumulative amount of fees lost as a result of the fee reduction adopted by Resolution 2012-142. Harris & Associates UPDATED FEES TRANSPORTATION FEE FEE INCREASE DUE TO: • iraffic Signal Unit Cost Update • Guild Ave and Victor Road Cost update - $785,000 • ENR Escalation Residential Trip Generation Factors DUE per Unit Cost per Unit Low Density 1.16 1.0000 $ 922.16 Medium Density High Density Non -Residential 0.63 0.63 0.5431 $ 0.5431 $ 500.83 500.83 DUE per 1,000 SF Cost per 1,000 SF Retail (Minor & Major) 1.96 1.6853 $ 1,554.12 Office/Medical 1.42 1.2250 $ 1,129.65 Industrial 0.72 0.6228 S 574.32 Category Existing Fees Proposed Fees Delta Residential Per DUE Low Density $ 711.00 $ 922.16 30% Medium Density $ 386.00 $ 500.83 30% High Density $ 386.00 $ 500.83 30% Non- Residential Per 1,000 SF Retail (Minor & Major) - Per 1,000 SF $ 1,199.00 $ 1,554.12 30% Office/Medical $ 872.00 $ 1,129.65 30% Industrial $ 443.00 $ 574.32 30% Institutional N/A N/A N/A ail Harris & Associates ROAD CLOSED TO THRU TRAFFIC Lik S! • • . 4:44 ,..r: • Im I !> Harris & Associates ii ti • a di All 51.51.11. PROJECT REVIEW POIICE FEF Police Station Costs Police Station portion of 2002 COP - Principal Police Station portion of 2002 COP - Interest Total Debt Service % Attributable to Existing Development Debt Service Allocated to Existing Development % Attributable to Future Development Beyond 2035 Debt Service Allocated to Future Development Beyond 2035 % Attributable to Future Development thru 2035 Debt Service Allocated to Future Development thru 2035 Police Vehicle Costs Vehicle Type Marked Patrol Unmarked/Administration Traffic Partners/Crime Prevention Code Enforcement Animal Control Current # of Vehicles 24 21 9 5 3 2 Vehicles / Sworn Officer 0.34 0.30 0.13 0.07 0.04 0.03 Total Vehicle Cost Allocated to Future Development thru 2035 Subtotal Cost Allocated to Future Development thru 2035 Police Fee Fund Balance City Contributions 5 Future Vehicles 3 5.1 4.4 1.9 1.1 0.6 0.4 Average $ / Vehicle 4 $44,583 $36,371 $20,512 $28,092 $30,616 $34,637 $14,320,000 $12,637,838 $26,957,838 66% $17,856,530.62 19% $5,038,920.63 15% $4,062,386.75 Total Cost $225,540.61 $160,999.69 $38,912.59 $29,607.67 $19,360.14 $14,602.02 $489,022.72 $4,551,409.47 $ (250,475.15) $ (359,466.00) Total Cost Allocated to Future Development thru 2035 $3,941,468.32 1 Capactity allocations were developed during the 2012 fee study and the percentage of costs attributable to new development have remained consistent. 2 Assumes a proportional growth in the employee resident -equivalent population beyond 2035. 3 Assumes an additional 15.0 sworn officers are required to serve future development through 2035. 4 Vehicle costs escalated from 2012 costs by CPI. 5 City Contributions is the cumulative amount of fees lost as a result of the fee reduction adopted by Resolution 2012-142. 9 HHarris & Associates UPDATED FEES POLICE FEF FEE INCREASE DUE TO: ENR E LalatiuIi • CPI Escalation Residential Low Density Medium Density High Density Non - Residential Retail (Minor & Major) Office/Medical Industrial Residents per Unit 2.85 2.40 2.00 Employees per 1,000 SF 2.50 4.00 1.33 Persons Served per Unit 2.85 2.40 2.00 Persons Served per 1,000 SF 1 1.25 2.00 0.67 DUEs per Unit 1.0000 0.8421 0.7018 DUEs per 1,000 SF 0.4386 0.7018 0.2339 Cost per Unit $ 785.94 $ 661.84 $ 551.57 Cost per 1,000 SF $ 344.71 $ 551.57 $ 183.83 1 Assumes a resident -to -employee ratio of 1.0 : 0.5 (i.e., 1.0 employee equaling 0.5 residents). Category Residential Low Density Medium Density High Density Non- Residential Retail (Minor & Major) - Per 1,000 SF Office/Medical Industrial Institutional Existing Fees Proposed Fees Delta $ $ $ 753.00 634.00 528.00 $ 330.00 $ 528.00 $ 176.00 N/A Per DUE $ 785.94 $ 661.84 $ 551.57 Per 1,000 SF $ 344.71 $ 551.57 $ 183.83 N/A 4% 4% 4% 4% 4% 4% N/A 10 PROJECT REVIEW FIRF Fire Station Costs Fire Station Station #1 Station #2 Station #3 Station #4 Subtotal Fire Vehicle Costs Sq. Ft. 10,910 9,830 5,300 7,110 Vehicles and Equipment Costs Total Units Type I Engine 6 Tillered Quint Truck 2 Straight Quint Truck 0 Mobile Command Vehicle 1 HazMat Response Unit 1 Type IV Engine Command Vehicle Staff Vehicle Portable Air Supply Trailer Subtotal Total Estimated Replacement Cost Attributable to Future Development Total Replacement Cost Attributable to Future Development Remaining Fire Costs Outstanding Loan Balance to Water Fee Fund Station #2 Expansion Cost ( [Future SF (9,830) - existing SF (6,200)] x $445/ SF ) Subtotal Fire Fee Fund Balance 1 3 2 1 Cost per Sq. Ft. $445 $445 $445 $445 Cost per Unit $515,000 $1,500,000 $844,800 $394,240 $337,920 $168,960 $61,952 $33,792 $33,792 Estimated Replacement Cost $4,854,950.00 $4,374,350.00 $2,358,500.00 $3,163,950.00 $14,751,750.00 Estimated Replacement Cost $3,090,000.00 $3,000,000.00 $0.00 $394,240.00 $337,920.00 $168,960.00 $185,856.00 $67,584.00 $33,792.00 $7,278,352.00 $22,030,102.00 19% $4,083,000.02 $1,024,024.89 $1,615,350.00 $2,639,374.89 ($201,241.57) Actual Cost Allocated to Future Development $2,438,133.32 Harris & Associates UPDATED FEES FIRE FEE FEE INCREASE DUE TO: • >445 per SF Cost • Vehicle Costs • ENR Escalation • CPI Escalation Residential Low Density