Loading...
HomeMy WebLinkAboutAgenda Report - December 20, 2017 C-08CITY OF LODI COUNCIL COMMUNICATION AGENDA ITEM Co " TM AGENDA TITLE: Accept Improvements Under Contract for 2017 Extruded Traffic Stripes MEETING DATE: December 20, 2017 PREPARED BY: Public Works Director RECOMMENDED ACTION: Accept improvements under contract for 2017 Extruded Traffic Stripes. BACKGROUND INFORMATION: Since 2009, the City has been using extruded thermoplastic traffic stripes rather than sprayed thermoplastic. The extruded thermoplastic material is a superior product because it lasts much longer. This project consisted of placing approximately 28.3 miles of extruded thermoplastic traffic stripes. The streets included in this project were portions of Cherokee Lane, Turner Road, Lower Sacramento Road, Century Boulevard, and Elm Street. Additionally, this project striped new bike lanes on a portion of Stockton Street (Lodi Avenue to Lockeford Street). The locations are shown on Exhibit A. The contract was awarded to Sierra Traffic Markings, Inc., of Roseville, in the amount of $109,052, on August 2, 2017. The contract has been completed in substantial conformance with the plans and specifications approved by City Council. The original contract completion date was October 11, 2017 and the actual contract completion date was November 18, 2017. The final cost of the project was $111,233. The difference between the original contract amount and final contract amount (and the delayed completion date) was due to the City requesting some minor striping modifications on Reynolds Ranch Parkway which was outside of the original scope of work. Photos of the completed work are shown in Exhibit B. Following acceptance by the City Council, as required by law, the City Engineer will file a Notice of Completion with the County Recorder's office. The notice serves to notify vendors and subcontractors that the project is complete and begins their 30 -day period to file a stop notice requiring the City to withhold payments from the prime contractor in the event of a payment dispute. FISCAL IMPACT: This project will extend the useful life of the lane lines which will reduce overall maintenance costs. FUNDING AVAILABLE: This project was funded by Fiscal Year 2017/18 Measure K (30399000.77020) and Bike/Ped (33199000.77020). Prepared by Sean Nathan, Senior Civil Engineer CES/SN/tdb Attachments cc: Utility Superintendent C)-QcQQ Charles E. Swimley, Jr. Public Works Director APPROVED: teen hwnia.auer, City Manager K:\WP\PROJECTS\STREETS\2017 Extruded Traffic Stripes\CAccept.doc 12/6/2017 1111111111 .2 :1111111 ; I11111111 lllll I/ ;:'Frill lll1, '1 llllllllll 1...;1:1 ::::..11111 an Mal 111111111111 u uunm EXHIBIT A 2017 Extruded Traffic Stripe Locations II111111111111_ l..m 111111..1........1Iul nra 1� 1\• ! -- 111111 ....= //4�� _ 1..- - -: -mnm•l n•l• 11!:::11: Gtr ,/11" ilii'::::.1111111 111.' X11111111111111111 :111: S ""►.