HomeMy WebLinkAboutAgenda Report - March 1, 2000 E-06V CITY OF LODI COUNCIL COMMUNICATION AGENDA TITLE: Accept Improvements Under Contract for Sacramento Street Reconstruction, Pine Street to Oak Street MEETING DATE: March 1, 2000 PREPARED BY: Public Works Director RECOMMENDED ACTION: That the City Council accept the improvements under the "Sacramento Street Reconstruction, Pine Street to Oak Street' contract, and direct the City Engineer to file a Notice of Completion with the County Recorder's office. BACKGROUND INFORMATION: The project was awarded to Teichert Construction, of Stockton, on July 7, 1999, in the amount of $159,197.20. The contract has been completed in substantial conformance with the plans and specifications approved by the City Council. The contract completion date was September 22, 1999, and the actual completion date was September 10, 1999. The final contract price was $171,156.20. Resolution 85-72 requires that we inform the City Council of all change orders exceeding 10% of the contract amount. The attached Contract Change Order 1, approved by the City Manager, was in the amount of $18,087.68, which is 11.4% of the contract. The work in the contract change order includes payment for extra work done to remove the concrete subbase which was found under the asphalt in the street, additional work in the tree wells, and additional work done to locate and connect the new electrical conduit to the existing electrical line. FUNDING: Budgeted Fund: Multimodal Station Project Contract Amount: $171,156.20 Richard C. Prima, Jr. Public Works Director Prepared by Wesley K. Fujitani, Senior Civil Engineer RCP/WKF/lm Attachment cc: Purchasing Officer Street Superintendent APPROVED: ` H. Dixon Flynn - Ci Manager caccpt 02/18/00 CITY OF LODI PUBLIC WORKS DEPARTMENT PROJECT: Sacramento Street Oak Street to Pine Street CONTRACTOR: Teichert Construction CONTRACT CHANGE ORDER NO. 1 Sheet 1 of 1 Date: 1/20/00 Account No. 125572 You are directed to make the following changes or do the following work not included in the Plans and Specifications on this contract. ---------------------------------------------------------------------- Description of work to be done, estimate of quantities, and prices to be paid. Specify whether additional work is at contract price, agreed price, or force account. Unless otherwise stated, rates for rental of equipment cover only such time as equipment is actually used and no allowance will be made for idle time. 1.) Aditlonal cost to remove asphalt and concrete in the street and replace subgrade area with fill material Agreed Upon Price $ 14,306.00 2.) Hauling cost to dispose of existing soil in 9 tree wells Agreed Upon Price $ 1,250.00 3.) Additional Cost to increase size of 9 tree wells Agreed Upon Price $ 1,292.00 4.) Revised irrigation work as requested by Tree Operations Supervisor Agreed Upon Price $ 68.68 5.) Locate and extend electrical conduit at SE corner of Sacramento St. and Walnut Street Agreed Upon Price $ 1,171.00 TOTAL $ 18,087.68 2affel=OW619 CONTRACT Original Contract Price $159,197.20 Total Cost of This Change Order NOT TO EXCEED $ 18,087.68 %11.4 Previous Change Orders $ 0.00 Total Cost of All Change Orders to Date $ 18,087.68 %11.4 Contract Price, Including All Change Orders, Will Be: $177,284.88 Time of completion will be adjusted as follows: N/A ---------------------------------------------------------------------- Submitted Sy --Z// - Approval Recommended Approved, Public Works Director Approved, City nager (Per Public W Poli and P�6cedures, Administration -4.1 The undersigned contractor, having carefully considered the change proposed, agrees, if this proposal is approved, to provide all equipment, furnish all materials, except as otherwise noted above, perform all services necessary for the work above specified, and accept as full payment the prices shown above. ACCEPTED: Date Contractor DOUG URBICK By TitlevirF F�=��Drrir STOCKTON DISTRICT MANAGER If the contractor does not sign acceptance of this order, the contractor should refer to Section 4- 1.03A of the Standard Specifications regarding filing a written protest within the specified time. a:o1