Loading...
HomeMy WebLinkAboutAgenda Report - February 15, 2017 G-02 PHTM CITY OF LODI COUNCIL COMMUNICATION AGENDA ITEM G-2 AGENDA TITLE: Continued Public Hearing to Consider Adopting a Resolution Approving the Planning Commission's Recommendation to Authorize 67 Low - Density Residential Growth Management Allocations and Approve a Vesting Subdivision Map for the Villa Fiore Ranch Subdivision, a 13.7 - Acre, 67 -Unit Subdivision MEETING DATE: February 15, 2017 PREPARED BY: Community Development Director RECOMMENDED ACTION: Continued public hearing to consider adopting a resolution approving the Planning Commission's recommendation to authorize 67 Low -Density Residential growth management allocations and approve a vesting subdivision map for the Villa Fiore Ranch Subdivision, a 13.7 - acre, 67 -unit subdivision. BACKGROUND INFORMATION: As part of the City's Growth Management program, the Planning Commission reviews allocation requests for new housing developments and makes a recommendation to the City Council. The City Council is also the ultimate approval authority for vesting subdivision maps after a recommendation from the Commission. On December 14, 2016, the Planning Commission held a public hearing regarding the 2016 Residential Growth Management Development Allocations and the vesting map request of the applicant. At this hearing the Planning Commission reviewed a request by Sunset Tartesso, LLC / Elliot Homes for 67 Low -Density Residential growth management allocations and approval of a vesting subdivision map for the Villa Fiore Ranch Subdivision, a 13.7 -acre, 67 -unit subdivision. The Commission voted 7-0 to recommend the City Council approve the applicant's request for 67 Low -Density Residential growth management allocations and approve a vesting subdivision map for the Villa Fiore Ranch subdivision. ENHANCED TRAIL At the Planning Commission meeting of December 14, 2016 and the City Council meeting of January 4, 2017 members of Bike Lodi voiced their concerns about the lack of an enhanced trail system and bike facilities on the west side of Lodi. Council members asked staff to work with the developer to ensure that bicycle and pedestrian opportunities were included in the project. The Villa Fiore project is an in -fill project within the larger Van Ruiten Ranch project. The overall Van Ruiten Ranch project does include Class 2 striped bicycle facilities in West Gate Drive, Century Boulevard and Blossom Drive. , City Manager The project right of way for West Gate Drive has been redesigned to include an enhanced trail feature that is 10 feet wide for pedestrians, families riding bikes or other recreational opportunities. This feature is something that will be built within the next few years and provides a trail connection within the City limits. Staff has worked with project developers to create a feature that will be located on the west side of West Gate Drive from Lodi Avenue to Harney Lane. This trail will run the length of western Lodi. The General Plan also identifies a Class 1 detached bicycle trail system to the west of the current City limits. This is a feature that will be incorporated into project design as the City develops to the west and land is annexed. The City is working to provide a feature that can serve the community in the near future and also looking to design features for future development. Staff has included a tentative map and the modified West Gate Drive cross section as attachments to the growth allocation resolution. ANALYSIS Background: On June 17, 2013, Bennett Homes submitted an application for the Van Ruiten Ranch Subdivision project, which included a Vesting Tentative Subdivision Map and review of the development standards for the Planned Development Unit. The Planning Commission approved this project on April 9, 2014. As part of the approved Van Ruiten Ranch project, a 13.7 -acre school site was identified and was consistent with the request of the Lodi Unified School District and the facilities master plan at the time. Subsequently, the school district updated the facilities master plan and determined that a school site was not necessary in the Van Ruiten subdivision or the entire Southwest Gateway area. The applicant has proposed to subdivide the former school site into residential Tots, consistent with the surrounding development. The Planned Development Guidelines from 2014 provided a detail of what the school site would look like if it was lotted for single family development. The project is essentially an in -fill project within an approved subdivision. Existing Conditions: The applicant has removed the previous vineyard / grapevine and completed some mass grading along with backbone infrastructure for roads, waterlines, storm water and sewer lines. Vesting Subdivision Map: The proposed Vesting Tentative Map would subdivide the project parcel into 67 