HomeMy WebLinkAboutMinutes - October 9, 2018 SSLODI CITY COUNCIL
SHIRTSLEEVE SESSION
CARNEGIE FORUM, 305 WEST PINE STREET
TUESDAY, OCTOBER 9, 2018
A. Roll Call by City Clerk
An Informal Informational Meeting ("Shirtsleeve" Session) of the Lodi City Council was held
Tuesday, October 9, 2018, commencing at 7:03 a.m.
Present: Council Member Chandler, Council Member Kuehne, and Mayor Nakanishi
Absent: Council Member Johnson, and Mayor Pro Tempore Mounce
Also Present: City Manager Schwabauer, City Attorney Magdich, and City Clerk Ferraiolo
B. Topic(s)
B-1 Fourth Quarter Fiscal Year 2017/18 Water, Wastewater, and Electric Utility Department
Financial Reports (CM)
Rates & Resources Manager Melissa Price provided a PowerPoint presentation regarding the
Electric Utility quarterly update for the period ending June 30, 2018. Specific topics of discussion
included cash flow summary, cash balances, reserve policy, Capital Improvement projects five-
year spending plan, power sales, Energy Cost Adjustment revenue, operating results, power
supply costs, load coverage, and Risk Oversight Committee report.
Electric Utility Director Elizabeth Kirkley provided a PowerPoint presentation regarding the
City Council strategic areas of focus.
Council Member Kuehne reported that he and Council Member Chandler met with
Senator Galgiani and an Assemblymember from Lockeford who both expressed an interest in
writing a letter regarding the 230 kV project when the timing is right to help move the
project along.
Mike Lusk posed questions regarding the westward connection on Eight Mile Road for the 230 kV
project, stating he thought that route had been abandoned. Ms. Kirkley confirmed that the
westward connection was no longer a part of the scope of the project, but there is a new section
that will loop to the 230 kV station east of Lockeford. Mr. Lusk further questioned whether the City
tracks time -of -day usage and if rate payers will be effected by that in the energy cost adjustment.
City Manager Schwabauer explained that Lodi does not have time of usage charges that are
passed onto rate payers on an hourly basis; instead, the City purchases high -load and low -load
power at different rates in the power market to meet appropriate demands during low -usage times
in the morning/late evening and high -usage times during prime time hours. Further, Mr. Lusk
pointed out that wait times at the Finance Department continue to be lengthy, he sees very few
people utilizing the payment kiosks, and customer service representatives at the payment
windows are often pulled away to handle customers with more specialized needs, leaving only
one teller to handle the demand. He suggested alternate staff be trained to handle the window
during those times. Deputy City Manager Keys reported that the City is looking into a queue
management system that may help in this regard. Finally, Mr. Lusk suggested the Lodi Electric
Utility Department do a better public relations job in advertising the rate structures and
communicating to the public that Lodi's rates are lower than PG&E's.
Myrna Wetzel also complained about the lengthy wait times in the Finance Department lines and
shared her observations from talking to customers in line who have shared their experiences,
complaints, and comments, stating she believes a majority of people do not utilize the payment
kiosks because it does not give change for a payment. Any overage is applied as a credit to their
next month's bill; however, many people cannot afford to pay more than their balance because
1
they are on a fixed income or do not have a high -paying job. Customers also choose not to call
the Finance Department because the lines go unanswered. She further complained that too many
Shirtsleeve Sessions have been cancelled this year.
Public Works Utilities Manager Lance Roberts provided a PowerPoint presentation regarding the
Water/Wastewater quarterly update for the period ending June 30, 2018. Specific topics of
discussion included Wastewater Fund cash flow summary, operating results, cash balances, and
planned Capital projects; Water Fund cash flow summary, operating results, cash balances, and
planned Capital projects; and Water/Wastewater utility operational and regulatory activities.
C. Comments by Public on Non -Agenda Items
None.
D. Adjournment
No action was taken by the City Council. The meeting was adjourned at 8:09 a.m.
