RESOLUTION NO. 2004-220
A RESOLUTION OF THE LODI CITY COUNCIL ESTABLISHING
AN AREA OF BENEFIT AND REIMBURSABLE COSTS FOR
KETTLEMAN LANE IMPROVEMENTS
WHEREAS, as part of the Kettleman Lane Gap Closure Project, the City is installing
public improvements that include widening the north side of Kettleman Lane between Lower
Sacramento Road and the Woodbridge Irrigation Canal (WID); and
WHEREAS, the City project includes the installation of street improvements (curb,
gutter, sidewalk and pavement) on the north side of Kettleman Lane that directly benefit the
properties located on the north side of Kettleman Lane between Tienda Drive and Lakeshore
Drive. The benefiting properties are shown on Exhibit A as the Area of Benefit; and
WHEREAS, pursuant to Lodi Municipal Code (LMC) §16.40.030, the costs of
improvements installed by the City that benefit adjacent properties and would be required of the
properties upon development are reimbursable to the City. The reimbursable costs for each of
the benefiting properties have been calculated based on the length of frontage of each parcel
and are shown on Exhibit B. First Church of the Nazarene, the owner of the property at 2223
West Kettleman Lane, entered into an agreement with the City on August 5, 1998. In part, the
agreement stated that the City would pay for the design and construction of the Kettleman Lane
frontage improvement in exchange for the right-of-way dedication on Kettleman Lane. Thus,
this parcel is not included. Other parcels along this segment are already developed and have
installed their frontage improvements as part of their development; and
WHEREAS, since the Kettleman Lane Improvement Project is not complete yet, the
reimbursable amounts shown on Exhibit B are maximum estimates only and will be adjusted
upon the completion and acceptance of the Kettleman Lane Improvement Project. Staff
requests permission to implement the necessary adjustments at completion of the project of the
amounts shown without further Council action. The reimbursement costs will be due at the time
of developrnent of the respective parcels. Pursuant to LMC §15.64.080, the reimbursable
amount will be adjusted annually to include an amount attributable to interest, which will be
based on the change in the Engineering News Record 20 Cities Construction Cost Index from
December 2003 to January 1St of the year of reimbursement; and
WHEREAS, in conformance with LMC 16.40, staff recommends that Council conduct a
public hearing to establish an area of benefit and reimbursable costs to recover the cost of
street improvements on the north side of Kettleman Lane fronting the benefiting properties.
NOW, THEREFORE, BE IT RESOLVED by the Lodi City Council that:
a) The City Council hereby establishes an area of benefit and reimbursable costs to
recover the cost for street improvements on the north side of Kettleman Lane
fronting the benefiting properties as shown on Exhibit A attached. The
reimbursable costs for each property are shown on Exhibit B attached and shall
be collected at the time of development for each parcel; and
b) Since the Kettleman Lane Improvement Project is not complete yet, the
reimbursable amounts shown on Exhibit B are maximum estimates only and will
be adjusted upon the completion and acceptance of the Kettleman Lane
Improvement Project. Staff is hereby authorized to implement the necessary
adjustments at completion of the project of the amounts shown without further
Council action. The reimbursement costs will be due at the time of development
of the respective parcels. Pursuant to LMC §15.64.080, the reimbursable
amounts will be adjusted annually to include an amount attributable to interest,
which will be based on the change in the Engineering News Record 20 Cities
Construction Cost Index from December 2003 to January 1st of the year of
reimbursement. The beginning ENR index will be 6581.
Dated: October 20, 2004
I hereby certify that Resolution No. 2004-220 was passed and adopted by the Lodi City
Council in a regular meeting held October 20, 2004, by the following vote:
AYES: COUNCIL MEMBERS — Beckman, Hitchcock, Howard, Land, and
Mayor Hansen
NOES: COUNCIL MEMBERS — None
ABSENT: COUNCIL MEMBERS — None
ABSTAIN: COUNCIL MEMBERS — None
Susan; J. Blacksty,
City Clerk
2004-220
I
EXHIBIT A
KETTLEMAN LANE
AREA OF BENEFIT
7
su
1
1
A,0
3
-Fp
ppru
16
0031
'IH
5
e
S
111
U
A
Kau
rira-4
r.
z
pleu is
d
u7 i'AOU
•
H
s
c
Cam
Mh'
mem
ram
IAMB
e IIin iii
MEM
1111111
arstbli
u..urn it
.10 ne f }eyo
la91aP1eE-I
NO SCALE
1
"+"'\
Yr wAyAvATAT
Waif/
kyArAyAr MI:67.11
r
illsbridg
WA=
titlf01
AU. 11
Elm!
'AKIO
Vintage
2223 '
•First Church'
'of Nazarene°
•Ja epue
J
z
ca.
