Loading...
HomeMy WebLinkAboutAgenda Report - December 6, 2017 C-07TM CITY OF LODI COUNCIL COMMUNICATION AGENDA ITEM C -7 AGENDA TITLE: Adopt Resolution Authorizing City Manager to Execute Change Order No. 2 to the 2017-2019 Sidewalk and Miscellaneous Concrete Repair Program Contract with Popuch Concrete Contracting, Inc., of Lodi ($88,000), and Appropriating Funds ($88,000) MEETING DATE: December 6, 2017 PREPARED BY: Public Works Director RECOMMENDED ACTION: Adopt resolution authorizing City Manager to execute Change Order No. 2 to the 2017-2019 Sidewalk and Miscellaneous Concrete Repair Program contract with Popuch Concrete Contracting, Inc., of Lodi, in the amount of $88,000, and appropriating funds in the amount of $88,000. BACKGROUND INFORMATION: This project provides the City with unit prices for removing and/or constructing curb, gutter, sidewalk, and curb ramps in various locations throughout the city. This two-year contract allows the City to repair damaged concrete sidewalk, construct curb ramps, remove potential tripping hazards, repair curb and gutter, and repair miscellaneous concrete as needed during Fiscal Years 2017/18 and 2018/19. The contract was bid in May 2017 and awarded by City Council on June 7, 2017 to the lowest bidder, Popuch Concrete Contracting, Inc., in the amount of $203,232. At project award, $200,000 was tentatively budgeted over Fiscal Year 2017/18 and Fiscal Year 2018/19 ($100,000 per year). The budget includes a combination of Measure K and Transportation Development Act (TDA) Bike/Pedestrian funds. The contract also allows for additional funds to be added if they become available. Staff has executed Change Order No. 1, in the amount of $55,649, in order to accommodate miscellaneous concrete work requested by other departments within the City. To date, the City has spent $149,123 of the $155,649 available for Fiscal Year 2017/18, including Change Order No. 1. Work associated with Change Order No. 1 was paid for out of operating accounts for the Parks, Recreation, and Cultural Services Department, Water Division, Wastewater Division, Transit Division, and Building Repairs. If proposed Change Order No. 2 is not approved, sidewalk replacement work performed between now and the end of Fiscal Year 2017/18 will be minimal due to the current remaining balance in the budget ($155,649 - $149,123 = $6,526 remaining balance). Additional Measure K and TDA Bike/Pedestrian funds have become available for use on this project. Staff recommends adding a total of $88,000 to the contract for Fiscal Year 2017/18. The additional funds will allow for more removal and replacement of potential tripping hazards and/or concrete improvements that remove barriers to access. APPROVED: S wabauer, Cs anager K:\WP\PROJECTS\STREETS\2017_19 Sidewalk and Concrete Repair\Change Orders\CC-Change-Orders.doc 11/27/2017 Adopt Resolution Authorizing City Manager to Execute Change Order No. 2 to the 2017-2019 Sidewalk and Miscellaneous Concrete Repair Program Contract with Popuch Concrete Contracting, Inc , of Lodi ($88,000), and Appropriating Funds ($88,000) December 6, 2017 Page 2 Contract Summary: $203,232 Original Contract Amount for Fiscal Years 2017/18 and 2018/19 $ 55,649 Change Order No. 1 (paid by operating funds from other departments) $ 88,000 Change Order No. 2 (proposed) $346,881 New Contract Amount over Fiscal Years 2017/18 and 2018/19 Budget Summary Fiscal Year 2017/18 only: $100,000 Amount Budgeted for Fiscal Year 2017/18 $ 55,649 Change Order No. 1 (paid by operating funds from other departments) $155,649 Current Budget Amount $ 88,000 Proposed Change Order No. 2 (Additional Appropriation Request) $243,649 Proposed Budget Amount Fiscal Year 2017/18 FISCAL IMPACT: Budget amounts were approved in the Fiscal Year 2017/18 budget. Money spent from this proposed Change Order No. 2 will reduce the risk of liability associated with the tripping hazards and/or non-compliant concrete improvements. If this change order is not executed, all unused Measure K and TDA funds will go back into their respective accounts for future use. This project does not impact the General Fund. FUNDING AVAILABLE: This change order will be funded by Measure K (303) and TDA/Bike Ped (331). Appropriation Request: Measure K (30399000.77020) $50,000 TDA/Bike Ped (33199000.77020) $38,000 TOTAL: $88,000 a47,„,_) Andrew Keys Deputy City Manager/Internal Services Director Charles E. Swimley, Jr. Public Works Director Prepared by Jimi Billigmeier, Associate Civil Engineer CES/JB/tdb Attachment cc: Deputy Public Works Director/City Engineer Utility Superintendent IMP \PROJECTS\STREETS\2017_,19 Sidewalk and Concrete Repair\Change Orders\CC-Change-Orders.doc 