Medium Density High Density Non -Residential Retail (Minor & Major) Office/Medical Industrial Residents per Unit 2.85 2.40 2.00 Employees per 1,000 SF 2.50 4.00 1.33 Persons Served per Unit 2.85 2.40 2.00 Persons Served per 1,000 SF 1.25 2.00 0.67 DUE per Unit 1.0000 0.8421 0.7018 DUE per 1,000 SF 0.4386 0.7018 0.2339 Cost per Unit $ 396.65 $ 334.02 $ 278.35 Cost per 1,000 SF $ $ $ 344.29 550.87 183.62 Category Residential Low Density Medium Density High Density Non- Residential Retail (Minor & Major) - Per 1,000 SF Office/Medical Industrial Institutional Existing Fees Proposed Fees Delta $ 385.00 $ 324.00 $ 270.00 $ 338.00 $ 540.00 $ 180.00 N/A Per DUE $ 396.65 $ 334.02 $ 278.35 Per 1,000 SF $ 344.29 $ 550.87 $ 183.62 N/A 3% 3% 3% 2% 2% 2% N/A Harris & Associates Harris & Associates H PROJECT REVIEW COMMUNITY PARK FEE Cost Allocation Park Facility Acres in Fee Included in Fee Program Total Acres Program Total Cost Expenditures to Date Remaing Costs DeBenedetti Park 24.0 24.0 100.0% $13,102,714.01 $781,860.00 $12,320,854.01 Pixley Park 27.0 27.0 100.0% $5,820,038.91 $5,820,038.91 Lodi Lake 8.0 8.0 100.0% $3,649,616.13 $75,000.00 $3,574,616.13 Total 59.0 59.0 $22,572,369.05 $21,715,509.05 Park Fee Fund Balance ($188,639.91) City Contributions ($1,858,318.00) Total Cost Allocated to Future Development $19,668,551.14 13 Harris & Associates MN UPDATED FEES COMMUNITY PARK FEF FEE INCREASE DUE TO: • Increased land cost per acre ENR Escalation • CPI Escalation Residents per Residential Unit Low Density 2.85 Medium Density 2.40 High Density 2.00 Non - Residential Retail (Minor & Major) Office/Medical Industrial Employees per 1,000 SF 2.50 4.00 1.33 User Equivalents per Unit 2.85 2.40 2.00 User Equivalents per 1,000 SF 1 0.30 0.48 0.16 DUEs per Unit 1.0000 0.8421 0.7018 Cost per Unit $ 4,755.16 $ 4,004.32 $ 3,337.17 DUE per 1,000 SF Cost per 1,000 SF 0.1053 $ 0.1684 $ 0.0561 $ 500.72 800.77 266.76 'Assumes a resident can utilize park facilities an average of 12 hours per day 7 days a week (84 hours) and an employee can utilize park facilities an average of 2 hours per day 5 days a week (10 hours); this translates to 1.0 employee equaling approx. 0.12 residents (10/84 = 0.12) in terms of potential park utilization. Category Residential Low Density Medium Density High Density Non- Residential Retail (Minor & Major) - Per 1,000 SF Office/Medical Industrial Institutional Existing Fees Proposed Fees Delta $ 3,890.00 $ 3,276.00 $ 2,730.00 $ 406.00 $ 650.00 $ 217.00 N/A Per DUE $ 4,755.16 $ 4,004.32 $ 3,337.17 Per 1,000 SF $ 500.72 $ 800.77 $ 266.76 N/A 22% 22% 22% 23% 23% 23% N/A 14 PROJECT REVIEWail NEIGHBORHOOD PARKS FEE Park Cost Estimate Park A 1 Park B Park C Park D Park E Park F Park G Park H Subtotal Costs Park Fee Fund Balance 5 $ 1,128,221.64 $ 3,311,793.95 $ 676,685.40 $ 2,462,084.50 $ 676,685.40 $ 1,847,222.85 $ 1,043,583.50 11,146,277.24 $ (66,744.28) s Total Costs Allocated to New Development $ 11,079,532.96 1 Park A was constructed during Rose Gate Phase I. CITY OF L.ODf PUBLIC WORKS DEPARTMENT ii Harris & Associates PARKS FEE ZONES Legend 2018 City Limits Future Basin L Future Park i General Plan Limits Developer Constructed Zone WI Neighborhood Park Fee Zone — — City Wide Zone 1 in = 3,500 ft 5/311241B G:IESRI MapslParks%Rarks Fee Zones Legend.mxd UPDATED FEES NEIGHBORHOOD PARKS FCC FEE INCREASE DUE TO: • Increased land cost per acre • ENR Escalation • CPI Escalation Residential Residents per Unit User Equivalents per Unit DUEs per Unit Cost per Unit Low Density 2.85 2.85 1.0000 $ 3,072.53 Medium Density 2.40 2.40 0.8421 $ 2,587.39 High Density 2.00 2.00 0.7018 $ 2,156.16 Non -Residential Employees per 1,000 SF User Equivalents per Cost per 1,000 1,000 SF 1 DUE per 1,000 SF SF Retail (Minor & Major) 2.50 0.30 0.1053 $ 323.42 Office/Medical 4.00 0.48 0.1684 $ 517.48 Industrial 1.33 0.16 0.0561 $ 172.49 1 Assumes a resident can utilize park facilities an average of 12 hours per day 7 days a week (84 hours) and an employee can utilize park facilities an average of 2 hours per day 5 days a week (10 hours); this translates to 1.0 employee equaling approx. 0.12 residents (10/84 = 0.12) in terms of potential park utilization. Category Existing Fees Proposed Fees Delta Residential Per DUE Low Density $ 2,541.00 $ 3,072.53 21% Medium Density $ 2,140.00 $ 2,587.39 21% High Density $ 1,783.00 $ 2,156.16 21% Non- Residential Per 1,000 SF Retail (Minor & Major) - Per 1,000 SF $ 266.00 $ 323.42 22% Office/Medical $ 428.00 $ 517.48 21% Industrial N/A $ 172.49 N/A Institutional N/A N/A N/A !> MN Harris & Associates HHarris & Associates PROJECT REVIEW GENERA' 2ITY F"CILITIES Costs Allocated to Existing and Future Development Project Existing Public Safety Building Remodel General Plan Total Cost % Attributable to Existing Development Cost Attributable to Existing Development Attributable to Future Development Cost Attributable to Future Development Costs Allocated to Future Development Only Library General Plan Standard (Sq Ft per capita) Future Residents Total Sq Ft Required to Serve Future Residents Cost per Sq Ft 2 Subtotal Library Cost Attributable to Future Development Subtotal Cost Attributable to Future Development Fee Program Updates 3 Total Cost Attributable to Future Development General City Facilities Fee Fund Balance City Contributions 4 Estimated Cost $2,866,433 $2,252,800 $5,119,233 81% $4,146,578.73 19% $972,654.27 0.45 13,128 5,907.60 $461.98 $2, 729,193.05 $3,701,847.32 $844,800.00 $4,546, 647.32 $ (207,638.53) $ (294,906.00) Total Actual Cost Allocated to Future Development $4,044,102.79 1 Assumes a resident -to -employee ratio of 1.0 : 0.5 (i.e., 1.0 employee equaling 0.5 residents). 