Loading...
HomeMy WebLinkAboutAgenda Report - May 17, 2000 E-07CITY OF LODI COUNCIL COMMUNICATION AGENDA TITLE: Purchase of Low and Medium -voltage Underground Cable ($94,475.20) MEETING DATE: May 17, 2000 PREPARED BY: Electric Utility Director RECOMMENDED ACTION: That the City Council adopt the attached resolution awarding the bids for the purchase of the following lengths and sizes of cable: 20,000 feet #110 600V Underground Triplex Western States Electric, Portland $15,860.80 20,000 feet #350 600V Underground Triplex Pirelli Cables, Colusa, CA $36,591.90 20,000 feet #2 15kV Primary Underground Cable Western States Electric $18,188.20 20,000 feet #2/0 15kV Primary Underground Cable Pirelli Cables $23,834.30 BACKGROUND INFORMATION: On April 19, 2000, the City Council approved specifications and authorized advertisement for bids for this conductor. On May 3, 2000, bids were opened. A summary of the bids received is attached as Exhibit A. Although King Wire of Las Vegas submitted the low bids for the #1/0 triplex and the #2 15kv primary, the manufacturer they represent, Taihan Wire of Korea, is not known to the City of Lodi. Staff checked with the City of Redding and Nevada Power regarding Taihan and King Wire: City of Redding rejected a Taihan bid for failure to meet specifications, and Nevada Power, based in Las Vegas, had not heard of either King Wire or Taihan. Staff therefore recommends that no conductor be purchased from Taihan Wire for use in the City's transmission or distribution system until Taihan has a record of successful service in our area. This conductor is planned for use in the following six subdivisions: Century Meadows #1, Unit 2, Century Meadows #4, Unit 1, Lodi West #7, Bridgetown #4, Towne Ranch #8, and the Sasaki property on Kettleman Lane, west of the WID canal. I11i1t111,Tkm Vicky McAthie, Nnance Director Prepared by Joel Harris, Purchasing Officer cc: Manager, Engineering and Operations Electric Utility Department Operating Fund, Page E-25 (Ref: Special Allocation #84, JV #20995, dated 3/8/2000) I ` Al"a"n N. Vallow, Electric Utility Director APPROVED: _o4 H. Dixon ynn —City an ger 15kv_8_600V_Triplex_CC2 05/o9/o0 Exhibit A Summary of Bids 600V Underground Triplex, and 15kV Underground Primary Bids Opened 5/3/2000 Firm Price per 1000' 1 $736.00 1 $751.00 1 $842.00 1 $899.79 $907.35 1 $935.33 1 $720.00 No Bid No Bid No Bid Firm Total Price lyffislt$6..0.8t)..1 $16,184.05 $18,145.10 $19,390.47 $19,553.39 $20,161.10 See Note 1 Lead Time(Weeks) 12 12-14 9 See Note 2 1 9 00 ft #350 600V UG Triplex Firm Price per 1000' $1,768.00 $1,698.00 No Bid $2,076.01 1 $2,089.74 No Bid $2,254.00 No Bid No Bid No Bid Firm Total Price $38,100.40 3659190;:> $44,738.02 $45,033.90 $48,573.70 Lead Time(Weeks) 5 12-14 See Note 2 1 8 00 ft #2 XLPE Underground Prima Hendrix Firm Price per 1000' $844.00 $852.00 $925.00 $977.48 1 $979.38 No Bid $1,114.00 No Bid No Bid No Bid Firm Total Price _'s18,188;2U $18,360.60 $19,933.75 $21,064.69 $21,105.64 $24,006.70 Lead Time Weeks 9 18 6 6-8 6-8 6 00 ft #2/0 XLPE Underground Primary Firm Price per 1000' $1,237.00 1 $1,106.00 1 $1,143.00 No Bid No Bid No Bid $2,104.00 No Bid No Bid No Bid Firm Total Price $26,657.35323r83430,L $24,631.65 1 $45,341.20 Lead Time(Weeks) 9 1 8 1 6 1 8 20,000 ft #1/0 600V UG Triplex Western Pirelli Stephens Graybar