HomeMy WebLinkAboutAgenda Report - October 18, 2017 G-01 PHTM
CITY OF LODI
COUNCIL COMMUNICATION
AGENDA TITLE:
MEETING DATE:
PREPARED BY:
AGENDA ITEM
c3I
Public Hearing to Consider Introducing an Ordinance Amending Lodi Municipal
Code Chapter 13.20 — "Electrical Service" by Repealing Section 13.20.185 —
"Schedule CSS — California Solar Initiative Surcharge" and Reenacting as follows,
"Schedule RES — Renewable Energy Surcharge"
October 18, 2017
Electric Utility Director
RECOMMENDED ACTION•
Public hearing to consider introducing an ordinance amending Lodi
Municipal Code Chapter 13.20 — "Electrical Service" by repealing
Section 13.20.185 — "Schedule CSS — California Solar Initiative
Surcharge" and reenacting as follows, "Schedule RES — Renewable
Energy Surcharge."
BACKGROUND INFORMATION: In 2006, California Senate Bill 1 (SB 1), known as the California
Solar Initiative (CSI), mandated all electric utilities to offer a solar
photovoltaic program to provide incentives to support the
development and installation of solar systems throughout each utility's service territory. Based upon the
CSI funding requirements, Lodi Electric Utility's (LEU) annual obligation was approximately $600,000
from 2008 through 2017. The City Council chose to fund LEU's CSI program by approving the California
Solar Initiative Surcharge (Schedule CSS), an additional rate schedule applied to all customer classes at
$0.00125 per kilowatt hour, with effective dates of January 1, 2008 through December 31, 2017.
LEU has successfully completed the CSI program requirements as mandated by SB 1. As of June 30,
2017, there are 694 customer -owned solar system installations with a total capacity of 7.5 MW as shown
in the following table.
Quantity
Type
System Capacity
641
Residential
3.2 MW
53
Commercial
4.3 MW
Total
7.5 MW
While the CSI requirements are no longer in effect, the State of California has subsequently adopted new
unfunded renewable energy requirements for electric service providers. The current Renewables
Portfolio Standard (RPS) requires 50 percent renewable energy resources by 2030. With LEU's current
resources, including historic carryover, its projection for 2030 is 30 percent; the average cost of meeting
the current RPS requirements is estimated at $1.1 million annually. In addition, proposed RPS legislation
would make this even more aggressive with a 50 percent requirement by 2025, 60 percent by 2030, and
100 percent carbon free by 2045; increasing the average annual impact by $1 million. The additional
costs associated with RPS compliant energy could be partially offset by continuing the current surcharge.
APPROVED: CAA.t.--r•
�v� Stephen Schwabauer, City Manager
Public Hearing to Consider Introducing an Ordinance Amending Lodi Municipal Code Chapter 13.20 — "Electrical Service" by
Repealing Section 13.20.185 — "Schedule CSS — California Solar Initiative Surcharge" and Reenacting as follows, "Schedule
RES — Renewable Energy Surcharge"
October 18, 2017
Page 2 of 2
Therefore, staff recommends repealing and reenacting this rate schedule to take effect January 1, 2018,
to assist in funding renewable energy requirements mandated by the State. This action would not
increase customers' electric utility bills.
FISCAL IMPACT: The proposed rate schedule change would not result in a rate increase for
electric utility customers but would continue to provide approximately
$600,000 in revenue annually to partially offset costs associated with
renewable energy related mandates. Should Council elect to discontinue
the surcharge, larger rate increases will be necessary to fully fund these
mandates.
FUNDING AVAILABLE: Not applicable.
E Izabeth A. Kirkley 9
Electric Utility Director
EAK/Ist
ORDINANCE NO.
AN ORDINANCE OF THE LODI CITY COUNCIL
AMENDING LODI MUNICIPAL CODE CHAPTER 13.20 - ELECTRICAL
SERVICE - BY REPEALING SECT -ION 13.20.185 SCH4E-DU CSS
CALIFORNIA SOLAR INITIATIVE SURCHARGE IN ITS ENTIRETY, AND
REENACTING SECTION 13.20.185 -SCHEDULE RES - RENEWABLE
ENERGY SURCHARGE IN ITS ENTIRETY
BE IT ORDAINED BY THE LODI CITY COUNCIL AS FOLLOWS:
SECTION 1. Lodi Municipal Code Chapter 13.20 - Electrical Service is hereby amended by
repealing Section 1-3.-20.185 Schedt- e -CSS - n a`Selar-initiative Surchar-ge-in its entirety, and
reenacting Section 13.20.185 Schedule RES - Renewable Energy Surcharge in its entirety, and
shall read as follows:
SECTION43 0,1-85-SCHEDULE-CSS--.CALI.FOR T SQL-AR-INI-T-IATIVE SJR -CHARGE
A. AP-R=!CAsl•LIT. This schedule is applieabl- - - - - • - •y -the -city
of Lodi. Each cueto fr chat „e-apllicablc rate(s) :. - - _ . _ • - , s tar Initiati• e+rge
—) 1.9 each I.iIowati—he r t Ih elivered to tho oustemeen
--
TheC-S^^',,S-Shaft-4uc tyes--for customers, -p rtieipating in the-Ledi-olar Rebate Pilot Program:
California -Senate Bill 1 (S$ 1) mandates -that -all electric utilities -e fer-a-solar photovolte e-pregrar
that provides ineeetives to support the -development -and installation of r sys'- 4e glinut
their given sere erritory. Based upon SB 1 funding requirements; Lodi Electric Utility shall -make
available-approx - - - - - - :-1nnnrs annuaity-botweon the years 2008-2017.
