Loading...
HomeMy WebLinkAboutAgenda Report - November 1, 2017 C-05TM CITY OF LODI COUNCIL COMMUNICATION AGENDA ITEM c.-5 AGENDA TITLE: Adopt Resolution Rejecting Non -Responsive Bid from Swierstok Enterprise, Inc. dba Pro Builders and Awarding Contract for Lodi Station Parking Garage Maintenance and Repair Project to TPA Construction, Inc., of Rocklin ($368,476) MEETING DATE: November 1, 2017 PREPARED BY: Public Works Director RECOMMENDED ACTION: Adopt resolution rejecting non-responsive bid from Swierstok Enterprise, Inc. dba Pro Builders and awarding contract for Lodi Station Parking Garage Maintenance and Repair Project to TPA Construction, Inc., of Rocklin, in the amount of $368,476. BACKGROUND INFORMATION: The Lodi Station Parking Garage, located at 50 North Sacramento Street, was constructed in 2002, using post -tensioned concrete. Due to the age of the facility and observations of cracks in the concrete and masonry, staff hired Siegfried Engineering, Inc., of Stockton, in October 2016, to conduct a structural assessment of the structure. The assessment report identified several issues (primarily related to normal wear and tear) that need to be addressed in order to maintain the parking structure's long-term structural integrity. It must be emphasized that none of the identified deficiencies pose a risk to the public at this time. This project consists of various structural repairs recommended by Siegfried Engineering, Inc. to address cracks in the concrete columns, beams, and concrete decks. The project will also replace some exterior veneer panels that were damaged by vehicles; and conduct other miscellaneous improvements needed to extend the life of the parking structure. Plans and specifications for this project were approved on September 6, 2017. The City received the following four bids for this project on October 12, 2017. Bidder Location Base Bid Abovel(Under) Estimate Engineer's Estimate $229,088.00 TPA Construction Inc. Rocklin $368,476.00 $139,388.00 Diede Construction Inc. Woodbridge $408,539.70 $179,451.70 Z Squared Construction El Dorado Hills $458,875.50 $229,787.50 *Swierstok Enterprise, Inc. (Pro Builders) Orangevale $263,083.70 $33,995.70 *Bidder did not submit Receipt of Addendum No.1 with the bid and is deemed non-responsive. The Engineer's Estimate provided by Siegfried Engineering, Inc. was based on unit prices obtained from bids on previous projects. Accurate engineering estimates are increasingly difficult to perform due to current market forces and the recent natural disasters in Texas and Florida escalating construction and material costs. Staff requested Siegfried Engineering, Inc. review the bids and, although substantially higher than estimated, they agree the bid price is reasonable. APPROVED: er, City Manager K:\WP\PROJECTS\TRANSIT\Lodi Station Parking Structure\2017 Structural Repair\CAward.doc 10/25/2017 Adopt Resolution Rejecting Non -Responsive Bid from Swierstok Enterprise, Inc. dba Pro Builders and Awarding Contract for Lodi Station Parking Garage Maintenance and Repair Project to TPA Construction, Inc., of Rocklin ($368,476) November 1, 2017 Page 2 The apparent low bid, submitted by Swierstok Enterprise, Inc., was deemed non-responsive because it did not include the "Receipt of Addendum No.1." Addendum No. 1 contained clarification addressing contractor questions resulting from a mandatory pre-bid conference. In accordance with contract documents, bids received without containing all receipts of addenda are deemed non-responsive and may be rejected. The second lowest bidder, TPA Construction, Inc., is the lowest responsive bidder for the project. Staff notes a clerical error on the City's bid proposal, inadvertently requiring a five percent bid bond as opposed to the State -required 10 percent bid bond. The bidder's bond submitted by the lowest responsive bidder indicated a value of 10 percent; however, it also included a not -to -exceed amount of $30,000, which is less than 10 percent ($36,847.60) of the submitted bid amount. The City Attorney determined this to be a bid irregularity that does not alter the outcome of the bid results. The City has received the 10 percent bid bond from TPA Construction, Inc. Staff recommends rejecting non-responsive bid form Swierstok Enterprises, Inc. dba Pro Builders and awarding contract for Lodi Station Parking Garage Maintenance and Repair Project Improvements to TPA Construction, Inc., of Rocklin, in the amount of $368,476. FISCAL IMPACT: The repair will extend the useful life of the parking structure. This project does not impact the General Fund. FUNDING AVAILABLE: Transportation Development Act funds (60199000.77020). 