AGENDA TITLE:
AGENDA ITEM'
Set Public Hearing for October 18 , 2017 to Consider Introducing an Ordinance
Amending Lodi Municipal Code Chapter 13.20 — "Electrical Service" by Repealing
Section 13.20.185 — "Schedule CSS — California Solar Initiative Surcharge" and
Reenacting as follows, "Schedule RES — Renewable Energy Surcharge"
MEETING DATE: September 26, 2017
PREPARED BY: Electric Utility Director
RECOMMENDED ACTION:
Set a public hearing for October 18, 2017 to consider introducing an
ordinance amending Lodi Municipal Code Chapter 13.20 —
"Electrical Service" by repealing Section 13.20.185 — "Schedule
CSS — California Solar Initiative Surcharge" and reenacting as
follows, "Schedule RES — Renewable Energy Surcharge."
BACKGROUND INFORMATION: In 2006, California Senate Bill 1 (SB 1), known as the California
Solar Initiative (CSI), mandated all electric utilities to offer a solar
photovoltaic program to provide incentives to support the
development and installation of solar systems throughout each utility's service territory. Based upon the
CSI funding requirements, Lodi Electric Utility's (LEU) annual obligation was approximately $600,000
from 2008 through 2017. The City Council chose to fund LEU's CSI program by approving the California
Solar Initiative Surcharge (Schedule CSS), an additional rate schedule applied to all customer classes at
$0.00125 per kilowatt hour, with effective dates of January 1, 2008 through December 31, 2017.
LEU has successfully completed the CSI program requirements as mandated by SB 1. As of June 30,
2017, there are 694 customer -owned solar system installations with a total capacity of 7.5 MW; 641
residential and 53 commercial systems with capacities of 3.2 MW and 4.3 MW, respectively.
While the CSI requirements are no longer in effect, the State of California has subsequently adopted new
unfunded renewable energy requirements for electric service providers. The current Renewables
Portfolio Standard (RPS) requires 50 percent renewable energy resources by 2030. With LEU's current
resources, including historic carryover, its projection for 2030 is 30 percent; the average cost of meeting
the current RPS requirements is estimated at $1.1 million annually. In addition, proposed RPS legislation
would make this even more aggressive with a 50 percent requirement by 2025, 60 percent by 2030, and
100 percent carbon free by 2045; increasing the average annual impact by $1 million. The additional
costs associated with RPS compliant energy could be partially offset by continuing the current surcharge.
Therefore, staff recommends repealing and reenacting this rate schedule to take effect January 1, 2018,
to assist in funding renewable energy requirements mandated by the State. This action would not
increase customers' electric utility bills.
APPROVED
en .suer, City Manager
Set Public Hearing for October 18, 2017 to Consider Introducing an Ordinance Amending Lodi Municipal Code Chapter 13.20 —
"Electrical Service" by Repealing Section 13.20.185 — "Schedule CSS — California Solar Initiative Surcharge" and Reenacting as
follows, "Schedule RES — Renewable Energy Surcharge"
September 26, 2017
Page 2 of 2
FISCAL IMPACT:
The proposed rate schedule change would not result in a rate
increase for electric utility customers but would continue to provide
approximately $600,000 in revenue annually to offset costs
associated with renewable energy related mandates.
FUNDING AVAILABLE: Not applicable.
EAK/Ist
Elizbe' . Kirk ey
Electric Utility Director
Please immediately confirm receipt
of this fax by calling 333-6702
CITY OF LODI
P. O. BOX 3006
LODI, CALIFORNIA 95241-1910
ADVERTISING INSTRUCTIONS
SUBJECT: PUBLIC HEARING TO CONSIDER INTRODUCING AN ORDINANCE
AMENDING LODI MUNICIPAL CODE CHAPTER 13.20, "ELECTRICAL
SERVICE," BY REPEALING SECTION 13.20.185, "SCHEDULE CSS -
CALIFORNIA SOLAR INITIATIVE SURCHARGE," AND REENACTING AS
FOLLOWS, "SCHEDULE RES - RENEWABLE ENERGY SURCHARGE"
(AS IDENTIFIED ON THE ATTACHED EXHIBIT A)
PUBLISH DATE: SATURDAY, SEPTEMBER 30 AND OCTOBER 7, 2017
LEGAL AD
TEAR SHEETS WANTED: One ) please
SEND AFFIDAVIT AND BILL TO:
LNS ACCT. #0510052
JENNIFER M. FERRAIOLO, CITY CLERK
City of Lodi
P.O. Box 3006
Lodi, CA 95241-1910
DATED: TUESDAY, SEPTEMBER 26, 2017
ORDERED BY: JENNIFER M. FERRAIOLO
CITY CLERK
