Loading...
HomeMy WebLinkAboutAgenda Report - September 20, 2017 C-03CITY OF LODI COUNCIL COMMUNICATION AGENDA ITEM C4•3 TM AGENDA TITLE: Adopt Resolution Rejecting All Bids for White Slough Water Pollution Control Facility Field 5 Levee Repair MEETING DATE: September 20, 2017 PREPARED BY: Public Works Director RECOMMENDED ACTION: Adopt resolution rejecting all bids for White Slough Water Pollution Control Facility Field 5 Levee Repair. BACKGROUND INFORMATION: Council approved the specifications, authorized the advertisement for bid, and authorized the City Manager to award the contract (not to exceed $75,000) on August 16, 2017. The City Manager had been authorized to award the construction contract to expedite completion of the work prior to the Giant Garter Snake (a state and federally protected species) hibernation period that begins on October 1, 2017. This project had a mandatory pre-bid meeting that was attended by five contractors. The City received only one bid on August 30, 2017 as follows: Bidder Preliminary Estimate Lamon Construction Location Yuba City Proposal $ 50,000 $137,000 The only bid received exceeded the City Manager's award authority of $75,000, making it impossible to complete the project prior to the October 1, 2017. Staff followed up with the contractors regarding the substantial difference between the preliminary estimate and the bid received. According to the single bidder, the additional costs were centered around the Giant Garter Snake mitigation measures and overtime required to complete the work within the project timeline. Other contractors cited the short construction window and the current workload as reasons for not submitting a bid. The levee repair project will be rebid over the winter with construction anticipated during the spring of 2018 to allow for a longer construction window. Until the levee is repaired, access to certain land application area facilities will be limited to standard maintenance vehicles. FISCAL IMPACT: Since heavy equipment access may be limited during the winter months, maintenance/repair work on existing pumping facilities requiring Field 5 Levee road access may be more costly until the levee road is repaired. FUNDING AVAILABLE: Wastewater Treatment Plant Operations funds would be used. Charles E. Swimiey, Jr Public Works Director Prepared by Sean Nathan, Senior Civil Engineer CES/SN/tdb cc: Utility Superintendent Wastewater Plant Superintendent Lamon Construction APPROVED: , City Manager K:\WP\PROJECTS\SEWER\WSWPCF\Field 5 Levee Repair\CSA— Reject-Rebid.doc 9/12/2017 RESOLUTION NO. 2017-179 A RESOLUTION OF THE LODI CITY COUNCIL REJECTING ALL BIDS FOR WHITE SLOUGH WATER POLLUTION CONTROL FACILITY FIELD 5 LEVEE REPAIR WHEREAS, Council approved the specifications, authorized the advertisement for bids, and authorized the City Manager to award the contract (not to exceed $75,000) on August 16, 2017; and WHEREAS, the City received only one bid on August 30, 2017, as follows: Bidder Preliminary Estimate Lamon Construction Location Yuba City Proposal $ 50,000 $137,000 WHEREAS, because the bid received exceeded the City Manager's award authority of $75,000, it is not possible to complete the project prior to the October 1, 2017, deadline, requiring the bid to be rejected; and WHEREAS, staff recommends that the City Council reject all bids for White Slough Water Pollution Control Facility Field 5 Levee Repair. NOW, THEREFORE, BE IT RESOLVED that the Lodi City Council does hereby reject all bids for White Slough Water Pollution Control Facility Field 5 Levee Repair. Dated: September 20, 2017 I hereby certify that Resolution No. 2017-179 was passed and adopted by the City Council of the City of Lodi in a regular meeting held September 20, 2017 by the following vote: AYES: COUNCIL MEMBERS — Chandler, Nakanishi, and Mayor Kuehne NOES: COUNCIL MEMBERS — None ABSENT: COUNCIL MEMBERS — Johnson and Mounce ABSTAIN: COUNCIL MEMBERS — None 2017-179 NNIFER itoF RRAIOLO ity Clerk