HomeMy WebLinkAboutAgenda Report - November 7, 2018 C-09CITY OF LODI COUNCIL COMMUNICATION AGENDA ITEM C-9 TM AGENDA TITLE: Adopt Resolution Awarding Contract for 2018 Pavement Crack Sealing Project to Pavement Coatings, Co., of Woodland ($38,870) MEETING DATE: November 7, 2018 PREPARED BY: Public Works Director RECOMMENDED ACTION: BACKGROUND INFORMATION: Adopt resolution awarding Contract for 2018 Pavement Crack Sealing Project to Pavement Coatings, Co., of Woodland, in the amount of $38,870. The primary cause of asphalt failure is water infiltration into the street subgrade. Crack sealing is one of the most basic, and important, preventive street maintenance practices. This project consists of thoroughly cleaning and sealing the existing transverse and longitudinal cracks in pavement surfaces and includes other incidental and related work. This contract is intended to supplement work performed by Street Division crews to maximize the street area sealed each year. The 2018 locations are shown on Exhibit A and listed on Exhibit B. The plans and specifications for this project were approved on September 19, 2018. The City received the following five bids for this project on October 17, 2018: Above/(Below) Bidder Location Bid Engineer's Estimate Engineer's Estimate $50,000 Pavement Coatings, CO. Woodland $38,869.98 ($11,130.02) Bond Blacktop, Inc Union City $51,149.04 $1,149.04 Graham Contractor's, Inc. San Jose $57,673.35 $7,673.35 Telfer Pavement Technologies McClellan $81,421.20 $31,421.20 Silicon Valley Paving, Inc. San Jose $145,385.82 $95,385.82 Staff recommends awarding Contract for 2018 Pavement Crack Sealing Project to Pavement Coatings, Co., of Woodland, in the amount of $38,870. FISCAL IMPACT: By increasing the crack sealing effort, the useful life of City streets will be extended. This project does not impact the General Fund. APPROVED: • -n Schwa. - - r, City Manager K:\WP\PROJECTS\STREETS\2018 Crack Seal\CAward.doc 10/29/2018 Adopt Resolution Awarding Contract for 2018 Pavement Crack Sealing Project to Pavement Coatings, Co., of Woodland ($38,870) November 7, 2018 Page 7 FUNDING AVAILABLE: Budgeted Fiscal Year 2018/19 - TDA Streets (30599000.77020) Andrew Keys " Deputy City Manager/Internal Services Director aA 0-C2 Charles E. Swimley, Jr. Public Works Director Prepared by Jimi Billigmeier, Associate Civil Engineer CES/JB/tdb Attachments cc: Utility Superintendent K:\WP\PROJECTS\STREETS\2018 Crack Seal\CAward.doc 10/24/2018 Exhibit A 2018 Crack Seal Locations 2018 Crack Seal Locations 0 � (0) „pm 111 ..1 x:;14.% � t, ,.„ Turner - u- Turner Rd'I` me mg ■ I: II'I in.n . ■ . Y I III IM‘ �........ „IIGIIIIF F.IIIIIiF �i�®EI �i. (n ,' I O .■ '^ 1 =� - qq�� •n,\!innlnn- p, �'� Iii mull ........ul'� ”'®®'• �; '11' - __ 1�1�;:��\,,,,, i■IIIIIIIIIIIIIIII. :gm QIi'Lockeford St._;,Vlctor�.=111�.1�' J .•_IIIIGirrTnill.'1:_noull, ;1'■=Rd.H.... 1 ,®®iIIIIIIti�:':�:nnn•'117 �Ipply®® -;LocL.k...e:ord_S t. . II111 Pine ' ' �, V� LLILY EO;'i:i! 1nI■�— _-� ::11111111: — 1l ❑ 11 it.111111 """'1 • ®iiui:®®-�°I, A••Mme*% I��ai'i'-.I=ai liiiI.;,,..'=:: ���� eli��I,.1;10•,••••-1111111,TVineSt.I' x11.1:111111111IIIII II_1..e-1IIv �O�V i®Ileirn,' I... '®Nii�-e�- ®®= is=11=i::'I:.. all�11111. EWE: ® '1 J` Woodbridge Rd O 0 0.2750.55 1.1 Miles imm =API l!■1' 1■ mot WsTurner Rd. 1.11111a 1� ®W 1111111 11f11111111111• JWY12) Elm '1111111¶:S . :IIIIIIIIIIi •• . .