HomeMy WebLinkAboutAgenda Report - April 5, 2017 C-03CITY OF LODI COUNCIL COMMUNICATION AGENDA ITEM C•Z AGENDA TITLE: Adopt Resolution Authorizing City Manager to Execute Amendment No. 1 for Directional Drilling, Excavation, and Conduit Installation with Westech Industries, Inc., of Galt ($1,000,000) MEETING DATE: April 5, 2017 PREPARED BY: Electric Utility Director RECOMMENDED ACTION: Adopt a resolution authorizing the City Manager to execute Amendment No. 1 for directional drilling, excavation, and conduit installation, with Westech Industries, Inc., of Galt, in an amount not to exceed $1,000,000. BACKGROUND INFORMATION: The Electric Utility (EU) maintains approximately 131 miles of overhead electric lines and 122 miles of underground cable to provide service to over 26,000 customers. As the underground system ages, repairs and replacements are necessary to mitigate outages and improve electric service reliability for its customers. EU endeavors to utilize the least intrusive and most economically feasible approach to install conduit for replacement and upgrade of failed or failing underground cables. This requires the use of directional drilling to minimize disturbances to the community, replacement of sidewalk, gutter or road surfaces while expediting the conduit installation process. On February 5, 2014, Council awarded the lowest responsive bid to Westech Industries, Inc. of Galt, for directional drilling and authorized the City Manager to execute a contract which allowed three one-year extensions; two were authorized by the Council on February 18, 2015 and July 20, 2016. All authorized funds have been expended ($1 million to date,) and the contract is set to expire on August 25, 2017. During the current fiscal year, Westech has completed many projects to support the EU capital improvement plan; these projects include installing underground infrastructure, installing, replacing and repairing damaged conduits, pull -boxes and other related appurtenances as well as emergency substructure repairs to restore electric service. Westech continues to perform satisfactorily; therefore, staff is recommending an amendment to add $300,000 in additional funding for the remainder of Fiscal Year 2016/17 while concurrently executing the third contract extension in an amount not to exceed $700,000 for Fiscal Year 2017/18, which concludes June 30, 2018. The additional funding will be used to address emergency -unplanned work as well as continuing to replace 1960's vintage underground cable that is far in excess of its planned 30 — 40 year useful life, and other related projects as determined by failure or predicative analysis. FISCAL IMPACT: Total not to exceed $1,000,000 as follows: FY2016/17 $300,000 FY2017/18 $700,000 APPROVED: uer, City Manager Adopt Resolution Authorizing City Manager to Execute Amendment No. 1 for Directional Drilling, Excavation, and Conduit Installation with Westech Industries, Inc., of Galt ($1,000,000) April 5, 2017 Page 2 FUNDING AVAILABLE: Funding is available in FY2016/17 Capital Budget Account No. 50199000 and included in proposed FY2017/18 Capital Budget Account No. 50199000. ,Of,�l1 /1;d Susan Bjork i J Supervising'Budge Analyst l PREPARED BY: Charles J. Berry, Electric Utility Superintendent EAK/CJB/Ist Elizabeth A. Kirkley Electric Utility Director AMENDMENT NO. 1 WESTECH INDUSTRIES, INC. THIS AMENDMENT NO. 1 TO PROFESSIONAL SERVICES AGREEMENT, made and entered this day of April, 2017, by and between the CITY OF LODI, a municipal corporation (hereinafter "CITY"), and WESTECH INDUSTRIES, INC. (hereinafter "CONTRACTOR"). WITNESSETH: 1. WHEREAS, CONTRACTOR and CITY entered into a Professional Services Agreement on May 9, 2014 and Contract Extension on August 25, 2015; and, a second Contract Extension on August 1, 2016, as set forth collectively in Exhibits 1 and 2, respectively; and 2. WHEREAS, CITY requests to amend said Agreement to extend the term through June 30, 2018, which includes the third and final extension of the Agreement signed May 9, 2014; and 3. WHEREAS, CITY requests to amend the existing