CITY OF LODI
COUNCIL COM M UNICATION
AGENDA ITEM
AGENDA TITLE: Adopt Resolution Authorizing City Manager to Execute Amendment No. 1 to
Professional Services Agreement with Holmes International, Inc., of Sacramento,
for Wastewater Pipeline Condition Assessment Project ($57,125)
MEETING DATE: April 19, 2017
PREPARED BY: Public Works Director
RECOMMENDED ACTION: Adopt resolution authorizing City Manager to execute Amendment
No. 1 to Professional Services Agreement with Holmes
International, Inc., of Sacramento, for Wastewater Pipeline
Condition Assessment Project, in the amount of $57,125.
BACKGROUND INFORMATION: On December 7, 2016, City Council approved the Professional
Services Agreement with Holmes International, Inc., for wastewater
pipeline condition assessment. The scope of work consists of
cleaning the pipelines to be inspected, inspecting the pipeline interior using a high definition 3D digital
panoramic camera, preparing the inspection and condition assessment reports, and preparing a capital
improvement program to identify and prioritize necessary repairs to the pipelines. In total, approximately
36,100 linear feet of pipes will be inspected and assessed.
After conducting the standard two -pass cleaning process stipulated in the Professional Services
Agreement, Holmes International, Inc., discovered a large amount of sediment remaining in the 42 -inch
pipeline in Century Boulevard. Since this large amount of sediment cannot be removed with the regular
cleaning process, they proposed to perform deep pipeline cleaning to remove the remaining material in
order to complete the pipeline inspection. The cost of the additional deep cleaning will be approximately
$52,325. Because the City does not have the proper equipment to clean large -diameter pipeline, staff
recommends Holmes International, Inc., perform deep cleaning of the pipeline.
Staff has determined there are 16 additional manholes requiring manned entry inspections than initially
estimated in the original Professional Services Agreement. Staff recommends adding 16 manned entry
manhole inspections to the scope of service, at a cost of $4,800.
Staff recommends authorizing City Manager to execute Amendment No. 1 to the Professional Services
Agreement with Holmes International, Inc., of Sacramento, for Wastewater Pipeline Condition
Assessment Project.
FISCAL IMPACT:
Performing the pipeline condition assessment is intended to support
planned capital maintenance activities in order to prevent costly
unbudgeted repairs to the aging pipeline infrastructure.
APPROVED:
• en Sc - + _ er, City Manager
K:\WP\PROJECTS\SEWER\Trunk Line Inspection\CC_HolmesPSA Amendment 01.doc 4/1 0/1 7
Adopt Resolution Authorizing City Manager to Execute Amendment No. 1 to Professional Services Agreement with Holmes International, Inc., of Sacramento, for
Wastewater Pipeline Condition Assessment Project ($57,125)
April 19, 2017
Page 2
FUNDING AVAILABLE: Wastewater Capital Fund (53199000.77020): $57,125
Andrew Keys
Deputy City Manager/Internal Services Director
Charles E. Swimley, Jr.
Public Works Director
Prepared by Lyman Chang, City Engineer/Deputy Public Works Director
LC/CS/tdb
Attachment
cc: City Engineer / Deputy Public Works Director Chang
Utility Manager Roberts
Public Works Management Analysis Areida-Yadav
Holmes International
K:\WP\PROJECTS\SEWER\Trunk Line Inspection\CC_HolmesPSA_Amendment 01.doc 4/5/17
AMENDMENT NO. 1
PROFESSIONAL SERVICES AGREEMENT
HOLMES INTERNATIONAL
THIS AMENDMENT NO. 1 TO PROFESSIONAL SERVICES AGREEMENT, is made and
entered this day of April, 2017, by and between the CITY OF LODI, a municipal corporation
(hereinafter "CITY"), and HOLMES INTERNATIONAL (hereinafter "CONTRACTOR").
WITNESSETH:
1. WHEREAS, CONTRACTOR and CITY entered into Professional Services Agreement (the
"Agreement") on January 4, 2017, as set forth in Exhibit 1, attached hereto and made part
hereof; and
2. WHEREAS, CITY requested to amend the Scope of Services and increase the Fees by
$57,125, for a total amount of $532,466, as set forth in Exhibit 2, attached hereto and made
part hereof; and
3. WHEREAS, CONTRACTOR agrees to said amendment.
NOW, THEREFORE, the parties agree to amend the Scope of Service and Fees as set forth
in Exhibit 2. All other terms and conditions of the Agreement remain unchanged.
IN WITNESS WHEREOF, CITY and CONTRACTOR have executed this Amendment No. 1 on
the date and year first above written.
CITY OF LODI, a municipal corporation HOLMES INTERNATIONAL
hereinabove called "CITY" hereinabove called "CONTRACTOR"
STEPHEN SCHWABAUER KENNETH T. HOLMES, P.E.
City Manager Owner/Project Manager
Attest
JENNIFER M. FERRAIOLO, City Clerk
Approved as to Form:
JANICE D. MAGDICH, City Attorney I'
AGREEMENT FOR PROFESSIONAL SERVICES
ARTICLE 1
PARTIES AND PURPOSE
Section 1.1 Parties
Exhibit 1
THIS AGREEMENT is entered into on t 201fr by and between
the CITY OF LODI, a municipal corporation (herei after "CITY"), and HOLMES
INTERNATIONAL (hereinafter "CONTRACTOR")
Section 1.2 Purpose
CITY selected the CONTRACTOR to provide the services required in
accordance with attached Scope of Services, Exhibit A, attached and incorporated by
this reference.
CITY wishes to enter into an agreement with CONTRACTOR for wastewater
pipeline condition assessment (hereinafter "Project") as set forth in the Scope of
Services attached here as Exhibit A. CONTRACTOR acknowledges that it is qualified to
provide such services to CITY.
ARTICLE 2
SCOPE OF SERVICES
Section 2.1 Scope of Services
CONTRACTOR, for the benefit and at the direction of CITY, shall perform the
Scope of Services as set forth in Exhibit A.
Section 2.2 Time For Commencement and Completion of Work
CONTRACTOR shall commence work pursuant to this Agreement, upon receipt
of a written notice to proceed from CITY or on the date set forth in Section 2,6,
whichever occurs first, and shall perform all services diligently and complete work under
this Agreement based on a mutually agreed upon timeline or as otherwise designated in
the Scope of Services.
CONTRACTOR shall submit to CITY such reports, diagrams, drawings and other
work products as may be designated in the Scope of Services.
CONTRACTOR shall not be responsible for delays caused by the failure of CITY
staff to provide required data or review documents within the appropriate time frames.
The review time by CITY and any other agencies involved in the project shall not be
counted against CONTRACTOR's contract performance period. Also, any delays due to
weather, vandalism, acts of God, etc., shall not be counted. CONTRACTOR shall
1
remain in contact with reviewing agencies and make all efforts to review and return all
comments.