64/4' Andrew Keys Deputy City Manager/Internal Services Director Prepared by Lyman Chang, City Engineer/Deputy Public CES/LC/tdb Attachment cc: Transportation Manager/Senior Traffic Engineer Public Works Management Analyst City Engineer/Deputy Public Works Director Siegfried Engineering, Inc. Charles E. Swimley, Jr. Public Works Director Works Director K:\WP\PROJECTS\TRANSIT\Lodi Station Parking Structure\2017 Structural Repair\CAward.doc 10/25/2017 LODI STATION PARKING GARAGE MAINTENANCE AND REPAIR PROJECT 50 N SACRAMENTO STREET CONTRACT CITY OF LODI, CALIFORNIA THIS CONTRACT made by and between the CITY OF LODI, State of California, herein referred to as the "City," and TPA CONSTRUCTION, INC., a California corporation, herein referred to as the "Contractor." WITNESSETH That the parties hereto have mutually covenanted and agreed, and by these presents do covenant and agree with each other, as follows: The complete Contract consists of the following documents which are incorporated herein by this reference, to -wit: Notice Inviting Bids Information to Bidders Certifications and Forms General Provisions Federal Requirements Special Provisions Bid Proposal Contract Contract Bonds Federal Minimum Wage Rates Plans Addenda The July 1992 Edition, Standard Specifications, State of California, Business and Transportation Agency, Department of Transportation All of the above documents, sometimes hereinafter referred to as the "Contract Documents," are intended to cooperate so that any work called for in one and not mentioned in the other is to be executed the same as if mentioned in all said documents. ARTICLE I - That for and in consideration of the payments and agreements hereinafter mentioned, to be made and performed by the City and under the condition expressed in the two bonds bearing even date with these presents and hereunto annexed, the Contractor agrees with the City, at Contractor's cost and expense, to do all the work and furnish all the materials except such as are mentioned in the specifications to be furnished by the City, necessary to construct and complete in a good workmanlike and substantial manner and to the satisfaction of the City the proposed improvements as shown and described in the Contract Documents which are hereby made a part of the Contract. ARTICLE II - The City hereby promises and agrees with the Contractor to employ, and does hereby employ, the Contractor to provide all materials and services not supplied by the City and to do the work according to the terms and conditions for the price herein, and hereby contracts to pay the same as set forth in Section 5.600, "Measurement, Acceptance and Payment," of the General Provisions, in the manner and upon the conditions above set forth; and the said parties for themselves, their heirs, executors, CONTRACT.doc 4.1 10112117 administrators, successors and assigns, do hereby agree to the full performance of the covenants herein contained. ARTICLE III - The Contractor agrees to conform to the provisions of Chapter 1, Part 7, Division 2 of the Labor Code. The Contractor and any Subcontractor will pay the general prevailing wage rate and other employer payments for health and welfare, pension, vacation, travel time, and subsistence pay, apprenticeship or other training programs. The responsibility for compliance with these Labor Code requirements is on the prime contractor. ARTICLE IV - And the Contractor agrees to receive and accept the following prices as full compensation for furnishing all materials and for doing all the work contemplated and embraced in this agreement; also for all loss or damage arising out of the nature of the work aforesaid or from the action of the elements, or from any unforeseen difficulties or obstructions which may arise or be encountered in the prosecution of the work until its acceptance by the City, and for all risks of every description connected with the work; also for all expenses incurred by or in consequence of the suspension or discontinuance of work and for well and faithfully completing the work, and the whole thereof, in the manner and according to the Plans and Contract Documents and the requirements of the Engineer under them, to -wit: This work consists of performing various minor structural repairs, reinforcement, and other miscellaneous improvements to Lodi Station Parking Garage as shown on the plans and specifications for the above project. CONTRACT ITEMS Item Description Unit Qty Unit Price Total 1 2 3 Mobilization/Demobilization LS 1 $15,000.00 $15,000.00 Traffic Control LS 1 $3,200.00 $3,200.00 Remove Concrete Deck Spalling Debris, Prep Surface (52) LS 1 $950.00 $950.00 4 Remove Existing Parking Deck Sealant, Prep Surface (S3) SF 11,134 $7.00 $77,938.00 5 6 Sawcut & Remove Damaged Masonry Wall (E2) LS 1 $15,000.00 $15,000.00 Elevator Door Concrete Threshold EA 3 $1,000.00 $3,000.00 7 8" Masonry Wall Repair/Doweling (North Elevator Tower) (E2) LS 1 $15,000.00 $15,000.00 8 Sawcut/Install Masonry Control Joints (MW1) LS 1 $5,400.00 $5,400.00 CONTRACT.doc 4.2 10/12/17 Item Description 9 Unit Qty 1 Unit Price Total Parking Deck SpaII Repair (S2) LS 1 $3,500.00 10 Crack Seal Deck (51) $3,500.00 11 Traffic Deck Coating System (S3) 12 13 14 FRP Wrap/Beam Concrete Fill (J2H) Beam -Masonry Wall Patching/Sealing (B3) Masonry Wall -Epoxy Injection (MW1) LF SF EA 1,723 $16.00 11,134 $4.00 1 EA 6 15 LS 1 Beam -Epoxy Injection (B2) 