Loading...
HomeMy WebLinkAboutAgenda Report - December 10, 2018 C-06 SMTM CITY OF LODI COUNCIL COMMUNICATION AGENDA ITEM AGENDA TITLE: Accept Improvements Under Contract for 2018 Pavement Resurfacing Project MEETING DATE: December 10, 2018 PREPARED BY: Public Works Director RECOMMENDED ACTION: Accept improvements under contract for 2018 Pavement Resurfacing Project. BACKGROUND INFORMATION: This project included the application of approximately 85,000 square yards of rubberized asphalt cape seal and 6,200 square yards of fiberized slurry seal. The project limits included Church Street (Lodi Avenue to Kettleman Lane), Hutchins Street (Kettleman Lane to Harney Lane), Industrial Way (Beckman Road to Guild Avenue), and Cluff Avenue (Industrial Way to Vine Street), as shown on Exhibit A. The contract was awarded to American Paving Systems, Inc., of Modesto, in the amount of $1,150,963, on August 15, 2018. The contract has been completed in substantial conformance with the plans and specifications approved by City Council on June 6, 2018. Pictures of the completed work are shown in Exhibit B. The final contract price was $1,318,508. The difference between the original contract amount and the final contract price is due to one change order that resulted in the additional amount of $167,545, modifying the scope of the existing pavement subgrade repairs. The original project scope was identified in early 2017. In the time between the original scoping and the start of construction, the condition of the existing subgrade had deteriorated significantly in numerous locations, expanding the subgrade repair area that was needed prior to the resurfacing work. Following acceptance by the City Council, as required by law, the City Engineer will file a Notice of Completion with the County Recorder's office. The notice serves to notify vendors and subcontractors that the project is complete and begins their 30 -day period to file a stop notice requiring the City to withhold payments from the prime contractor in the event of a payment dispute. FISCAL IMPACT: By investing in the recommended maintenance project, significant capital dollars will be saved by extending the useful life of the pavement and foregoing more costly pavement reconstruction. FUNDING AVAILABLE: This project was funded by Federal Transportation Improvement Program, Senate Bill 1 Gas Tax, and Street Fund/Industrial Development funds. Prepared by Sean Nathan, Senior Civil Engineer CES/SN/tdb Attachment cc: Utilities Manager Public Works Management Analyst C.� Charles E. Swimley, Jr. Public Works Director APPROVED: �� S - ■ - en Schwabaue7 ity Manager K:\WP\PROJECTS\STREETS\2018 Pavement Resurfacing\CAccept.doc 11/27/2018 EXHIBIT A 2018 PAVEMENT RESURFACING PROJECT PROJECT LOCATION MAP Legend Cape Seal Slurry Seal s 0 0.25 0.5 Miles 1M®®®®ffl ..rKvn,,! mow_ �,�,e,_ �� ■, :Ili ve. �- �. 1.0 Moil u■uuul "1uu111' LOdI ■— - !1l�■■11.1 nota 11' ■ . , Ill;lll11g; IiIIGii11: 111111111;1 luuuulu 111111 1= ! -1ii _III \_-- - -==_ "�� IIII , °111!!111: 111!11111= =1!111111!: 1:111111111 1 _– Illliiiii:il iJlllllilll :Ilililliil ;�`_--- -� ■III.1111111111.■II =� ■III' 11!14..:_ IIII'1_ ■III 1 Idllli= uiilllli.11111i!Iii +-' ■! ■III II!II!1111' "1111!1= _1!1!11111 IIIIIIIi: - y 1: 1 :1111111111: 11111111= �IIIIIIii Iiii1illllli II IIII III ��1■-iiiiiil�l r�iinn• ®°a J1111 -III p :11,1 `� -uWlr p11� I III;IIII■ mow= �■� r1:1:11111111filill 1111.:11111111=X1111111111'mu11L11111111 111 r.0- 111111=1;llI 11111 II 11111111= =111 / 11.11 E - l� :IIIIIII� =111111.■ i.II1n. = � •111 Vine St.11111111.111111114:" 111111 I 1111111111111111. 1 /y� ®•- !••... I �. 1111111111 111111111 1dd— ® _ _:.-_'I 1111111111111111111. uuuuu= _ low -. II I ®_ III 11■ ■ .ril.. IF 1111 ■ .1111 1111.1111! 11111111111111,,► 1111111111111111■ 111111111111111.. M.1 11111111 Ile 111111 1.111■11 111111IlIlIl1 111111lIlIlIlIll 111111111111111111 111111 lllllll 11111 111111IlIlIl 11111 11111111111111111 11111111111111111 11111111111111111 111111111111111111 111111111111111 :,1111111.■II :111,,1.,,,, :111,, , Oar \.1 P.l �.1 /.1 aiiiiiiil 111111111111. 1111111111 4= ..0 :11 uuuuu llllll11.. 11111111E ■11111. 11�■ : v) iii 1 c = tl `'IIIMMI v v .I m� III Q qui i `III 1111111 -:`nn•11�III i ow j,�11..III .,,..4..1111 �. lllll inI =iii O lllllllll_ 1111.1ll•=111 Ra .41:1 :III ��11 =;,1: =III - - :1111111 =III .-� 1 _ 1 1 MN • iii MIN =1111= 211111E- sou 111.1111E 11111111 = 111:11' _ • =11111r 1. IIII ■1111= w111= Kettleman.Ln. 11.111111..............•..... ..1111.1.. 1IF X111111111. • .1.1.1.1.1 • 111 OT 1 ■1I IIIIILIIIIIIII • /.11111111.11\111111/ u►� 111111 - 11111111lllll11 ulWu� 111111 = 11111Century,Blyd v1111 111111111111 111111111111 111111111111 111111111111 .1111111 .1 111111111111111 M111111111111 _ 11111 111111111 1_11 L11111111 ►.111 111111 11.11. ■_ 1111110111 ►.111 :111: IHarney Ln. ii4— :1111111 Industrialdustrial Wy vine,St- v ■ 1 1 1 1 • WIUH I 11 II Exhibit B