2 Assumes construction of a new library facility and does not include land acquisition costs; costs have been escalated to 2017 dollars 3Total estimated cost to update the fee program at 5 -year intervals for a total of 4 updates, from 2020 through 2035. 4 City Contributions is the cumulative amount of fees lost as a result of the fee reduction adopted by Resolution 2012-142. !> Harris & Associates UPDATED FEES GENERAL CITY Fi- 1TIEF FEE INCREASE DUE TO: - Updating the Public Safety Remodel to reflect actual costs • ENR Escalation • CPI Escalation Residential Low Density Medium Density High Density Non -Residential Retail (Minor & Major) Office/Medical Industrial Residents per Unit 2.85 2.40 2.00 Employeesper 1,000 SF 2.50 4.00 1.33 Persons Served per Unit 2.85 2.40 2.00 Persons Served per 1,000 SF 1.25 2.00 0.67 DUEs per Unit 1.0000 0.8421 0.7018 Cost per Unit $ 806.40 $ 679.07 $ 565.93 DUEs per 1,000 SF Cost per 1,000 SF 0.4386 $ 353.69 0.7018 $ 565.93 0.2339 $ 188.62 1 Excludes 50% of future development within the multi -use corridors. It is assumed that 50% of future development will replace existing development and therefore will not increase demand on general city facilities. Category Residential Low Density Medium Density High Density Non- Residential Retail (Minor & Major) - Per 1,000 SF Office/Medical Industrial Institutional Existing Fees Proposed Fees $ $ $ $ $ $ Per DUE 617.00 $ 806.40 519.00 $ 679.07 433.00 $ 565.93 Per 1,000 SF 270.00 $ 353.69 433.00 $ 565.93 144.00 $ 188.62 N/A N/A Delta 31% 31% 31% 31% 31% 31% N/A 18 PROJECT REVIEW & COST PER DUE ART IN F I it PLACES EE Art in Public Places Replacement Costs Existing Art Location Esti mated Replacement Cost 1. Water Tower Main Street $59,086.91 2. Better Days Pergola Lodi Avenue $96,870.40 3. Grape Wall of Lodi Wall @ Westgate $45,056.00 4. Japantown Murals Main Street $32,665.60 5. PALS Mural Kettleman Lane $64,221.70 6. Sacramento Street Mural Sacramento Street $51,814.40 7. Celebrate Harvest bronze sculpture School Street $172,339.20 8. Cranes Train Depot $33,792.00 9. Bus Stop Loel Center $16,896.00 10. Sculpture Exhibit (rentals) School Street $33,792.00 11. Art Purchase - Transit Clock Tower $5,632.00 12. Mosaics Lodi Avenue $2,816.00 13. Van Buskirk Park Pleasant Avenue $5,269.30 14. Veterans Memorial Plaza $506,880.00 15. Lodi Avenue Gateway $152,064.00 16. Water Shed Mural Church & Oak St $22,528.00 17. Segale Murals Sacramento Street & Japantown $84,480.00 18. Recognition Plaques $3,564.84 19. Wall Dog Murals (10) $112,640.00 20. School Street Gateway Arch $878,592.00 21. Library Bike Rack $3,214.80 22. River Friendly Bench Project $5,563.50 23. Bicycle Rack initiative $14,520.74 24. Heritage School Watershed Mosaic $1,947.23 25. Seward Johnson Atelier $25,718.40 Subtotal Replacement Cost $2,431,965.01 Art in Public Places Fee Fund Balance $158,032.23 Total $2,589,997.24 Existing Persons Served 76,848 Cost per Existing Persons Served $33.70 Harris & Associates HHarris & Associates UPDATED FEES ART IN PUBLIC P! " FEE INCREASE DUE TO: • Adding the artwork installed since 2012 • CPI Escalation Residents per Persons Served Total Persons Cost per Person Residential Units 1 Unit per Unit Served Served Total Costs Fee per Unit Low Density 3,592 2.85 2.85 10,237 $33.70 $344,994 $96.05 Medium Density 317 2.40 2.40 761 $33.70 $25,655 $80.88 High Density 0 2.00 2.00 0 $33.70 $0 $67.40 Subtotal 3,909 10,998 $370,649 Non -Residential Retail (Minor & Major) Office/Medical Industrial Subtotal Employees per Persons Served Bldg SF 1 1,000 SF per 1,000 SF 2 599,271 2.50 1.25 598,000 4.00 2.00 2,221,000 1.33 0.67 3,418,271 Total Persons Served 749 1,196 1,481 3,426 Cost per Persons Served $33.70 $33.70 $33.70 Total Costs $25,244 $40,305 $49,898 $115,448 per 1,000 SF $42.13 $67.40 $22.47 Total 14,424 $486,097 1 Excludes 50% of future development within the multi -use corridors. It is assumed that 50% of future development will replace existing development and therefore will not increase demand on art in public places. 