G.E. Supply Wesco Ace Bidder States Cables McCarthyElectric $712.00 Co. Intraline Distribution Kin Wire Supply PlattElectric City Portland Colusa Novato Sac'to Sac'to Burl'game S.F. Las Ve as Emeryville Stockton Manufacturer BICC Pirelli See Below Southwire Southwire Nehring Not Listed Taihan 20,000 It #110 $14,373.85 FIRM PRICES 600V UG Triplex (Nehring) Firm Price per 1000' 1 $736.00 1 $751.00 1 $842.00 1 $899.79 $907.35 1 $935.33 1 $720.00 No Bid No Bid No Bid Firm Total Price lyffislt$6..0.8t)..1 $16,184.05 $18,145.10 $19,390.47 $19,553.39 $20,161.10 See Note 1 Lead Time(Weeks) 12 12-14 9 See Note 2 1 9 00 ft #350 600V UG Triplex Firm Price per 1000' $1,768.00 $1,698.00 No Bid $2,076.01 1 $2,089.74 No Bid $2,254.00 No Bid No Bid No Bid Firm Total Price $38,100.40 3659190;:> $44,738.02 $45,033.90 $48,573.70 Lead Time(Weeks) 5 12-14 See Note 2 1 8 00 ft #2 XLPE Underground Prima Hendrix Firm Price per 1000' $844.00 $852.00 $925.00 $977.48 1 $979.38 No Bid $1,114.00 No Bid No Bid No Bid Firm Total Price _'s18,188;2U $18,360.60 $19,933.75 $21,064.69 $21,105.64 $24,006.70 Lead Time Weeks 9 18 6 6-8 6-8 6 00 ft #2/0 XLPE Underground Primary Firm Price per 1000' $1,237.00 1 $1,106.00 1 $1,143.00 No Bid No Bid No Bid $2,104.00 No Bid No Bid No Bid Firm Total Price $26,657.35323r83430,L $24,631.65 1 $45,341.20 Lead Time(Weeks) 9 1 8 1 6 1 8 20,000 ft #1/0 600V UG Triplex Nehrin VARIABLE PRICES (See Note 3) Variable Price per 1000' $712.00 $733.00 No Bid No Bid No Bid No Bid $911.00 $667.00 No Bid No Bid Variable Total Price $15,343.60 $15,796.15 See Note 1 $14,373.85 20,000 ft #350 600V UG Triplex Variable Price per 1000' $1,710.00 $1,648.00 No Bid No Bid No Bid No Bid $3,058.00 $1,710.00 No Bid No Bid Variable Total Price $36,850.50 $35,514.40 $65,899.00 $36,850.50 20,000 ft #2 XLPE Underground Primary Hendrix Variable Price per 1000' $831.00 $827.00 $922.00 No Bid No Bid No Bid $1,708.00 $815.00 No Bid No Bid Variable Total Price $17,908.05 $17,821.85 $19,869.10 $36,807.40 $17,563.25 20,000 ft #2/0 XLPE Underground Primary Variable Price per 1000' $1,210.00 $1,074.00 $1,141.00 No Bid No Bid No Bid $3,058.00 $1,300.00 No Bid No Bid Variable Total Price $26,075.50 $23,144.70 $24,588.55 1 $65,899.90 $28,015.00 Note 1: Wesco quoted #2 Triplex instead of#1/0 as specified Note 2: In stock, subject to prior sale Note 3: Staff recommends purchasing under Firm Prices proposals, since only an 8% escalation in metals prices during leadtimes would result in a higher total cost to the City RESOLUTION NO. 2000-77 A RESOLUTION OF THE LODI CITY COUNCIL AWARDING THE BID FOR THE PURCHASE OF ELECTRICAL CABLE TO THE LOW BIDDERS WHEREAS, in answer to notice duly published in accordance with law and the order of this City Council, sealed bids were received and publicly opened on May 3, 2000, at 11:00 a.m. for the purchase of 20,000 feet #1/0 600V Underground Triplex, 20,000 feet #350 600V Underground Triplex, 20,000 feet #2 15kV Primary Underground Cable, and 20,000 feet #2/0 15kV Primary Underground Cable, described in the specifications therefore approved by the City Council on April 19, 2000; and WHEREAS, said bids have been compared, checked, and tabulated and a report thereof filed with the City Manager as shown on Exhibit A attached hereto; and WHEREAS, staff recommends award of the bid for the