B. Rates. Effective-enh;no render -ed a or after January 1, 2008 -until Decembef , 2017, a
surcharge per kilowatt hour (kWh-) will be applied to ail kWh sold—The CSS shall be applied to all
kWh sold and wiII-heen-diunted-:
he -surcharge amount of $0.00125 will be aped-to-all-k-eensumed-by-ea h `stomer 1n .amu-fae
Glasses,
All-f-urrds-callested-endef-th --surcharge-will be -placed in an -account solely-feF-the--purpose of
iFF)p le menting- he -L -df -Solar Rebate-P4lot-Rfograrre
SECTION 13.20.185 SCHEDULE RES - RENEWABLE ENERGY SURCHARGE
A. Applicability. This schedule is applicable to all electric customers served by the City of Lodi.
Each customer shall pay the applicable rate(s) plus the Renewable Energy Surcharge (RES) for
each kilowatt-hour (kWh) delivered and sold to the customer.
The RES shall fund costs associated with the following activities:
• Lodi Electric Utility's purchase of renewable and/or carbon free energy;
• Community solar or other community renewable energy efforts; and/or
• Customer incentives associated with renewable energy and/or distributed generation.
B. Rates. A surcharge of $0.00125 will be applied to all kWh delivered and sold to each
customer in all rate classes and shall not be discounted.
All funds collected under this surcharge will be placed in an account solely for the purposes
identified above.
SECTION 2. No Mandatory Duty of Care. -This ordinance is not intended to and shall not be
construed or given effect in a manner which imposes upon the City, or any officer or employee
thereof, a mandatory duty of care towards persons or property within the City or outside of the City
so as to provide a basis of civil liability for damages, except as otherwise imposed by law.
SECTION 3. Severability. If any provision of this ordinance or the application thereof to any person
or circumstances is held invalid, such invalidity shall not affect other provisions or applications of the
ordinance which can be given effect without the invalid provision or application. To this end, the
provisions of this ordinance are severable. -The City Council hereby declares that it would have
adopted this ordinance irrespective of the invalidity of any particular portion thereof.
SECTION 4. All ordinances and parts of ordinances in conflict herewith are repealed insofar as
such conflict may exist.
SECTION 5, Effective Date and Publication. This Ordinance shall take effect on January 1, 2018.
In lieu of publication of the full text of the ordinance within fifteen (15) days after its passage, a
summary of the ordinance may be published at least five (5) days prior to and fifteen (15) days after
adoption by the City Council, and a certified copy shall be posted in the office of the City Clerk
pursuant to Government Code section 36933(c)(1).
ATTEST:
JENNIFER M. FERRAIOLO
City Clerk
Approved this day of , 2017
DOUG KUEHNE
Mayor
State of California
County of San Joaquin, ss.
I, Jennifer M. Ferraiolo, City Clerk of the City of Lodi, do hereby certify that
Ordinance No. was introduced at a regular meeting of the City Council of the City of Lodi held
October 18, 2017, and was thereafter passed, adopted, and ordered to print at a regular meeting of
said Council held , 2017, by the following vote:
AYES: COUNCIL MEMBERS —
NOES: COUNCIL MEMBERS —
ABSENT: COUNCIL MEMBERS —
ABSTAIN: COUNCIL MEMBERS —
I further certify that Ordinance No. was approved and signed by the Mayor on the date
of its passage and the same has been published pursuant to law.
Approved as to Form: JENNIFER M. FERRAIOLO
City Clerk
JANICE D. MAGDICH
City Attorney
2
Background
Customer Solar Installations
Renewables Portfolio Standard (RPS) Requirements
Current (SB 350)
Proposed (SB goo)
LEU Energy Resources
Financial Impact
Options
Staff Recommendation
2
2006 —California Senate Bill 1 (SB 1)
California Solar Initiative (CSI) mandated electric utilities
provide incentives to promote development and installation
of new solar systems with declining rebates to transition
solar industry to be self-sustaining without incentives.