16 Column -Epoxy Injection (J1H) 17 18 19 20 Exterior Stair Injection (M2) Prep & Paint Exposed Surfaces (P1) Veneer Replacement (M1) Secutiry Modifications (M3) LS EA LS 1 $27,568.00 $44,536.00 $12,714.00 $1,050.00 $27,300.00 $12,714.00 $6,300.00 $27,300.00 $22,500.00 7 1 $1,300.00 $22,500.00 $ 9,100.00 $11,250.00 SF 22,110 $2.00 $11,250.00 $44,220.00 LS LS $10,000.00 $10,000.00 $14,000.00 $14,000.00 TOTAL $368,476.00 ARTICLE V - By my signature hereunder, as Contractor, I certify that I am aware of the provisions of Section 3700 of the Labor Code, which requires every employer to be insured against liability for workers' compensation or to undertake self-insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the work of this contract. ARTICLE VI - It is further expressly agreed by and between the parties hereto that, should there be any conflict between the terms of this instrument and the Bid Proposal of the Contractor, then this instrument shall control and nothing herein shall be considered as an acceptance of the said terms of said proposal conflicting herewith. ARTICLE VII - The City is to furnish the necessary rights-of-way and easements and to establish lines and grades for the work as specified under the Special Provisions. All labor or materials not mentioned specifically as being done by the City will be supplied by the Contractor to accomplish the work as outlined in the specifications. ARTICLE VIII - The Contractor agrees to commence work pursuant to this contract within 15 calendar days after the City Manager has executed the contract and to diligently prosecute to completion within 60 CALENDAR DAYS. ARTICLE IX - State of California Senate Bill 854 requires the following: • No contractor or subcontractor may be listed on a bid proposal for a public works project unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)]. CONTRACT.doc 4.3 10/12/17 • No contractor or subcontractor may be awarded a contract for public work on a public works project unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5. • This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. WHEN SIGNING THIS CONTRACT, THE CONTRACTOR AGREES THAT THE TIME OF COMPLETION FOR THIS CONTRACT IS REASONABLE AND THE CONTRACTOR AGREES TO PAY THE CITY LIQUIDATED DAMAGES AS SET FORTH IN SECTION 6-04.03 OF THE SPECIAL PROVISIONS. CONTRACTOR AGREES THAT THIS AMOUNT MAY BE DEDUCTED FROM THE AMOUNT DUE THE CONTRACTOR UNDER THE CONTRACT. IN WITNESS WHEREOF, the parties to these presents have hereunto set their hands the year and date written below. CONTRACTOR: CITY OF LODI, a municipal corporation By: STEPHEN SCHWABAUER City Manager By: Date: Title Attest JENNIFER M. FERRAIOLO City Clerk (CORPORATE SEAL) Approved As To Form: CONTRACT doc JANICE D. MAGDICH City Attorney 4.4 10/12/17 RESOLUTION NO. 2017-199 A RESOLUTION OF THE LODI CITY COUNCIL REJECTING NON-RESPONSIVE BID FROM SWIERSTOK ENTERPRISES, INC., dba PRO BUILDERS AND AWARDING THE CONTRACT FOR THE LODI STATION PARKING GARAGE MAINTENANCE AND REPAIR PROJECT TO TPA CONSTRUCTION, INC., OF ROCKLIN WHEREAS, in answer to notice duly published in accordance with law and the order of this City Council, sealed bids were received and publicly opened on October 12, 2017, at 11:00 a.m., for the Lodi Station Parking Garage Maintenance and Repair Project, described in the plans and specifications therefore approved by the City Council on September 6, 2017; and WHEREAS, said bids have been checked and tabulated and a report thereof filed with the City Manager as follows: Bidder Engineer's Estimate TPA Construction, Inc. Diede Construction, Inc. Z Squared Construction *Swierstok Enterprise, Inc. (Pro Builders) Base Bid Above/(Under) Estimate $229,088.00 $368,476.00 $408,539.70 $458,875.50 $263,083.70 $139,388.00 $179,451.70 $229,787.50 $33,995.70 *Bidder did not submit Receipt of Addendum No.1 with the bid and it is deemed non-responsive. WHEREAS, staff recommends that the City Council reject non-responsive bid from Swierstok Enterprises, Inc., dba Pro Builders, and award the contract for the Lodi Station Parking Garage Maintenance and Repair Project to TPA Construction, Inc., of Rocklin, in the amount of $368,476. NOW, THEREFORE, BE IT RESOLVED that the Lodi City Council does hereby reject non-responsive bid from Swierstok Enterprises, Inc., dba Pro Builders, and award the contract for the Lodi Station Parking Garage Maintenance and Repair Project to TPA Construction, Inc., of Rocklin, California, in the amount of $368,476; and BE IT FURTHER RESOLVED that the City Manager is hereby authorized to execute the contract on behalf of the City of Lodi. Dated: November 1, 2017 I hereby certify that Resolution No. 2017-199 was passed and adopted by the City Council of the City of Lodi in a regular meeting held November 1, 2017 by the following vote: AYES: COUNCIL MEMBERS — Chandler, Nakanishi, and Mayor Kuehne NOES: COUNCIL MEMBERS — None ABSENT: COUNCIL MEMBERS — Johnson and Mounce ABSTAIN: COUNCIL MEMBERS — None 2017-199 �.,25:e-AAOLGta NIFER FERRRIOLO y Clerk