Loading...
HomeMy WebLinkAboutAgenda Report - June 7, 2017 C-16TM CITY OF LODI COUNCIL COMMUNICATION AGENDA ITEM CIb AGENDA TITLE: Receive Update on Emergency Condition at Lodi Lake Nature Area, Emergency Repair of Mokelumne River Levee MEETING DATE: June 7, 2017 PREPARED BY: Public Works Director RECOMMENDED ACTION: Receive update on emergency condition at Lodi Lake Nature Area, emergency repair of Mokelumne River levee. BACKGROUND INFORMATION: On April 11, 2017, Park's staff noticed that a portion of the Mokelumne River levee at the Lodi Lake Nature Area trail has eroded into the river, at the location shown on Exhibit A. The eroded vertical face of the levee bank, along with fresh cracks appearing along the levee structure indicated the levee was becoming unstable and could fail at any time, as shown in Exhibit B. This portion of the levee was repaired in 2012 by Woodbridge Irrigation District, however, the combination of sustained high river flows experienced this winter, along with minimal regrowth of vegetation in the repair area, had caused a substantial portion of the heavily saturated slope to fall into the river. If the levee had failed, it would have caused flooding in the nature area, potentially killing trees and native plants, and displacing wildlife. In response, Staff retained the services of Kjeldsen, Sinnock & Neudeck, Inc. (KSN), a local engineering firm that specializes in levee maintenance and repair, to assist staff with formulating an expedited plan to repair the damaged levee section. On April 19, 2017, Council declared a local emergency and authorized the City Manager to execute the required documents to perform the repairs. Staff conducted an informal bid process and received the following two bids for this project on May 9, 2017. Bidder Location Bid Engineer's Estimate $145,900.00 Ford Construction, Inc. Lodi $ 94,010.00 A.M. Stephens Construction, Inc. Lodi $113,032.00 The construction work to repair the Mokelumne River levee began on May 10, 2017. During construction, the contractor found more damage to the levee than was originally believed to exist, requiring a minor design modification to control costs. The substantial completion date was May 24, 2017 and is shown in Exhibit C. The remaining work includes portions of the nature trail that was disturbed by the construction work and some replanting of vegetation in the area of the levee repair. Expenditures as of May 24, 2017 are approximately $135,000. The total cost is not expected to exceed $175,000 including City staff time and KSN's consulting fee, which is substantially less than the original appropriation of $250,000. A timeline of the procurement and construction schedule is reflected below. As noted above, the repairs were substantially complete on May 24, 2017. APPROVED: chwab t.e ity Manager K:\WP\PROJECTS\PARKS\LODILAKE\Levee Repair 2017\CUpdate060717.doc 6/2/17 Receive Update on Emergency Condition at Lodi Lake Nature Area, Emergency Repair of Mokelumne River Levee June 7, 2017 Page 2 Project Definition Meeting / Initiate design contract (KSN) Emergency Declaration / Authorize Project Submittal of FEMA claim reimbursement Conduct Pre -Bid Meeting Receive Bids Contract Executed Substantial Project Completion FISCAL IMPACT: April 17, 2017 April 19, 2017 April 24, 2017 May 5, 2017 May 9, 2017 May 10, 2017 May 24, 2017 This emergency project is funded using the General Fund Capital Outlay Fund. Discussions with the Federal Emergency Management Agency (FEMA) staff indicate the City is eligible to recover up to 75 percent of the project costs from the Federal Government and 18.75 percent from the State of California. The City of Lodi is responsible for the remaining funding obligation of 6.25 percent. FUNDING AVAILABLE: On April 19, 2017, Council appropriated $250,000 from the General Fund Capital Outlay Fund for this project. Charles E. Swiml r. y, Public Works Director CES/CES/tdb Attachments cc: Senior Civil Engineer Nathan Wastewater Plant Superintendent Construction Project Manager K:\WP\PROJECTS\PARKS\LODILAKE\Levee Repair 2017\CUpdate060717.doc 5/25/17 River Bank Erosion Areal Lodi Lake Wilderness / Nature Area Edgewood Mokelumne River Lodi Lake (Water Drained) vorthwo0 Maplewood 'vorthw0o Kirkwood italGlobe, Aeregrid, Lodi Lake Wilderness and Nature Area 1101 W Turner Road, Lodi s 1 inch = 400 feet Path: K:\DESIGN\Projects\GIS\Lodi_Lake.mxd