'Assumes a resident -to -employee ratio of 1.0 : 0.5 (i.e., 1.0 employee equaling 0.5 residents). Category Existing Fees Proposed Fees Delta Residential Per DUE Low Density $ 80.00 $ 96.05 20% Medium Density $ 67.00 $ 80.88 21% High Density $ 56.00 $ 67.40 20% Non- Residential Per 1,000 SF Retail (Minor & Major) - Per 1,000 SF $ 35.00 $ 42.13 20% Office/Medical $ 56.00 $ 67.40 20% Industrial $ 19.00 $ 22.47 18% 20 PROJECT REVIEW NON -POTABLE WATER Pumping Stations Quantity UOM Cost Each Construction Costs Expenditures to Date Remaining Cost Fencing and Gates Asphalt Paving and Concrete Catchbasin and Stormline NPW Piping and Valves Potable Water Source and Valves Intake Structure with Fish Screens 3 Pumps (2 Duty, 1 Sustaining) Inline Filters with Automatic Backwash VFD Motors and Controls Electrical Connection Subtotal Cost for Pumping Stations 600 LF 800 SF 2 LS 2 LS 2 LS 2 LS 2 LS 2 LS 2 LS 2 LS $350 $6 $7,000 $20,000 $20,000 $20,000 $80,000 $140,000 $70,000 $20,000 $210,000 $4,800 $14,000 $40,000 $40,000 $40,000 $160,000 $280,000 $140,000 $40,000 $968,800 $210,000 $4,800 $14,000 $40,000 $40,000 $40,000 $160,000 $280,000 $140,000 $40,000 $968,800 Other Capital Costs Quantity UOM Cost per LF Total Cost Reimburse Harney Lane 10" NPW Reimburse Harney Lane Water Valves Hwy 12 Boring & Connections L. Sacramento Borning & DeBenedetti Connection WID Boring & Connections Subtotal for Other Capital Costs Contingency Engineering and Construction Management 3,540 LF 2 LS 1 LS 1 LS 1 LS 15% 20% $60 $2,500 $50,000 $50,000 $40,000 $212,400 $5,000 $50,000 $50,000 $40,000 $357,400 $198,930 $265,240 $212,400 $5,000 $50,000 $50,000 $40,000 $357,400 $198,930 $265,240 Total Cost for Non -Potable Water System $1,790,370 $1,790,370 Harris & Associates UPDATED FEES NON -POTABLE WATER FEE COMPARISON UNAVAILABLE: • A Non -Potable Water fee is being proposed as part of this I M FP Update. DUE Factor Residential per Unit Low Density 1.0000 Medium Density 0.8421 High Density 0.7018 DUE Factor Non -Residential Retail (Minor & Major) Office/Medica Industrial per 1,000 SF 0.4148 0.4148 0.1659 Cost per Unit $ 378.99 $ 319.15 $ 265.98 Cost per 1,000 SF $ 157.21 $ 157.21 $ 62.87 Category Residential Low Density Medium Density High Density Non- Residential Retail (Minor & Major) - Per 1,000 SF Office/Medical Industrial Institutional Existing Fees N/A N/A N/A N/A N/A N/A N/A Proposed Fees Delta Per DUE $ 378.99 $ 319.15 $ 265.98 Per 1,000 SF $ 157.21 $ 157.21 $ 62.87 N/A N/A N/A N/A N/A N/A N/A N/A Harris & Associates 1.;ifirditteal 4 ,.t. !> Harris & Associates WM 0 Cal 0 L g LI 1 E 0 0 c ti Ir TURNER RID 176 FORD S T 0 KETTLEMANLH CITY LIMITS GENERAL PLAN LIMITS City of Lodi PUBLIC WORKS DEPARTMENT Figure 7-1 STORM DRAINAGE FEE ZONES LEGEND ZONE 1 DEVELOPER CONSTRUCTED FUTURE ANALYSIS ZONE 2 a YJ$ 1.4 3/Fj 112 MILE [r '200 74.100 3O?1L1 FEET ElHarris & Associates PROJECT REVIEW STORM DRAINAGE Fri- Zone 1 Basin Improvements Zone 1 Construction Cost Expenditures to Date Remaining Costs C -Basin Pump Station $2,419,177.53 $2,419,177.53 C -Basin $1,073,848.18 $1,073,848.18 Total Zone 1 Cost $3,493,025.71 $3,493,025.71 Available SD Fee Fund Revenue $0.00 City Contributions $0.00 Net Storm Drainage Cost Zone 1 $3,493,025.71 F -Basin Improvements 1 Basins Zone 2: F & 1 -Basin Watershed Areas $9,229,597.35 $9,229,597.35 Subtotal Cost $9,229,597.35 $9,229,597.35 I -Basin Improvements 1 Basins $7,627,163.74 $7,627,163.74 Subtotal Cost $7,627,163.74 $7,627,163.74 Total Zone 2 Cost $16,856,761.09 $16,856,761.09 Available SD Fee Fund Revenue ($911,566.44) City Contributions 2 $0.00 Net Storm Drainage Cost Zone 2 $15,945,194.65 Costs for F -Basin and I -Basin Improvements updated per the costs of the staff report for agenda item G-01 on October 16, 2013 and have been escalated by the Engineers News Record Construction Cost Index (ENR CCI). 2 City Contributions is the cumulative amount of fees lost as a result of the fee reduction adopted by Resolution 2012- 142. UPDATED FEES ORM DRAINAGE FEE Residential Zone 1 DUE per Acre Cost Per Acre Average Density Cost Per Unit Low Density 1.0000 $ 9,839.51 6.00 $ 1,639.92 Medium Density 1.2500 $ 12,299.39 15.00 $ 819.96 High Density 1.2500 $ 12,299.39 25.00 $ 491.98 Non -Residential DUE per Acre Cost Per Acre Average Density Cost Per 1,000 SF Retail (Minor & Major) 1.7500 $ 17,219.14 N/A N/A Office/Medical 1.7500 $ 17,219.14 N/A N/A Industrial 1.8750 $ 18,449.08 N/A N/A Category Existing Fees Proposed Fees Delta Residential Per DUE Low Density $ 1,394.00 $ 1,639.92 18% Medium Density $ 687.00 $ 819.96 19% High Density $ 561.00 $ 491.98 -12% Non- Residential Per 1,000 SF Retail (Minor & Major) - Per 1,000 SF $ 14, 640.00 $ 17, 219.14 18% Office/Medical $ 14, 640.00 $ 17, 219.14 18% Industrial $ 15, 686.00 $ 18, 449.08 18% Harris & Associates FEE INCREASE DUE TO: Updated land costs per acre • ENR Escalation Residential Zone 2: F -Basin & I -Basin Cost Allocation DUE per Acre Cost Per Acre Average Density Cost Per Unit Low Density 1.0000 $ 28,221.58 6.00 $ 4,703.60 Medium Density 1.2500 $ 35,276.98 15.00 $ 2,351.80 High Density 1.2500 $ 35,276.98 25.00 $ 1,411.08 Non -Residential DUE per Acre Cost Per Acre Average Density Cost Per 1,000 SF Retail (Minor & Major) 1.7500 $ 49,387.77 N/A N/A Office/Medical 1.7500 $ 49,387.77 N/A N/A Industrial 1.8750 $ 52,915.46 N/A N/A Institutional 1.2500 $ 35,276.98 N/A N/A Category Existing Fees Proposed Fees Delta Residential Per DUE Low Density $ 3, 889.00 $ 4,703.60 21% Medium Density $ 1, 944.00 $ 2,351.80 21% High Density $ 1,568.00 $ 1,411.08 -10% Non- Residential Per 1,000 SF Retail (Minor & Major) - Per 1,000 SF $ 40, 834.00 $ 49, 387.77 21% Office/Medical $ 40, 834.00 $ 49, 387.77 21% Industrial $ 43, 871.00 $ 52, 915.46 21% 24 HHarris & Associates PROJECT REVIEW ELECTRICAL UTILITY FEE Facilities Distribution Reinforcements $1,023,169.00 Feeder Additions $1,107,274.96 Added Bank at Industrial $4,200,000.00 Reynolds Ranch Phase 1 Line Extension $649,665.00 East Side Overhead Phase 1 Line Extension $259,085.00 Future Underground North Line Extension $390,000.00 1272 Feeder Ext for SW Dev. $250,000.00 230 KV Intertie System $156,000.00 Subtotal Costs Allocated to Future Development $8,035,193.96 Electrical Fee Fund Balance ($1,009,893.08) Reimbursement to Lodi Electrical Capital Fund from Fee Fund Balance 1 $506,318.28 City Contributions 2 ($455,700.00) Total Cost Allocated to Future Development $7,075,919.16 1 Lodi Electrical expends all capital projects from a Lodi Electrical held capital fund to ensure funding is available at the time the CIP is required and subsequently reimburses these costs from the IMFP Fund Balance. 