contract to add $300,000 during the current Fiscal Year 2016/17 while concurrently executing the third and final contract extension in an amount not to exceed $700,000 for Fiscal Year 2017/18, which concludes June 30, 2018. The additional funding will be used to continue capital system improvements and emergency work, to be performed during the remainder of the proposed term; and 4. WHEREAS, CONTRACTOR agrees to said amendment. NOW, THEREFORE, the parties agree to amend the Agreement for an amount Not -to -Exceed $1,000,000 and extend the term of the Agreement to and including June 30, 2018. IN WITNESS WHEREOF, CITY and CONTRACTOR have executed this Amendment No. 1 on the date and year first above written. CITY OF LODI, a municipal corporation WESTECH INDUSTRIES, INC. hereinabove called "CITY" hereinabove called "CONTRACTOR" STEPHEN SCHWABAUER JOSEPH McCURLEY City Manager Officer Attest: JENNIFER M. FERRAIOLO City Clerk Approved as to Form: JANICE D. MAGDICH City Attorney CONTRACT EXTENSION AGREEMENT NO. 2 WESTECH INDUSTRIES, INC. THIS CONTRACT EXTENSION AGREEMENT, made and effective this ( day of by and between the CITY OF LODI, a municipal corporation, hereinafter called "City', and WESTECH INDUSRIES, INC., hereinafter called "Contractor." WITNESSETH: CONTRACT: Contractor and City, entered into a contract for Directional Drilling, Excavation, and Conduit Installation on May 9, 2014, and Contract Extension Agreement on August 25, 2015, extending the term of the contract to and including August 24, 2016. Contractor and City now desire to extend the term of the contract for one (1) additional year to and including August 25, 2017. 3. TERM AND TERMS: All other terms and conditions, including compensation paid to Contractor, will remain as fully set forth in the Contract for Directional Drilling, Excavation, and Conduit Installation dated May 9, 2014, attached hereto as Exhibit A and made a part hereof as though fully set forth herein. CITY OF LODI, a municipal corporation WESTECH INDUSTRIES, INC. ST ' -.N' SC' ►'. : ER�PH cCURLEY City Manager / icer Attest: E�INIFER IVItJERRAIOLO City Clerk APPROVED AS TO FORM; JA E D. MAGDICH (\.,‹ City Attorney EXHIBIT 1 DIRECTIONAL BORING, EXCAVATION AND CONDUIT INSTALLATION SECTION 4 CONTRACT CITY OF LODI, CALIFORNIA THIS CONTRACT made by and between the CITY OF LODI, State of California, herein referred to as the "City," and WESTECH INDUSTRIES, INC., herein referred to as the "Contractor." WITNESSETH: That the parties hereto have mutually covenanted and agreed, and by these presents do covenant and agree with each other, as follows: The complete Contract consists of the following documents which are incorporated herein by this reference, to -wit: Notice Inviting Bids Information to Bidders General Provisions Special Provisions Bid Proposal Contract Contract Bonds Plans The Latest Edition of Standard Specifications, State of California, Business and Transportation Agency, Department of Transportation All of the above documents, sometimes hereinafter referred to as the "Contract Documents," are intended to cooperate so that any work called for in one and not mentioned in the other is to be executed the same as if mentioned in all said documents. ARTICLE I - That for and in consideration of the payments and agreements hereinafter mentioned, to be made and performed by the City and under the condition expressed in the two bonds bearing even date with these presents and hereunto annexed, the Contractor agrees with the City, at Contractor's cost and expense, to do all the work and furnish all the materials except such as are mentioned in the specifications to be furnished by the City, necessary to construct and complete in a good workmanlike and substantial manner and to the satisfaction of the City the. proposed improvements as shown and described in the Contract Documents which are hereby made a part of the Contract. ARTICLE 11 - The City hereby promises and agrees with the Contractor to employ, and does hereby employ, the Contractor to provide all materials and services not supplied by the City