AGENDA TITLE: Adopt Resolution Awarding Contract for 2017 Pavement Crack Sealing to Graham
Contractors, Inc., of San Jose ($54,790)
MEETING DATE: May 3, 2017
PREPARED BY: Public Works Director
RECOMMENDED ACTION: Adopt resolution awarding contract for 2017 Pavement Crack
Sealing to Graham Contractors, Inc., of San Jose, in the amount of
$54,790.
BACKGROUND INFORMATION: This project consists of thoroughly cleaning and sealing the existing
transverse and longitudinal cracks in pavement surfaces and
includes other incidental and related work as described in the
specifications. The primary cause of asphalt failure is water infiltration into the street subgrade. Crack
sealing is one of the most basic, and important, preventive street maintenance practices. This contract is
intended to supplement work performed by Street Division crews to maximize the street area sealed each
year. The 2017 locations are shown on Exhibit A and listed on Exhibit B.
Plans and specifications for this project were approved on March 15, 2017. The City received the
following two bids for this project on April 12, 2017.
Bidder Location Bid
Engineer's Estimate $ 64,751.83
Graham Contractors, Inc. San Jose $ 54,790.01 *
Bond Blacktop Union City $ 83,106.08 *
* Corrected Figure
Staff recommends awarding the contract for the 2017 Pavement Crack Sealing to Graham Contractors,
Inc., of San Jose, in the amount of $54,790.
FISCAL IMPACT: The City's crack sealing effort extends the useful life of the City streets. If
this street maintenance activity is not performed on a regular basis, future,
more costly repairs may be necessary.
FUNDING AVAILABLE: Budgeted Fiscal Year 2016/17 TDA Streets (30599000.77020).
(fAttka VI )61
Andrew Keys
Deputy City Manager/Internal Services Director
Prepared by Sean Nathan, Senior Civil Engineer
CES/SN/tdb
Attachments
cc: Utility Manager
Charles E. Swimley, Jr.
Public Works Director
fl�
APPROVED: cki" r�
Stephen Schw bau , City Manager
K:\WP\PROJECTS\STREETS\2017 Crack Seal\CAward.doc 4/21/17
1•..11
...111
...I.
jnnnl
„HIM
EXHIBIT A
2017 Crack Seal Locations
-I 111I1��
mo
1 4.1111111 -
1111111111
:'11!11111
:111!11111
111111=
1111111111
2017 Crack Seal Locations
Railroad
•ft.••4
.9
c•I 3
—1111
tin,
s .i -- .,
jo'12: '•`. 1'1
Turner Rd. �.
CO N
J
v11111111111
i1MPM
:nn
MEM
81
Minium
1111
11111/11
1!111111
1111111
1111111
111mi
DIM
1111111
111111
11111
rrhl: 11111
:11■111i
I.
11111111
Hill
111111
111!9
11111:
111111
1111!
:!!111
911
ii
n..nu.e
11111111
11111111
7111111
:111111
/1111111111
111
Vine St
11111
Ira
11
LIE
ffia
:II
s
0 0.25 0.5
Miles
Lockeford St.
Ea
Eirl
.. .mi�'TCI�ry1!
11EmSt1111I I
Nf111�11Plilne St.
®❑ Ie I1WJL
II1
11111/11
Nunn
II1111111111B
:11;n_
ILn_
=11111■
1111111111111
0
11111111111
111111111111
111111111111
1111111111111
_IIII
VIII
1111:
1111:
•11i1
EE
=I=
,111111111111111
7
18
=11111111111
1:1:::iimi11
11111111111111
11,1,1:1
11•11nn1
11111111111
!!1111:111:
illi iia:il
111111111=
ill!ll!1111!
11111111111:
I:IIIiii11:
111!11111=
H11111lilll
n:a11n=
511111°'
�IIIIIIL_
-111p111_
IIIIIIIll
IIIIII..�
11.IIg
MEM
I�111i
11111111:
I111111n
111111•1111111111"
111111111� 1•
111111111=
1111 im:
i.ii
11111111.
IIIIIIIIII
IIInnIL
1■
1111111111:
•111111111=
111111
1711111
HOWE
P11111
!!11111111
1111111111
Lord i
Avl
:1111111111
11111111111
amour!
Illililliil
!lnrnl!!!
IIIIIi:1a
_1!1!11111
:mann
111111111
111111
II
Em111
:1111111111
=_num
!11111111=_
.1S11111IHI
11 11117
n.mi:
■1111=
=111111=
1111111N
111111111111
!!!11111111
1111111`
I'nn11111
"1'l:_■
1i:111111::
1:111:1111.
i4nn1111
:111..