Section 2.3 Meetings
CONTRACTOR shall attend meetings as may be set forth in the Scope of
Services
Section 2.4 Staffing
CONTRACTOR acknowledges that CITY has relied on CONTRACTOR's
capabilities and on the qualifications of CONTRACTOR's principals and staff as
identified in its proposal to CITY. The Scope of Services shall be performed by
CONTRACTOR, unless agreed to otherwise by CITY in writing. CITY shall be notified
by CONTRACTOR of any change of Project Manager and CITY is granted the right of
approval of all original, additional and replacement personnel at CITY's sole discretion
and shall be notified by CONTRACTOR of any changes of CONTRACTOR's project staff
prior to any change.
CONTRACTOR represents it is prepared to and can perform all services within
the Scope of Services (Exhibit A) and is prepared to and can perform all services
specified therein. CONTRACTOR represents that it has, or will have at the time this
Agreement is executed, all licenses, permits, qualifications, insurance and approvals of
whatsoever nature are legally required for CONTRACTOR to practice its profession, and
that CONTRACTOR shall, at its own cost and expense, keep in effect during the life of
this Agreement all such licenses, permits, qualifications, insurance and approvals, and
shall indemnify, defend and hold harmless CITY against any costs associated with such
licenses, permits, qualifications, insurance and approvals which may be imposed against
CITY under this Agreement.
Section 2.5 Subcontracts
Unless prior written approval of CITY is obtained, CONTRACTOR shall not enter
into any subcontract with any other party for purposes of providing any work or services
covered by this Agreement.
Section 2.6 Term
The term of this Agreement commences on November 28, 2016 and terminates
upon the completion of the Scope of Services or on May 27, 2018, whichever occurs
first.
2
ARTICLE 3
COMPENSATION
Section 3.1 Compensation
CONTRACTOR's compensation for all work under this Agreement shall conform
to the provisions of the Fee Proposal, attached hereto as Exhibit B and incorporated by
this reference.
CONTRACTOR shall not undertake any work beyond the scope of this
Agreement unless such additional work is approved in advance and in writing by CITY.
Section 3.2 Prevailing Wage
The Contractor agrees to conform to the provisions of Chapter 1, Part 7, Division
2 of the Labor Code. The Contractor and any Subcontractor will pay the general
prevailing wage rate and other employer payments for health and welfare, pension,
vacation, travel time, and subsistence pay, apprenticeship or other training programs.
The responsibility for compliance with these Labor Code requirements is on the prime
contractor.
Section 3.3 Contractor Registration — Labor Code §1725.5
No contractor or subcontractor may be awarded a contract for public work on a
public works project (awarded on or after April 1, 2015) unless registered with the
Department of Industrial Relations pursuant to Labor Code section 1725.5
This project is subject to compliance monitoring and enforcement by the
Department of Industrial Relations.
Section 3.4 Payment Bond
CONTRACTOR shall furnish a good and sufficient payment bond for labor and
materials, in an amount covering 100% of the public work labor and materials identified
in the AGREEMENT. The bond shall be in a form as provided and approved by CITY.
The bond will be required at the time the signed AGREEMENT is returned to the CITY,
and shall be approved by CITY prior to performing any public work.
Section 3.5 Method of Payment
CONTRACTOR shall submit invoices for completed work on a monthly basis, or
as otherwise agreed, providing, without limitation, details as to amount of hours,
individual performing said work, hourly rate, and indicating to what aspect of the Scope
of Services said work is attributable. CONTRACTOR's compensation for all work under
this Agreement shall not exceed the amount of the Fee Proposal.
Section 3.6 Costs
The Fee Proposal shall include all reimbursable costs required for the
performance of the Scope of Services. Payment of additional reimbursable costs
3
considered to be over and above those inherent in the original Scope of Services shall
be approved in advanced and in writing, by CITY.
Section 3.7 Auditing
CITY reserves the right to periodically audit all charges made by CONTRACTOR
to CITY for services under this Agreement. Upon request, CONTRACTOR agrees to
furnish CITY, or a designated representative, with necessary information and assistance
needed to conduct such an audit.
CONTRACTOR agrees that CITY or its delegate will have the right to review,
obtain and copy all records pertaining to performance of this Agreement.
CONTRACTOR agrees to ,provide CITY or its delegate with any relevant information
requested and shall permit CITY or its delegate access to its premises, upon reasonable
notice, during normal business hours for the purpose of interviewing employees and
inspecting and copying such books, records, accounts, and other material that may be
relevant to a matter under investigation for the purpose of determining compliance with
this requirement. CONTRACTOR further agrees to maintain such records for a period of
three (3) years after final payment under this Agreement.
ARTICLE 4
MISCELLANEOUS PROVISIONS
Section 4.1 Nondiscrimination
In performing services under this Agreement, CONTRACTOR shall not
discriminate in the employment of its employees or in the engagement of any sub
CONTRACTOR on the basis of race, color, religion, sex, sexual orientation, marital
status, national origin, ancestry, age, or any other criteria prohibited by law.
Section 4.2 ADA Compliance
In performing services under this Agreement, CONTRACTOR shall comply with
the Americans with Disabilities Act (ADA) of 1990, and all amendments thereto, as well
as all applicable regulations and guidelines issued pursuant to the ADA.
Section 4.3 Indemnification and Responsibility for Damage
CONTRACTOR to the fullest extent permitted by law, shall indemnify and hold
harmless CITY, its elected and appointed officials, directors, officers, employees and
volunteers from and against any claims, damages, losses, and expenses (including
4
reasonable attorney's fees and costs), arising out of performance of the services to be
performed under this Agreement, provided that any such claim, damage, loss, or
expense is caused by the negligent acts, errors or omissions of CONTRACTOR, any
subcontractor employed directly by CONTRACTOR, anyone directly or indirectly
employed by any of them, or anyone for whose acts they may be liable, except those
injuries or damages arising out of the active negligence, sole negligence, or sole willful
misconduct of the City of Lodi, its elected and appointed officials, directors, officers,
employees and volunteers. CITY may, at its election, conduct the defense or participate
in the defense of any claim related in any way to this indemnification. If CITY chooses at
its own election to conduct its own defense, participate in its own defense, or obtain
independent legal counsel in defense of any claim related to this indemnification,
CONTRACTOR shall pay all of the costs related thereto, including without limitation
reasonable attorney fees and costs. The defense and indemnification obligations
required by this Agreement are undertaken in addition to, and shall not in any way be
limited by the insurance obligations set forth herein
Section 4.4 No Personal Liability
Neither the City Council, nor any other officer or authorized assistant or agent or
City employee shall be personally responsible for any liability arising under this
Agreement.
Section 4.5 Responsibility of CITY
CITY shall not be held responsible for the care or protection of any material or
parts of the work described in the Scope of Services prior to final acceptance by CITY,
except as expressly provided herein.
Section 4.6 Insurance Requirements for CONTRACTOR
CONTRACTOR shall take out and maintain during the life of this Agreement,
insurance coverage as set forth in Exhibit C attached hereto and incorporated by this
reference.
Section 4.7 Successors and Assigns
CITY and CONTRACTOR each bind themselves, their partners, successors,
assigns, and legal representatives to this Agreement without the written consent of the
others. CONTRACTOR shall not assign or transfer any interest in this Agreement
without the prior written consent of CITY. Consent to any such transfer shall be at the
sole discretion of CITY.