and to do the work according to the terms and conditions for the price herein, and hereby contracts to pay the same as set forth in Section 5-600, "Measurement, Acceptance and Payment," of the General Provisions, in the manner and upon the conditions above set forth; and the said parties for themselves, their heirs, executors, administrators, successors and assigns, do hereby agree to the full performance of the covenants herein contained. ARTICLE III - The Contractor agrees to conform to the provisions of Chapter 1, Part 7, Division 2 of the Labor Code. The Contractor and any Subcontractor will pay the Directional Boring, Excavation and Conduit Installation Sec 6.doc 4.1 01/27/14 general prevailing wage rate and other employer payments for health and welfare, pension, vacation, travel time, and subsistence pay, apprenticeship or other training programs. The responsibility for compliance with these Labor Code requirements is on the prime contractor. ARTICLE IV - And the Contractor agrees to receive and accept the following prices as full compensation for furnishing all materials and for doing all the work contemplated and embraced in this agreement; also for all loss or damage arising out of the nature of the work aforesaid or from the action of the elements, or from any unforeseen difficulties or obstructions which may arise or be encountered in the prosecution of the work until its acceptance by the City, and for all risks of every description connected with the work; also for all expenses incurred by or in consequence of the suspension or discontinuance of work and for well and faithfully completing the work, and the whole thereof, in the manner and according to the Plans and Contract Documents and the requirements of the Engineer under them, to -wit: Perform the work necessary for directional boring, installing conduit, and other incidental and related work for multiple projects with a contract price of not to exceed $500,000, all as shown on the plans and specifications for the above project. UNIT PRICE ITEMS Directional Boring, Excavation and Conduit Installation Sec 6.doc 4.2 01/27/14 ITEM NO. DESCRIPTION UNIT UNIT PRICE Trench 1 Mainline Trench (Non -Joint Use) LF 38.63 2 Secondary Trench (Non -Joint Trench) LF 55.32 3 Compact/Backfill Mainline Trench LF 10.20 4 Compact/Backfill Secondary Trench LF 10.20 5 Remove/Replace Concrete SF 30.60 6 Remove/Replace Asphalt SF 25.50 7 Remove/Replace landscaping (Sod) SF 5.10 8 Trench Plate Install/Remove (Including Prep) EA 10.20 Directional Boring, Excavation and Conduit Installation Sec 6.doc 4.2 01/27/14 Conduit 9 Assemble and install 6" Conduit LF 2.04 10 Assemble and install 4" Conduit IF 2.04 11 Assemble and install 3" Conduit LF 1.02 12 Assemble and install 2" Conduit LF 1.02 13 Assemble and install 1" Conduit LF 0.51 14 Assemble and install 3/4" Conduit LF 0.51 15 Install Each Additional Conduit LF 1.02 Bore 16 Bore and Install 6" Conduit LF 59.02 17 Bore and Install 4" Conduit LF 50.28 18 Bore and Install 3" Conduit LF 43.80 19 Bore and Install 2" Conduit LF 36.43 20 Bore and Install 1" Conduit LF 36.07 21 Bore and Install 3/4" Conduit LF 35.99 22 Send/Receive Pit (Per Job) EA 204.00 23 Install Each Additional Conduit LF 10.20 24 Hourly Rate for Bore Crew HR 255.00 Misc. 25 Disposal of Excess Material CY 5.10 26 Construction Notification (Per Project) EA 102.10 27 EU Field Directed Work (Extra Work) $50,000.00 ARTICLE V - By my signature hereunder, as Contractor, I certify that I am aware of the provisions of Section 3700 of the Labor Code, which requires every employer to be insured against liability for workers' compensation or to undertake self-insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the work of this contract. ARTICLE VI - It is further expressly agreed by and between the parties hereto that, should there be any conflict between the terms of this instrument and the Bid Proposal of the Contractor, then this instrument shall control and nothing herein shall be considered as an acceptance of the said terms of said proposal conflicting herewith. ARTICLE