—.11.,111 ■11V ■`p_•• ■ 1�4 1111: 1111 IIIA: 11■ :u: • 311111111:1 111'1;1 1 II - 11111111 II LEN ,- ' it 1 °, •iv: gm 1 1 -: id 11 11111„ Century Blvd: 1®®� IMF 1, •II 11111111 K:\WP\PROJECTS\STREETS\2018 Crack Seal\Exhibit A.mxd c.) 11. Century Blvd 1 N. mo ism 11 Lodi Ave. I ma guar loft IMO nu I _.11 ■ Immo1 ■i • Exhibit B Site Description Road Name From To Street Length (ft) Width (ft) Area (SF) Beckman Rd. Industrial Wy. Thurman St. 1,167.00 38 44,346.00 Beckman Rd. Thurman St. Lodi Av. 811 38 30,818.00 Beckman Rd. Vine St. Industrial Wy. 735 38 27,930.00 Beckman Rd. Vine St. Auto Center Dr. 2,135.00 55 117,425.00 Beckman Rd_ SUBTOTAL 220,519.00 _ Cluff Av. Black Diamond St. Turner Rd. 1,709.00 45 76,905.00 Cluff Av. Black Diamond St. Lockeford St. 760 45 34,200.00 Cluff Av. Pine St. Mounce St. 714 35 24,990.00 Cluff Av. Victor Rd.(HWY 12) Mounce St. 613 45 27,585.00 _ _ _ Cluff Av. SUBTOTAL 163,680.00 Pine St. Beckman Rd. Kelly St. 669 46 30,774.00 Pine St. Cherokee Ln. Houston Ln. 694 39 27,066.00 Pine St. Cluff Av. Commerce St. 929 46 42,734.00 Pine St. Guild Av. Commerce St. 452 46 20,792.00 Pine St. Houston Ln. Hwy. 99 198 39 7,722.00 Pine St. Hwy. 99 OC Beckman Rd. 98 39 3,822.00 Pine St. Kelly St. Cluff Av. 743 46 34,178.00 _ Pine St. SUBTOTAL 167,088.00 E. Turner Rd. Beckman Rd. Cluff Av. i 1,970.00 31 61,070.00 E. Turner Rd. Cluff Av. Beckman Rd. 1,970.00 31 61,070.00 E. Turner Rd. Cluff Av. Guild Av. 1,302.00 31 40,362.00 E. Turner Rd. Guild Av. Cluff Av. 1,300.00 31 40,300.00 E. Turner Rd. SUBTOTAL 202,802.00 _ W. Turner Rd. Evergreen Dr.. Lower Sacramento Rd. 1,400.00 30 42,000.00 W. Turner Rd. Golden Oak Dr. Evergreen Dr. 580 30 17,400.00 W. Turner Rd. W.I.D. Canal Golden Oak Dr. 392 30 11,760.00 W. Turner Rd. Bridgetowne Dr, Westbridge Dr. 900 31 27,900.00 W. Turner Rd. Westbridge Dr. W.I.D. Canal 490 31 15,190.00 W. Turner Rd. Woodhaven Wy. Bridgetowne Dr, 990 31 30,690.00 W. Turner Rd. SUBTOTAL 144,940.00 2018 PAVEMENT CRACK SEALING Various Locations CONTRACT CITY OF LODI, CALIFORNIA THIS CONTRACT made by and between the CITY OF LODI, State of California, herein referred to as the "City," and PAVEMENT COATINGS CO., a California corporation, herein referred to as the "Contractor." WITNESSETH: That the parties hereto have mutually covenanted and agreed, and by these presents do covenant and agree with each other, as follows: The complete Contract consists of the following documents which are incorporated herein by this reference, to -wit: Notice Inviting Bids Information to Bidders General Provisions Special Provisions Bid Proposal Contract Contract Bonds Plans The July 1992 Edition, Standard Specifications, State of California, Business and Transportation Agency, Department of Transportation All of the above documents, sometimes hereinafter referred to as the "Contract Documents," are intended to cooperate so that any work called for in one and not mentioned in the other is to be executed the same as if mentioned in all said documents. ARTICLE I - That for and in consideration of the payments and agreements hereinafter mentioned, to be made and performed by the City and under the condition expressed in the two bonds bearing even date with these presents and hereunto annexed, the Contractor agrees with the City, at Contractor's cost and expense, to do all the work and furnish all the materials except such as are mentioned in the specifications to be furnished by the City, necessary to construct and complete in a good workmanlike and substantial manner and