HomeMy WebLinkAboutResolutions - No. 2018-22When Recorded Please Return to:
Lodi City Clerk
P.O. Box 3006
Lodi, CA 95241-1910
A*16AIjti[0101l0[0
Doc 4: 2018-021599
02/26/2018 12:43:28 PM
Page; 1 of 1 Fee: $0
Stege J. Bestalarides
San laquin County Recorders
Paid By: SHOWN ON DOCUMENT
ILII �llti�
A RESOLUTION OF THE LODI CITY COUNCIL ACCEPTING
THE REYNOLDS RANCH WASTEWATER PIPELINE
EXTENSION PUBLIC IMPROVEMENTS
WHEREAS, the entire Reynolds Ranch development, including the residential
and commercial developments, was being served by a temporary wastewater lift station,
located at Stockton Street and Rocky Lane, and the wastewater from the pump station
was discharged to an existing wastewater pipe in Stockton Street, where it flowed north
to the Century Boulevard wastewater trunk line; and
WHEREAS, the Reynolds Ranch Wastewater Master Plan indicated that a
parallel wastewater pipeline was required to convey the wastewater generated from the
entire Reynolds Ranch development area; and
WHEREAS, the wastewater pipeline extension included the installation of
2,190 lineal feet of 12 -inch diameter wastewater pipeline installed parallel to the existing
Stockton Street wastewater pipeline from Harney Lane to Century Boulevard; and
WHEREAS, the public improvements have been completed in substantial
conformance with the project requirements, and staff recommends accepting the
Reynolds Ranch Wastewater Pipeline Extension public improvements.
NOW, THEREFORE, BE IT RESOLVED that the Lodi City Council does hereby
accept the Reynolds Ranch Wastewater Pipeline Extension public improvements.
Dated: February 21, 2018
I hereby certify that Resolution No. 2018-22 was passed and adopted by the City
Council of the City of Lodi in a regular meeting held February 21, 2018, by the following
vote:
AYES: COUNCIL MEMBERS — Chandler, Johnson, Kuehne, Mounce,
and Mayor Nakanishi
NOES: COUNCIL MEMBERS — None
ABSENT: COUNCIL MEMBERS — None
ABSTAIN: COUNCIL MEMBERS — None
I ' ;�j�
NIFE FERRAIOLO
y Clerk
2018-22