VII - The City is to furnish the necessary rights-of-way and easements and to establish lines and grades for the work as specified under the Special Provisions. All labor or materials not mentioned specifically as being done by the City will be supplied by the Contractor to accomplish the work as outlined in the specifications. ARTICLE VIII - The Contractor agrees to commence work pursuant to this contract within 30 calendar days and to diligently prosecute to completion within 45 WORKING DAYS for each project submitted within the one-year term of this contract. ARTICLE IX — This agreement may be extended for three (3) additional one-year terms at the City's option on the same terms and conditions as set forth herein. City shall exercise its option in writing 30 days before the expiration of this agreement. Directional Boring, Excavation and Conduit Installation Sec 6.doc 4.3 01/27/14 WHEN SIGNING THIS CONTRACT, THE CONTRACTOR AGREES THAT THE TIME OF COMPLETION FOR THIS CONTRACT IS REASONABLE AND THE CONTRACTOR AGREES TO PAY THE CITY LIQUIDATED DAMAGES AS SET FORTH IN SECTION 6.5 OF THE SPECIAL PROVISIONS. CONTRACTOR AGREES THAT THIS AMOUNT MAY BE DEDUCTED FROM THE AMOUNT DUE THE CONTRACTOR UNDER THE CONTRACT. IN WITNESS WHEREOF, the parties to these presents have hereunto set their hands the year and date written below. CONTRACTOR: CITY OF LODI Westech Industries, Inc. By: BY: \-(?, aRA Pi', he tair)/ Title (CORPORATE SEAL) .01196.. ekt.cLtA4 Ueir City Manager ( Date: Attest: Randi Jo City Clerk son Approved As To orm Janice D. Magdich, -Deputy City orney Directional Boring, Excavation and Conduit Installation Sec 6,doc 4.4 01/27/14 Insurance Requirements for Contractor The Contractor shall take out and maintain during the life of this contract, insurance coverage as listed below. These insurance policies shall protect the Contractor and any subcontractor performing work covered by this contract from claims for damages for personal injury, including accidental death, as well as from claims for property damages, which may arise from Contractor's operations under this contract, whether such operations be by Contractor or by any subcontractor or by anyone directly or indirectly employed by either of them, and the amount of such insurance shall be as follows: 1. COMPREHENSIVE GENERAL LIABILITY 2. COMPREHENSIVE AUTOMOBILE LIABILITY $3,000,000 Ea. Occurrence $2,000,000 - Ea. Occurrence $6,000,000 Aggregate NOTE: Contractor agrees and stipulates that any insurance coverage provided to the City of Lodi shall provide for a claims period following termination of coverage which is at least consistent with the claims period or statutes of limitations found in the California Tort Claims Act (California Government Code Section 810 et seq.). NOTE: (1) The street address of the CITY OF LODI must be shown along with (a) and (b) above: 221 West Pine Street, Lodi, California, 95240-1910; (2) The insurance certificate must state, on its face or as an endorsement, a description of the project that it is insuring. A copy of the certificate of insurance with the following endorsements shall be furnished to the City: (a) Additional Named Insured Endorsement Such insurance as is afforded by this policy shall also apply to the City of Lodi, its elected and appointed Boards, Commissions, Officers, Agents, Employees, and Volunteers as additional named insureds. (This endorsement shall be on a form furnished to the City and shall be included with Contractor's policies.) (b) Primary Insurance Endorsement Such insurance as is afforded by the endorsement for the Additional Insureds shall apply as primary insurance. Any other insurance maintained by the City of Lodi or its officers and employees shall be excess only and not contributing with the insurance afforded by this endorsement. (c) Completed Operations Endorsement A certificate of insurance with a Completed Operations Endorsement, CG 20 37 07 04, will be provided to the City of Lodi during construction and for three years after acceptance. (d) Severability of Interest Clause The term "insured" is used