� � -_ i1111unnnn111 IIIIn,11111111111111-111. d ®♦'Y♦: -� 1..1 ;r. I,dl!S? :11!1111: �'1-_ ::;;E:11: ITIE1'i/J/E 1,"?':nll_' -'1!1111'� 111iSllii: 11111111 `II .,I- _'. !111111111■Ilm _:... %,.;;;f,.711_ ■ :un■: ■III iiiiiiiiI 1.in. _ '\ -° -- nIU■all 9111111111111-•111111 1111�I Y� = Il!cll�llnn1=:Ilulnl•=,= :11111.1 _1� 11111.11111 11a i1�� "�%11m1..�:1111mm111•Gi111: nm m....IIIIIIIIIG 11 '911!! 1!11111! 211:1� St.®®11111®ililillim:: ■.1111! 1111111 1�� ■�®®®-=1�=®:Illlli i111�■; ll� ■15 E'lll!II!'_ ...... y uu ®®®®®® ®11■I IIIII 1111! 11■ Lp n ■II : Pir a St. • IIIII I 111111 !:1111 €n is 11= ;r,= ii, __ m nn r -: 111111!1119 1 .. -2 iiiii 'I 11 MMMM� 1 Ih11IiIIi ill ':1911■511111!1!1: IIIII 111E IIIII, I�.i,�G': =1111111:::111iILi of =_ ■�+ rIII1I1 1111: 111Qiiiiila ®®® ..1 1• ml 1! .n- ■ ®®®®� mu 11■�' 11■11111a1:11- 11 ■ mut i� .,1i: l � 1nlnlm;; Ian;:111: 1 Erjle lli'I ii®�I,�� �� 1::1111 I._ I■� iicm:nm ..... J 111 i id11111111 :11111. ■ ®�nm II11 rolic��!!. ®®J=II t�®11.9 c®__11111111111 'Kettleman Ln. 1 • 1® Lys s' li�iiill ' 1. 0 B lllli�llll, = �: 4 marl..m1.I1 Ir 111 dil $1111021110 '1t 1 I • II 111a�1, .. aim mrlEat g -HWY-12 • 1 II■ A :err c♦.. _l 1 nnn10� ow. 1lmmmmq IESE c_F Z` Li 11 11 0 Lockeford u.11:: St 111/11111 6'::11111111 1'111: 111:= 1� ininlr: m Y iillllllIIIII :1111111 11511111 .1. Ie'-! !R1111 1 11 NOR • .11 .111 .a1 •111 414. LLLLJ i9..... ■ 1111• ■1111- 111 11111 IIIII El EE .2,411 IIP-: gC blIH 111111 -®s1Q }}Illllllll'Vie St Toy iii 6,Ly 11111111111 1/31311* .111111111111111111111111111111 0m 1 .7 ■ -11111 1: W nm\ 1 11 111 1 1II INLE• '.1 11111111111111.. 111111111111111.. 11.`,11111111 :ilii■11 111111:111: ii:lr::a 191!!:1::: 11.11:1111! 11i11111: 11111112 - 111111 = :11111111- :11111:11. 11111111= W111111111 1119:::1= 1:11110 21111:1E :1111111= '!'III:','• _n� 1� 1111111- _1:111111: :11:111111 6!1111!:11 1111111111 ;11ren1, 1111.11111 am11n11 1111!1111:1 11!111111a :1,:1:11::1 !711:1:19: 11111::11: -111:1 ann111 111111111 11111 elinnn :1111111111 1111111? 1111111111111111 111111111111111111 111111111111111 • 1111111 1111,,,. •,,•111111111: i 1111111: lllllllll 1111 `%';11111111mIIIIIIIIH gip=N11111101 1 : 1111m /✓..111111111 Century Blvd. 1 llllll 11 llllllll ;1111111 111.= Ei 11 11® 1 _11: 11111111= 1111111/ 111111- A . ;1111111: .11.11111 p11111!1111111111r 1111111111111111: 1111111111 nnn 1111111111 nnnnn 1.11 H Legend Restriping New Bike Lane Additional Striping (Outside of Scope) Harney Ln. 10. c J • EMI Valle 11111117 nnnn: :nnnm= 11111E 6111 m 2111215 idlll. ni•n1. II 11111 !HMI._ amira 111 EIDE :IIIIIIII- .-1nnn1�1 MI -"'1111_ =111m: 11 Lodi Ave. Pine_ a -St 1liiiinnl yMI4 Wit, ,.1111111111111, 1111111111111111: ,,111111111 11 111111111111 111111111111111 ,111111111111 11111 ■' i010 w 2 a1 0 .................... 111111111111111 :,.11111111111 111 .111 HINNI :1,1111! I.E1 PIM ■■■■ c N W uL MI 0 0.25 0.5 1 Miles \\CVCFILV02\PubWks$\WP\PROJECTS\STREETS\2017 Extruded Traffic Stripes\Thermo-Exhibit-A.mxd Exhibit B Cherokee Lane at Elm Street Looking North Century Boulevard at Tokay High School Looking West Turner Road East of 99 Looking East