PAMELA M. FARRIS
DEPUTY CITY CLERK
ELIZABETH BURGOS
ADMINISTRATIVE CLERK
Verify Appearance of this Legal in the Newspaper — Copy to File
Emailed to the Sentinel at krystals@lodinews.com at ,(time) on (date) (pages)
LNS Phoned to confirm receipt of all pages at (time) EB PMF (initials)
forms\advins.doc
DECLARATION OF POSTING
PUBLIC HEARING TO CONSIDER INTRODUCING AN ORDINANCE AMENDING
LODI MUNICIPAL CODE CHAPTER 13.20, "ELECTRICAL SERVICE," BY
REPEALING SECTION 13.20.185, "SCHEDULE CSS — CALIFORNIA SOLAR
INITIATIVE SURCHARGE," AND REENACTING AS FOLLOWS, "SCHEDULE RES —
RENEWABLE ENERGY SURCHARGE" (AS IDENTIFIED ON THE ATTACHED
EXHIBIT A)
On Tuesday, September 26, 2017, in the City of Lodi, San Joaquin County, California, a
Notice of Public Hearing to consider introducing an ordinance amending Lodi Municipal
Code Chapter 13.20, "Electrical Service," by repealing Section 13.20.185, "Schedule
CSS — California Solar Initiative Surcharge," and reenacting as follows, "Schedule RES
— Renewable Energy Surcharge" (attached and marked as Exhibit A) was posted at the
following locations:
Lodi City Clerk's Office
Lodi City Hall Lobby
Lodi Carnegie Forum
WorkNet Office
I declare under penalty of perjury that the foregoing is true and correct.
Executed on September 26, 2017, at Lodi, California.
ORDERED BY:
JENNIFER M. FERRAIOLO
CITY CLERK
PAMELA M. FARRIS ELIZABETH BURGOS
DEPUTYCITY CLERK ADMINISTRATIVE CLERK
N:\Administration\CLERK\Public Hearings\AFFADAVITS\DECPOSTEUD.DOC
1
CITY OF LODI
Carnegie Forum
305 West Pine Street, Lodi
NOTICE OF PUBLIC HEARING
Date: October 18, 2017
Time: 7:00 p.m.
For information regarding this notice please contact:
Jennifer M. Ferraiolo
City Clerk
Telephone: (209) 333-6702
NOTICE OF PUBLIC HEARING
NOTICE IS HEREBY GIVEN that on Wednesday, October 18, 2017, at the
hour of 7:00 p.m., or as soon thereafter as the matter may be heard, the City
Council will conduct a public hearing at the Carnegie Forum, 305 West Pine
Street, Lodi, to consider the following matter:
a) Consider introducing an ordinance amending Lodi Municipal Code
Chapter 13.20, "Electrical Service," by repealing Section 13.20.185,
"Schedule CSS — California Solar Initiative Surcharge," and
reenacting as follows, "Schedule RES — Renewable Energy
Surcharge" (as identified on the attached Exhibit A).
Information regarding this item may be obtained in the Electric Utility
Department, 1331 South Ham Lane, Lodi, (209) 333-6762. All interested persons
are invited to present their views and comments on this matter. Written
statements may be filed with the City Clerk, City Hall, 221 West Pine Street,
2"d Floor, Lodi, 95240, at any time prior to the hearing scheduled herein, and oral
statements may be made at said hearing.
If you challenge the subject matter in court, you may be limited to raising only
those issues you or someone else raised at the public hearing described in this
notice or in written correspondence delivered to the City Clerk, 221 West Pine
Street, at or prior to the close of the public hearing.
By Order of the Lodi City Council:
r• + 0
err fer M. ' raiolo
Efty Clerk
Dated: September 26, 2017
Approved as to form:
1
Janic D. Magdich
City Attorney
AVISO: Para obtener ayuda interpretativa con esta noticia, por favor (lame a la oficina de la
Secretaria Municipal, a las (209) 333-6702.
..J
CLERK\PUBHEAR\NOTICES\Noteud.doc 9/25/17
Exhibit A
Proposed Renewable Energy Surcharge
SECTION 13.20.185 SCHEDULE RES — RENEWABLE ENERGY SURCHARGE
A. Applicability. This schedule is applicable to all electric customers served by the City of Lodi.
Each customer shall pay the applicable rate(s) plus the Renewable Energy Surcharge
(RES) for each kilowatt-hour (kWh) delivered and sold to the customer.
The RES shall fund costs associated with the following activities:
• Lodi Electric Utility's purchase of renewable and/or carbon free energy;
• Community solar or other community renewable energy efforts; and/or
• Customer incentives associated with renewable energy and/or distributed generation.
B. Rates. A surcharge of $0.00125 will be applied to all kWh delivered and sold to each
customer in all rate classes and shall not be discounted.
All funds collected under this surcharge will be placed in an account solely for the purposes
identified above.