severally and not collectively, but the inclusion herein of more than one insured shall not operate to increase the limit of the company's liability. (e) Notice of Cancellation or Change in Coverage Endorsement This policy may not be canceled nor the coverage reduced by the company without 30 days' prior written notice of such cancellation or reduction in coverage to the Risk Manager, City of Lodi, 221 W. Pine St., Lodi, CA 95240. Compensation Insurance The Contractor shall take out and maintain during the life of this contract, Worker's Compensation Insurance for all of Contractor's employees employed at the site of the project and, if any work is sublet, Contractor shall require the subcontractor similarly to provide Worker's Compensation Insurance for all of the tatter's employees unless such employees are covered by the protection afforded by the Contractor. In case any class of employees engaged in hazardous work under this contract at the site of the project is not protected under the Worker's Compensation Statute, the Contractor shall provide and shall cause each subcontractor to provide insurance for the protection of said employees. A waiver of subrogation is required for workers compensation insurance. This policy may not be canceled nor the coverage reduced by the company without 30 days' prior written notice of such cancellation or reduction in coverage to the Risk Manager, City of Lodi, 221 W. Pine St., Lodi, CA 95240. NOTE: No contract agreement will be signed nor will afty work begin on a project until the proper insurance certificate is received by the City. EXHIBIT 2 r.)1RECTlONAL BORlNG, EXCAVAION AND CONDUIT INsTALLATFm CITY OF LODI, CALIFORNIA SECTION 4 CONTRACT THIS CONTRACT made by and between the CITY OF LODI, State of California, herein referred to as the "City," and WESTE-iCH INDUSTRIES, INC., herein referred to as the "Contractor," WITNESSETH: That the parties hereto have mutually covenanted and agreed, and by these presents do covenant and agree with each other, as follows: The complete Contract consists of the following documents which are incorporated herein by this reference, to -wit: Notice Inviting Bids Information to Bidders General Provisions Special Provisions Bid Proposal Contract Contract Bonds Plans The Latest Edition of Standard Specifications, State of California, Business and Transportation Agency, Department of Transportation All of the above documents, sometimes hereinafter referred to as the "Contract Documents," are intended to cooperate so that any work called for in one and not mentioned in the other is to be executed the same as if mentioned in all said documents. ARTICLE I - That for and in consideration of the payments and agreements hereinafter mentioned, to be made and performed by the City and under the condition expressed in the two bonds bearing even date with these presents and hereunto annexed, the Contractor agrees with the City, at Contractor's cost and expense, to do all the work and furnish all the materials except such as are mentioned in the specifications to be furnished by the City, necessary to construct and complete in a good workmanlike and substantial manner and to the satisfaction of the City the proposed improvements as shown and described in the Contract Documents which are hereby made a part of the Contract. ARTICLELI The City hereby promises and agrees with the Contractor to employ, and does hereby employ, the Contractor to provide all materials and services not supplied by the City and to do the work according to the terms and conditions for the price herein, and hereby contracts to pay the same as set forth in Section 5-600, "Measurement, Acceptance and Payment," of the General Provisions, in the manner and upon the conditions above set forth; and the said parties for themselves, their heirs, executors, administrators, successors and assigns, do hereby agree to the full performance of the covenants herein contained. Directional Boring, Excavation & Conduit Installation Sec 4.cioc 4,1 01/08/15 The Contractor agrees to conform to the provisions of Chapter 