purchase of the conductor be made to the following bidders in each size category as shown as follows: Description/-Bidder/Location Western States Electric, Portland. OR: 20,000 feet 1/0 600V Underground Triplex 20,000 feet #2 15kV Primary Underground Cable Pirelli Cable Company. Colusa. CA: 20,000 feet #350 600V Underground Triplex 20,000 feet #2/0 15kV Primary Underground Cable Bids $ 15,860.80 $ 18,188.20 $ 36,591.90 L 23.834.30 TOTAL $ 94,475.20 *Note: Although King Wire of Las Vegas submitted the low bids for the #110 triplex and the #2 15kv primary, the manufacturer they represent, Taihan Wire of Korea, is not known to the City of Lodi. Staff checked with the City of Redding and Nevada Power regarding Taihan and King Wire: City of Redding rejected a Taihan bid for failure to meet specifications, and Nevada Power, based in Las Vegas, had not heard of either King Wire or Taihan. Staff therefore recommends that no conductor be purchased from Taihan Wire for use in the City's transmission or distribution system until Taihan has a record of successful service in our area. RESOLUTION NO. 2000-77 A RESOLUTION OF THE LODI CITY COUNCIL AWARDING THE BID FOR THE PURCHASE OF ELECTRICAL CABLE TO THE LOW BIDDERS -------------------------------------------------------------------- -------------------------------------------------------------------- WHEREAS, in answer to notice duly published in accordance with law and the order of this City Council, sealed bids were received and publicly opened on May 3, 2000, at 11:00 a.m. for the purchase of 20,000 feet #1/0 600V Underground Triplex, 20,000 feet #350 600V Underground Triplex, 20,000 feet #2 15kV Primary Underground Cable, and 20,000 feet #2/0 15kV Primary Underground Cable, described in the specifications therefore approved by the City Council on April 19, 2000; and WHEREAS, said bids have been compared, checked, and tabulated and a report thereof filed with the City Manager as shown on Exhibit A attached hereto; and WHEREAS, staff recommends award of the bid for the purchase of the conductor be made to the following bidders in each size category as shown as follows: Description/Bidder/Location Western States Electric, Portland, OR: 20,000 feet 1/0 600V Underground Triplex 20,000 feet #2 15kV Primary Underground Cable Pirelli Cable Company, Colusa, CA: 20,000 feet #350 600V Underground Triplex 20,000 feet #2/0 15kV Primary Underground Cable Bids $ 15,860.80 $ 18,188.20 $ 36,591.90 S 23.834.30 TOTAL $ 94,475.20 *Note: Although King Wire of Las Vegas submitted the low bids for the #1/0 triplex and the #2 15kv primary, the manufacturer they represent, Taihan Wire of Korea, is not known to the City of Lodi. Staff checked with the City of Redding and Nevada Power regarding Taihan and King Wire: City of Redding rejected a Taihan bid for failure to meet specifications, and Nevada Power, based in Las Vegas, had not heard of either King Wire or Taihan. Staff therefore recommends that no conductor be purchased from Taihan Wire for use in the City's transmission or distribution system until Taihan has a record of successful service in our area. BE IT FURTHER RESOLVED by the Lodi City Council that the award of the bids for the purchase of Electrical Cable be made to the following bidders in each size category as shown as follows: Description/Bidder/Location