-1111M
Im
herokee Ln.
91
Victor Rd.(HWY 12)
M
M
Pine St
I 1
C.C.T. Railroad.
39
Kettleman Ln.
u
11. 11111I..I.................
11I..1111.
uhhhIhiliii T
I::I
1
I1
►'
IA
PI
tr
ER
Z.
-II111I111.
111111111.
11E
- 7s.
=
mi 111111/ ii;
11.. 111111 7
�: 111111 - :..
1
1
1
1
1
L
r
1
\\CVCFILV02\PubWks$\WP\PROJECTS\STREETS\2017 Crack Seal \2017 Crack Seal-Exhibit-A.mxd
Exhibit B
Site Description
ID
Road Name
From
To
Street
Length (ft)
Width (ft)
Area (SF)
1
Awani Dr.
Mokelumne River Dr.
END
182
36
6,552
2
Awani Dr.
Otta Dr.
Mokelumne River Dr.
501
36
18,036
3
Koni Ct.
E END
Miwok Dr.
336
36
12,096
4
Lowe St.
Sacramento St.
END
136
35
4,760
5
Lowe St.
School St.
Sacramento St.
251
35
8,785
6
Miwok Dr.
Koni Ct.
Mokelumne River Dr.
350
36
12,600
7
Miwok Dr.
Koni Ct.
Otta Dr.
261
36
9,396
8
Miwok Dr.
Otta Dr.
Turner Rd.
197
36
7,092
9
Mokelumne River Dr.
Miwok Dr.
Awani Dr.
699
36
25,164
10
Mokelumne River Dr.
Yuloni Dr.
Miwok Dr.
293
36
10,548
11
Mokelumne River Dr.
Yuloni Dr.
Wintun Dr.
251
36
9,036
12
Mokelumne River Dr.
Wintun Dr.
E END
340
36
12,240
13
Sacramento St.
Village St.
Lowe St.
849
34
28,866
14
Sacramento St.
Village St.
Schlenker Dr.
973
34
33,082
15
School St.
Lowe St.
Kettleman Ln.
150
24
3,600
16
School St.
Village St.
Lowe St.
821
24
19,704
17
School St.
Village St.
Schlenker Dr.
1,002
24
24,048
18
Village St.
Church St.
School St.
278
35
9,730
19
Village St.
School St.
Sacramento St.
250
35
8,750
20
Village St.
Sacramento St.
E END
135
35
4,725
21
Wintun Dr.
Mokelumne River Dr.
Yuloni Dr.
376
36
13,536
22
Wintun Dr.
Turner Rd.
Yuloni Dr.
168
36
6,048
23
Yuloni Dr.
Wintun Dr.
Mokelumne River Dr.
819
36
29,484
24
Beckman Rd.
Turner Rd.
Black Diamond St.
2,163
24
51,912
25
Beckman Rd.
Black Diamond St.
Lockeford St.
783
33
25,839
26
Black Diamond St.
Beckman Rd.
Cluff Av.
1,666
45
74,970
27
Cluff Av.
Victor Rd.(HWY 12)
Mounce St.
613
45
27,585
28
Cluff Av.
Mounce St.
Pine St.
734
45
33,030
29
CluffAv.
Lodi Av.
Pine St.
1,171
45
52,695
30
Cluff Av.
Industrial Wy.
Vine St.
733
45
32,985
31
Industrial Wy.
Beckman Rd.
Cluff Av.
1,277
61
77,897
32
Industrial Wy.
CluffAv.
Guild Av.
1,332
35
46,620
33
Kelly St.
Lodi Av.
Pine St.
1,136
24
27,264
34
Lockeford St.
Cherokee Ln.
Hwy. 99
818
34
27,812
35
Maggio Cir.
Stockton St.
2395 Maggio Cir.
700
42
29,400
36
Maggio Cir.
2459 Maggio Cir
Stockton St.
730
42
30,660
37
Maggio Cir.
2395 Maggio Cir
2459 Maggio Cir
650
24
15,600
38
Mounce St.
Cluff Av.
END
402
40
16,080
39
Thurman St.
Beckman Rd.
Guild Av.
2,399
45
107,955
Total:
996,182
2017 PAVEMENT CRACK SEALING
Various Locations CONTRACT
CITY OF LODI, CALIFORNIA
THIS CONTRACT made by and between the CITY OF LODI, State of California, herein
referred to as the "City," and GRAHAM CONTRACTORS, INC., a California Corporation, herein
referred to as the "Contractor."