1, Part 7, Division 2 of the Labor Code. The Contractor and any Subcontractor will pay the general prevailing wage rate and other employer payments for health and wmKare, pene|on, vacatiDn, travel t|rne, and subsistence pay, apprenticeship or other training programs. The responsibility for compliance with these Labor Code requirements is on the prime contractor. ARTICLE/V - And the Contractor agrees to receive and accept the following prices as full compensation for furnishing all materials and for doing all the work contemplated and embraced in thi agreernent; eisa for all oss or damage arising out of the nature of the work aforesaid or from the action of the elements, or from any unforeseen difficulties or obstructions which may arise or be encountered in the prosecution of the work until its acceptance by the City, and for all risks of every description connected with the work; also for all expenses incurred by or in consequence of the suspension or discontinuance of work and for well and faithfully completing the work, and the whole thereof, in the manner and according to the Plans and Contract Documents and the requirements of the Enginoer under them, to -wit: Perform the work necessary for directional boring, }nstmUiing conduit, and other incidental and related work for multiple projects with a contract price of not to exceed $500.000. ali as shown on the plans and specifications for the above UNIT PR CE ITEMS ��K�,.�O. Trench _____ 2 Secondary Trench (Non -Joint Trench) LF i______ 3 Compact/Backfill Mainline Trench LE LT Compact/Backfill Secondary Trench LE 10.20 _ Remove/Replace Concrete „ SF 30.60 DESCRIPTI _________ od) SF 5.10 , Trench Install/Remove EA 10.20 Directional Boring, Excavation 8iConduit Installation Sec 4.uoc 4 2 01108/15 . Conduit 9 �s�em�eondin�oU6"Cunduit - LF 2.04 10 Axeemb|eandins�'U4"Condu� LF 2.04 11 Aycemb|eandin��U3"Conduit LF -1.02 12 Conduit -- LF -1.02 | 13 Assemble - ----- �__ =LF 0.51 14 Assemble and install ]/4"Condu� -- -1 LF 0.51 15 __ /nxtaUEach Addibona|Conduit --- LF 'I.� ----i Bore 02 ' --' --- � __ __ -' - ---- 16 8unemnd|n��U6"ConduitUF 59,02 _-____. ' | ____. __ l7 Boreand|n�aU4"Conduit LF 50.28 __ - ' ------ --- 18 Borend|nataU3"ConduitLF 43.80 _------_ 19 Boreand Install Z"�onduit LF G _ _ 6.07 ___ 20 _ Bore Install 1" Conduit LF ---�------ _ 21 Bore and Install 3/4"Conduit LF 35.99 22 | Send/RncivePit (Per Job) EA 204.00 _ _ 23 Install Each Additional Conduit LF 10 20 _ 24 HourlyF��r}�C� _, - HR 2 --' Misc,[-� L - -' 25 Disposal of Excess Material CY � � � __ 26 Construction Notification (Per Project) _ 27 EU Field Directed Work (Extra 5.10 102.10 $50,000.00 __ By my signature hereunder, as Contractor, i certify that | am aware of the provisions of Section 3700 of the Labor Code, which requires every employer to be insured against |iabi/rty for workers' compensation or to undertake self-insurance in accordance with the provisions of that code, and | will comply with such provisions before commencing the performance of the work of this contract. ARTICLE V1 - It is further expressly agreed by and between the parties hereto that, should there be any conflict between the terms of this instrument and the Bid Proposal of the Contractor, then this instrument shall control and nothing herein shall be considered as an acceptance of (he said terms of said proposal conthctng herewith. ARTICLE V|( ' The City is to furnish the necessary rights-of-way and easements and to establish lines and grades for the work as specified under the Special Provisions. All labor or materials not mentioned specifically as being done by the City will be supplied by the Contractor to accomplish the work as outlined in the specifications. ARTICLE V/1/ - The Contractor agrees to commence work pursuant to this contract within 30 calendar days and to diligently prosecute to completion within 45 WORKING DAYS for each project GUbmi�eUVvith|nthenOe`ye@rterDlnfihiscoDtrGct. Directional Coring, Excavation mConduit installation Sec *zoc 4.3 01/08/15 ARTICLE IX — This agreement may be extended for three (3) additional