2 City Contributions is the cumulative amount of fees lost as a result of the fee reduction adopted by Resolution 2012-142. 25 UPDATED FEES ELECTRICAL UTILITY FEL FEE INCREASE DUE TO: upaated CIP Project Costs • Addition of the 230KV Intertie System • ENR Escalation Electric Utility Fees - Single Phase Panel Single Phase Panel 208 Volts 240 Volts 480 Volts 60 amps N/A $ 295.65 N/A 100 amps N/A $ 492.75 N/A 125 amps N/A $ 615.94 N/A 200 amps N/A $ 985.50 N/A 400 amps N/A $ 1,971.00 N/A 600 amps N/A $ 2,956.50 N/A Category Existing Fees Proposed Fees Delta 60 amps $ 248.00 $ 295.65 19% 100 amps $ 413.00 $ 492.75 19% 125 amps $ 516.00 $ 615.94 19% 200 amps $ 826.00 $ 985.50 19% 400 amps $ 1,652.00 $ 15971.00 19% 600 amps $ 2,478.00 $ 2,956.50 19% Electric Utility Fees - Three Phase Panel Harris & Associates Three Phase Panel 208 Volts 240 Volts 480 Volts 200 amps $ 1,405.38 $ 1,621.59 $ 3,243.18 400 amps $ 2,810.75 $ 3,243.18 $ 6,486.36 600 amps $ 4,216.13 $ 4,864.77 $ 9,729.54 800 amps $ 5,621.51 $ 6,486.36 $ 12,972.71 1000 amps $ 7,026.89 N/A $ 16,215.89 1200 amps $ 8,432.26 N/A $ 19,459.07 1600 amps $ 11,243.02 N/A $ 25,945.43 2000 amps $ 14,053.77 N/A $ 32,431.79 2500 amps $ 17,567.22 N/A $ 40,539.73 3000 amps $ 21,080.66 N/A $ 48,647.68 Category Existing Fees Proposed Fees Delta 200 amps $ 1,178.00 $ 1,405.38 19% 400 amps $ 2,356.00 $ 2,810.75 19% 600 amps $ 3,534.00 $ 4,216.13 19% 800 amps $ 4,712.00 $ 5,621.51 19% 1000 amps $ 5,890.00 $ 7,026.89 19% 1200 amps $ 7,068.00 $ 8,432.26 19% 1600 amps $ 9,423.00 $ 11,243.02 19% 2000 amps $ 11, 779.00 $ 14, 053.77 19% 2500 amps $ 14, 724.00 $ 17, 567.22 19% 3000 amps $ 17, 669.00 $ 21, 080.66 19% 26 PROJECT REVIEW WATER FE Water Treatment Facility Costs Planning and Design Costs Laboratory Testing Environmental and Design Costs Design Review City Staff Raw Water Intake Pipe Construction Miscellaneous Total Paid from Reserves Construction Costs (financed) Construction Contract (bid amount) Wastewater Connection Fee Site Acquisition (land cost) Testing and Inspection Other Construction Costs Pall Membrane Purchase Engr. Service - Contract Admin. Subtotal Construction Costs Debt Financing 2010A & 2010B Water Revenue Bonds (par) 1 Total of Annual Debt Service Payments 2 Total Water Trtmt. Costs for IMF Calculation Total $ 64,375 $ 3,021,724 $ 50,000 $ 210,008 $ 577,608 $ 41,648 $ 3,965,363 $ 25,515,343 $ 1,096,383 $ 1,200,000 $ 419,182 $ 1,235,216 $ 3,962,308 $ 742,881 $ 34,171,313 $ 38,665,000 $ 67,795,425 $ 71,760,788 New Water System Facilities Est. Cost 1.5 MG Storage Reservoir (Well 28 Site) Groundwater Well (South of Harney Between Mills & Hutchins) Total Facilities Cost Water Fee Fund Balance City Contributions 1 Total Facilities Cost to Future Develoment 3,530,100 1,000,000 4,530,100 (592,485.03) (393,576.00) 3,544,038.97 Harris & Associates UPDATED FEES WATER FEE FEE INCREASE DUE TO: • Updated Water Treatment Plant Financing Costs to reflect actual debt service • ENR Escalation Meter Size Hydraulic Capacity Factor Water System IMF 5/8" meter 0.67 $ 2,119.42 3/4" meter 1.00 $ 3,163.31 1" meter 1.67 $ 5,282.73 11/2" meter 3.33 $ 10,533.83 2" meter 5.33 $ 16,860.45 3" meter 10.00 $ 31,633.12 4" meter 16.67 $ 52,732.40 6" meter 33.33 $ 105,433.18 8" meter 53.33 $ 168, 699.41 10" meter 76.67 $ 242,531.10 Category Existing Fees Proposed Fees Delta 5/8 -inch meter $ 2,079.00 $ 2,119.42 2% 3/4 -inch meter $ 3,103.00 $ 3,163.31 2% 1 -inch meter $ 5,181.00 $ 5,282.73 2% 1 1/2 -inch meter $ 10,332.00 $ 10,533.83 2% 2 -inch meter $ 16,537.00 $ 16,860.45 2% 3 -inch meter $ 31, 026.00 $ 31,633.12 2% 4 -inch meter $ 51,721.00 $ 52,732.40 2% 6 -inch meter $103,411.00 $ 105,433.18 2% 8 -inch meter $165,464.00 $ 168,699.41 2% 10 -inch meter $237,880.00 $ 242,531.10 2% Harris & Associates HHarris & Associates PROJECT REVIEW & COST PER DUE WASTEWATER FEE Wastewater Debt Financing Total Wastewater Stystem Cost Flag City 0.19 MGD Capacity Purchase Initial Debt Financing 2016 and 2017 Refinancing Revised Interest and Financing Costs Total Wastewater Treatment Improvements Expansion from 5.8 to 6.3 mgd Expansion from 6.3 to 8.5 mgd Phase 1 Phase 2 Phase 3 Thickening Dewatering & Storage Total Wastewater Treatment IMF Calculation WWTP Capacity (mgd) Capacity per DUE (gpd) DUEs of Expanded Capacity Growth Share of WWTP DS $ 70, 561, 000.00 $ (5,800,000.00) $ 64, 761, 000.00 $ (4,880,000.00) $ 59, 881, 000.00 $ 59, 881, 000.00 WWTP Improv. Costs $ 11, 240, 000.00 $ $ 1, 976, 000.00 11, 528, 000.00 27, 