WITNESSETH:
That the parties hereto have mutually covenanted and agreed, and by these presents do
covenant and agree with each other, as follows:
The complete Contract consists of the following documents which are incorporated herein by
this reference, to -wit:
Notice Inviting Bids
Information to Bidders
General Provisions
Special Provisions
Bid Proposal
Contract
Contract Bonds
Plans
The July 1992 Edition,
Standard Specifications,
State of California,
Business and Transportation Agency,
Department of Transportation
All of the above documents, sometimes hereinafter referred to as the "Contract Documents,"
are intended to cooperate so that any work called for in one and not mentioned in the other is to
be executed the same as if mentioned in all said documents.
ARTICLE I - That for and in consideration of the payments and agreements hereinafter
mentioned, to be made and performed by the City and under the condition expressed in the two
bonds bearing even date with these presents and hereunto annexed, the Contractor agrees
with the City, at Contractor's cost and expense, to do all the work and furnish all the materials
except such as are mentioned in the specifications to be furnished by the City, necessary to
construct and complete in a good workmanlike and substantial manner and to the satisfaction
of the City the proposed improvements as shown and described in the Contract Documents
which are hereby made a part of the Contract.
ARTICLE II - The City hereby promises and agrees with the Contractor to employ, and does
hereby employ, the Contractor to provide all materials and services not supplied by the City and
to do the work according to the terms and conditions for the price herein, and hereby contracts
to pay the same as set forth in Section 5.600, "Measurement, Acceptance and Payment," of the
General Provisions, in the manner and upon the conditions above set forth; and the said parties
for themselves, their heirs, executors, administrators, successors and assigns, do hereby agree
to the full performance of the covenants herein contained.
ARTICLE III - The Contractor agrees to conform to the provisions of Chapter 1, Part 7, Division
2 of the Labor Code. The Contractor and any Subcontractor will pay the general prevailing
CONTRACT.doc
4.1
4/13/2017
wage rate and other employer payments for health and welfare, pension, vacation, travel time,
and subsistence pay, apprenticeship or other training programs. The responsibility for
compliance with these Labor Code requirements is on the prime contractor.
ARTICLE IV - And the Contractor agrees to receive and accept the following prices as full
compensation for furnishing all materials and for doing all the work contemplated and embraced
in this agreement; also for all loss or damage arising out of the nature of the work aforesaid or
from the action of the elements, or from any unforeseen difficulties or obstructions which may
arise or be encountered in the prosecution of the work until its acceptance by the City, and for
all risks of every description connected with the work; also for all expenses incurred by or in
consequence of the suspension or discontinuance of work and for well and faithfully completing
the work, and the whole thereof, in the manner and according to the Plans and Contract
Documents and the requirements of the Engineer under them, to -wit:
Perform the work necessary for thoroughly cleaning and sealing the existing transverse and
longitudinal cracks and joints and random cracks in bituminous pavement surfaces and includes
other incidental and related work as described in the specifications.
See Section 6-07 "Description of Bid Items" and Exhibits A and B for additional information,
CONTRACT ITEMS
Item
Description
Approx. Street
Area (SF)
Price / SF
Total Cost / Street
1
Awani Dr.
24,588
$0.055
$1,352.34
2
Koni Ct.
12,096
$0.055
$665.28
3
Lowe St.
13,545
$0.055
$744.97
4
Miwok Dr.
29,088
$0.055
$1,599.84
5
Mokelumne River Dr.
56,988
$0.055
$3,134.34
6
Sacramento St.
61,948
$0.055
$3,407.14
7
School St.
47,352
$0.055
$2,604.36
8
Village St.
23,205
$0.055
$1,276.27
9
Wintun Dr.
19,584
$0.055
$1,077.12
10
Yuloni Dr.
29,484
$0.055
$1,621.62
11
Beckman Rd.
77,751
$0.055
$4,276.30
12
Black Diamond St.
74,970
$0.055
$4,123.35
13
Cluff Av.
146,295
$0.055
$8,046.22
14
Industrial Wy.
124,517
$0.055
$6,848.43
15
Kelly St.
27,264
$0.055
$1,499.52
16
Lockeford St.
27,812
$0.055
$1,529.66
17
Maggio Cir.
75,660
$0.055
$4,161.30
18
Mounce St.
16,080
$0.055
$884.40
19
Thurman St.
107,955
$0.055
$5,937.52 _.___,
CONTRACT.doc
4.2
TOTAL : $ 54,789.98
4/13/2017
ARTICLE V - By my signature hereunder, as Contractor, I certify that I am aware of the
provisions of Section 3700 of the Labor Code, which requires every employer to be insured
against liability for workers' compensation or to undertake self-insurance in accordance with the
provisions of that code, and I will comply with such provisions before commencing the
performance of the work of this contract.