ATTEST:
Jennifer M. Ferraiolo
City Clerk
2
TM
CITY OF LODI
COUNCIL COMMUNICATION
AGENDA ITEM
AGENDA TITLE: Fourth Quarter Fiscal Year 2017/18 Water, Wastewater and Electric Utility
Department Financial Reports
MEETING DATE: October 9, 2018
PREPARED BY: Deputy City Manager
RECOMMENDED ACTION: Receive utility financial reports for the fourth quarter of Fiscal Year
2017/18.
BACKGROUND INFORMATION: In accordance with the Lodi Municipal Code, quarterly financial
reports are to be prepared for the Water, Wastewater, and Electric
Utilities. Highlights of the operations and financial performance of
each utility will be presented at the meeting of October 9, 2018.
FISCAL IMPACT:
None directly related to the preparation of the report. However, the
presentation is intended to keep the Council apprised of the financial
conditions of the major municipal utilities.
FUNDING AVAILABLE: Not applicable.
AK: LT
Andrew Keys
Deputy City Manager/Internal Services Director
APPROVED:
tephen wabauer, City Manager
Public Works Department
Water/Wastewater
FY 18 Quarterly Update
(Ending June 30, 2018)
City Council Shirtsleeve Session
October 9, 2018
1
Wastewater Fund
Cash Flow Summary
(Ending June 30, 2018)
*Of the remaining capital budget, $7.2M or 76% of the total budget was rolled to the next FY in encumbered contracts
2
Budget
Actuals
% of Budget
Revenue
Sales
15,108,850
14,863,543
98%
Development Impact Mitigation Fees
1,266,190
559,132
44%
Other (interest, septic, misc.)
2,575,140
1,003,463
39%
Total Revenues
18,950,180
16,426,138
87%
Expenses
Operating
8,023,158
7,450,179
93%
Capital
9,441,226
2,063,603*
22%
Debt Service
3,465,000
3,121,413
90%
Cost of Services Payment To General Fund
1,108,270
1,108,270
100%
Total Expenses
22,037,654
13,743,465
62%
Beginning Cash (Operations Only)
16,415,483
Ending Cash (Operations Only)
15,478,578
Days Cash (Excluding Capital)
484
of Target — 90 Days Cash on Hand
537%
*Of the remaining capital budget, $7.2M or 76% of the total budget was rolled to the next FY in encumbered contracts
2
Wastewater
Operating Results
(Ending June 30, 2018)
3
Budget
Actuals
% of Budget
Personnel
$ 3,727,545
$ 3,856,918
103%
Supplies, Materials, Services
$ 2,725,718
$ 2,384,205
87%
Equipment, Land, Structures
$ 449,335
$ 163,928
36%
Other Payments
$ 406,160
$ 298,540
74%
Utilities
$ 686,090
$ 726,588
106%
Work for Others
$ 28,310
$ 20,000
71%
Total Operating Expenses
$ 8,023,158
$ 7,450,179
93%
3
Wastewater Funds
Cash Balances
(Ending June 30, 2018)
18,000,000
16,000,000
14,000,000
12,000,000
10,000,000
8,000, 000
6,000, 000
4,000, 000
2,000,000
0
Actual Reserves vs. Target
326%
206%
537%
429%
14/15 15/16 16/17 17/18
■ Target
Actual
Amounts above
reserve target are
held for scheduled
capital maintenance
4
Operating (530)
15,478,578
Utility Capital / Infrastructure Replacement (531)
246,851
Capital Reserve (532) (Fund used to pay White Slough COP Debt Service)
120,231
Wastewater IMF (533)
809,400
Rate Stabilization Reserve (534)
500,000
Storm Drain IMF (535)
930,384
Total
18,085,444
18,000,000
16,000,000
14,000,000
12,000,000
10,000,000
8,000, 000
6,000, 000
4,000, 000
2,000,000
0
Actual Reserves vs. Target
326%
206%
537%
429%
14/15 15/16 16/17 17/18
■ Target
Actual
Amounts above
reserve target are
held for scheduled
capital maintenance
4
Wastewater
Planned Capital Projects
Villa Fiore Reimbursement
Lockeford Street Improvements
Storm Drain Trash Handling
Water Meter Program Phase 7
MSC Security Improvements
Misc. System Relocations
Misc. Wastewater Taps
Collection System Capacity Enhancement Projects
Pipeline Condition Assessment
Main Replacement Project #7
Northeast Sewer Lift Pipe Repl.
