Loading...
HomeMy WebLinkAboutAgenda Report - May 2, 2018 C-04TM CITY OF LODI COUNCIL COMMUNICATION AGENDA ITEM C-4 AGENDA TITLE: Approve Plans and Specifications and Authorize Advertisement for Bids for Blakely Park — North Pool Improvements MEETING DATE: May 2, 2018 PREPARED BY: Public Works Director RECOMMENDED ACTION: BACKGROUND INFORMATION: Approve plans specifications and authorize advertisement for bids for Blakely Park — North Pool Improvements. This project consists of removing the existing concrete deck and plaster/fiberglass pool finish and installing a new white plaster finish and concrete decking, along with other miscellaneous improvements. The north pool was originally constructed in 1987. The existing plaster/fiberglass pool finish was installed in 2001 with an expected 10 to 12 year life span. The plaster is currently blistering and breaking away from the pool shell. The pool decking received a polymer concrete overlay in 2006 or 2007. The polymer has been failing over the past few years and the old deck cracks are coming through the polymer surface. In some cases portions of the polymer surface have broken off causing immediate safety concerns. This project also includes the replacement of the existing starting block platforms along with new backstroke stations, pool deck tile markers, and two new main drains to meet the current public swimming pool code requirements. The plans and specifications are on file in the Public Works Department. The planned bid opening date is May 23, 2018. The project estimate is $150,000. FISCAL IMPACT: The project will have a minimal impact on annual maintenance costs, and will reduce the City's exposure to claims related to the condition of pool decking. This project will not impact the General Fund. FUNDING AVAILABLE: The City will be using Community Development Block Grant funds. Specific account information will be identified at project award. Charles E. Swimley, Jr. Public Works Director Prepared by Sean Nathan, Senior Civil Engineer CES/SN/tdb Attachment cc: CDBG Program Specialist Parks Director APPROVED: Stephen abauer, City Manager K:\WP\PROJECTS\PARKS\Blakely Park\2018 Pool Resurfacing\CPSA.doc 4/11/2018 Exhibit A .40 1