to the satisfaction of the City the proposed improvements as shown and described in the Contract Documents which are hereby made a part of the Contract. ARTICLE II - The City hereby promises and agrees with the Contractor to employ, and does hereby employ, the Contractor to provide all materials and services not supplied by the City and to do the work according to the terms and conditions for the price herein, and hereby contracts to pay the same as set forth in Section 5.600, "Measurement, Acceptance and Payment," of the General Provisions, in the manner and upon the conditions above set forth; and the said parties for themselves, their heirs, executors, administrators, successors and assigns, do hereby agree to the full performance of the covenants herein contained. ARTICLE III - The Contractor agrees to conform to the provisions of Chapter 1, Part 7, Division 2 of the Labor Code. The Contractor and any Subcontractor will pay the general prevailing CONTRACT doc 4.1 10/17/2018 wage rate and other employer payments for health and welfare, pension, vacation, travel time, and subsistence pay, apprenticeship or other training programs. The responsibility for compliance with these Labor Code requirements is on the prime contractor. ARTICLE IV - And the Contractor agrees to receive and accept the following prices as full compensation for furnishing all materials and for doing all the work contemplated and embraced in this agreement; also for all loss or damage arising out of the nature of the work aforesaid or from the action of the elements, or from any unforeseen difficulties or obstructions which may arise or be encountered in the prosecution of the work until its acceptance by the City, and for all risks of every description connected with the work; also for all expenses incurred by or in consequence of the suspension or discontinuance of work and for well and faithfully completing the work, and the whole thereof, in the manner and according to the Plans and Contract Documents and the requirements of the Engineer under them, to -wit: Perform the work necessary for thoroughly cleaning and sealing the existing transverse and longitudinal cracks and joints and random cracks in bituminous pavement surfaces and includes other incidental and related work as described in the specifications. See Section 6-07 "Description of Bid Items" and Exhibits A and B for additional information. CONTRACT ITEMS Item Approx. Description Street Area (SF) Price / SF Total Cost / Street 1 Cluff Av. 163,680 $0.07 $11,457.60 2 Pine St. 167,088 $0.06 $10,025.28 3 E. Turner Rd. 202,802 $0.05 $10,140.10 4 W. Turner Rd. 144,940 $0.05 $7,247.00 TOTAL : $ 38,869.98 ARTICLE V - By my signature hereunder, as Contractor, I certify that I am aware of the provisions of Section 3700 of the Labor Code, which requires every employer to be insured against liability for workers' compensation or to undertake self-insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the work of this contract. ARTICLE VI - It is further expressly agreed by and between the parties hereto that, should there be any conflict between the terms of this instrument and the Bid Proposal of the Contractor, then this instrument shall control and nothing herein shall be considered as an acceptance of the said terms of said proposal conflicting herewith. ARTICLE VII - The City is to furnish the necessary rights-of-way and easements and to establish lines and grades for the work as