Vinewood Storm Water Pump Rehab
Lincoln Storm Pump Rehab
Vehicles/Equipment
Upgrade Blowers
Irrigation Improvements
Plant Maintenance Improvements
Digester #4 Cleaning
Lagoon Cleaning
Pump & Equipment Upgrades
Corrosion Repairs
Electrical/Screen/SCADA Design
Electrical Upgrades/SCADA Construction
White Slough Recycled Water Storage
Field #5 Road Repair
Miscellaneous Future Projects
Totals
FY 17-18
FY 18-19
FY 19-20
FY 20-21
9,974
930,000
100,000
750,000
750,000
750,000
90,857
35,000
35,000
35,000
35,000
2,906
40,000
40,000
40,000
20,000
200,000
191,397
500,000
35,185
2,000,000
2,600,000
2,000,000
523
60,000
6,290
100,000
75,000
439,384
135,000
150,000
150,000
750,000
69,069
1,650,000
53,823
55,000
85,000
140,000
220,000
300,000
345,000
250,866
308,432
800,000
900,000
7,000,000
604,545
4,000,000
352
150,000
100,000
100,000
100,000
$2,063,603 $13,075,000
$4,935,000 $10,215,000
5
Water Fund
Cash Flow Summary
(Ending June 30, 2018)
*Included in the budget was $5.2M for the Water Meter Project Phase 8 which was delayed
**Of the remaining capital budget, $1.1M or 1% of the total budget was rolled to the next FY in encumbered contracts
6
Budget
Actuals
% of Budget
Revenue
Sales
13,136,300
13,005,023
99%
Development Impact Mitigation Fees
520,690
337,657
65%
Other (interest, tap fees, water meters, misc.)
1,065,530
1,093,030
103%
Total Revenues
14,722,520
14,435,710
98%
Expenses
Operating
6,966,090
6,195,601
89%
Capital
11,045,415*
4,371,021**
40%
Debt Service
2,967,660
2,807,328
95%
Cost of Services Payment To General Fund
820,560
820,560
100%
Total Expenses
21,799,726
14,194,510
65%
Beginning Cash (Operations Only)
3,713,488
Ending Cash (Operations Only)
3,226,517
Days Cash (Excluding Capital)
120
% of Target — 90 Days Cash on Hand
133%
*Included in the budget was $5.2M for the Water Meter Project Phase 8 which was delayed
**Of the remaining capital budget, $1.1M or 1% of the total budget was rolled to the next FY in encumbered contracts
6
Water
Operating Results
(Ending June 30, 2018)
7
Budget
Actuals
% of Budget
Personnel
$ 3,005,815
$ 2,858,502
95%
Supplies, Materials, Services
$ 1,643,425
$ 1,164,740
71%
Equipment, Land, Structures
$ 110,000
$ 7,942
7%
Other Payments
$ 1,543,100
$ 1,537,296
100%
Utilities
$ 563,750
$ 518,271
92%
Work for Others
$ 100,000
$ 108,850
109%
Total Operating Expenses
$ 6,966,090
$ 6,195,601
89%
7
Water Funds
Cash Balances
(Ending June 30, 2018)
7,000,000
6,000,000
5,000,000
4,000,000
3,000,000
2,000,000
1,000, 000
Actual Reserves vs. Target
264%
238%
145%
133%
AAA
14/15 15/16 16/17 17/18
■ Target
Actual
Amounts above
reserve target are
held for scheduled
capital maintenance
8
Operating (560)
3,226,517
Utility Capital / Infrastructure Replacement (561)
144,411
IMF (562)
1,079,382
PCE/TCE Settlements
9,482,820
PCE/TCE Rates (565)
4,040,262
Total
17, 973, 392
7,000,000
6,000,000
5,000,000
4,000,000
3,000,000
2,000,000
1,000, 000
Actual Reserves vs. Target
264%
238%
145%
133%
AAA
14/15 15/16 16/17 17/18
■ Target
Actual
Amounts above
reserve target are
held for scheduled
capital maintenance
8
Water
Planned Capital Projects
Water Meter Program
Lockeford Street Imprv.