Frontage Improvements from 34 feet out from the right-of-way only
1723 W Kettleman
George Nakamura
031-040-42
100 0 0- 0 0 co A N
t;O O 0 N N A
f. N a C) (N N N 7
(00 V n 6- C0 (00 O030) 0i CV O
0 a O) N 0) N
(A 49 69 (A (A 69 (A W fA
0 0 CO C) CO 0) O CO
Q M N N A N 0) O W
O 3- O
N
N 0 0
(0 Occi
G V)
30
0' 0) 00)
0) N N
0)
69 H 69
A
10
CO
n
(0
99
1811 W Kettleman
John Bezug
031-040-40
r C) ` COCOCOCO0 CO 0 0 A 0 N
0 1 O 0 l0 C)
H O) 0) (C (O CO Ni O1(j 0
N N C) 000 61 CA
CO N CO 0 0 r O 0
'O A V N N N
(A (A 69 (A 69 69 (A (A 69
g 0 0) 0 0 } 0 N 00 O
co' O o O C
0 N 0
N A
C)
N In N
0
R 0) AV
N N—
39 69 (A
9.
0)
COA
<MO
69
1833 W Kettleman
Mary Tsutoaka
031-040-20 I
aO 0 A 0 0 A N A 0
0 N N 0 CO CO A 01 d
1- N N C0 C C) N 0 N 0
O C) O 0 0 C) 0) N
7 0 C N C) co CO CO N
r (V W 0) 01 70
3-N
�T+ (A 69 69 69 69 69 (9 (A (A
Ali 0 N 0) . N N ( CO N0 (NOS 6-
O C) .-O
0) NI (0
30
Cl N
0) 00
0) c)
0) O C)
O N N
EA EA 69
N
CO
0
W
CO
h
N
M
2100 Tienda
Church of God 7th Day
of Lodi
027-410-22
aN N 0 OND 0 64 (O 8
f.. < 4 4) ( C) c0 A 0 co
N O W CO (O 0 0- 00))
N (7(O < CD A
.-- .- .- s-
co oo 69 w d! H M (9 69
0V 00) ? 0 0 N M W N
O N N G
0)
V N ((2
N CO 0
0. (9 CO16.
(7 W O
m
39 (A 63
M
(Y
N
(O
A
co,
2111 W Kettleman
John Giannoni
027-410-21
N064040064000
C 0) 0) A 0 0 A O C)
1... 0 N N 000 N O co A N
0004046404004. -CO
h W C) (O . 0) 0)
e9 co (A 69 69 69 (9 69 69
6- 136 O CO 0 A N 0 3-
Q N O M .- O
00 0
.- O
0 M O
CO 0 W_
C) 0)
(•)
69 69 (A
O
0)
(0(1
c0
8
N
2115 W Kettleman
Brittany LLC
027-410-20
3 n N. CO 0 CO o n 9. (co
0
~ CO0CON(O 003 0 VA 64 N N
1.0 01 0) CO 0 N 0 V 3-
30 0 (O A M M
69 69 69 f9 69 (9 49 69 (9
T CO CO 4- cO 0 4- CO 0) O
Q N 9- C) .- N r 0-
O 0) O
9 rn
M m V
0 CO 0
(O 0) .-
ro
(9 69 69
6-
66)
V
E
9.
w
2241 W Kettleman
SJCOE School
027-410-15
DI O O O 0 C) 0) 0
G (O 0 O 0 0 N 0 o
I"' 13- C0) 64 M 1(( 04 COOCO 0
E. 0 (0 O) N 0 0
69 W 69 (9 (A 99 8 fag (OO (A (A
Q N V, N N f0 '
N O 00 ? 0
0 A 0)
0 0 0
0 V N
4 8 N
69 69 (9
0
0
O
N
V9
(0•) N 9- 0 A 0 0 0 0
O V O) O) 0 0 C) O
01 000 0 0 0 00 0 004 N 0
O O O 0 N 0 N A 0) O
I- 0 0 C 0 •— c0 CO
69 69 w (0 69 69 69 (9 v>
$ 339,938.75
(0 0
0)C)
00 N
0) 0
(0 r
w (9
0 0 0 0 0 0 0 0 0 0 C 0
O 0 0 0 0 0 0 0 0 0 O 8
1N O C) N O Cl O N O
d N 309 V N.- 0 000 9..0 0)
M y' E 'C C
c
71 Q ()
W QQ QQ
f W J E • in
F
0
5 r N N 00 COON N U
{.) co co N r °0
0
0)
00
y NC _
m y m n n
o U� Lm a E o
tT50) 0) O d 0)
o 7,5
0) y
x
K C O p 0� c b c O .O O
Q (g U LD
_ .. 0 ❑ E rn m
t 2 o E E co
ami o m a .. c o o rn x
E
r
'-040406400.00
$ 390,929.588
Total Reimbursable Costs
C)
E
0)
O
0
0
W
0
0)
0.
0
0
0
0
(7
0)
E
to
{gyp
8
to
0)
DI
O
0
a
(0
E
w
(2) Prorated based on length of parcel frontage on Kettleman Lane.