HomeMy WebLinkAboutResolutions - No. 2017-202RESOLUTION NO. 2017 -202
A RESOLUTION OF THE LODI CITY COUNCIL AUTHORIZING THE
CITY MANAGER TO EXECUTE AMENDMENT NO. 2 TO TASK ORDER
NO. 39 FOR WHITE SLOUGH WATER POLLUTION CONTROL FACILITY
2016 CALENDAR YEAR REPAIRS AND IMPROVEMENT, ENGINEERING
DESIGN, AND CONSTRUCTION MANAGEMENT SERVICES WITH
==================y::]J::Ï1t=t=:9]1]5llI3:::3iYlt==================
WHEREAS, on February 17,2016, Council approved Task Order No. 39 with West Yost
& Associates, in the amount of $¿69,300, for the WSWPCF 2016 Calendar Year Repairs and
lmprovement Engineering Design, and Construction Management Services; and
WHEREAS, on June 16, 2016, Council awarded a contract to Western Water
Constructors, lnc., for the WSWPCF 2016 lmprovements Corrosion Repair Project, to perform
repairs to and coating of existing concrete structures and process channels, and the
replacement of various corroded hatches and piping components; and
WHEREAS, Amendment No. 1 to Task Order No. 39 includes a scope of service to
perform additional design and construction management services to facilitate work resulting
irom unforeseen condiiions encountered during the contract, as well as additional items
requested by the City to install remote monitoring capability for the facility storage pond levels
(required by the State), and internal digester temperatures, Digester No. 3 cleaning and interior
òoaiing, anb the repair of a pipeline that feeds forced air to the aeration basins. The additional
work e-itends the d'uration of the contract and expands the services needed from West Yost &
Associates; and
WHEREAS, proposed Amendment No. 2 to Task Order No. 39 includes construction
management services through the September 25,2017 proiect completion date ($4,762) and
the preparation of as-built drawings to document the repairs associated with the forced air
pipeiine and Digester No. 3 ($4,OOO), for a total of $8,762, or 1.7 percent of the current task
order amount; and
WHEREAS, staff recommends that the City Council authorize the City Manager to
execute Amendment No. 2 to Task Order No. 39 for White Slough Water Pollution Control
Facility 2016 Calendar Year Repairs and lmprovement, Engineering Design, and Construction
Management Services with West Yost & Associates, lnc., in the amount of $8,762.
NOW, THEREFORE, BE lT RESOLVED that the Lodi City Council does hereby
authorize the City Manager to execute Amendment No. 2 to Task Order No. 39 for White Slough
Water Pollution Control Facility 2016 Calendar Year Repairs and lmprovement, Engineering
Design, and Construction Management Services with West Yost & Associates, lnc., of Davis,
California, in the amount of $8,762.
Dated: November 1,2017
I hereby certify that Resolution No. 2017-202 was passed and adopted by the City
Council of the City of Lodi in a regular meeting held November 1, 2017 by the following vote:
AyES: COUNCIL MEMBERS - Chandler, Nakanishi, and Mayor Kuehne
NOES: COUNCIL MEMBERS - None
ABSENT: COUNCIL MEMBERS - Johnson and Mounce
ABSTAIN: COUNCIL MEMBERS - None
IFER
2017-202
Clerk
FERRAIOLO