LEU's requirements
Incentives of —$600,000 annually for 10 years (2008-2017)
Up to an installed customer solar capacity of —7.1 MW
Funded via CSI Surcharge (Schedule CSS) of $o.00i25/kWh
Currently due to sunset December 31, 2017
3
Residential
Commercial
TOTAL
• 641
• 3.2 MW
• 53
• 4.3 MW
• 694
• 7.5 MW
4
504
100%
8o%
6o%
4o%
20%
o%
Current (SB 350) Proposed (SB goo)
40%
45%
iLi
100%
8o%
6o%
4o%
20%
o/
50%
6o%
i00%
carbon
free
2020 2024 2027 2030 2026 2030 2045
5
California
Eligible
Renewable
Energy
Resources
6
Geothermal
Solar
Wind
Biomass
Bio -Fuel
Small Hydro (<3o MW)
Ocean/Tidal Current
■ Unspecified
Power
49D/
---
•--
■ Natural Gas
13%
■ Geothermal
21%
All
Renewables
24%
■ Large Hydro
14%
7
■ Small
Hydro
0.4%
Solar
1.8%
■ Biomass
0.4%
(PAWN
250,000
2 WOOD
150,000
100,000
50,000
0
Compliance
Period 2
RPS Requirement vs. LEU Renewable Energy
Compliance
Period 3
25%
1
1
45%
406
•
1
50%
•
2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030
Future RPS
Historic Carryover iSci/air Projects Existing R PS 4.11"M' RFS Req.
8
(MWh)
500,000
450,000
400,000
350,000
300,000
250,000
200,000
150,000
100,000
50,000
SBioo Requirement vs. LEU Renewable Energy
50% 6o%
L
aONAI ado NS ,o a0�0
2021
r
••
l00%
!.!12316aQa� '.! !.! 1,03(3 a0"11110111 a0�a -ISI Ck
•
1
1 1 Carbon -Free Offset 1 1 Future RPS Large Hydro Historic Carryover Soar Projects Existing RPS —.—RPS Req.
9
Current
Average
incremental cost
• $1.1 million/year
Proaosed
Additional
average
incremental cost
• $1 million/year
10
Combined
Average
incremental cost
• $2.1 million/year
Customer Class / Usage
Current / Proposed
Surcharge
Residential
A
1
Low Usage — 350 kWh
Average Usage — 550 kWh
illmm-
High Usage — 750 kWh l
Small Commercial
Medium Commercial $29.76
i
Large Commercialil
$302.25
Industrial A4 $1,209.00
$0.44
$0.69
$0.944
$4.38,
11
1) Let CSI Solar Surcharge (Schedule CSS) sunset December 31, 2017
$o.00125/kWh monthly charge goes away
Repeal Schedule CSS and reenact as Renewable Energy Surcharge
(Schedule RES) effective January 1, 2018
Provides---$600,000/year toward $1.1 million average annual revenue
requirement to meet current renewable mandates
Supports Council direction for small, incremental rate adjustments
Funds renewable energy related projects for the benefit of all customers
No added impact to customer bills
In accordance with LEU Financial Strategic Area of Focus
12
Introduce an ordinance amending Lodi Municipal Code
Chapter 13.20 - "Electrical Service" by repealing Section
13.20.185 - "Schedule CSS - California Solar Initiative
Surcharge" and reenacting as follows, "Schedule RES -
Renewable Energy Surcharge."