11/27/2017 CITY OF LODI PROPOSED CHANGE ORDER PROJECT: 2017-2019 SIDEWALK AND MISC. CONCRETE REPAIR PROGRAM CO No.: 2 CONTRACTOR: Popuch Concrete Contracting, Inc. PCO No.: N/A RFI No.: N/A ARCHITECT/ENGINEER: City of Lodi, Public Works FI No.: N/A Submit Proposal Within 15 Days Upon Receipt of This Request Brief Description Of Work This Change Order is being processed based on additional funding that is available. Section 6-04.01 of the project specifications states that: "Work orders will be issued for curb, gutter, sidewalk, ramps, or other miscellaneous concrete items as they are needed during the 2017/18 and 2018/19 fiscal years. The quantities shown on the bid proposal are approximate quantities and are included for bid comparison purposes only. The City is anticipating approximately $200,000 available for sidewalk and miscellaneous concrete in the fiscal years 2017/18 and 2018/19 ($100,000 each year). Funding from other sources may increase the amount of work performed by the Contractor." Accounts: 30399000.77020 33199000.77020 (Measure K) (TDA Bike/Ped) Amount $50,000.00 $38,000.00 $88,000.00 Project String PWST-0026.Const. ExtLabor PWST-0026.Const. ExtLabor. Bike/Ped Request, Proposal, Recommendation And Approval Requesting Official: J.Billigmeier Request Date: 11/9/2017 Schedule Impact: 0 Days Contractor Proposal Date: N/A Add Amount: $88,000.00 Deduct Amount $0.00 Reason For Change: Work Needed for other departments Account: See Above CONTRACTOR AGREES TO FURNISH ALL LABOR AND MATERIALS AND PERFORM ALL WORK REQUIRED TO COMPLETE THE ABOVE DESCRIBED WORK CHANGE IN ACCORDANCE WITH THE REQUIREMENTS FOR SIMILAR WORK COVERED BY THE CONTRACT EXCEPT AS OTHERWISE STIPULATED HEREIN FOR THE STATED CONSIDERATION. TO PERFORM THE CHANGES FOR THE AMOUNT INDICATED WHICH INCLUDES ANY EXTENDED OR JOBSITE OVERHEAD, DISRUPTION, RIPPLE EFFECT AND OTHER IMPACT COSTS. NO WORK WILL BE STARTED UNTIL THIS PROPOSAL IS ACCEPTED. IF THE CONTRACTOR DOES NOT SIGN ACCEPTANCE OF THIS ORDER, THE CONTRACTOR SHOULD REFER TO SECTION 4- 1.03A OF THE STANDARD SPECIFICATIONS REGARDING FILING A WRITTEN PROTEST WITHIN THE SPECIFIED TIME. ORIGINAL CONTRACT: $ 258,881.00 PREVIOUS ADDS: $ - Contractor Date PREVIOUS DEDUCTS: $ - THIS CHANGE ORDER: $88,000.00 Deputy Public Works Director Date TOTAL CONTRACT AMOUNT INCLUDING ALL CHANGE ORDERS: $ 346,881.00 Public Works Director Date CONTRACT TIME ADJUSTMENT 0 DAYS ORIGINAL COMPLETION DATE: 6/30/2019 City Manager Date ADJUSTED CONTRACT COMPLETION DATE: 6/30/2019 MiscConcreteCO2.xls 11/15/2017 RESOLUTION NO. 2017-212 A RESOLUTION OF THE LODI CITY COUNCIL AUTHORIZING CHANGE ORDER NO. 2 TO THE 2017-2019 SIDEWALK AND MISCELLANEOUS CONCRETE REPAIR PROGRAM CONTRACT, AND FURTHER APPROPRIATING FUNDS WHEREAS, the 2017-2019 Sidewalk and Miscellaneous Concrete Repair Program contract was publically bid in May 2017 and awarded by City Council on June 7, 2017, to the lowest bidder, Popuch Concrete Contracting, Inc., in the amount of $203,232; and WHEREAS, to date, the City has spent $149,123 on various concrete work from Measure K and TDA funds; and WHEREAS, staff executed Change Order No. 1, in the amount of $55,649, in order to provide miscellaneous concrete work for other departments within the City; and WHEREAS, additional Measure K and TDA Bike/Pedestrian funds have become available for use on this project; and WHEREAS, staff recommends authorizing the City Manager to execute Change Order No. 2 to the 2017-2019 Sidewalk and Miscellaneous Concrete Repair Program contract with Popuch Concrete Contracting, Inc., of Lodi, in the amount of $88,000; and WHEREAS, staff also recommends that the City Council appropriate funds in the amount of $50,000, from Measure K Fund Capital fund balance (30399000.77020) and $38,000 from TDA/Bike Ped fund balance (33199000.77020) for Fiscal Year 2017/18. NOW, THEREFORE, BE IT RESOLVED that the Lodi City Council does hereby authorize the City Manager to execute Change Order No. 2 to the 2017-2019 Sidewalk and Miscellaneous Concrete Repair Program contract with Popuch Concrete Contracting, Inc., of Lodi, California, in the amount of $88,000; and BE IT FURTHER RESOLVED that Lodi City Council does hereby appropriate funds for the project, in the amount of $88,000, as set forth above. Dated: December 6, 2017 I hereby certify that Resolution No. 2017-212 was passed and Council of the City of Lodi in a regular meeting held December 6, 2017, by AYES: COUNCIL MEMBERS — Chandler, Johnson, Mounce, Mayor Kuehne NOES: COUNCIL MEMBERS — None ABSENT: COUNCIL MEMBERS — None ABSTAIN: COUNCIL MEMBERS — None 2017-212 adopted by the City the following vote: Nakanishi, and 411111A-NIFE FERRAIOLO ity Clerk