Water Taps
Misc. Water Mains
GAC Replacement
Meter Shop Design/Construction
Water Plant Generator
MSC Security Improvements
Well 7 Pump Rehab
Well 14 Pump Rehab
Well 16 Pump Rehab
Well 21 Pump Rehab
Well 23 Pump Rehab
Well 24 Rehab
Well 27 GAC Treatment & Standby Generator
Well 28 GAC Treatment
Vehicles/Equipment
FY 17-18
FY 18-19
FY 19-20
FY 20-21
3,759,502
3,630,000
2,350,000
1,000,000
400,000
16,728
75,000
75,000
75,000
50,000
50,000
50,000
300,000
300,000
15,800
200,000
300,000
35,000
175,000
166,000
166,000
200,000
80,000
6,339
165,000
70,000
750,000
70,000
950,000
20,354
120,000
80,000
40,000
Totals 3,818,723
5,000,000
3,841,000 3,081,000
9
Water / Wastewater Utility
Activities
Operational
• Water Distribution
• Water Production
• Collection System
• Wastewater Treatment
Regulatory
• SSO's
• Discharge Violations
• Monitoring and Reporting
10
Electric Utility Department
FY 18 Quarterly Update
(Ending June 30, 2018)
City Council Shirtsleeve Session
October 9, 2018
Electric Utility Fund
Cash Flow Summary
(June 30, 2018)
Beginning Cash Balance (6/30/17)
Budget
Actuals
% of Budget
Revenue
26,573,007
Reserve Policy Target
% of Target
Sales Revenues
69,828,170
69,246,709
99%
Development Impact Fees
143,470
137,611
96%
Other Revenues (interest, misc)
4,024,990
4,180,967
104%
Total Revenues
73,996,630
73,565,287
99%
Expenses
Purchase Power*
41,822,160
39,893,145
95%
Non Power
14,557,637
11,762,566
81%
Capital Projects
3,923,135
2,718,234
69%
Debt Service
5,538,340
5,583,667
101%
Cost of Service/Capital Xfer
2,393,690
2,393,690
100%
In -lieu Transfer to General Fund
7,158,850
7,158,850
100%
Total Expenses
75,393,812
69,510,152
92%
Beginning Cash Balance (6/30/17)
22,713,089
Ending Cash Balance (6/30/18)
26,573,007
Reserve Policy Target
% of Target
23,301,000
114%
2
Electric Utility Funds
Cash Balances
(Ending June 30, 2018)
3
Operating Funds
$ 14,922,758
Utility Outlay Reserve Fund
$ 750,000
Public Benefits Fund
$ 2,450,462
Impact Fee Fund
$ 635,018
Solar Surcharge Fund
$ 316,235
Greenhouse Gas Fund
$ 7,498,534
Total
$ 26,573,007
3
Electric Utility Reserve Policy
(June 30, 2018)
Purpose
Target
Actual*
Operating Reserves
$ 22, 301, 000
$ 25,823,007
Capital Reserve
$ 1,000,000
$ 750,000
Total Target
$ 23,301,000
$ 26,573,007
*Includes cash held locally and at NCPA
$30,000
$25,000
$20,000
in
c $15,000
$10,000
$5,000
$-
Actual Reserves vs. Target
116%
95%
1
1
1
100%
FY 12/13 FY 13/14 FY 14/15 FY 15/16 FY 16/17 FY 17/18
• Actual
❑ Target
1
Cash balances
support City Council
approved reserve
requirements and
provide funds for pay
as you go Capital
Improvement
Projects.
