HomeMy WebLinkAboutAgenda Report - March 7, 2018 B-01 SMTM CITY OF LODI COUNCIL COMMUNICATION AGENDA ITEM 8-( AGENDA TITLE: Adopt Resolution Rejecting All Bids, Approving Plans and Specifications, and Authorizing Re -Advertisement for Bids for White Slough Water Pollution Control Facility Storage Expansion and Surface, Agricultural, and Groundwater Improvements Project MEETING DATE: March 7, 2018 (Special Meeting) PREPARED BY: Public Works Director RECOMMENDED ACTION: Adopt resolution rejecting all bids, approving plans and specifications, and authorizing re -advertisement for bids for White Slough Water Pollution Control Facility Storage Expansion and Surface, Agricultural, and Groundwater Improvements Project. BACKGROUND INFORMATION: Council approved the plans and specifications and authorized advertisement for bids on January 17, 2018. This project includes a 300 acre-foot capacity storage pond, pipelines, pump station, a flow monitoring/control structure, modifications to existing structures, electrical/instrumentation improvements, and associated work as described in the project plans and specifications. This project had a mandatory pre-bid meeting that was attended by 19 contractors. The City received the following four bids on March 1, 2018: Bidder Engineers Estimate CNI Conco West, Inc. Ford Construction AM Stephens Const. Co. Steve P. Rados, Inc. Location Manteca Lodi Lodi Santa Ana Base Bid $3,751,950 $3,367,500 $3,631,890 $3,748,985 $4,092,000 Alternate Bid $150,000 $106,700 $145,000 $130,400 $140,000 Total Bid $3,901,950 $3,474,200 $3,776,890 $3,879,385 $4,232,000 CNI Conco West's Receipt of Addendum No. 2 was not located at the time their bid was publically opened and read. City of Lodi Staff opening the bids was unable to locate the Receipt of Addendum No. 2 and requested the assistance of the representative for CNI Conco West to locate the receipt. CNI Conco West's representative was also unsuccessful. At that time, CNI Conco West was deemed non- responsive for not including Receipt of Addendum No. 2 with their bid and the next lowest bidder, Ford Construction, of Lodi, was deemed the apparent lowest responsive bidder. Approximately one hour after the public bid opening, the Receipt of Addendum No. 2 for CNI Conco West was located with their submitted bid, sandwiched between two pieces of paper. It is unknown how both City Staff and the CNI Conco West representative missed the Receipt of Addendum No. 2 during the bid opening. Staff recommends rejecting all bids, approving plans and specifications, and authorizing re -advertisement for bids for White Slough Water Pollution Control Facility Storage Expansion and Surface, Agricultural, and Groundwater Improvements Project. The specifications are on file in the Public Works Department. The planned re -bid opening date is March 29, 2018. The estimate remains at $3,700,000. APPROVED: Stephen Schwabauer, ity Manager K:\WP\PROJECTS\SEWER\WSWPCF\WSWPCF Storage Expansion\CSA — Reject-Rebid.doc 3/1/2018 Adopt Resolution Rejecting All Bids, Approving Plans and Specifications, and Authorizing Re -Advertisement for Bids for White Slough Water Pollution Control Facility Storage Expansion and Surface, Agricultural, and Groundwater Improvements Project March 7, 2018 Page 2 FISCAL IMPACT: The cost for this work is programmed in the Fiscal Year 2017/18 budget. The City's cost share is 25 percent and the remaining 75 percent will be reimbursed through the Proposition 84 Grant. FUNDING AVAILABLE: Funding will be identified at project award. Charles E. Swimley, .7r. Public Works Director Prepared by Gary Wiman, Construction Project Manager CES/GW/tdb K:\WP\PROJECTS\SEWER\WSWPCF\WSWPCF Storage Expansion\CSA— Reject-Rebid.doc 3/1/2018 RESOLUTION NO. 2018-36 A RESOLUTION OF THE LODI CITY COUNCIL REJECTING ALL BIDS; APPROVING PLANS AND SPECIFICATIONS; AND AUTHORIZING RE -ADVERTISEMENT FOR BIDS FOR WHITE SLOUGH WATER POLLUTION CONTROL FACILITY STORAGE EXPANSION AND SURFACE, AGRICULTURAL, AND GROUNDWATER IMPROVEMENTS PROJECT WHEREAS, Council approved the plans and specifications and authorized advertisement for bids for the White Slough Water Pollution Control Facility Storage Expansion and Surface, Agricultural, and Groundwater Improvements Project on January 17, 2018; and WHEREAS, the project includes a 300 -acre-foot capacity storage pond, pipelines, pump station, a flow monitoring/control structure, modifications to existing structures, electrical/instrumentation improvements, and associated work as described in the project plans and specifications; and WHEREAS, this project had a mandatory pre-bid meeting that was attended by 19 contractors. The City received the following four bids on March 1, 2018: Bidder Base Bid Alternate Bid Total Bid CNI Conco West, Inc. $3,367,500 $106,700 $3,474,200 Ford Construction $3,631,890 $145,000 $3,776,890 AM Stephens Const. Co. $3,748,985 $130,400 $3,879,385 Steve P. Rados, Inc. $4,092,000 $140,000 $4,232,000 WHEREAS, Receipt of Addendum No. 2 from CNI Conco West, of Manteca, was not located at the time their bid was publicly opened and read. City of Lodi staff opening the bids was unable to locate the Receipt of Addendum No. 2 and requested the assistance of the representative for CNI Conco West to locate the receipt. CNI Conco West's representative was also unsuccessful. At that time, CNI Conco West was deemed non-responsive for not including Receipt of Addendum No. 2 with their bid and the next lowest bidder, Ford Construction, of Lodi, was deemed the apparent lowest responsive bidder. Approximately one hour after the public bid opening, the Receipt of Addendum No. 2 for CNI Conco West was located with their submitted bid, sandwiched between two pieces of paper. It is unknown how both City staff and the CNI Conco West representative missed the Receipt of Addendum No. 2 during the bid opening; and WHEREAS, staff recommends rejecting all bids, approving plans and specifications, and authorizing re -advertisement for bids for White Slough Water Pollution Control Facility Storage Expansion and Surface, Agricultural, and Groundwater Improvements Project. NOW, THEREFORE, BE IT RESOLVED that the Lodi City Council does hereby reject all bids; approve plans and specifications; and authorize re -advertisement for bids for White Slough Water Pollution Control Facility Storage Expansion and Surface, Agricultural, and Groundwater Improvements Project. Dated: March 7, 2018 I hereby certify that Resolution No. 2018-36 was passed and adopted by the City Council of the City of Lodi in a special meeting held March 7, 2018, by the following vote: AYES: COUNCIL MEMBERS — Chandler, Mounce, and Mayor Nakanishi NOES: COUNCIL MEMBERS — Johnson ABSENT: COUNCIL MEMBERS — Kuehne ABSTAIN: COUNCIL MEMBERS — None NNIFEFERRAIOLO City Clerk 2018-36