Section 4.8 Notices
Any notice required to be given by the terms of this Agreement shall be in writing
signed by an authorized representative of the sender and shall be deemed to have been
given when the same is personally served or upon receipt by express or overnight
5
delivery, postage prepaid, or three (3) days from the time of mailing if sent by first class
or certified mail, postage prepaid, addressed to the respective parties as follows:
To CITY:
City of Lodi
221 West Pine Street
P.O. Box 3006
Lodi, CA 95241-1910
Attn:
To CONTRACTOR: Holmes International
91 Parklite Circle
Sacramento, CA 95831
Attn: Kenneth T. Holmes, P. E
Section 4.9 Cooperation of CITY
CITY shall cooperate fully and in a timely manner in providing relevant
information it has at its disposal relevant to the Scope of Services.
Section 4.10 CONTRACTOR is Not an Employee of CITY
CONTRACTOR agrees that in undertaking the duties to be performed under this
Agreement, it shall act as an independent contractor for and on behalf of CITY and not
an employee of CITY. CITY shall not direct the work and means for accomplishment of
the services and work to be performed hereunder. CITY, however, retains the right to
require that work performed by CONTRACTOR meet specific standards without regard
to the manner and means of accomplishment thereof.
Section 4.11 Termination
CITY may terminate this Agreement, with or without cause, by giving
CONTRACTOR at least ten (10) days written notice. Where phases are anticipated
within the Scope of Services, at which an intermediate decision is required concerning
whether to proceed further, CITY may terminate at the conclusion of any such phase.
Upon termination, CONTRACTOR shall be entitled to payment as set forth in the
attached Exhibit B to the extent that the work has been performed. Upon termination,
CONTRACTOR shall immediately suspend all work on the Project and deliver any
documents or work in progress to CITY. However, CITY shall assume no liability for
costs, expenses or lost profits resulting from services not completed or for contracts
entered into by CONTRACTOR with third parties in reliance upon this Agreement.
Section 4.12 Confidentiality
CONTRACTOR agrees to maintain confidentiality of all work and work products
produced under this Agreement, except to the extent otherwise required by law or
permitted in writing by CITY. CITY agrees to maintain confidentiality of any documents
owned by CONTRACTOR and clearly marked by CONTRACTOR as "Confidential" or
"Proprietary", except to the extent otherwise required by law or permitted in writing by
6
CONTRACTOR. CONTRACTOR acknowledges that CITY is subject to the California
Public Records Act.
Section 4.13 Applicable Law, Jurisdiction, Severability. and Attorney's Fees
This Agreement shall be governed by the laws of the State of California.
Jurisdiction of litigation arising from this Agreement shall be venued with the San
Joaquin County Superior Court. If any part of this Agreement is found to conflict with
applicable laws, such part shall be inoperative, null, and void insofar as it is in conflict
with said laws, but the remainder of this Agreement shall be in force and effect. In the
event any dispute between the parties arises under or regarding this Agreement, the
prevailing party in any litigation of the dispute shall be entitled to reasonable attorney's
fees from the party who does not prevail as determined by the San Joaquin County
Superior Court.
Section 4.14 City Business License Requirement
CONTRACTOR acknowledges that Lodi Municipal Code Section 3.01.020
requires CONTRACTOR to have a city business license and CONTRACTOR agrees to
secure such license and pay the appropriate fees prior to performing any work
hereunder.
Section 4.15 Captions
The captions of the sections and subsections of this Agreement are for
convenience only and shall not be deemed to be relevant in resolving any question or
interpretation or intent hereunder.
Section 4.16 Integration and Modification
This Agreement represents the entire understanding of CITY and
CONTRACTOR as to those matters contained herein. No prior oral or written
understanding shall be of any force or effect with respect to those matters covered
hereunder. This Agreement may not be modified or altered except in writing, signed by
both parties.
Section 4.17 Contract Terms Prevail
All exhibits and this Agreement are intended to be construed as a single
document. Should any inconsistency occur between the specific terms of this
Agreement and the attached exhibits, the terms of this Agreement shall prevail.
Section 4.18 Severability
The invalidity in whole or in part of any provision of this Agreement shall not void
or affect the validity of any other provision of this Agreement.
Section 4.19 Ownership of Documents
All documents, photographs, reports, analyses, audits, computer media, or other
material documents or data, and working papers, whether or not in final form, which
7
have been obtained or prepared under this Agreement, shall be deemed the property of
CITY Upon CITY's request, CONTRACTOR shall allow CITY to inspect all such
documents during CONTRACTOR's regular business hours. Upon termination or
completion of services under this Agreement, all information collected, work product and
documents shall be delivered by CONTRACTOR to CITY within ten (10) calendar days.
CITY agrees to indemnify, defend and hold CONTRACTOR harmless from any
liability resulting from CITY's use of such documents for any purpose other than the
purpose for which they were intended.
Section 4.20 Authority
The undersigned hereby represent and warrant that they are authorized by the
parties to execute this Agreement.
Section 4.21 Federal Transit Funding Conditions
❑ If the box at left is checked, the Federal Transit Funding conditions attached as
Exhibit D apply to this Agreement. In the event of a conflict between the terms of this
Agreement or any of its other exhibits, and the Federal Transit Funding Conditions, the
Federal Transit Funding Conditions will control.
IN WITNESS WHEREOF, CITY and CONTRACTOR have executed this
Agreement as of the date first above written.
ATTEST
y
NIFER 1FERRAIOLO
Clerk
APPROVED AS TO FORM:
dr,- JANICE D. MAGDICH, City Attorney
BY /4
rl /
CITY OF LODI, a municipal corporation
STEP SCH ABNER
City Manager
HOLMES INTERNATIONAL
By:
Nal ENNETH T HO MES, P. E.
Title: Owner/Project Manager
Attachments:
Exhibit A — Scope of Services
Exhibit B — Fee Proposal
Exhibit C — Insurance Requirements
Exhibit D — Federal Transit Funding Conditions (if applicable)
Funding Source: 53199000.77020
(Business Unit & Account No.)
Doc ID:K:\WP\PROJECTS\PSA's12016\Holmes PSA.doc
CA: Rev.11.2016
8
Scope of Work
Project Understanding
Exhibit A
This project includes the inspection and pipeline condition assessment of about 26,300 linear feet of
the Ham Lane and Century Boulevard trunk sewers. The Ham Lane trunk sewers range in size from
12 -inch to 30 -inch in diameter. The City believes that the pipelines were constructed using mainly
unreinforced/reinforced concrete pipe. The pipelines along Ham Lane less than 18" in diameter may
be old clay pipe if they are not concrete while the pipelines 18" to 30" are probably all concrete pipe.
The Century Boulevard trunk sewer pipelines are believed to all be concrete pipe ranging in size from
24 -inch to 42 -inch in diameter. The Ham Lane pipeline is over 60 years old and Century Boulevard
pipeline is over 50 years old.
The inspection and pipeline condition assessment work is being undertaken on the Ham Lane and
Century Boulevard pipelines due to concern about possible internal corrosion of the concrete pipelines
and possible structural issues with the smaller pipes.