4
Capital Improvement Project
5 -Year Spending Plan
Project
FY 17-18
FY 18-19
FY 19-20
FY 20-21
FY 21-22
Distribution Capacity Program
$68,575
$960,000
$250,000
$250,000
$250,000
Underground / Overhead Maint*
$2,129,108
$1,300,000
$1,400,000
$1,400,000
$1,400,000
Streetlight Maintenance / Repair
$57,614
$90,000
$50,000
$50,000
$50,000
LED Streetlight Improvements
$166,428
$90,000
$200,000
$200,000
$200,000
230 kV Interconnection Project
$22,747
$60,000
$60,000
$60,000
$0
Substation Maint / Improvements
$7,600
$525,000
$350,000
$650,000
$1,500,000
Building & Security Improvements
$198,316
$1,035,000
$50,000
$50,000
$50,000
Vehicles & Equipment
$67,846
$264,000
$350,000
$250,000
$370,000
Total Projects
$2,718,234
$4,324,000
$2,710,000
$2,910,000
$3,820,000
*Includes work for others.
5
Power Sales
(Ending June 30, 2018)
Power Sales
Customer Class
(kWh)
Budget
Actual
Residential
151,255,540
155,539,509
Small Commercial
160,043,844
154,551,448
Large Commercial/Small Industrial
49,188,321
45,644,331
Industrial
71,906,433
69,422,586
Total
432,394,138
425,157,874
Revenue ($)
Customer Class Budget
Actual
Average Ran
Residential
$ 27,937,783
$ 27,967,918
$ 0.1798
Small Commercial
$ 27,302,858
$ 26,401,194
$ 0.1708
Large Commercial/Small Industrial
$ 6,939,313
$ 6,873,986
$ 0.1506
Industrial
$ 7,648,216
$ 8,003,611
$ 0.1153
Total
$ 69,828,170
$ 69,246,709
$ 0.1629
6
ECA Revenue
(Ending June 30, 2018)
Customer Class
Total ($)
Residential
$ 1,353,012
Small Commercial
$ 1,645,947
Large Commercial / Small Industrial
$ 505,518
Industrial
$ 687,839
Total Revenue
$ 4,192,316
7
Electric Utility Fund
Operating Results
(Ending June 30, 2018)
8
FY18 Budget
FY18 Actual
% of Budget
Personnel
$ 8,906,935
$ 8,268,021
93%
Supplies, Materials, Services
$ 3,836,042
$ 2,119,660
55%
Other Payments
$ 1,730,760
$ 1,309,818
76%
Utilities
$ 83,900
$ 65,067
78%
Total Operating Expenses
$ 14,557,637
$ 11,762,566
81%
8
Power Supply Costs
(Ending June 30, 2018)
9
Budgeted
Year to Date
% of Budget
Generation
$ 29,919,900
$ 28,816,249
96%
Transmission
$ 10,503,530
$ 9,611,374
92%
Management Services
$ 1,398,730
$ 1,465,522
105%
Total Power Supply Costs
$ 41,822,160
$ 39,893,145
95%
9
Load Coverage
PF
MWh Load
ROC Matrix
Target
Load Coverage
(Including Purchases)
Q4 — 2018
104,752
80.0%
82.7%
Q1 — 2019
99,306
80.0%
80.1%
Q2 — 2019
111,308
70.0%
71.9%
Q3 — 2019
137,322
60.0%
67.0%
t
g
2
160,000
140,000
120,000
100,000
80,000
60,000
40,000
20,000
•
Q4-2018 Q1-2019 Q2-2019 Q3-2019
M Cove rage
Target
—s—Load
Includes energy purchases through July 2018 as approved by the Risk Oversight Committee (ROC)
10
Risk Oversight Committee Report
• Forward Energy Purchases Completed
• Cap and Trade Activities
• Hydrology Conditions Update
• 2017 RPS and GHG Reports
• Low Carbon Fuel Standard Program
Registration
• 230 kV Project Update
City Council Strategic Areas of Focus
• Customer
• Technology
• Financial
• Reliability
• Workforce
DECLARATION OF POSTING
On Thursday, October 4, 2018, in the City of Lodi, San Joaquin County,
California, a copy of the October 9, 2018 Shirtsleeve Session agenda (attached
and marked as Exhibit A) was posted on the door of Room No, =i l of
Fairmont Rehabilitation Hospital, 960 South Fairmont Avenue, Lodi, California.
