Loading...
HomeMy WebLinkAboutResolutions - No. 2018-22When Recorded Please Return to: Lodi City Clerk P.O. Box 3006 Lodi, CA 95241-1910 A*16AIjti[0101l0[0 Doc 4: 2018-021599 02/26/2018 12:43:28 PM Page; 1 of 1 Fee: $0 Stege J. Bestalarides San laquin County Recorders Paid By: SHOWN ON DOCUMENT ILII �llti� A RESOLUTION OF THE LODI CITY COUNCIL ACCEPTING THE REYNOLDS RANCH WASTEWATER PIPELINE EXTENSION PUBLIC IMPROVEMENTS WHEREAS, the entire Reynolds Ranch development, including the residential and commercial developments, was being served by a temporary wastewater lift station, located at Stockton Street and Rocky Lane, and the wastewater from the pump station was discharged to an existing wastewater pipe in Stockton Street, where it flowed north to the Century Boulevard wastewater trunk line; and WHEREAS, the Reynolds Ranch Wastewater Master Plan indicated that a parallel wastewater pipeline was required to convey the wastewater generated from the entire Reynolds Ranch development area; and WHEREAS, the wastewater pipeline extension included the installation of 2,190 lineal feet of 12 -inch diameter wastewater pipeline installed parallel to the existing Stockton Street wastewater pipeline from Harney Lane to Century Boulevard; and WHEREAS, the public improvements have been completed in substantial conformance with the project requirements, and staff recommends accepting the Reynolds Ranch Wastewater Pipeline Extension public improvements. NOW, THEREFORE, BE IT RESOLVED that the Lodi City Council does hereby accept the Reynolds Ranch Wastewater Pipeline Extension public improvements. Dated: February 21, 2018 I hereby certify that Resolution No. 2018-22 was passed and adopted by the City Council of the City of Lodi in a regular meeting held February 21, 2018, by the following vote: AYES: COUNCIL MEMBERS — Chandler, Johnson, Kuehne, Mounce, and Mayor Nakanishi NOES: COUNCIL MEMBERS — None ABSENT: COUNCIL MEMBERS — None ABSTAIN: COUNCIL MEMBERS — None I ' ;�j� NIFE FERRAIOLO y Clerk 2018-22