low-density residential single-family Tots and associated public roadways. The applicant has requested the vesting map in order to protect against potential future changes in policy and design requirements by the state or other agencies. The applicant has requested the vesting protection, but also agreeing to pay whatever development fees are in place at the time of building permit review. Staff supports this request and recommends approval. The Planning Commission is empowered to review the vesting tentative map and recommend approval or denial of the vesting map to the City Council. If the Commission approves, a Final Map for a subdivision of five or more parcels must be prepared, filed, processed and recorded as set forth in Chapter 17.54 (Parcel Maps and Final Maps), to complete the subdivision. The City Council has a final say on the approval or disapproval of the vesting tentative map. Access and Circulation: The project is accessed by the extension of Century Boulevard with access points to the north and south consistent with land use diagrams in the General Plan. The overall circulation pattern anticipates development to the north, south and west. Streets have detached sidewalks to create a tree canopy consistent with historical Lodi residential areas. General Plan Compliance: The project site is designated public — quasi public in the general plan and was identified as a place holder for a potential K- 6 school. The school district has identified that this school is no longer needed. The applicant is proposing to subdivide the property consistent with the surrounding area. Zoning Compliance: The project site is zoned Planned Development 41 (PD -41). Planned Development zoning designations provide flexibility in the application of development standards that will produce development projects of superior quality, including retention of unique site characteristics, creative and efficient project design, etc., than would have been achieved through strict application of the development standards required by the primary zoning district. The proposed project is divided into three distinct land uses areas; low density, medium density and high density. The project provides for a wide range of housing options for the community. Planned Development Guidelines: The applicant prepared the Van Ruiten Ranch Planned Development Standards and Guidelines. The organization of these guidelines is presented as a series of community design components that when combined create a comprehensive project design. The chapters highlight and articulate the various community design components, establishing specific development guidelines and standards for how the project will develop. Growth Management Compliance: The current allocation program has been suspended since 2012 and staff processes growth management requests at any time during the year as long as there are unused allocations in reserve. This may change in the future. The allocation system gives priority through point assignments to projects that reduce impacts on services, infrastructure, and resources. The ordinance sets an annual growth limit of two percent of the City's population, compounded annually. Once the number of allocable units is figured, the City requires that the allocation units be distributed among housing types as follows; 44 percent low density, 28 percent medium density and 28 percent high density (GM -P4). The California Department of Finance sets the City population for January 1st of each year. The population has been as follows: 2012 — 62,575 2013 — 63,233 2014 — 63,651 2015 — 63,791 (62,772) 2016 — 63,219 Staff believes the drop in population is based upon how the state now counts temporary population and transient individuals. Growth Allocations for 2013 and 2014 were higher because the persons per household was lower. New Department of Finance numbers show Lodi at 2.85 persons per household in 2015 compared with 2.7 in the past. Growth allocations for 2016 are also lower because of a reduction in the City population. The following calculation explains the current City population of 63,219 as of January 1, 2016 and 443 units available for 2016: 1. Calculate two percent of the City's current population: 63,219 x 2% = 1,264.38 2. Divide 1,264 by the average number of persons per household 1,264 / 2.85 = 443.50 3. Divide the 443.50 (443 du) units into the 3 housing types: 44% low density = 195 units 28% medium density = 124 units 28% high density = 124 units. In 2012, the City Council expired allocations accumulated since 2008. In the five-year period since 2008, 2,235 allocations were added to the reserve. The Council eliminated 800 Low Density and 1,435 High Density allocations. This Council action created a new balance of 4,674 as detailed below in Table A. Table A: Growth Management Allocation History 2012 Density Base Available Allocations Total