I declare under penalty of perjury that the foregoing is true and correct.
Executed on October 4, 2018, at Lodi, California.
ORDERED BY:
Posted by:
r`
JENNIFER M. FERRAIOLO
CITY CLERK
10/14 ?
( (�9 �ture) (Date)
Jenn(4, \lp c(Print nam ere)
Fairmont Rehabilitation Hospital
(Person who posted the agenda)
DECLARATION OF POSTING
On Thursday, October 4 2018, in the City of Lodi, San Joaquin County,
California, a copy of the October 9, 2018, Shirtsleeve Session City Council
agenda (attached and marked as Exhibit A) was posted at 1311 Midvale Road,
Lodi, California.
declare under penalty of perjury that the foregoing is true and correct.
Executed on October 4, 2018, at Lodi, California.
ORDERED BY:
Posted by:
JENNIFER M. FERRAIOLO
CITY CLERK
104- l k
Je er M. Ferraiolo (Date)
Cit Jerk
LODI CITY COUNCIL
Carnegie Forum
305 West Pine Street, Lodi
*and via conference call:
1311 Midvale Road
Lodi, CA 95240
Fairmont Rehab Hospital
960 S. Fairmont Avenue
Lodi, CA 95240
"SHIRTSLEEVE" SESSION
Date: October 9, 2018
Time: 7:00 a.m.
St.
For information regarding this Agenda please contact:
Jennifer M. Ferraiolo
City Clerk
Telephone: (209) 333-6702
EXHBIT Al
Informal Informational Meeting
A. Roll Call by City Clerk
B. Topic(s)
B-1 Fourth Quarter Fiscal Year 2017/18 Water, Wastewater, and Electric Utility Department
Financial Reports (CM)
C. Comments by Public on Non -Agenda Items
D. Adjournment
Pursuant to Section 54954.2(a) of the Government Code of the State of California, this agenda was
posted at least 72 hours in advance of the scheduled meeting at a public place freely accessible to the
public 24 hours a day.
k.
nifer M. rraiolo
ity Clerk
All staff reports or other written documentation relating to each item of business referred to on the agenda are on file
in the Office of the City Clerk, located at 221 W Pine Street, Lodi, and are available for public inspection. If
requested, the agenda shall be made available in appropriate alternative formats to persons with a disability, as
required by Section 202 of the Americans with Disabilities Act of 1990 (42 U.S.C. Sec. 12132), and the federal rules
and regulations adopted in implementation thereof. To make a request for disability -related modification or
accommodation contact the City Clerk's Office as soon as possible and at least 72 hours prior to the meeting date.
Language interpreter requests must be received at least 72 hours in advance of the meeting to help ensure
availability, Contact Jennifer M. Ferraiolo at (209) 333-6702. Solicitudes de interpretacibn de idiomas deben ser
recibidas por to menos con 72 horas de anticipacidn a la reunion para ayudar a asegurar la disponibilidad. Llame a
Jennifer M. Ferraiolo (209) 333-6702.
J:\CITYCLRK\AGENDA\SHIRTSLVISHRTSLV. DOC