Western States Electric, Portland, OR: 20,000 feet 110 600V Underground Triplex 20,000 feet #2 15kV Primary Underground Cable Pirelli Cable Company, Colusa, CA: 20,000 feet #350 600V Underground Triplex 20,000 feet #2/0 15kV Primary Underground Cable Dated: May 17, 2000 Bids $ 15,860.80 $ 18,188.20 $ 36,591.90 S 23.834.30 TOTAL $ 94,475.20 I hereby certify that Resolution No. 2000-77 was passed and adopted by the City Council of the City of Lodi in a regular meeting held May 17, 2000, by the following vote: AYES: COUNCIL MEMBERS — Hitchcock, Land, Pennino and Mann (Mayor) NOES: COUNCIL MEMBERS — None ABSENT: COUNCIL MEMBERS — Nakanishi ABSTAIN: COUNCIL MEMBERS — None 2000-77 Exhibit A Summary of Bids 600V Underground Triplex, andl5kV Underground Primary Bids Open d 5/3!2000 Western Bidder States Pirelli Cables Stephens McCarthyElectric Graybar G.E. Supply Co. Intraline Wesco Distribution Ace King Wire Supply Platt Electric City Portland Colusa Novato Sac'to Sac'to Burl'game S.F. Las Vegas Emeryville Stockton Manufacturer BICC Pirelli See Below Southwire Southwire Nehring Not Listed Taihan 20,000ft#1/0 FIRM PRICES 600V UG Triplex (Nehring) Firm Price per 1000' $736.00 $751.00 1 $842.00 1 $899.79 $907.35 $935.33 $720.00 No Bid No Bid No Bid Firm Total Price 415,860.80':=' $16,184.05 1 $18,145.10 1 $19,390.47 $19 553.39 $20,161.10 See Note 1 Lead Time(Weeks) 12 1 12-14 1 9 See Note 2 1 9 10 ft #350 600V UG Triplex Firm Price per 1000' $1,768.00 $1,698.00 No Bid $2,076.01 $2,089.74 No Bid $2,254.00 No Bid No Bid No Bid Firm Total Price $38,100.40 :$36;591.90: $44,738.02 $45,033.90 $48,573.70 Lead Time Weeks 5 12-14 See Note 2 1 8 10 ft #2 XLPE Underground Primary Hendrix Firm Price per 1000' 1 $844.00 1 $852.00 1 $925.00 $977.48 $979.38 1 No Bid J $1,114.00 1 No Bid No Bid No Bid Firm Total Price 1$18j188.20�:.1 $18,360.60 1 $19,933.75 $21,064.69 $21,105.64 $24,006.70 Lead Time Weeks 9 1 18 1 6 6-8 6-8 6 0 ft #2/0 XLPE Underground Primary Firm Price per 1000' $1,237.00 $1,106.00 $1,143.00 No Bid No Bid No Bid $2,104.00 No Bid No Bid No Bid Firm Total Price $26,657.35 1 $23,834:30:, $24,631.65 1 1 1 1 $45,341.20 Lead Time(Weeks) 9 8 6 1 L I 1 8 20,000ft#1/0 VARIABLE PRICES (See Note 3) 600V UG Triplex Nehrin Variable Price per 1000' $712.00 $733.00 No Bid No Bid No Bid No Bid $911.00 $667.00 No Bid No Bid Variable Total Price $15,343.60 $15,796.15 See Note 1 $14,373.85 20,000 ft #350 600V UG Tri lex Variable Price per 1000' $1,710.00 $1,648.00 No Bid No Bid No Bid No Bid $3,058.00 $1,710.00 No Bid No Bid Variable Total Price $36,850.50 $35,514.40 $65_899.00 $36,850.50 20,000 ft #2 XLPE Underground Primary Hendrix Variable Price per 1000' $831.00 $827.00 $922.00 No Bid No Bid No Bid $1,708.00 $815.00 No Bid No Bid Variable Total Price $17,908.05 $17,821.85 $19,869.10 $36,807.40 $17,563.25 20,000 ft #2/0 XLPE Underground Primary Variable Price per 1000' $1,210.00 $1,074.00 $1,141.00 No Bid No Bid No Bid $3,058.00 $1,300.00 No Bid No Bid Variable Total Price $26,075.50 $23,144.70 $24,588.55 1 $65,899.90 $28,015.00 Note 1: Wesco quoted #2 Triplex instead of #110 as specified Note 2: In stock, subject to prior sale Note 3: Staff recommends purchasing under Firm Prices proposals, since only an 8% escalation in metals prices during leadtimes would result in a higher total cost to the City.