341, 000.00 1, 263, 000.00 3, 930, 000.00 57,278,000.00 Total 8.50 200 42,500 Upgrade $ 3,082,450.79 $ 1,464,741.27 $ 8, 822, 000.00 $ 13, 341, 000.00 $ 933, 997.50 $ 2, 906, 263.00 $ 30,550,452.55 Original 5.80 200 29,000 Expansion $ 8,157,549.21 117, 347, 080.32 $ 62, 583, 441.60 $ 117,159, 000.00 53.3% 511, 258.73 2, 706, 000.00 14, 003, 000.00 329, 002.50 1, 023, 737.00 26, 730, 547.45 Upgrade Expansion 27.4% 72.6% 74.1% 76.5% 48.8% 74.0% 74.0% 53.3% Expansion portion of outstanding debt Expansion 2.70 200 13,500 54, 763, 638.72 $ 46.7% Subscribed 0.56 25.9% 23.5% 51.2% 26.0% 26.0% 46.7% 45.3% Available 2.14 2,811 10,689 11, 402,195.24 $ 43, 361, 443.48 20.8% 79.2% Wastewater Treatment IMF $ 4,056.64 per DUE 29 PROJECT REVIEW & COST PER DUE WASTEWATER FEE Mtr. Size Hydr. Cap. Factor Wastewater Treatment IMF 5/8" meter 0.67 $ 2,717.95 3/4" meter 1.00 $ 4,056.64 1" meter 1.67 $ 6,774.59 1 1/2" meter 3.33 $ 13,508.61 2" meter 5.33 $ 21,621.89 3" meter 10.00 $ 40,566.40 4" meter 16.67 $ 67, 624.19 6" meter 33.33 $ 135,207.81 8" meter 53.33 $ 216,340.61 10" meter 76.67 $ 311,022.59 High Strength/High Volume Commercial and Industrial Development Charge for Flow $ 12.57 per gpd Charge for BOD Loading $ 1,922 per ppd Charge for SS Loading $ 1,603 per ppd Category Existing Fees Proposed Fees Delta 5/8 -inch meter $ 2,831.00 $ 2,717.95 -4% 3/4 -inch meter $ 4,225.00 $ 4,056.64 -4% 1 -inch meter $ 7,056.00 $ 6,774.59 -4% 1 1/2 -inch meter $ 14, 070.00 $ 13,508.61 - 4% 2 -inch meter $ 22, 521.00 $ 21,621.89 -4% 3 -inch meter $ 42, 253.00 $ 40,566.40 -4% 4 -inch meter $ 70,453.00 $ 67,624.19 -4% 6 -inch meter $140,828.00 $ 135,207.81 - 4% 8 -inch meter $225,333.00 $ 216,340.61 - 4% 10 -inch meter $323,951.00 $ 311,022.59 -4% FEE DECREASE DUE TO: • Debt service refinancing issued in 2016 and 2017 totaling $4.88 Harris & Associates !> Harris & Associates ii EXISTING WASTEWATER TRUNK HARKEY LN LEGEND CITY LIMITS GENERAL PLAN LIMITS City of Lodi PUBLIC WORKS DEPARTMENT Figure -2 WASTEWATER FEE ZONES -kJ / WWTP FEE ONLY a 7fe ir4 31e712 "LE 7200 7400 WICK) FEET WWTP FEE AND SOUTH WASTEWATER TRUNK LINE IEE SOUTH WASTEWATER TRUNK LINE STUDY AREA FUTURE ANALYSIS II Harris & Associates PROJECT REVIEW SOUTH WASTEWATER TRUNK LINE FEE South Wastewater Trunk Line Quantity Unit Price Construction Cost 1 Expenditures to Date Remaining Costs Pump Station 1 $800,000 $1,040,000 $1,040,000 Wastewater Connection Manhole 1 $20,000 $26,000 $26,000 14" Force Main in ex. Street 1,180 $150 $230,100 $230,100 15" Wastewater Pipe 2,700 $105 $368,550 $368,550 24" Watewater Pipe in ex. Street 1,680 $190 $414,960 $414,960 24" Wastewater Pipe 14,500 $125 $2,356,250 $2,356,250 24" UPRR Crossing in 36" Casing 100 $1,000 $130,000 $130,000 24" WID Crossing 100 $1,000 $130,000 $130,000 Subtotal South Wastewater Trunk Line $4,695,860 $4,695,860 Available South Wastewater Sewer Line Fee Fund Revenue ($21,164) City Contributions 2 ($89,243) Total Cost Allocated to Future Development 1 Construction Cost Estimate derived from the City of Lodi Amendment to the South Wastewater Trunk Line Master Plan dated October 2017. Costs include a 30% markup for contingency, engineering and constuction administration 2 City Contributions is the cumulative amount of fees lost as a result of the fee reduction adopted by Resolution 2012-142. 31 Harris & Associates H UPDATED FEES SOUTH WASTEWATER TRU!" 1NE FEE FEE INCREASE DUE TO: Updated unit costs to reflect the SWTL Master Plan • Removal of properties east of Highway 99 Residential Low Density Medium Density High Density Non -Residential Retail (Minor & Major) Office/Medical Industrial Gallons Per Day 200 168 140 185 154 83 DUE Factor per Unit 1.0000 0.8421 0.7018 DUE Factor per 1,000 SF 0.9279 0.7733 0.4143 Cost Per Unit $ 1,353.22 $ 1,139.55 $ 949.69 Cost Per 1,000 SF $ 1,255.65 $ 1,046.45 $ 560.64 Category Residential Low Density Medium Density High Density Non- Residential Retail (Minor & Major) - Per 1,000 SF Office/Medical Industrial Existing Fees Proposed Fees Delta $ $ $ $ 1,181.00 994.00 829.00 1,096.00 913.00 489.00 Per DUE $ 1,353.22 $ 1,139.55 $ 949.69 Per 1,000 SF $ 1,255.65 $ 1,046.45 $ 560.64 15% 15% 15% 15% 15% 15% i 2018 IMFP PROPOSED FEE SUMMARY FEES PER UNIT OR 1,000 SF EXCLUDING ELECTRICAL, WATER AND WASTEWATER ZONE 1 Category Existing Fees Proposed Fees Delta Low Density $ 7,830.00 $ 9,781.27 24.92% Medium Density $ 5,893.00 $ 7,400.07 25.57% High Density $ 4,964.00 $ 6,059.21 22.06% Retail $ 2,914.09 $ 3,692.17 26.70% Office/Medical $ 3,415.09 $ 4,218.69 23.53% Industrial $ 1,539.10 $ 1,906.03 23.84% $12,000.00 $10,000.00 $8,000.00 $6,000.00 $4,000.00 $2,000.00 $- Proposed Fees Existing Fees Low Medium High Retail Office Industrial Density Density Density (1,000 SF) (1,000 SF) (1,000 SF) ZONE 2 Category Existing Fees Proposed Fees Delta Low Density $ 12, 866.00 $ 15, 917.48 23.72% Medium Density $ 9,290.00 $ 11,519.30 24.00% High Density $ 7,754.00 $ 9,134.47 17.80% Retail $ 3,781.42 $ 4,754.08 25.72% Office/Medical $ 4,444.42 $ 5,474.66 23.18% Industrial $ 2,186.14 $ 2,869.76 31.27% $18,000.00 $16,000.00 $14,000.00 $12,000.00 $10,000.00 $8,000.00 $6,000.00 $4,000.00 $2,000.00 $- Proposed Fees Existing Fees Low Medium High Retail