HomeMy WebLinkAboutAgenda Report - June 6, 2018 C-03TM
CITY OF LODI
COUNCIL COMMUNICATION
AGENDA ITEM
C-3
AGENDA TITLE: Approve Specifications and Authorize Advertisement for Bids for 2018 Pavement
Resurfacing Project
MEETING DATE: June 6, 2018
PREPARED BY: Public Works Director
RECOMMENDED ACTION: Approve specifications and authorize advertisement for bids for
2018 Pavement Resurfacing Project.
BACKGROUND INFORMATION: This project includes the application of approximately 85,000 square
yards of rubberized asphalt cape seal and 6,200 square yards of
fiberized slurry seal. The project limits will include Church Street (from
Lodi Avenue to Kettleman Lane), Hutchins Street (from Kettleman Lane to Harney Lane), Industrial Way
(from Beckman Road to Guild Avenue), and Cluff Avenue (from Industrial Way to Vine Street), as shown on
Exhibit A.
The rubberized asphalt cape seal is a combination of a rubberized chip seal on the bottom with a
fiberized slurry seal (slurry seal with strands of glass fiber added) on top. The fiberized slurry seal will
also be applied by itself on a portion of Industrial Way. The rubberized cape seal will be applied to streets
with more surface defects, while fiberized slurry seal will be applied only to a street with fewer surface
defects.
While the asphalt overlay is superior in ride quality, these pavement rehabilitation alternatives are
expected to extend the life of deteriorated roads by around one-half of that of an overlay, at approximately
one-third of the cost.
The specifications are on file in the Public Works Department. The project will not be advertised until the
appropriate Caltrans authorizations are received. The planned bid opening date is July 11, 2018. The
contract estimate is $1,350,000. Project award is anticipated to be August 1, 2018.
FISCAL IMPACT: By investing in the recommended maintenance project, significant capital
dollars will be saved by extending the useful life of the pavement and
foregoing more costly pavement reconstruction
FUNDING AVAILABLE: Funding will be identified at project award. A portion of the project funding
will come from the new Road Repair and Accountability Act of 2017 (Senate
Bill 1) gas tax proceeds.
Prepared by Sean Nathan, Senior Civil Engineer
CES/SN/tdb
Attachment
cc: Utility Manager
CoO
Charles E. Swimley, .fr.
Public Works Director
APPROVED:
Sten Sch
, City Manager
K:\WP\PROJECTS\STREETS\2018 Pavement Resurfacing\CSA doc 5/16/2018
EXHIBIT A
2018 PAVEMENT RESURFACING PROJECT
PROJECT LOCATION MAP
Legend
Cape Seal
Slurry Seal
s
0 0.25 0.5
Miles
1M®®®®ffl ..rKvn,,! mow_ �,�,e,_ ��
■, :Ili ve.
�- �. 1.0 Moil
u■uuul "1uu111' LOdI ■— -
!1l�■■11.1 nota 11' ■ . , Ill;lll11g; IiIIGii11: 111111111;1 luuuulu
111111 1= ! -1ii _III \_-- - -==_
"�� IIII , °111!!111: 111!11111= =1!111111!: 1:111111111 1
_– Illliiiii:il iJlllllilll :Ilililliil ;�`_--- -�
■III.1111111111.■II
=� ■III' 11!14..:_ IIII'1_
■III 1 Idllli= uiilllli.11111i!Iii
+-' ■! ■III II!II!1111' "1111!1= _1!1!11111 IIIIIIIi: - y
1: 1 :1111111111: 11111111= �IIIIIIii Iiii1illllli
II IIII III ��1■-iiiiiil�l r�iinn•
®°a J1111 -III
p :11,1 `� -uWlr p11� I III;IIII■
mow= �■� r1:1:11111111filill
1111.:11111111=X1111111111'mu11L11111111
111 r.0-
111111=1;llI 11111
II
11111111= =111 / 11.11 E
- l� :IIIIIII� =111111.■ i.II1n. = �
•111 Vine St.11111111.111111114:"
111111 I 1111111111111111. 1 /y�
®•- !••... I
�. 1111111111 111111111 1dd—
® _ _:.-_'I 1111111111111111111.
uuuuu=
_
low
-. II I ®_
III
11■
■
.ril..
IF
1111 ■
.1111
1111.1111!
11111111111111,,►
1111111111111111■
111111111111111..
M.1 11111111
Ile 111111
1.111■11
111111IlIlIl1
111111lIlIlIlIll
111111111111111111
111111 lllllll 11111
111111IlIlIl 11111
11111111111111111
11111111111111111
11111111111111111
111111111111111111
111111111111111
:,1111111.■II
:111,,1.,,,,
:111,,
,
Oar
\.1
P.l
�.1
/.1
aiiiiiiil
111111111111.
1111111111
4=
..0
:11
uuuuu
llllll11..
11111111E
■11111.
11�■ : v)
iii 1 c
= tl
`'IIIMMI v
v
.I m� III Q
qui i
`III
1111111 -:`nn•11�III
i
ow j,�11..III
.,,..4..1111
�. lllll inI =iii
O lllllllll_
1111.1ll•=111
Ra .41:1 :III ��11
=;,1: =III
- - :1111111 =III .-�
1 _ 1 1 MN
•
iii MIN
=1111=
211111E-
sou
111.1111E
11111111 =
111:11' _
•
=11111r
1. IIII
■1111=
w111=
Kettleman.Ln.
11.111111..............•.....
..1111.1.. 1IF
X111111111.
• .1.1.1.1.1
•
111
OT
1
■1I
IIIIILIIIIIIII
• /.11111111.11\111111/
u►� 111111 -
11111111lllll11 ulWu� 111111 =
11111Century,Blyd
v1111
111111111111
111111111111
111111111111
111111111111
.1111111
.1
111111111111111
M111111111111
_ 11111 111111111
1_11
L11111111
►.111
111111
11.11.
■_
1111110111
►.111
:111:
IHarney Ln. ii4—
:1111111
Industrialdustrial Wy
vine,St-
v
■
1
1
1
1
•
WIUH I 11 II