The project will include the inspection and condition assessment of the 71 manhole access structures
(manholes) that connect the pipelines included in the project. To gather physical information on the
condition of the concrete manholes and pipelines, up to 10 manholes will be entered by field crew staff
to perform penetration and scrape tests of the manhole bases and sidewalls and the crowns of the
pipelines entering and leaving the manhole structures.
Separately from the inspection and pipeline condition assessment work to be completed along Ham
Lane and Century Boulevard, inspection and pipeline condition assessment will be completed at the
City's White Slough Water Pollution Control Facility (WPCF) for portions of the irrigation system.
This will include approximately 9,800 linear feet of irrigation distribution and runoff & tailwater
pipeline.
The pipelines inspected along Ham Lane and Century Boulevard will be cleaned prior to the inspection
work using hydro -vacuum trunks. The cleaning work for these pipelines will include two passes
through the pipelines using high pressure water delivered from nozzles attached to hoses from the
cleaning trucks.
The pipelines at the White Slough WPCF are partially or fully plugged with soil and debris. Thus,
these pipelines will require heavy cleaning before the inspection work can be undertaken. Assistance
by the City to excavate the ends of the pipelines that are partially or fully buried will be required. City
assistance will also be required to dewater the irrigation distribution pipeline before the project begins.
Task 1 — Project Management
A. Kickoff Meeting
The first activity to be accomplished will be to hold a kickoff meeting to familiarize the key
people with the project. During this meeting the lead people for the City, the Consultant's staff,
and the sub -consultants will be introduced. We also plan to discuss and agree on a number of
key issues including:
• Onsite Coordination
• Reporting protocols and schedules
• Specific field procedures, including:
Traffic control
- Safety
- Any special access permits required
- Any locations where specific traffic control plans will be required
— Emergency response to issues in case the Consultant team needs help in the middle of the
night
— Emergency reporting. Procedures and contacts in case something is found that needs to
be brought to the attention of the City immediately
- Right of entry on private property and public easements
- Electronic file numbering and labeling for data collected during the study
• The procedures to be followed if and when significant structural or maintenance defects are
located.
• Quality assurance / quality control steps
Work Products
Meeting Agenda
Meeting Minutes
Contact Lists
B. Prepare Wastewater Pipeline Condition Assessment Technical
Memorandum
Under this Subtask we will prepare a Wastewater Pipeline Condition Assessment Technical
Memorandum summarizing the method of inspection, tasks, activities, and deliverables. Using
the information gained during the kickoff meeting, the Technical Memorandum will include
discussion of any required permits, relevant public agency contacts, key project team contacts,
and other information necessary to coordinate and inform field crews, project managers, and City
Personnel.
The Technical Memorandum will include a schedule for all activities and tasks incorporated
within. The Schedule will include key milestones, deliverable deadlines, review time, and
permitting and coordination with agencies. The Work Plan will be submitted to the City as an
administrative draft for review and approval prior to starting any field work activities.
As part of the work to prepare the Technical Memorandum, we will prepare a Traffic Control
Plan (TCP) summarizing any necessary traffic control measures or activities to be undertaken
while conducting field work or activities. The TCP will conform to provisions of the
CAMUTCD 2014 and any local agency standards or requirements. The TCP will include contact
numbers for fire, police and other City or agency departments for notifications and coordination
regarding proposed traffic control activities.
We are anticipating that most if not all of the inspections on major streets will be performed
during the late night — early morning hours of the day to minimize disruption of traffic flow and
to improve the safety of the work. Working in the late night — early morning hours also allows us
to view the pipelines when the wastewater flow depths are at their lowest levels, improving
viewing of the interior of the pipelines.
Work Product
Project approach technical memo
Task 2 — Pipeline and Manhole Inspection
Under this Task we will clean and inspect the sanitary sewer pipelines shown on the Pipe Location
Map included as Attachment A to this Scope of Work. This work will be documented using
NASSCO's PACP and MACP coding version 6 or higher. An electronic copy of the NASSCO PACP
and MACP database will be provided at the end of project for integration into the City's CMMS
system.
A. Sewer Cleaning
The designated sewer sections will be cleaned using Hydro -Vac hydro -cleaning machines to
remove blockages and allow video capture of the entire length of pipe. The sewer cleaning
work will be completed by Pro -Pipe. The cleaning will be performed to remove debris, grease,
and roots, and to provide a clear view of the pipeline. A minimum of two (2) complete passes
with the hydraulic nozzle will be completed. The work will be performed using a two person
hydro cleaning crew except for conditions where a third person might be needed to assist with
traffic control. This approach will be used until pipeline(s) that have excessive debris are
encountered. Excessive debris requiring what is classified as heavy cleaning will be used for
pipelines where two passes using the hose and jetting nozzle do not clean out all of the solids
located in the pipeline.
If and when such pipelines are encountered, our crews will move on to other pipelines
segments and continue cleaning. We will then develop a list of pipelines where excessive
solids were encountered and heavy cleaning is needed. After the remainder of the pipelines
have been cleaned, we will develop an estimate of the additional cleaning needs and will clean
the remaining pipelines on a time and materials basis at an approved unit rate for the extra
work.
If the cleaning operation reveals evidence of possible major problems in the pipeline that may
imply structural problems in the pipeline, we will immediately stop work on trying to clean
these pipelines further and will bring this information to the attention of the City.
Sludge, dirt, sand, rocks, grease, roots, and other solid or semisolid material resulting from the
cleaning operation will be removed at the downstream manhole of the section being cleaned.
All solids from the cleaning operations will be disposed at the White Slough Water Pollution
Control Facility off of Thornton Rd
Pipeline cleaning and subsequent inspection work will be performed on the pipelines listed in
the updated Request for Proposals. The tables included in the updated RFP included the
following quantities:
Approximate Length, LF
Dia Ham Century Total
12 2,565 2,565
18 1,831 1,831
21 2,289 2,289
24 1,341 4,027 5,368
30 3,592 6,122 9,714
42 4,528 4,528
Total 11,618 14,677 26,295
City Support
Water used for the cleaning work will be provided from City water hydrants at no cost to
the project team
Disposal of the debris and solids removed from the sewer system during the pipeline
cleaning along the Ham Lane and Century Blvd pipeline routes at no cost to the project
team
B. Pipeline Inspection
Under this subtask, we will inspect the pipelines shown on the Pipe Location. This will mean
the inspection of the same length, number, and sizes of pipelines included in the Century and
Ham WW tables included in the updated RFP and as summarized above. This work will also
be accomplished by Pro -Pipe field crews lead by NASSCO PACP and MACP certified
operators.
The sanitary sewer pipelines will be inspected and the attributes and defects will be coded
using NASSCO PACP Standards, Version 6 or higher. Prior to commencing the field work,
our crews will first upload the City of Lodi sewer GIS data information to the computers within
the video inspection vans for use with the inspection software. The inspections shall be
performed one pipeline section at a time. The inspections will normally be completed with the
camera proceeding from the upstream manhole or structure to the downstream manhole or
structure. For long runs that include multiple connected pipeline runs, we may inspect multiple
pipeline segments without moving the inspection van. Where this occurs, the crew will stop
the work at any intermediate manhole and will begin a new inspection report before continuing
to proceed with the next inspection. This will allow the work to proceed quickly and
efficiently, reducing the time that traffic will be impacted.