Office Industrial Density Density Density (1,000 SF) (1,000 SF) (1,000 SF) Harris & Associates INDEX INCREASES ENR increase from 2012-2018 was 18%. CPI increase from 2012-2018 was 13% DEVELOPER CONSTRUCTED Category Existing Fees Proposed Fees Delta Low Density $ 7,617.00 $ 9,494.57 24.65% Medium Density $ 6,200.00 $ 7,719.66 24.51% High Density $ 5,232.00 $ 6,516.92 24.56% Retail $ 3,674.00 $ 4,552.52 23.91% Office/Medical $ 3,992.00 $ 4,869.85 21.99% Industrial $ 1,668.00 $ 2,043.14 22.49% $10,000.00 $9,000.00 $8,000.00 $7,000.00 $6,000.00 $5,000.00 $4,000.00 $3,000.00 $2,000.00 $1,000.00 $- Proposed Fees Existing Fees i Low Medium High Retail Office Industrial Density Density Density (1,000 SF) (1,000 SF) (1,000 SF) 33 HHarris Associates 2018 IMFP PROPOSED FEE SUMMARY WATER AND WASTEWATER pr WATER FEES Category Existing Fees Proposed Fees Delta 5/8 -inch meter $ 2,079.00 $ 2,119.42 2% 3/4 -inch meter $ 3,103.00 $ 3,163.31 2% 1 -inch meter $ 5,181.00 $ 5,282.73 2% 1 1/2 -inch meter $ 10, 332.00 $ 10,533.83 2% 2 -inch meter $ 16, 537.00 $ 16,860.45 2% 3 -inch meter $ 31, 026.00 $ 31, 633.12 2% 4 -inch meter $ 51, 721.00 $ 52, 732.40 2% 6 -inch meter $103,411.00 $ 105,433.18 2% 8 -inch meter $165,464.00 $ 168,699.41 2% 10 -inch meter $237,880.00 $ 242,531.10 2% $300,000.00 $250,000.00 $200,000.00 $150,000.00 $100,000.00 $50,000.00 $- Proposed Fee 1 ■ Existing Fee 1 I 5/8 3/4 Inch Inch 1 1-1/2 2 Inch Inch Inch 3 4 6 Inch Inch Inch WASTEWATER FEES Category Existing Fees Proposed Fees Delta 5/8 -inch meter $ 2,831.00 $ 2,717.95 -4% 3/4 -inch meter $ 4,225.00 $ 4,056.64 -4% 1 -inch meter $ 7,056.00 $ 6,774.59 - 4% 1 1/2 -inch meter $ 14, 070.00 $ 13,508.61 -4% 2 -inch meter $ 22, 521.00 $ 21,621.89 -4% 3 -inch meter $ 42,253.00 $ 40,566.40 -4% 4 -inch meter $ 70,453.00 $ 67, 624.19 - 4% 6 -inch meter $140,828.00 $ 135,207.81 - 4% 8 -inch meter $225,333.00 $ 216,340.61 - 4% 10 -inch meter $323,951.00 $ 311,022.59 -4% $350,000.00 $300,000.00 $250,000.00 $200,000.00 $150,000.00 $100,000.00 $50,000.00 $ Proposed Fee . • 1 ■ Existing Fee it 1 8 10 5/8 3/4 1 1-1/2 2 3 4 6 8 10 Inch Inch Inch Inch Inch Inch Inch Inch Inch Inch Inch Inch 34 Harris & Associates H SINGLE PHASE @ 240V 2018 IMFP PROPOSED FEE SUMMARY ELECTRICAL UTILITY FEF THREE PHASE @ 208V THREE PHASE @ 240V THREE PHASE @ 480V Proposed Category Existing Fees Delta Fees Proposed Category Existing Fees Delta Fees Proposed Category Existing Fees Delta Fees Category 200 amps 400 amps 600 amps 800 amps 1000 amps 1200 amps 1600 amps 2000 amps 2500 amps 3000 amps Proposed Existing Fees Delta Fees $ 2,718.00 $ 3,243.18 19% $ 5,437.00 $ 6,486.36 19% $ 8,155.00 $ 9,729.54 19% $ 10,873.00 $ 12,972.71 19% $ 13, 591.00 $ 16, 215.89 19% $ 16,310.00 $ 19,459.07 19% $ 21,746.00 $ 25,945.43 19% $ 27,183.00 $ 32,431.79 19% $ 33, 979.00 $ 40, 539.73 19% $ 40, 774.00 $ 48, 647.68 19% 60 amps $ 248.00 $ 295.65 19% 200 amps $ 1,178.00 $ 1,405.38 19% 200 amps $ 1,359.00 $ 1,621.59 19% 400 amps $ 2,718.00 $ 3,243.18 19% 100 amps $ 413.00 $ 492.75 19% 400 amps $ 2,356.00 $ 2,810.75 19% 125 amps $ 516.00 $ 615.94 19% 600 amps $ 4,077.00 $ 4,864.77 19% 600 amps $ 3,534.00 $ 4,216.13 19% 800 amps $ 5,437.00 $ 6,486.36 19% 200 amps $ 826.00 $ 985.50 19% 800 amps $ 4,712.00 $ 5,621.51 19% 400 amps $ 1,652.00 $ 1,971.00 19% 1000 amps N/A N/A N/A 1000 amps $ 5,890.00 $ 7,026.89 19% 600 amps $ 2,478.00 $ 2,956.50 19% 1200 amps $ 7,068.00 $ 8,432.26 19% 1200 amps N/A N/A N/A 1600 amps N/A N/A N/A 1600 amps $ 9,423.00 $ 11,243.02 19% 2000 amps $ 11, 779.00 $ 14, 053.77 19% 2000 amps N/A N/A N/A 2500 amps $ 14, 724.00 $ 17, 567.22 19% 2500 amps N/A N/A N/A 3000 amps $ 17, 669.00 $ 21, 080.66 19% 3000 amps N/A N/A N/A $3,500.00 $3,000.00 $2,500.00 $2,000.00 $1,500.00 $1,000.00 $500.00 $- • Proposed Fee Existing Fee .UIi • I 1 1 $25,000.00 $20,000.00 $15,000.00 $10,000.00 $5,000.00 $- Proposed Fee . . .1 1 lit! 1 1 60 100 125 200 400 600 200 600 1000 1600 2500 amps amps amps amps amps amps amps amps amps amps amps $7,000.00 $6,000.00 $5,000.00 $4,000.00 $3,000.00 $2,000.00 $1,000.00 $- Proposed Fee P 200 amps 400 amps 600 amps 800 amps $60,000.00 $50,000.00 $40,000.00 $30,000.00 $20,000.00 $10,000.00 $ Proposed Fee . . . 1 1 1 1 1 1 200 600 1000 1600 2500 amps amps amps amps amps 35 SURROUNDING AGENCY COMPARISON $50,000.00 $45,000.00 $40,000.00 $35,000.00 $30,000.00 $25,000.00 $20,000.00 $15,000.00 $10,000.00 $5,000.00 $- SINGLE FAMILY RESIDENTIAL Lodi Davis Manteca Ripon Tracy Turlock $1,600,000.00 $1,400,000.00 $1,200,000.00 $1,000,000.00 $800,000.00 $600,000.00 $400,000.00 $200,000.00 $- GENERAL COMMERCIAL FACILITY Lodi Davis Manteca Ripon Tracy Turlock Harris & Associates SINGLE FAMILY RESIDENTIAL Assumes a 2,000 SF home with 3 bedrooms, 2.5 bathrooms at a density of 6 units per acre GENERAL COMMERCIAL Assumes a 65,000 SF building with 200 Employees, a 3" Water Meter and is 85% Impervious GENERAL ASSUMPTIONS Lodi includes the SW Trunk Line fee and uses Zone 2 Storm Drainage costs 36 Harris & Associates THANK YOU 2018 IMFP adam.marston@weareharris.com UPDATE Phone: 949.655.3900 E-mail. alison.bouley@weareharris.com Jennifer Ferraiolo From: Charles Swimley Sent: Tuesday, October 9, 2018 6:06 PM To: John Beckman (johnb@biagv.org); 'Dale Gillespie'; 'Tom Doucette'; 'Price Walker'; jwhite@grupe.com; Dennis Bennett; Darryl Browman (DBrowman@BrowmanDevelopment.com); Aaron Zuzack (AZuzack@BrowmanDevelopment.com); 'J. Jeffrey Kirst'; 'Michael Carouba, CCIM'; Donnie Garibaldi Cc: 'Adam Marston'; Steve Schwabauer; Craig Hoffman; Lyman M Chang; Sean Nathan; Rebecca Areida-Yadav; Andrew Keys; 'mclusk@softcom.net; Alison Bouley; Denise Wiman; Karissa Kiriu; Jennifer Ferraiolo; Janice Magdich Subject: City of Lodi Impact Fee Update Attachments: IMFP Summary of Changes 10.8.18.pdf; IMFP Report v.1 9.25.18 Final Draft Revisions.pdf; IMFP Fee Comparison.pdf; Shirtsleeve IMF Update 10-16-2018.doc All, Please find attached a draft copy of the City's IMF update, Fee Comparison, Summary of Changes and draft shirtsleeve council report for the October 16th meeting. As you will see, the basic structure of the City's fee program remains the same with the exception of an added Recycled Water fee. As reflected in the fee comparison, some fees increased while others decreased. The summary of changes document provides a brief explanation as to what drove the changes associated with each particular fee. As noted in the draft council report, the current, low-density impact fees, where the developer constructs the storm drain facilities and neighborhood park (outside of the Southwest Wastewater Trunkline Service Area) total $14,450 per unit (excluding RTIF). The proposed total fee would increase approximately 12 percent to $16,345 per unit. In 2016, Council eliminated the initial 60 percent reduction in impact fees for low and medium -density zoning designations and infill projects of more than 10 lots. The multi -family reduction as well as the infill projects (10 lots or less) will remain in place until December 31, 2019. Impact fees associated with those subdivisions under existing development agreements will remain governed by the terms of their respective agreements. We wanted to provide this information in advance of the shirtsleeve meeting to be held at Carnegie Forum on October 16, 2018 at 7:00 a.m. Regards, Charlie Charles E. Swimley Jr. Public Works Director City of Lodi 209-333-6709 1 DECLARATION OF POSTING On Thursday, October 11 2018, in the City of Lodi, San Joaquin County, California, a copy of the October 16, 2018, Shirtsleeve Session City Council agenda (attached and marked as Exhibit A) was posted at 1311 Midvale Road, Lodi, California. I declare under penalty of perjury that the foregoing is true and correct. Executed on October 11, 2018, at Lodi, California. ORDERED BY: Posted by: Sylvia Doming Administrative Ierk JENNIFER M. FERRAIOLO CITY CLERK (Date)/ I DECLARATION OF POSTING On Thursday, October 11, 2018, in the City of Lodi, San Joaquin County, California, copies of the October 16, 2018 Shirtsleeve Session agenda and October 17, 2018 Regular Meeting agenda (attached and marked as Exhibit A) were posted on the door of Room No. 31 of Fairmont Rehabilitation Hospital, 960 South Fairmont Avenue, Lodi, California. I declare under penalty of perjury that the foregoing is true and correct. Executed on October 11, 2018, at Lodi, California, Posted by: iqpgLi (signature (Print name Fre) Fairmont Rehabilitation Hospital (Person who posted the agenda) ORDERED BY: JENNIFER M. FERRAIOLO CITY CLERK (0 /1g (Date) LODI CITY COUNCIL Carnegie Forum 305 West Pine Street, Lodi *and via conference call: 1311 Midvale Road Lodi, CA 95240 Fairmont Rehab Hospital 960 S. Fairmont Avenue Lodi, CA 95240 "SHIRTSLEEVE" SESSION Date: October 16, 2018 Time: 7:00 a.m. 1 For information regarding this Agenda please contact: Jennifer M. Ferraiolo City Clerk Telephone: (209) 333-6702 JEXHIBIT A Informal Informational Meeting A. Roll Call by City Clerk B. Topic(s) B-1 Provide an Overview of Impact Mitigation Fee Program Update (PW) C. Comments by Public on Non -Agenda Items D. Adjournment Pursuant to Section 54954.2(a) of the Government Code of the State of California, this agenda was posted at least 72 hours in advance of the scheduled meeting at a public place freely accessible to the public 24 hours a day. All staff reports or other written documentation relating to each item of business referred to on the agenda are on file in the Office of the City Clerk, located at 221 W. Pine Street, Lodi, and are available for public inspection. If requested, the agenda shall be made available in appropriate altemative formats to persons with a disability, as required by Section 202 of the Americans with Disabilities Act of 1990 (42 U.S. C. Sec. 12132), and the federal rules and regulations adopted in implementation thereof. To make a request for disability -related modification or accommodation contact the City Clerk's Office as soon as possible and at least 72 hours prior to the meeting date. Language interpreter requests must be received at least 72 hours in advance of the meeting to help ensure availability. Contact Jennifer M. Ferraiolo at (209) 333-6702. Solicitudes de interpretacion de idiomas deben ser recibidas por to menos con 72 horas de anticipacion a la reunion para ayudar a asegurar la disponibilidad. Llame a Jennifer M. Ferraiolo (209) 333-6702. J:\CITYCLRK AGENDA\SHIRTSLV\SHRTSLV DOC