AGENDA TITLE: Approve Plans and Specifications and Authorize Advertisement for Bids for Cluff
Avenue Sewer Lift Station Improvements
MEETING DATE: May 2, 2018
PREPARED BY: Public Works Director
RECOMMENDED ACTION:
BACKGROUND INFORMATION:
Approve plans and specifications and authorize advertisement for
bids for Cluff Avenue Sewer Lift Station Improvements.
The ductile iron discharge pipe for the Cluff Avenue Sewer Lift
Station, located at 515 North Cluff Avenue, is severely corroded and
in imminent danger of failing.
This project will replace 72 feet of ductile iron pipe with new PVC piping that is designed to be extremely
resistant to corroding. This project will also replace the air pressure release valve and assembly, replace
the pump discharge manifold, remove an unused existing 10 -inch force main from Cluff Avenue right-of-
way, provide a bypass pumping plan to facilitate improvements, and other incidental work, all as shown
on the plans and specifications for the above project.
The specifications are on file in the Public Works Department. The planned bid opening date is May 23,
2018. The project estimate is $50,000.
FISCAL IMPACT:
The project will have a minimal impact on total maintenance costs but
enhance the reliability of the sewer lift station by the upgraded discharge
infrastructure.
FUNDING AVAILABLE: Funding will be identified at project award.
cu9_32.c2
Charles E. Swimley, Jr.
Public Works Director
Prepared by Jimi Billigmeier, Associate Civil Engineer
CES/JB/tdb
cc: City Engineer/Deputy Public Works Director
Utilities Superintendent
APPROVED:
yep e abauer, City Manager
K:\WP\PROJECTS\SEWER\Cluff Avenue Sewer Lift Station\CPSA,doc 4/11/2018