We will attempt to perform the work in favorable flow conditions so that there will not be a
need to control flows during the inspections. Since many of the pipelines are on trunk sewers
that collect and convey flows from smaller sewer mains, and since many of the pipelines to be
inspected are located along major streets, we anticipate performing much of the work during
the late night — early morning hours from approximately midnight to 6:00 a.m. Exceptions to
working through the night might be taken to clean and inspect pipelines that are located in the
backyards east of the canal easement south of Kettleman Lane. It might be necessary to clean
and inspect these pipelines during the day in order to gain access to the backyards where the
manholes are located.
Undertaking the inspection work during the early morning hours will minimize traffic
interruption and will allow the work to be performed when the flow levels are at their lowest
levels. If flow control is needed, this would involve temporarily plugging the pipeline entering
an upstream manhole and inspecting the pipeline while the flow is being slowed or stopped.
The flow level in an upstream manhole would be monitored to observe how fast the water is
rising in the upstream pipeline segments. This will allow the plug to be pulled before the water
level rises too high. Plugging and bypass pumping is not included in our budget since it
requires more time and likely is not needed. If bypass pumping is needed, this is a major
additional cost element and would be performed only under an approved change in scope and
cost.
We will inspect the pipelines using high definition photography technology, also called digital
3D, or digital 360 degree inspection. The specific equipment that we propose to use is the
IBAK Panoramo 3D Optoscanner. The data will be provided in a format that will permit
uploading to the CITY's computerized maintenance management system. The data will be
provided in an unaltered PACP and MACP Version 6 or higher database. The database will
contain a composite set of all of the inspection data. The data will be provided on an external
hard drive for ease of data transfer.
The video files will be submitted in digital format with IPF extensions. The .ipf file extensions
can be launched with a free viewer that is provided by IBAK, which makes the Panoramo
equipment.
Work Products
Inspection data including video files
C. Manhole and Junction Structure Inspections
Under this subtask, we will inspect the manholes listed in the GIS attribute table for the Ham
Lane trunk sewer and the manholes listed in the GIS attribute table for the Century Blvd trunk
sewer. We will inspect these using the Panoramo scanning technology which will provide data
without needing to enter the structure.
In addition to these inspections, we will inspect up to 10 manholes using man entry procedures
where the technician entering the manholes will perform scrape tests on the crown of the inlet
and outlet pipelines to test for pipe Loss due to active corrosion. During the inspections we will:
1) measure the depth of debris in the pipelines entering and leaving the structures, 2) perform
scrape tests on the manholes and pipelines to determine the severity of corrosion, and 3) inspect
the manhole to determine the condition of the manholes and the ends of the pipelines entering
and leaving.
At completion of the project, we will provide Panoramo SI film files on an external hard drive
with the manhole inspection files and data.
Work Products
MACP compliant database
Video files
D. White Slough WPCF Pipeline Inspections
Under this subtask, we will clean and inspect approximately 9,800 linear feet of the irrigation
system pipelines located at the White Slough Water Pollution Control Facility (WPCF). The
pipelines to be inspected are shown on the Figure titled "Attachment 1 Areas for CCTV Data
from 8/31/16 Kickoff Meeting, City of Lodi White Slough WPCF Irrigation System
Assessment". The pipelines to be inspected are outlined in bold black dashed lines on the
figure. A copy of this figure is included as Attachment B to this Scope of Work.
The three 36 -inch concrete storm drainage and tailwater return pipelines crossing under
Interstate 5 are a third to a half full of mud and debris. The pipeline under the road at the
southwest corner of Pond IC is completely buried. The drainage and tailwater return pipeline
may also contain significant deposits of mud and debris. Thus, the City will need to excavate
the ends of the drainage and tailwater return pipelines crossing under Interstate 5 and the
pipeline under the road by the SW corner of Pond 1C. There is uncertainty about how much
cleaning will be needed of the irrigation distribution pipelines. After discussing this with the
City, we agreed to clean the pipelines at the White Slough WPCF using a daily cleaning rate of
$6,900 per day. We have agreed to attempt to clean the WPCF pipelines within 31 days. A
contingency of $22,080 has been established for possible extra cleaning that may be needed at
the White Slough WPCF which can be used as needed without additional formal approval. If
more budget is needed than the cleaning budget and contingency allow, this will be considered
a change in scope and will be performed after a change order has been approved.
One element we cannot control is rain. If there is a significant rain after one of more of the
pipelines have cleaned and new mud and debris is washed into the pipelines before the
inspection has been completed, there will be a need for additional cleaning that will likely
require a change order to re -clean.
There will also be a one- time lump sum charge of $6,900 for the required Payment Bond under
this task.
We will inspect the pipelines using is the IBAK Panoramo 3D Optoscanner. The data will be
provided in a format that will permit uploading to the CITY's computerized maintenance
management system. The data will be provided in an unaltered PACP and MACP Version 6 or
higher database. The database will contain a composite set of all of the inspection data. The
data will be provided on an external hard drive for ease of data transfer.
The video files will be submitted in digital format with IPF extensions. The .ipf file extensions
can be launched with a free viewer that is provided by IBAK, which makes the Panoramo
equipment.
City Support
Excavation and removal of excess soil and debris upstream and downstream of the drainage
and tailwater return pipelines crossing under Interstate 5 and the pipeline under the road
by the SW corner of Pond IC
Dewatering of the irrigation distribution pipelines
Water used for the cleaning work provided from City water hydrants at no cost to the
project team
Disposal of the debris and solids removed from the sewer system during the pipeline
cleaning at the White Slough WPCF at no cost to the project team
Electronic copies of the GIS datasets for the pipelines at the White Slough WPCF
Work Products
Inspection data including video files
Task 3 — Data Review and Condition Assessment
Under this Task, we will review the collected data and assign condition assessment ratings to each
manhole structure and interceptor pipe inspected using a condition assessment rating system. The
rating system accounts for the internal physical condition of the manhole structure and pipeline, age of
the system components, types of construction materials used and number of physical defects observed.
A. Data Review
Under this subtask, we will review the coded data provided by Pro -Pipe for conformance with
PACP standards.
B. Condition Assessment
Once we have confirmed the defect coding, we grade the pipelines and manholes. We begin
the process by calculating pipe segment ratings using the PACP Condition Grading System.
Using this system we will determine the PACP Quick Rating. We will use the PACP Quick
Rating as a quality control check and to complete an initial assessment of the inspections for
significant damage or corrosion that should be brought to the attention of the City. We will
then review each pipeline to assign grades ranging from "A" through "F" (no "E" is used,
however) depending upon the overall condition of the pipeline.
C. Develop Rehabilitation and Replacement Recommendations and Costs
Under this subtask, we will develop rehabilitation or replacement recommendations using the
information gained from the condition assessment work. Each pipeline where a significant
structural problem was observed will be evaluated for appropriate repair or rehabilitation option
to determine an effective means to correct the problems found. In evaluating the options, the
various construction technologies using both open cut and `trenchless' techniques will be
considered.