specified under the Special Provisions. All labor or materials not mentioned specifically as being done by the City will be supplied by the Contractor to accomplish the work as outlined in the specifications. CONTRACT doc 4.2 10/17/2018 ARTICLE VIII - The Contractor agrees to commence work pursuant to this contract within 15 calendar days after the City Manager has executed the contract and to diligently prosecute to completion within 30 CALENDAR DAYS. ARTICLE IX - State of California Senate Bill 854 requires the following: • No contractor or subcontractor may be listed on a bid proposal for a public works project unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)]. • No contractor or subcontractor may be awarded a contract for public work on a public works project unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5. • This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. WHEN SIGNING THIS CONTRACT, THE CONTRACTOR AGREES THAT THE TIME OF COMPLETION FOR THIS CONTRACT IS REASONABLE AND THE CONTRACTOR AGREES TO PAY THE CITY LIQUIDATED DAMAGES AS SET FORTH IN SECTION 6-04.03 OF THE SPECIAL PROVISIONS. CONTRACTOR AGREES THAT THIS AMOUNT MAY BE DEDUCTED FROM THE AMOUNT DUE THE CONTRACTOR UNDER THE CONTRACT. CONTRACT.doc 4.3 10/17/2018 IN WITNESS WHEREOF, the parties to these presents have hereunto set their hands the year and date written below. CONTRACTOR: CITY OF LODI. a municipal corporation By: STEPHEN SCHWABAUER City Manager By: Date: Attest: Title JENNIFER M. FERRAIOLO City Clerk (CORPORATE SEAL) Approved As To Form: CONTRACT doc JANICE D. MAGDICH City Attorney 4.4 10/17/2018 RESOLUTION NO. 2018-202 A RESOLUTION OF THE LODI CITY COUNCIL AWARDING CONTRACT FOR THE 2018 PAVEMENT CRACK SEALING PROJECT TO PAVEMENT COATINGS CO., OF WOODLAND WHEREAS, in answer to notice duly published in accordance with law and the order of this City Council, sealed bids were received and publicly opened on October 17, 2018, at 11:00 a.m., for the 2018 Pavement Crack Sealing Project, described in the plans and specifications therefore approved by the City Council on September 19, 2018; and WHEREAS, said bids have been checked and tabulated and a report thereof filed with the City Manager as follows: Above/(Below) Bidder Bid Engineer's Estimate Pavement Coatings Co. $38,869.98 ($11,130.02) Bond Blacktop, Inc. $51,149.04 $1,149.04 Graham Contractor's, Inc. $57,673.35 $7,673.35 Telfer Pavement Technologies $81,421.20 $31,421.20 Silicon Valley Paving, Inc. $145,385.82 $95,385.82 WHEREAS, staff recommends that the City Council award the contract for the 2018 Pavement Crack Sealing Project to the low bidder, Pavement Coatings Co., of Woodland, in the amount of $38,870. NOW, THEREFORE, BE IT RESOLVED that the Lodi City Council does hereby award the contract for the 2018 Pavement Crack Sealing Project to the low bidder, Pavement Coatings Co., of Woodland, California, in the amount of $38,870; and BE IT FURTHER RESOLVED that the Lodi City Council does hereby authorize the City Manager to execute the contract on behalf of the City. Dated: November 7, 2018 I hereby certify that Resolution No. 2018-202 was passed and adopted by the City Council of the City of Lodi in a regular meeting held November 7, 2018 by the following vote: AYES: COUNCIL MEMBERS — Chandler, Johnson, Kuehne, and Mayor Nakanishi NOES: COUNCIL MEMBERS — None ABSENT: COUNCIL MEMBERS — Mounce ABSTAIN: COUNCIL MEMBERS — None # I4 NIFER FERRAIOLO City Clerk 2018-202