one-year terms at the City's option on the same terms and conditions as set forth herein. City shall exercise its option in writing 30 days before the expiration of this agreement. WHEN SIGNING THIS CONTRACT, THE CONTRACTOR AGREES THAT THE TIME OF COMPLETION FOR THIS CONTRACT IS REASONABLE AND THE CONTRACTOR AGREES TO PAY THE CITY LIQUIDATED DAMAGES AS SET FORTH IN SECTION 6.5 OF THE SPECIAL PROVISIONS. CONTRACTOR AGREES THAT THIS AMOUNT MAY BE DEDUCTED FROM THE AMOUNT DUE THE CONTRACTOR UNDER THE CONTRACT. IN WITNESS WHEREOF, the parties to these presents have hereunto set their hands the year and date written below. CONTRACTOR: CITY OF LODI Westech Industries, Inc. By: By: M 014 -Pic er Title (CORPORATE SEAL) Directional Boring, Excavation & Conduit Installation Sec 4.doc p enSchw-...•i City Manager Date: 3 Attest: Approved As To Form ce . Ma Bich Attorney ani g City l 4.4 01108!15 RESOLUTION NO. 2017-46 A RESOLUTION OF THE LODI CITY COUNCIL AUTHORIZING THE CITY MANAGER TO EXECUTE CONTRACT AMENDMENT NO. 1 WITH WESTECH INDUSTRIES, INC., OF GALT WHEREAS, the Electric Utility (EU) maintains approximately 131 miles of overhead electric lines and 122 miles of underground cable to provide service to over 26,000 customers; and WHEREAS, as the underground system ages, repairs and replacements are necessary to mitigate outages and improve electric service reliability for customers; and WHEREAS, EU endeavors to utilize the least intrusive and most economically feasible approach to install conduit for replacement and upgrade of failed or failing underground cables; and WHEREAS, this requires the use of directional drilling to minimize disturbances to the community and replacement of sidewalk, gutter or road surfaces while expediting the conduit installation process; and WHEREAS, on February 5, 2014, Council awarded the lowest responsive bid to Westech Industries, Inc., of Galt, for directional drilling and authorized the City Manager to execute a contract which allowed three one-year extensions; two were authorized by the Council on February 18, 2015 and July 20, 2016; and WHEREAS, all authorized funds have been expended ($1 million to date) and the contract is set to expire on August 25, 2017; and WHEREAS, during the current fiscal year, Westech has completed many projects to support the EU capital improvement plan. These projects include installing underground infrastructure; installing, replacing, and repairing damaged conduits, pull -boxes, and other related appurtenances; and emergency substructure repairs to restore electric service; and WHEREAS, Westech continues to perform satisfactorily; therefore, staff is recommending an amendment to add $300,000 in additional funding for the remaining of Fiscal Year 2016/17 while concurrently executing the third contract extension in an amount not to exceed $700,000 for Fiscal Year 2017/18, which concludes June 30, 2018; and WHEREAS, the additional funding will be used to address emergency -unplanned work, continuing to replace 1960's vintage underground cable that is far in excess of its planned 30 to 40 year useful life, and other related projects as determined by failure or predicative analysis; and WHEREAS, funding is available in FY 2016/17 Capital Budget Account No. 50199000 and included in proposed FY 2017/18 Capital Budget Account No. 50199000. NOW, THEREFORE, BE IT RESOLVED that the Lodi City Council hereby authorizes the City Manager to execute Contract Amendment No. 1 with Westech Industries, Inc., of Galt, California, for directional drilling, excavation, and conduit installation in an amount not to exceed $1,000,000 and extend the term of the Agreement to and including June 30, 2018. Dated: April 5, 2017 hereby certify that Resolution No. 2017-46 was passed and adopted by the City Council of the City of Lodi in a regular meeting held April 5, 2017, by the following vote: AYES: COUNCIL MEMBERS — Chandler, Johnson, Mounce, and Mayor Kuehne NOES: COUNCIL MEMBERS — None ABSENT: COUNCIL MEMBERS — Nakanishi ABSTAIN: COUNCIL MEMBERS — None . ENNIFER II. FERRAIOLO C ty Clerk 2017-46