Loading...
HomeMy WebLinkAboutAgenda Report - February 21, 2018 C-05TM CITY OF LODI COUNCIL COMMUNICATION AGENDA ITEM C -5 AGENDA TITLE: Approve Plans and Specifications and Authorize Advertisement for Bids for Henry Glaves Playground Improvements MEETING DATE: February 21, 2018 PREPARED BY: Public Works Director RECOMMENDED ACTION: Approve plans and specifications and authorize advertisement for bids for Henry Glaves Playground Improvements. BACKGROUND INFORMATION: This project includes replacing playground surfacing material, removing existing playground equipment, installing new City - supplied playground equipment, and installing an Americans with Disabilities Act (ADA) -accessible concrete ramp. The playground equipment at Henry Glaves Park is approximately 24 years old and in need of replacement. Many of its original features have been removed because of safety hazards. The City Council approved using available Parks Capital funds for this project on June 21, 2017 and authorized purchase of playground equipment for Henry Glaves Park on January 17, 2018. The work consists of removing the existing playground equipment, concrete footings, non -woven fabric, and engineered wood fiber; salvaging approximately 100 yards of existing engineered wood fiber safety surfacing; assembling and installing a new playground equipment structure provided by the City of Lodi; installing new non -woven fabric, new and salvaged engineered wood fiber, and an ADA -accessible concrete access ramp; and providing a third -party playground inspection, and other incidental and related work, all as shown on the plans and specifications for the project. The new playground must comply with ADA and Consumer Product Safety Commission guidelines, American Society for Testing and Materials standards, and certification from a State -required, third -party testing organization for playground surfaces and equipment. The plans and specifications are on file in the Public Works Department. The planned bid opening date is March 14, 2018. The project estimate is $78,000.00. FISCAL IMPACT: The project will have a minimal impact on annual maintenance costs, and will reduce the City's exposure to claims related to the condition of playground surfaces. This project will not impact the General Fund. FUNDING AVAILABLE: Parks Capital (43299000.77020). Prepared by Jimi Billigmeier, Associate Civil Engineer CES/JB/tdb cc: PRCS Director APPROVED: Charles E. Swimley_ Jr. Public Works Director tephen STwabauer, City Manager K:\WP\PROJECTS\PARKS\Henry Glaves Park\Playground Improvements\CPSA.doc 2/5/2018