13
Please immediately confirm receipt
of this fax by calling 333-6702
CITY OF LODI
P. O. BOX 3006
LODI, CALIFORNIA 95241-1910
ADVERTISING INSTRUCTIONS
SUBJECT: PUBLIC HEARING TO CONSIDER INTRODUCING AN ORDINANCE
AMENDING LODI MUNICIPAL CODE CHAPTER 13.20, "ELECTRICAL
SERVICE," BY REPEALING SECTION 13.20.185, "SCHEDULE CSS -
CALIFORNIA SOLAR INITIATIVE SURCHARGE," AND REENACTING AS
FOLLOWS, "SCHEDULE RES - RENEWABLE ENERGY SURCHARGE"
(AS IDENTIFIED ON THE ATTACHED EXHIBIT A)
PUBLISH DATE: SATURDAY, SEPTEMBER 30 AND OCTOBER 7, 2017
LEGAL AD
TEAR SHEETS WANTED: One (1) please
SEND AFFIDAVIT AND BILL TO:
LNS ACCT. #0510052
JENNIFER M. FERRAIOLO, CITY CLERK
City of Lodi
P.O. Box 3006
Lodi, CA 95241-1910
DATED: TUESDAY, SEPTEMBER 26, 2017
ORDERED BY: JENNIFER M. FERRAIOLO
CITY CLERK
PAMELA M. FARRIS
DEPUTY CITY CLERK
ELIZABETH BURGOS
ADMINISTRATIVE CLERK
Verify Appearance of this Legal in the Newspaper — Copy to File
(date) (pages)
LNS Phoned to confirm receipt of all pages at (time) _ES PMF (initials)
Emailed to the Sentinel at krystals@lodinews.com at (t+me) on
forms\advins.doc
DECLARATION OF POSTING
PUBLIC HEARING TO CONSIDER INTRODUCING AN ORDINANCE AMENDING
LODI MUNICIPAL CODE CHAPTER 13.20, "ELECTRICAL SERVICE," BY
REPEALING SECTION 13.20.185, "SCHEDULE CSS — CALIFORNIA SOLAR
INITIATIVE SURCHARGE," AND REENACTING AS FOLLOWS, "SCHEDULE RES —
RENEWABLE ENERGY SURCHARGE" (AS IDENTIFIED ON THE ATTACHED
EXHIBIT A)
On Tuesday, September 26, 2017, in the City of Lodi, San Joaquin County, California, a
Notice of Public Hearing to consider introducing an ordinance amending Lodi Municipal
Code Chapter 13.20, "Electrical Service," by repealing Section 13.20.185, "Schedule
CSS — California Solar Initiative Surcharge," and reenacting as follows, "Schedule RES
— Renewable Energy Surcharge" (attached and marked as Exhibit A) was posted at the
following locations:
Lodi City Clerk's Office
Lodi City Hall Lobby
Lodi Carnegie Forum
WorkNet Office
I declare under penalty of perjury that the foregoing is true and correct.
Executed on September 26, 2017, at Lodi, California.
ORDERED BY:
JENNIFER M. FERRAIOLO
CITY CLERK
PAMELA M. FARRIS ELIZABETH BURGOS
DEPUTYCITY CLERK ADMINISTRATIVE CLERK
N:\Administration\CLERK\Public Hearings\AFFADAVITS\DECPOSTEUD.DOC
CITY OF LODI
Carnegie Forum
305 West Pine Street, Lodi
rNOTICE OF PUBLIC HEARING
Date: October 18, 2017
Time: 7:00 p.m.
For information regarding this notice please contact:
Jennifer M. Ferraiolo
City Clerk
Telephone: (209) 333-6702
1
NOTICE OF PUBLIC HEARING
NOTICE IS HEREBY GIVEN that on Wednesday, October 18, 2017, at the
hour of 7:00 p.m., or as soon thereafter as the matter may be heard, the City
Council will conduct a public hearing at the Carnegie Forum, 305 West Pine
Street, Lodi, to consider the following matter:
a) Consider introducing an ordinance amending Lodi Municipal Code
Chapter 13.20, "Electrical Service," by repealing Section 13.20.185,
"Schedule CSS — California Solar Initiative Surcharge," and
reenacting as follows, "Schedule RES — Renewable Energy
Surcharge" (as identified on the attached Exhibit A).
Information regarding this item may be obtained in the Electric Utility
Department, 1331 South Ham Lane, Lodi, (209) 333-6762. All interested persons
are invited to present their views and comments on this matter. Written
statements may be filed with the City Clerk, City Hall, 221 West Pine Street,
2"d Floor, Lodi, 95240, at any time prior to the hearing scheduled herein, and oral
statements may be made at said hearing.
If you challenge the subject matter in court, you may be limited to raising only
those issues you or someone else raised at the public hearing described in this
notice or in written correspondence delivered to the City Clerk, 221 West Pine
Street, at or prior to the close of the public hearing.
By Order of the Lodi City Council:
fifer M. raiolo
y Clerk
Dated: September 26, 2017
Approved as to form:
i.anice D. Magdich
City Attorney
AVISO: Para obtener ayuda interpretativa con esta noticia, por favor (lame a la oficina de la
Secretaria Municipal, a las (209) 333-6702.
CLERK\PUBHEAR\NOTICES\Noteud.doc 9/25/17
Exhibit A
Proposed Renewable Energy Surcharge
SECTION 13.20.185 SCHEDULE RES — RENEWABLE ENERGY SURCHARGE
A. Applicability. This schedule is applicable to all electric customers served by the City of Lodi.
Each customer shall pay the applicable rate(s) plus the Renewable Energy Surcharge
(RES) for each kilowatt-hour (kWh) delivered and sold to the customer.
The RES shall fund costs associated with the following activities:
• Lodi Electric Utility's purchase of renewable and/or carbon free energy;
• Community solar or other community renewable energy efforts; and/or
• Customer incentives associated with renewable energy and/or distributed generation.
B. Rates. A surcharge of $0.00125 will be applied to all kWh delivered and sold to each
customer in all rate classes and shall not be discounted.
All funds collected under this surcharge will be placed in an account solely for the purposes