HomeMy WebLinkAboutResolutions - No. 95-89 RESOLUTION NO. 95-89 A RESOLUTION OF THE LODI CITY COUNCIL A WARDING THE BID FOR THE PURCHASE OF 30,000 FEET OF #2A WG, AND 22,500 FEET OF 750KCMIL 15 KV PRIMARY UNDERGROUND CONDUCTOR WHEREAS, in answer to notice duly published in accordance with law and the order of this City Council sealed bids were received and publicly opened on June 28, 1995 at 11 :00 a.m. for the bid for 30,000 feet of #2A WG, and 22,500 feet of 750kcmil 15-kVPrimary Underground Conductor, described in the specifications therefore approved by the City Council on June 7, 1995; and WHEREAS, said bids have been compared, checked, and tabulated and a report thereof filed with the City Manager as shown on Exhibit A attached hereto and made a part hereof.: WHEREAS, the City Manager recommends award of the Bid for 30,000 feet of #2A WG, and 22,500 feet of 750kcmil 15kV Primary Underground Conductor, be made to the low bidder, :BICC Utility Cable Company of Huntington Beach, California and NOW, THEREFORE, BE IT RESOLVED by the Lodi City Council that the award of the Bid for 30,000 feet of #2A WG, and 22,500 feet of 750kcmil l 5kV Primary Underground Conductor be and the same is hereby awarded to BICC Utility Cable Company of Huntington Beach, CA, the low bidder, in the amount of $108,854.44. Dated: July 19, 1995 I hereby certify that Resolution No. 95-89 was passed and adopted by the City Council of the City of Lodi in a regular meeting held July 19, 1995, by the following vote: AYES: COUNCIL MEMBERS -Davenport, Pennino, Sieglock, Warner and Mann (Mayor) NOES: COUNCIL MEMBERS -None ABSENT: COUNCIL MEMBERS -None ABSTAIN: COUNCIL MEMBERS -None
FIRM PRICING·
30,000 ft #2A WG (Price oer 1,000 feet) TOTAL. DEL'D
7,500 fl 750kcmll Unjacketed (Price ner I 000 rcct)
22,500 ft 750kcmil Jacketed {Price PCr 1,000 feel) TOTAL. DEL'D
I GRAND TOTAL
I DEL'Y {Weeks ARO) TERMS
SUMMARY OF BIDS JUNE 28, 199 5
ISkV PRIMARY CONDUCTOR B-2616
Page I
BICC UTILITY I PIRELLI CABLE I ROME CABLE SOUTHWIRE
$895.00/M · $991.00/M' $9H.OSJM' No Bid
S28.930.88 Sl203M8 $19 8711.89
S3,241.00/M' Sl,805.00IM' S3,246.00/M' . NoBid
$),482.00/M' S-t, 179.00IM' $3,690.t)O/M' No Bid
582 .,,9.70 S98 292.2_, 585 871,36
S1111400.58 SIJ0,J26.l2 s11s,u2.2s
g 11 12 NET30 NETl0 NET JO
EXHIBIT A
WESCO NEHRING
S1,102.00/M' Sec Note I
$35622.15
S3,41 l.00/M" No Bid
SJ,950.CJO/M' No Bid
S91.407.02
s1211019,11
NET30
Note I: Nehring'5 bid of SI, 105.00 per 1,000 feet is considered non-responsi11e. Unit prices 1\-ere not extended, no tax or total total eosls were provided, and bid was not signed by an authorized representative of the company.
SUMMARY OF' BIDS
JUNE 28, 1995
ISkV PRIMARY CONDUCTOR B-2616Pagel
BICC UTILITY I PIRELLI CABLE I ROME CABLE SOUTH WIRE
PRICES SUBJECT TO CHANGE
30,000 ft #2A WG (Price oer 1,000 feel) TOTAL. DEL'D Lbs AL ner 1000 fed Lb, CU per 1000 feet
7,500 fl 750kcmll Unjackrted CPrii:e per I 000 feel)
22,500 fl 750kcmll Jacketed {Price per 1,000 feet) TOTALDEL'D
Lhs AL ncr 11100 fl Lbs CU �r 111110 ft
I GRAND TOTAL
Price Base AL Price Base CU
DEL'Y eeks ARO TERMS
$880.00/M'
S28.-146.00 � 133
SJ,156.00/M'
SJ,397.00/M'
$80 .f08.44 10.J 528
S1081854,_,_,
$.85583/lb. St.47nb.
8 NET30
S979.00/M'
Sll 6.f6,II
61.2 IJ0.4
S3 ,720.00/M'
S4,09S.OO/M'
s,6,z.n.69
699 . .S SI 1.4
5127.S!>J.87
S .BS/lb. SUS/lb
17 NET30
$924.08/M' $992.00/M'
$29,870.89 $32.066.40
61.2 62.3 IJ0.l uu
SJ,246.�/M' SJ,070.00/M'
SJ,690.00IM' SJ,562.00/M'
585,871.36 S82.3811.26
701.J 70.J 49.J.2 504.5
S 115,742.25 $11-1,.,4&.66
S.8559 S .8559
· Sl.459 S1.2793
12 4 #2);6(750
NET30 NET JO
WESCO NEHRING
Sl,102.00/M' Sec Nole I
$35.622.15 62.3 13.U
No Bid No Bid
No Bid No Bid
$ .8559 $1.2793
4
NET JO
Nole I: Nchring's bid or SI ,OS0.00 per 1,000 feet is collsidcrcd non-responsive. Unit prices were nol c:,<tcndcd, no sales tax or tolal costs were provided, and bid was not signed by ar1 au1harizcd represcnlalive of the compaay.