D. Apply Criticality Factors
To account for factors like school and municipal bus routes, whether the pipeline is located under a
collector or arterial street, or if the pipeline extends under a stream, railroad, or highway, we will
apply criticality factors to adjust the rehabilitation and replacement work to assess the
consequences of failure.
E. Develop Prioritized Pipeline Ratings
After the condition and criticality factors are assigned for each pipeline segment, we will compute
an overall score computed by multiplying the condition rating number by the criticality adjustment
factor.
Task 4 — Prepare Condition Assessment Report
A. Prepare Draft Report
Under this Subtask, we will prepare a draft report for the condition assessment project. This
will include maps and tables to demonstrate findings. The report will include:
a. A discussion of the assessment plan, field inspections, standards, procedures, materials and
methods utilized, including precision and accuracy of findings.
b. Discussion regarding the components of the systems assessed, including grade/rank of the
various components assessed.
c. Findings regarding deficiencies, defects, observations or potential failures and any
conclusions relating to underlying cause of deficiencies, defects and failures.
d. Recommendations regarding repairs, replacement, operations and maintenance.
e. A prioritized list and schedule for implementing recommendations.
f. A table showing the costs estimates for all recommendations.
We will submit up to five (5) hard bound copies, or a digital copy in MS Word format which
can be used to return comments in Track Changes mode, for review. After we receive and
tabulate comments and recommendations, we will respond to comments and incorporate
responses into the report as appropriate.
B. Prepare Final Report
Under this Subtask, we will prepare the final condition assessment report.
Work Products
Pipeline inspection video files including all pipeline inspection data, deliverable in digital
format and media (USB thumb drive or USB portable hard disk drive)
Five (5) bound hard copies of the final condition assessment report
One (1) digital copy in pdf format.
Proposed Project Schedule
Our proposed project schedule is shown below. Based on the tasks that we've identified and the order
that we expect to perform the work, this schedule should be "do -able" if the weather cooperates. There
are assumptions in assembling a schedule and a few key items that will directly impact the schedule.
We're assuming that most of the month of October will be used to finish the consultant selection
process, prepare the final contract, and schedule a City Council meeting for adoption of the contract.
We will do our best to get the field work completed before the onset of the rainy season, which would
be the one foreseeable issue that we cannot control. The time line shown for the pipeline and manhole
condition assessment includes the time for the field work, data review, and the assessment of the
pipeline conditions. There are several holidays covered by this time period which we tried to account
for. We can't account for wet weather, however.
TaskiSubtask
Nov
Dec
Jan
Feb
Mar I
May
6 13 20 27
4 11 18 25
1 8 15 22 23
6 13 20 27
6 13 20 27
7 14 21 26
Project Management
Kickoff Meeting
Prepare Tech Memo
Pipeline Inspections
Sewer Cieanin
WPCF Pipeline
Cleaning Pipeline
Pipeline Inspections111111111::
WPCF Pipeline Inspections
Mil Inspections
Data Rvw a Cond Assmt
Data Review
Condition Assessment
R&R Reco and Costs
Criticality Factors
Prioritized pipe a[NI gs
Cond Assessment Report
Draft Report
Final Report
`
ME
_
1
.. ..
1111111111116
111111111111
.
.
1111111
. ... ,......
.
Attachment A
Ham Lane and Century Blvd Trunk Sewer Condition Assessment Pipe Location Map
Turner Ftd. Timmer Id.
Useks04144 IL
E.
It.
a
3
cat1.4alLawL4 4
Latodtdri.
ittekttoed
it.
I I
Kettivman +
1
I4 I
g
30 Century RI
1
a
2
— tddltd..
VP'S
1
a
liatitsy
1
Attacht nent
E
0
ri
•o • 4 1
LJ
Z
Exhibit B
Lodi Ham Lane, Century Blvd and White Slough WPCF Pipeline Condition Assessment
Tas k/Su btask
1 Project Management
Kickoff Meeting
Technical Memorandum
2 Pipeline & MH Inspections
Sewer Cleaning
Pipeline Inspections
Manhole Inspections
Manhole Entries w/ Scrap Test
WPCF Pipeline Cleaning
WPCF Pipeline Inspection
3 Cond Assessment
Data Review
Condition Assessment
R&R List and Costs
Criticality Factors
Prioritized Pipeline Ratings
4 Condition Assessment Report
Draft Report
Final Report
Labor Hours
Holmes Intl
KTH JCB
Labor Cost Direct
KTH JCB Exp
165.00 155.00 Labor Total Total
16 6 2,640 930
24 4 3,960 620
8 8 1,320 1,240
8 8 1,320 1,240
8 8 1,320 1,240
8 8 1,320 1,240
8 8 1,320 1,240
8 8 1,320 1,240
84 13,860
44 78 7,260 12,090
88 14,520
6 990
6 990
120 20 19,800 3,100
30 16 4,950 2,480
Totals
Expenses
Mileage (Travel)
Copy/Printing
Payment Bond Charge
Expense Subtotal
Outside Services: Pro -Pipe
Ham/Century Pipeline Cleaning
Ham/Century Cleaning Contingency
Cleaning Traffic Control
Cleaning Subtotal w/Traffic Cntl
Ham/Century Pipeline Inspection
Mobilization/Demobilization
Inspection Traffic Control
Inspection w/all components
Ham/Century Manhole Inspections
Manhole Entries with Scrap Test
WPCF Pipeline Cleaning
WPCF Pipeline Cleaning Contingency
WPCF Pipeline Inspection
Pro -Pipe Subtotal
Pro -Pipe
Task
Cost
3,570
4,580
2,560
2,560
2,560
2,560
2,560
2,560
13,860
19,350
14,520
990
990
22,900
7,430
466 172 76,890 26,660
150
150
930
150
7,050
202
53
105
104
1,104
103,550 9,995
31,458
60,341
14,697
2,415
235,980
16,905
8,300
385,636
49,868
31,538
2,095
1,000
6,900
9,995
18,144
1,814
11,500
31,458
34,811
8,280
17,250
60,341
14,697
2,415
213,900
22,080
16,905
361,796
Total Proj Cost 475,341
361,796
475,341
EXHIBIT C
Insurance Requirements for Contractor The Contractor shall take out and maintain during the life of this
Agreement, insurance coverage as listed below These insurance policies shall protect Contractor and any
subcontractor performing work covered by this Agreement from claims for damages for personal injury, including
accidental death, as well as from claims for property damages, which may arise from Contractor's operations under
this Agreement, whether such operations be by Contractor, or by any subcontractor, or by anyone directly or
indirectly employed by either of them, and the amount of such insurance shall be as follows:
1 COMPREHENSIVE GENERAL LIABILITY
$2,000,000 Each Occurrence
$4,000,000 General Aggregate
2 COMPREHENSIVE AUTOMOBILE LIABILITY
$1,000,000 Combined Single Limit
Such insurance shall cover liability arising out of any vehicle (including, owned, hired and non -hired vehicles)
operated in performing any and all services pursuant to this Agreement. Coverage shall be written on ISO form
CA 00 01 12 90, or a later version, that provides liability coverage at least as broad as this form
All limits are to be designated strictly for the City of Lodi, its elected and appointed boards, commissions, officers,
agents, employees, and volunteers. All deductibles or self-insured retentions (SIR) must be disclosed to City's Risk
Manager for approval and shall not reduce the limits of liability set forth hereinabove. Insurance policies containing
any deductible or SIR provision shall provide, or be endorsed to provide, that the deductible or SIR may be satisfied
by either the Named Insured(s) or the City of Lodi.