ARTICLE VI - It is further expressly agreed by and between the parties hereto that, should
there be any conflict between the terms of this instrument and the Bid Proposal of the
Contractor, then this instrument shall control and nothing herein shall be considered as an
acceptance of the said terms of said proposal conflicting herewith.
ARTICLE VII - The City is to furnish the necessary rights-of-way and easements and to
establish lines and grades for the work as specified under the Special Provisions. All labor or
materials not mentioned specifically as being done by the City will be supplied by the Contractor
to accomplish the work as outlined in the specifications.
ARTICLE VIII - The Contractor agrees to commence work pursuant to this contract within 15
calendar days after the City Manager has executed the contract and to diligently prosecute to
completion within 30 CALENDAR DAYS.
ARTICLE IX - State of California Senate Bill 854 requires the following
• No contractor or subcontractor may be listed on a bid proposal for a public works project
unless registered with the Department of Industrial Relations pursuant to Labor Code
section 1725.5 [with limited exceptions from this requirement for bid purposes only
under Labor Code section 1771.1(a)].
• No contractor or subcontractor may be awarded a contract for public work on a public
works project unless registered with the Department of Industrial Relations pursuant to
Labor Code section 1725.5.
• This project is subject to compliance monitoring and enforcement by the Department of
Industrial Relations.
WHEN SIGNING THIS CONTRACT, THE CONTRACTOR AGREES THAT THE TIME OF
COMPLETION FOR THIS CONTRACT IS REASONABLE AND THE CONTRACTOR AGREES
TO PAY THE CITY LIQUIDATED DAMAGES AS SET FORTH IN SECTION 6-04.03 OF THE
SPECIAL PROVISIONS. CONTRACTOR AGREES THAT THIS AMOUNT MAY BE
DEDUCTED FROM THE AMOUNT DUE THE CONTRACTOR UNDER THE CONTRACT.
CONTRACT doc
4.3
4/13/2017
IN WITNESS WHEREOF, the parties to these presents have hereunto set their hands the year
and date written below.
CONTRACTOR CITY OF LODI, a municipal corporation
By:
STEPHEN SCHWABAUER
City Manager
By: Date:
Attest:
Title
JENNIFER M. FERRAIOLO
City Clerk
(CORPORATE SEAL) Approved As To Form:
CONTRACT doe
JANICE D. MAGDICH
City Attorney
4.4
4/13/2017
RESOLUTION NO. 2017-79
A RESOLUTION OF THE LODI CITY COUNCIL AWARDING THE
CONTRACT FOR THE 2017 PAVEMENT CRACK SEALING
PROJECT TO GRAHAM CONTRACTORS, INC., OF SAN JOSE
WHEREAS, in answer to notice duly published in accordance with law and the order of
this City Council, sealed bids were received and publicly opened on April 12, 2017, at
11:00 a.m., for the 2017 Pavement Crack Sealing Project, described in the plans and
specifications therefore approved by the City Council on March 15, 2017; and
WHEREAS, the 2017 Pavement Crack Sealing Project includes thoroughly cleaning and
sealing the existing transverse and longitudinal cracks in pavement surfaces and includes other
incidental and related work as described in the specifications; and
WHEREAS, said bids have been checked and tabulated and a report thereof filed with
the City Manager as follows:
Bidder Bid
Graham Contractors, Inc. $ 54,790.01 *
Bond Blacktop $ 83,106.08 *
* Corrected Figure
WHEREAS, staff recommends awarding the contract for the 2017 Pavement Crack
Sealing Project to the low bidder, Graham Contractors, Inc., of San Jose, in the amount of
$54,790.01.
NOW, THEREFORE, BE IT RESOLVED that the Lodi City Council does hereby award
the contract for the 2017 Pavement Crack Sealing Project to Graham Contractors, Inc., of
San Jose, California, in the amount of $54,790.01; and
BE IT FURTHER RESOLVED that the City Manager is hereby authorized to execute the
contract on behalf of the City of Lodi.
Dated: May 3, 2017
I hereby certify that Resolution No. 2017-79 was passed and adopted by the City
Council of the City of Lodi in a regular meeting held May 3, 2017 by the following vote:
AYES: COUNCIL MEMBERS — Chandler, Johnson, Mounce, Nakanishi, and
Mayor Kuehne
NOES: COUNCIL MEMBERS — None
ABSENT: COUNCIL MEMBERS — None
ABSTAIN: COUNCIL MEMBERS — None
---, ` L/1)u1VNIFERI
City Clerk
2017-79
FERRAIOLO