Loading...
HomeMy WebLinkAboutAgenda Report - August 16, 2017 C-05TM CITY OF LODI COUNCIL COMMUNICATION AGENDA ITEM C-5 AGENDA TITLE: Accept Improvements Under Contract for Lodi Bus Wash Improvements Project MEETING DATE: August 16, 2017 PREPARED BY: Public Works Director RECOMMENDED ACTION: Accept improvements under contract for Lodi Bus Wash Improvements Project. BACKGROUND INFORMATION: This project was awarded to Diede Construction, Inc., of Woodbridge, on May 4, 2016, in the amount of $425,569. The contract has been completed in substantial conformance with the plans and specifications approved by City Council on October 21, 2015. The current transit operations contract requires that the transit buses in operation (20 buses) be washed one time per week. The City currently shares a bus wash system located at the Lodi Unified School District (LUSD) Transportation Facility on Vine Street, east of Highway 99. It takes a driver and a LUSD required "spotter" a total of 1.25 man hours to perform one bus wash, including the round trip travel time using the LUSD shared system. The new bus wash system is located next to the City's compressed natural gas fueling station, allowing the drivers to wash buses more efficiently (wash time approximately two minutes per bus) directly after fueling. This substantial reduction in bus wash time is expected to save the Transit Division at least $60,000 per year in vehicle wear and tear and fuel costs. This project consisted of modifications to the existing Municipal Utility Services wash bay by installing a fixed -gantry, drive-through vehicle wash system. The wash system is suitable for washing the City's smaller and larger buses with high pressure nozzles and brushes. A touchless wash is also provided to accommodate the City's heavy-duty and light-duty vehicles. The wash system includes a water recycling system to save water while reducing discharges to the City wastewater system. Photos of the completed work are shown in Exhibit A. The original contract completion date was February 9, 2017 and the actual contract completion date was July 19, 2017. The final cost of the project was $508,105. The difference between the original contract amount and final contract amount is due to three change orders, all requested by the City. Change Order No. 1 included relocating bollards, electrical line, additional asphalt concrete for sewer relocation, and larger size electrical conduits ($4,424). Change Order No. 2 included additional excavation, asphalt base, grading and paving, additional lighting in the bus wash area, and relocating existing electrical and mechanical lines ($20,316). Change Order No. 3 included additional bus wash equipment to accommodate washing the front of buses equipped with bicycle racks, and relocating the equipment to provide access to the operating panel for safety reasons ($57,796). Following acceptance by the City Council, as required by law, the City Engineer will file a Notice of Completion with the County Recorder's office. The notice serves to notify vendors and subcontractors that APPROVED: Stephen Sc wa K:\WP\PROJECTS\TRANSIT\MSC Bus Wash\CAward bus wash.doc er, City Manager 8/2/17 Accept Improvements Under Contract for Lodi Bus Wash Improvements Project August 16, 2017 Page 2 the project is complete and begins their 30 -day period to file a stop notice requiring the City to withhold payments from the prime contractor in the event of a payment dispute. FISCAL IMPACT: There will be an increase in the long-term maintenance costs associated with these improvements, which will be absorbed in the Transit Operations budget. However, the new bus wash, will be substantially more efficient, reducing annual operating costs by at least $60,000 per year in vehicle wear and tear and fuel costs. FUNDING AVAILABLE: This project was funded by Transportation Development Act funds (60199000). Charles E. Swimley, Jr. Public Works Director Prepared by Paula J. Fernandez, Transportation Manager/Senior Traffic Engineer CES/PJF/tdb Attachment cc: Transportation Manager/Senior Traffic Engineer Fleet Services Supervisor Diede Construction, Inc. KPFF, Dan Allwardt K:\WP\PROJECTS\TRANSIT\MSC Bus Wash\Caccept bus wash.doc 8/2/17 CITY COUNCIL DOUG KUEHNE, Mayor ALAN NAKANISHI, Mayor Pro Tempore MARK CHANDLER BOB JOHNSON JOANNE MOUNCE CITY OF LODI CITY HALL, 221 WEST PINE STREET P.O. BOX 3006 LODI, CALIFORNIA 95241-1910 (209) 333-6706 / FAX (209) 333-6710 EMAIL: pwdept@lodi gov www.lodi.gov August 10, 2017 KPFF 1508 Eureka Road, Suite 290 Roseville, CA 95661 STEPHEN SCHWABAUER City Manager JENNIFER M. FERRAIOLO City Clerk JANICE D. MAGDICH City Attorney CHARLES E. SWIMLEY, JR. Public Works Director SUBJECT: Accept Improvements Under Contract for Lodi Bus Wash Improvements Project Enclosed is a copy of background information on an item on the City Council agenda of Wednesday, August 16, 2017. The meeting will be held at 7 p.m. in the City Council Chamber, Carnegie Forum, 305 West Pine Street. This item is on the consent calendar and is usually not discussed unless a Council Member requests discussion. The public is given an opportunity to address items on the consent calendar at the appropriate time. If you wish to write to the City Council, please address your letter to City Council, City of Lodi, P. O. Box 3006, Lodi, California, 95241-1910. Be sure to allow time for the mail. Or, you may hand -deliver the letter to City Hall, 221 West Pine Street. If you wish to address the Council at the Council Meeting, be sure to fill out a speaker's card (available at the Carnegie Forum immediately prior to the start of the meeting) and give it to the City Clerk. If you have any questions about communicating with the Council, please contact Jennifer M. Ferraiolo, City Clerk, at (209) 333-6702. If you have any questions about the item itself, please call Paula Fernandez at (209) 333- 6706. / - Y Ides E. Swimley, Jr. lic Works Director CES/tdb Enclosure cc: City Clerk CITY COUNCIL DOUG KUEHNE, Mayor ALAN NAKANISHI, Mayor Pro Tempore MARK CHANDLER BOB JOHNSON JOANNE MOUNCE Diede Construction, Inc. P.O. Box 1007 Woodbridge, CA 95258 CITY OF LODI CITY HALL, 221 WEST PINE STREET P 0. BOX 3006 LODI, CALIFORNIA 95241-1910 (209) 333-6706 / FAX (209) 333-6710 EMAIL: pwdept@lodi gov www.lodi.00v August 10, 2017 STEPHEN SCHWABAUER City Manager JENNIFER M. FERRAIOLO City Clerk JANICE D. MAGDICH City Attorney CHARLES E. SWIMLEY, JR Public Works Director SUBJECT: Accept Improvements Under Contract for Lodi Bus Wash Improvements Project Enclosed is a copy of background information on an item on the City Council agenda of Wednesday, August 16, 2017. The meeting will be held at 7 p.m. in the City Council Chamber, Carnegie Forum, 305 West Pine Street. This item is on the consent calendar and is usually not discussed unless a Council Member requests discussion. The public is given an opportunity to address items on the consent calendar at the appropriate time. If you wish to write to the City Council, please address your letter to City Council, City of Lodi, P. O. Box 3006, Lodi, California, 95241-1910. Be sure to allow time for the mail. Or, you may hand -deliver the letter to City Hall, 221 West Pine Street. If you wish to address the Council at the Council Meeting, be sure to fill out a speaker's card (available at the Carnegie Forum immediately prior to the start of the meeting) and give it to the City Clerk. If you have any questions about communicating with the Council, please contact Jennifer M. Ferraiolo, City Clerk, at (209) 333-6702. If you have any questions about the item itself, please call Paula Fernandez at (209) 333- 0706lqikitt/. Charles E. Swimley, Jr. Public Works Director CES/tdb Enclosure cc: City Clerk