It is required that any available insurance proceeds broader than or in excess of the specified minimum insurance
coverage requirements and/or limits set forth above, shall be available to City as an additional insured. Furthermore,
the requirements for coverage and limits shall be (i) the minimum coverage and limits specified in these insurance
requirements; or (ii) the broader coverage and maximum limits of coverage of any insurance policy or proceeds
available to the Contractor; whichever is greater.
Contractor agrees and stipulates that any insurance coverage provided to the City of Lodi shall provide for a claims
period following termination of coverage which is at least consistent with the claims period or statutes of limitations
found in the California Tort Claims Act (California Government Code Section 810 et seq.)_
A copy of the certificate(s) of insurance with the following endorsements shall be furnished to the City:
(a) Additional Named Insured Endorsement
Pursuant to a separate endorsement (ISO form CG 2010 (11/85) or a later version, that provides liability
coverage at least as broad as this form) such insurance as is afforded by this policy shall also apply to the City
of Lodi, its elected and appointed boards, commissions, officers, agents, employees, and volunteers as
additional named insureds. An additional named insured endorsement is also required for Auto Liability
(b) Primary and Non -Contributory Insurance Endorsement
Additional insurance coverage under the Contractor's policy shall be "primary and non-contributory" and will
not seek contribution from City's insurance or self-insurance and shall be at least as broad as ISO form CG 20
01 04 13.
NOTE: (1) The street address of the CITY OF LODI must be shown along with (a) and (b) above: 221 West
Pine Street, Lodi, California, 95240; (2) The insurance certificate must state, on its face or as an
endorsement, a description of the proiect that it is insuring.
(c) Waiver of Subrogation
Include a waiver of subrogation against the City of Lodi, its elected and appointed boards, commissions,
officers, agents, employees, and volunteers. A waiver is required for General Liability and Auto Liability
(d) Limits of Coverage
The limits of insurance coverage required may be satisfied by a combination of primary and umbrella or
excess insurance. Any umbrella or excess insurance of Contractor shall contain, or be endorsed to contain, a
provision that such coverage shall also apply on a primary and non-contributory basis for the benefit of the City
before the City's own insurance or self-insurance shall be called upon to protect the City as a named insured.
Page 1 I of 2 pages
Risk: rev.03.2016
Insurance Requirements for Contractor (continued)
(e) Completed Operations Endorsement
For three years after completion of project, a certificate of insurance with a Completed Operations
Endorsement, CG 20 37 07 04, will be provided to the City of Lodi.
(f) Severability of Interest Clause
The term "insured" is used severally and not collectively, but the inclusion herein of more than one insured
shall not operate to increase the limit of the company's liability.
(g)
Notice of Cancellation or Chanae in Coverage Endorsement
This policy may not be canceled nor the coverage reduced by the company without 30 days' prior written
notice of such cancellation or reduction in coverage to the Risk Manager, City of Lodi, 221 West Pine St., Lodi,
CA 95240.
(h) Continuity of Coverage
All policies shall be in effect on or before the first day of the Term of this Agreement. At least thirty (30) days
prior to the expiration of each insurance policy, Contractor shall furnish a certificate(s) showing that a new or
extended policy has been obtained which meets the minimum requirements of this Agreement. Contractor
shall provide proof of continuing insurance on at least an annual basis during the Term. If Contractor's
insurance lapses or is discontinued for any reason, Contractor shall immediately notify the City and
immediately obtain replacement insurance
(,) Failure to Comply
If Contractor fails or refuses to obtain and maintain the required insurance, or fails to provide proof of
coverage, the City may obtain the insurance. Contractor shall reimburse the City for premiums paid, with
interest on the premium paid by the City at the maximum allowable legal rate then in effect in California. The
City shall notify Contractor of such payment of premiums within thirty (30) days of payment stating the amount
paid, the name(s) of the insurer(s), and rate of interest. Contractor shall pay such reimbursement and interest
on the first (1s1) day of the month following the City's notice. Notwithstanding any other provision of this
Agreement, if Contractor fails or refuses to obtain or maintain insurance as required by this agreement, or fails
to provide proof of insurance, the City may terminate this Agreement upon such breach. Upon such
termination, Contractor shall immediately cease use of the Site or facilities and commence and diligently
pursue the removal of any and all of its personal property from the site or facilities.
(i) Qualified Insurer(s)
All insurance required by the terms of this Agreement must be provided by insurers licensed to do business in
the State of California which are rated at least "A-, VI" by the AM Best Ratings Guide, and which are
acceptable to the City. Non -admitted surplus lines carriers may be accepted provided they are included on the
most recent list of California eligible surplus lines insurers (LESLI list) and otherwise meet City requirements.
Workers Compensation Insurance The Contractor shall take out and maintain during the life of this Agreement,
Worker's Compensation Insurance for all of Contractor's employees employed at the site of the project and, if any
work is sublet, Contractor shall require the subcontractor similarly to provide Worker's Compensation Insurance for all
of the latter's employees unless such employees are covered by the protection afforded by the Contractor. In case
any class of employees engaged in hazardous work under this Agreement at the site of the project is not protected
under the Worker's Compensation Statute, the Contractor shall provide and shall cause each subcontractor to
provide insurance for the protection of said employees. A waiver of subrogation is required for workers
compensation insurance. This policy may not be canceled nor the coverage reduced without 30 days' prior written
notice of such cancellation or reduction in coverage to the Risk Manager, City of Lodi, 221 West Pine St., Lodi, CA
95240.
NOTE: The City reserves the right to obtain a full certified copy of any insurance policy or endorsements
required. Failure to exercise this right shall not constitute a waiver of the City's right to exercise after the
effective date.
Page 21 of 2 pages Risk: rev.03.2016
Holmes International
91 Parklite Circle
Sacramento, CA 95831
Phone (916) 421-6060
Fax (916) 421-6061
City of Lodi Public Works Department
Attn: Lyman Chang, City Engineer
221 W Pine Street
Lodi, CA 95240
Exhibit 2
March 17, 2017
Subject: Wastewater Pipeline Condition Assessment Project Change Order Request
Dear Mr. Chang:
In our original and revised cost proposals for the Wastewater Pipeline Condition Assessment
project, we stipulated that the cleaning of the pipelines along Ham Lane and Century Boulevard
would be limited to two (2) complete passes with the hydraulic nozzle using Hydrovac cleaning
machines. Cleaning beyond this level was to be considered a change in scope to be performed
after authorization by the City.
Unfortunately our field crews have encountered excessive solids in the lower portions of both the
Ham Lane and Century Boulevard pipelines and heavy cleaning has been needed. As stated in
our cost proposal, heavy cleaning was to be performed on a time and materials basis at an
approved unit rate for the extra work. If heavy cleaning required more budget than the cleaning
budget and contingency allow, this was to be considered a change in scope. Thus, while we have
been given written email authorization to continue our work, we need to request a Change Order
to formally increase our budget.
