HomeMy WebLinkAboutAgenda Report - September 19, 2018 C-06CITY OF LODI
COUNCIL COMMUNICATION
AGENDA ITEM C • 6
TM
AGENDA TITLE: Approve Specifications and Authorize Advertisement for Bids for 2018 Pavement
Crack Sealing Project
MEETING DATE: September 19, 2018
PREPARED BY: Public Works Director
RECOMMENDED ACTION: Approve specifications and authorize advertisement for bids for
2018 Pavement Crack Sealing Project.
BACKGROUND INFORMATION:
The primary cause of asphalt failure is water infiltration into the
street subgrade. Crack sealing is one of the most basic, and
important, preventive street maintenance practices.
This project consists of thoroughly cleaning and sealing the existing transverse and longitudinal cracks in
pavement surfaces and includes other incidental and related work as described in the specifications.
This contract is intended to supplement work performed by Street Division crews to maximize the street
area sealed each year. The 2018 locations are shown on Exhibit A and listed on Exhibit B.
The specifications are on file in the Public Works Department. The planned bid opening date is October
17, 2018. The project estimate is $50,000.
FISCAL IMPACT: By increasing the crack sealing effort, the useful life of City streets will be
extended.
FUNDING AVAILABLE: Budgeted Fiscal Year 2018/19 - TDA Streets (30599000.77020)
Prepared by Jimi Billigmeier, Associate Civil Engineer
CES/JB/tdb
Attachments
cc: Utility Superintendent
(_�
Charles E. Swimle , Jr.
Public Works Director
APPROVED:tc,--lkit----
Stephen Schwabauer, itManager
K:\WP\PROJECTS\STREETS\2018 Crack Seal\CSA.doc 8/29/2018
Exhibit A
2018 Crack Seal Locations
2018 Crack Seal Locations
0 �
(0)
„pm 111
..1
x:;14.% � t,
,.„ Turner - u- Turner Rd'I` me
mg
■
I: II'I in.n . ■ . Y I
III IM‘ �........
„IIGIIIIF F.IIIIIiF �i�®EI �i. (n ,' I O .■
'^
1 =� - qq�� •n,\!innlnn- p, �'� Iii mull
........ul'� ”'®®'• �; '11' - __ 1�1�;:��\,,,,, i■IIIIIIIIIIIIIIII.
:gm
QIi'Lockeford St._;,Vlctor�.=111�.1�' J .•_IIIIGirrTnill.'1:_noull, ;1'■=Rd.H.... 1 ,®®iIIIIIIti�:':�:nnn•'117 �Ipply®® -;LocL.k...e:ord_S
t. . II111 Pine
' ' �, V� LLILY EO;'i:i!
1nI■�—
_-� ::11111111: —
1l ❑
11 it.111111
"""'1 • ®iiui:®®-�°I, A••Mme*% I��ai'i'-.I=ai liiiI.;,,..'=:: ���� eli��I,.1;10•,••••-1111111,TVineSt.I' x11.1:111111111IIIII II_1..e-1IIv �O�V i®Ileirn,' I... '®Nii�-e�- ®®= is=11=i::'I:.. all�11111.
EWE: ® '1 J`
Woodbridge Rd O
0 0.2750.55 1.1
Miles
imm
=API
l!■1' 1■
mot
WsTurner Rd.
1.11111a 1�
®W 1111111 11f11111111111• JWY12)
Elm '1111111¶:S .
:IIIIIIIIIIi •• . .—.11.,111 ■11V ■`p_•• ■
1�4
1111:
1111
IIIA:
11■
:u:
•
311111111:1
111'1;1
1 II -
11111111
II
LEN
,- '
it
1 °, •iv: gm
1 1 -:
id 11
11111„
Century Blvd:
1®®�
IMF
1,
•II
11111111
K:\WP\PROJECTS\STREETS\2018 Crack Seal\Exhibit A.mxd
c.)
11.
Century
Blvd
1
N.
mo
ism
11
Lodi Ave.
I ma
guar
loft
IMO
nu I
_.11 ■ Immo1
■i
•
Exhibit B
Site Description
Road Name
From
To
Street
Length (ft)
Width (ft)
Area (SF)
Beckman Rd.
Industrial Wy.
Thurman St.
1,167.00
38
44,346.00
Beckman Rd.
Thurman St.
Lodi Av.
811
38
30,818.00
Beckman Rd.
Vine St.
Industrial Wy.
735
38
27,930.00
Beckman Rd.
Vine St.
Auto Center Dr.
2,135.00
55
117,425.00
Beckman Rd_ SUBTOTAL 220,519.00
_
Cluff Av.
Black Diamond St.
Turner Rd.
1,709.00
45
76,905.00
Cluff Av.
Black Diamond St.
Lockeford St.
760
45
34,200.00
Cluff Av.
Pine St.
Mounce St.
714
35
24,990.00
Cluff Av.
Victor Rd.(HWY 12)
Mounce St.
613
45
27,585.00
_ _ _
Cluff Av. SUBTOTAL 163,680.00
Pine St.
Beckman Rd.
Kelly St.
669
46
30,774.00
Pine St.
Cherokee Ln.
Houston Ln.
694
39
27,066.00
Pine St.
Cluff Av.
Commerce St.
929
46
42,734.00
Pine St.
Guild Av.
Commerce St.
452
46
20,792.00
Pine St.
Houston Ln.
Hwy. 99
198
39
7,722.00
Pine St.
Hwy. 99 OC
Beckman Rd.
98
39
3,822.00
Pine St.
Kelly St.
Cluff Av.
743
46
34,178.00
_
Pine St. SUBTOTAL 167,088.00
E. Turner Rd.
Beckman Rd.
Cluff Av.
i 1,970.00
31
61,070.00
E. Turner Rd.
Cluff Av.
Beckman Rd.
1,970.00
31
61,070.00
E. Turner Rd.
Cluff Av.
Guild Av.
1,302.00
31
40,362.00
E. Turner Rd.
Guild Av.
Cluff Av.
1,300.00
31
40,300.00
E. Turner Rd. SUBTOTAL 202,802.00
_
W. Turner Rd.
Evergreen Dr..
Lower Sacramento Rd.
1,400.00
30
42,000.00
W. Turner Rd.
Golden Oak Dr.
Evergreen Dr.
580
30
17,400.00
W. Turner Rd.
W.I.D. Canal
Golden Oak Dr.
392
30
11,760.00
W. Turner Rd.
Bridgetowne Dr,
Westbridge Dr.
900
31
27,900.00
W. Turner Rd.
Westbridge Dr.
W.I.D. Canal
490
31
15,190.00
W. Turner Rd.
Woodhaven Wy.
Bridgetowne Dr,
990
31
30,690.00
W. Turner Rd. SUBTOTAL 144,940.00