Available for 2012 I 2% Allocations for 2013 Total Available for 2013 Low (0.1-7) 2,995 197 Medium (7.1-20) 557 126 3,192 683 High (20.1-30) 1,122 125 TOTAL 4,674 448 1,247 5,122 Table B identifies the available Allocations in 2013, Allocations provided to projects in 2013 and those available for 2014. Table B: Growth Management Allocation for 2013 and 2014 Total Available for 2013 Available Allocations Total Allocated in 2%Allocations 2013 (Rose Gate) for 2014 Total Available for 2014 Low (0.1-7) Medium (7.1-20) High (20.1-30) 3,192 683 1,247 - 232 (2960) - 0 (683) - 0 (1,247) 199 127 127 3,159 810 1,374 TOTAL 5,122 4,890 453 5,343 Table C identifies the 2014 Total Allocations, the requested Allocations for projects, and the remaining overall Allocations. Table C: Growth Management Allocation for 2014 Density Available Allocations Total Allocation for Available Van Ruiten for2014 Ranch Allocation for Remaining Reynolds Allocations for Ranch 2014 Total Remaining for 2014 Low (0.1-7) 3,159 145 Medium (7.1-20) 810 High (20.1-30) TOTAL 55 1,374 88 5,343 288 0 227 330 145 - 199 (54) 282 - 127 (-155) 3,014 528 418 - 127 (-291) 956 557 - 392 4,498 Table D identifies the 2015 Total Allocations, the requested Allocations for projects, and the remaining overall Allocations. Table D: Growth Management Allocation for 2015 Density Total Remaining for 2014 Available Allocations Total Tot 2%Allocations Available Grupe — Taylor Remaining for 2015 for 2015 Road for 2015 Low (0.1-7) 3,014 Medium (7.1-20) 528 High (20.1-30) TOTAL 956 4,498 197 125 125 3,211 653 1081 22 0 0 447 4,945 4,923 3,189 653 1081 4,923 Table E identifies the 2016 Total Allocations, the requested 2016 Allocations for projects, and the remaining overall Allocations. Table E: Growth Management Allocation for 2016 Available Allocations Density 2% Total Allocation Available Garfield Camper . Harvest for 2016 for 2016 -Sac Crossing Rose Villa 2016 Gate II Fiore Allocation Total Remain Low (0.1-7) Medium (7.1-20) High (2.0.1-30) TOTAL 195 3,384 124 777 6 0 0 0 250 67 323 3,061 28 42 95 0 165 124 1205 443 0 0 0 180 0 180 5,366 5,360 5,332 5,290 4,765 4,698 668 612 1,025 4,698 Table F identifies Growth Allocations provided to recent projects and some historic projects from 2005 that are still active. Table F: Current Allocations from 2013 to 2017 ISSUED ALLOCATIONS Project Low (0.1-7) Medium (7.1-20) High (20.1-30) TOTAL Luca Place* 17 17 Gianoni / Baker 18 18 Miller Property* 65 65 Rose Gate 232 232 Van Ruiten Ranch 145 55 88 288 Reynolds Ranch 227 330 (298) 557 Vintner Square 57 57 Garfield 6 6 Camper - Sac 28 28 Harvest Crossing 42 42 Rose Gate II 250 95 180 525 Villa Fiore (VRR) 67 67 TOTAL 774 530 598 1,902 * The Luca Place project was allocated 17 growth allocations in 2005. The Miller property was allocated 65 growth allocations in 2005. These allocations have not been used, but remain active allocations. Table G identifies the allocations remaining from 2016 and what Allocations will be available for 2017. Table G: Growth Management Allocation for 2017 Density Base Available Allocations Total Remaining after 2% Allocations for Total Available for 2016 2017 2017 Low (0.1-7) Medium (7.1-20) High (20.1-30) 3,061 612 1,025 195 124 124 3,256 736 1,149 TOTAL 4,698 443 5,141 Conclusion Staff sent a copy of the application to various City departments for review and comment. Their comments and requirements incorporated into the attached resolution. The proposed tentative map is consistent with the current General Plan (2010). The proposed residential development aligns with the residential land use designations and densities assigned to the site in the current General Plan. The site for the proposed subdivision is suitable for the density and type of development proposed in that it is a flat piece of land. The project design of the subdivision and type of improvements proposed would not conflict with easements, acquired by the public at Targe, for access through or use of the property within the proposed subdivision in that there are no existing public access easements on the site. The Planning Commission reviewed the project in its entirety and recommended the City Council grant the applicant 67 Low -Density Residential Growth Management Allocations. Staff is also requesting the Council to affirm the request for a modified trail system along the west side of West Gate Drive from Lodi Avenue to Harney Lane. FISCAL IMPACT Not applicable. FUNDING AVAILABLE: Not applicable. Stephen wabauet-,_ _a Community Development Director Attachment: 1. Aerial /Vicinity Map 2. Tentative Subdivision Map 3. Planned Development Guidelines 4. Planning Commission Staff Report 5. Planning Commission Resolution 6. Draft Resolution Growth Allocation 7. Draft Resolution Vesting Map VICINITY/ AERIAL MAP 7- IPA- • ; • --r''' 11.. i 71-'4 .. • V's• 3-• li. 1.. r -" '°-:— ..K. r iiir i k 4. .....i..ti..V...mi. '-...... 