As we discussed on the telephone on March 6, after completing the standard two pass cleaning
stipulated in our contract, the inspection crew found that the camera was submerged at about
2:30 a.m. when they tried to perform the video inspection of the 42 -inch diameter lower section
of the Century Boulevard pipeline. This was surprising since our calculations had projected that
we should have been able to inspect this pipeline as long as we did the work after 1:00 a.m. in
the morning. During the late night hours of March 6 and the early morning hours of March 7,
the crew performed heavy cleaning on the upper portion of this section of the Century Boulevard
pipeline and was able to clean about 900 feet of the pipeline. From this work they found that
there were still some mounds of debris in the pipeline that had not been removed by the standard
cleaning which we believe was causing the problem. Later cleaning work determined that some
of this debris was asphalt construction debris, probably from a street paving project.
Using the email authorization you provided on March 3rd, the crews continued work on the
project. Earlier this week the field cleaning crew encountered very dirty pipelines on the Ham
Lane trunk wastewater pipeline through the City Corporation Yard and in the backyard
easements between Kettleman Lane and Century Boulevard.
Lyman Chang, City Engineer
Wastewater Pipeline Condition Assessment Project Change Order Request
Page 2
March 17, 2017
Based on the work completed to date, Thomas Romero, the field crews manager, projects that we
should be able to get the entire Century Boulevard pipeline cleaned well enough for us to inspect
all of it with up to 13 days of extra cleaning. He also provided a reduced price for this cleaning
which was lower than we negotiated for our heavy cleaning contingency at the White Slough
WPCF. The reduced price reflects the fact that they will not need the water truck and extra
personnel that will be needed if heavy cleaning is needed at the treatment plant. The cost for the
extra cleaning of the Century Boulevard pipeline is $4,025 per day. Thus, the extra cleaning will
cost up to $52,325.
Based on this unexpected turn of events which is outside of our control and contract with the
City, I am requesting additional budget of $52,325 to perform the extra cleaning. Since we have
also agreed via email upon an additional $4,800 for additional manhole entry inspections to
increase the number of sites to 26, the total Change Order request is for a total cost of $57,125.
This would increase the total budget to $532,466.
As we have shared with you, in addition to high amounts of sediment, we are finding the there is
a great deal of corrosion in these two major wastewater pipelines. While the work at the White
Sough Water Pollution Control Facility was put on hold until the treatment plant site dried up
enough to allow the City and our crews to get our work completed, we will move forward with
the pipeline condition assessment work for the pipelines along Ham Lane and Century
Boulevard. This will hopefully allow the City to incorporate projects in next year's budget to
start correcting some of the problems we have been finding.
Best regards,
HOLMES INTERNATIONAL
._',.y.,.g,
Kenneth T. Holmes, P.E.
Owner / Project Manager
RESOLUTION NO. 2017-63
A RESOLUTION OF THE LODI CITY COUNCIL
AUTHORIZING THE CITY MANAGER TO EXECUTE
AMENDMENT NO. 1 TO THE PROFESSIONAL SERVICES
AGREEMENT WITH HOLMES INTERNATIONAL, INC., OF
SACRAMENTO, FOR THE WASTEWATER PIPELINE
CONDITION ASSESSMENT PROJECT
WHEREAS, on December 7, 2016, the City Council approved the Professional
Services Agreement with Holmes International, Inc., of Sacramento, for wastewater
pipeline condition assessment; and
WHEREAS, after the initial cleaning process was performed on the 42 -inch
pipeline in Century Boulevard, Holmes International, Inc., discovered a large amount of
sediment remaining in the pipeline; and
WHEREAS, this large amount of sediment cannot be removed with the regular
cleaning process, and a deep pipeline cleaning is required to remove the remaining
material in order to complete the pipeline inspection; and
WHEREAS, inspection of the wastewater manholes also indicated there are
more manholes requiring special manhole entry inspection than initially estimated in the
original Professional Services Agreement; and
WHEREAS, staff recommends authorizing the City Manager to execute
Amendment No. 1 to the Professional Services Agreement with Holmes International,
Inc., of Sacramento, for Wastewater Pipeline Condition Assessment Project, in the
amount of $57,125.
NOW, THEREFORE, BE IT RESOLVED that the Lodi City Council does hereby
authorize the City Manager to execute Amendment No. 1 to the Professional Services
Agreement with Holmes International, Inc., of Sacramento, California, for the
Wastewater Pipeline Condition Assessment Project, in the amount of $57,125.
Dated: April 19, 2017
I hereby certify that Resolution No. 2017-63 was passed and adopted by the City
Council of the City of Lodi in a regular meeting held April 19, 2017 by the following vote:
AYES: COUNCIL MEMBERS — Chandler, Johnson, Mounce, Nakanishi,
and Mayor Kuehne
NOES: COUNCIL MEMBERS — None
ABSENT: COUNCIL MEMBERS — None
ABSTAIN: COUNCIL MEMBERS — None
"Y1(1,?fjAkrua4
NNIFEFJII. FERRAIOLO
City Clerk
2017-63
CITY COUNCIL
DOUG KUEHNE, Mayor
ALAN NAKANISHI,
Mayor Pro Tempore
MARK CHANDLER
BOB JOHNSON
JOANNE MOUNCE
Holmes International
91 Parklite Circle
Sacramento, CA 95831
CITY OF LODI
CITY HALL, 221 WEST PINE STREET
P.O. BOX 3006
LODI, CALIFORNIA 95241-1910
(209) 333-6706 / FAX (209) 333-6710
EMAIL: pwdept@lodi.gov
www.lodi.gov
April 13, 2017
STEPHEN SCHWABAUER
City Manager
JENNIFER M. FERRAIOLO
City Clerk
JANICE D. MAGDICH
City Attorney
CHARLES E. SWIMLEY, JR.
Public Works Director
SUBJECT: Adopt Resolution Authorizing City Manager to Execute Amendment No. 1 to
Professional Services Agreement with Holmes International, Inc., of
Sacramento, for Wastewater Pipeline Condition Assessment Project
($57,125)
Enclosed is a copy of background information on an item on the City Council agenda of
Wednesday, April 19, 2017. The meeting will be held at 7 p.m. in the
City Council Chamber, Carnegie Forum, 305 West Pine Street.
This item is on the consent calendar and is usually not discussed unless a
Council Member requests discussion. The public is given an opportunity to address
items on the consent calendar at the appropriate time.
If you wish to write to the City Council, please address your letter to City Council,
City of Lodi, P. O. Box 3006, Lodi, California, 95241-1910. Be sure to allow time for the
mail. Or, you may hand -deliver the letter to City Hall, 221 West Pine Street.
If you wish to address the Council at the Council Meeting, be sure to fill out a speaker's
card (available at the Carnegie Forum immediately prior to the start of the meeting) and
give it to the City Clerk. If you have any questions about communicating with the
Council, please contact Jennifer M. Ferraiolo, City Clerk, at (209) 333-6702.
If you have any questions about the item itself, please call Lyman Chang at (209) 333-
67Q6.
4/
Charles E. Swimley, Jr.
;Public Works Director
CES/tdb
Enclosure