'Ail, .''- '.. v rtf-A• I "... IA, 7 s '4* 1 - " '-' OM 4% •-,...,,...-%,'• • ,-..... _ -7,... O :IJ ,.. '7..lee'R• tl, , . 17/111.1.14 Vi Kr.t11,:7rE.- i 7 {. e J.- P,Oetree'si, 1::. — Link, Caesa rs Pqza n ,.. 1 a 11.11 ii.,,-,-....Lril . .... t •;.' MP+ a ...... • ::,' . 1 ur.) OA • I' hp i .--ti2.7 0 lk. . Ar 2:11,.11E . . 11.3d, , -, 1CrirliLT Rentais 1 Lowe Irnpro 1!"/!4T.;61.3911! , . . , L) sfvt.4146 Carrano.wav- ii• . .. ;a ihozan yi a rif 't. . '4, War .41. ,.. -.....„..... .4 o it . . Titan& a Mti 4.1 t * • 1 0, * • • Lower Sacramento Road / Extension of Century Boulevard Van Ruiten Ranch Planned Development Standards & Guidelines April 2014 BENNETT HOMES, INC. /e> WCDC:1 c, i=c)c)GER TABLE OF CONTENTS Chapter 1: INTRODUCTION 1 .1 Overview 1.1.1 1.1.2 1.1.3 PD Organization Context & Setting Relationship to Existing Plans 1.2 Community Framework 1.2.1 Vision & Objectives 1.2.2 The Plan Chapter 2: RESIDENTIAL USES PD STANDARDS & GUIDELINES 3.1.2 Open Space / Detention Basin 3.2 Landscaping Standards 3.3 Lighting & Furniture 3.4 Entries & Monumentation 3.5 Signage 3.6 Fencing & Walls 3.7 Community Facilities 3.7.1 Schools 3.7.2 Fire Protection 3.7.3 Police Protection 3.7.4 Cultural Facilities 2.1 Overview 2.2 Residential Districts Chapter 4: TRANSPORTATION 2.3 Development Standards 2.3.1 Low Density Residential 2.3.2 Medium Density Residential 2.3.3 High Density Residential 2.4 Architectural Guidelines 2.4.1 Design Philosophy 2.4.2 Guidelines Chapter 5: IMPLEMENTATION & PHASING 2.4.3 Styles 2.5 Site Design 5.1 Phasing 2.5.1 Parking 5.2 Future Development Applications 2.5.2 Landscaping 5.2.1 Design Review 5.3 PD Guidelines Amendments 4.1 Transportation Network 4.1.1 Vehicular Circulation 4.1.2 Bicycle & Pedestrian Circulation 4.2 Multi -Modal Guidelines Chapter 3: PARKS, OPEN SPACE & COMMUNITY FACILITIES 3.1 Parks & Open Space Overview 3.1.1 Neighborhood Park Van Ruiten Ranch 1 FIGURES Figure 1 Figure 2A & B Figure 3 Figure 4A & B Figure 5 Figure 6 Figure 7 Figure 8 Figure 9 Figure 10 Figure 11 Figure 12 Figure 13 Figure 14 Figure 15 Figure 16 Figure 17 TABLES Location Map PD Schematic Plan & School Site Alternative Low Density Lot Typical (Conventional Front -Loaded) Medium Density Lot Typicals (Small Lot & Detached) High Density Lot Typical (Attached) Italian Style Pattern Diagram Spanish Style Pattern Diagram Craftsman Style Pattern Diagram Farmhouse Style Pattern Diagram Park Illustrative Plan Entry Monument @ Century Boulevard Fence & Wall Design Circulation Network Diagram Century Boulevard Street Sections Westgate Drive & Blossom Drive Street Sections Van Ruiten Drive & Residential Street Sections Phasing Plan Table 1 Table 2 Land Use Summary Residential Dimensional Standards PD STANDARDS & GUIDELINES Van Ruiten Ranch 2 Chapter 1: INTRODUCTION 1.1 OVERVIEW The Van Ruiten Ranch community is a vibrant, compact neighborhood inspired by Lodi's continued high quality of life and small-town character. As a reflection of Lodi's historic neighborhoods, the Van Ruiten Ranch community includes tree -lined, pedestrian- and bicycle -friendly streets and homes with attractive, high quality architecture. The document to follow constitutes the Van Ruiten Ranch Planned Development (PD) Standards and Guidelines. The purpose of the document is to establish development and design standards, including conditions and restrictions related to size, timing and sequence of development, to ensure a quality project in accordance with the City of Lodi 2010 General Plan. These guidelines shall be applied to all development within the project to ensure that Van Ruiten Ranch develops as a cohesive community. The Guidelines, once approved, are binding on the project, and shall be implemented consistent with the provisions set forth in the City's Municipal Code. 1.1.1 PD Organization As a guiding document for Van Ruiten Ranch, the organization of these guidelines is presented as a series of community design components that when combined create a comprehensive project design. The chapters to follow highlight and articulate the various community design components, establishing specific development guidelines and standards for each component. These components include: Chapter 1 PD STANDARDS & GUIDELINES Introduction - Provides an overview of the project, establishes the regulatory framework, and gives a summary of the PD organization. Chapter 2 Residential Uses - Elaborates on residential uses by providing development standards and architectural guidelines. Site design standards are also included in this chapter. Chapter 3 Parks, Open Space & Community Facilities - Discusses distribution, location and standards for parks, open space, and basin features. This includes landscaping standards, lighting and street furniture guidelines. A discussion of community facility availability is also included in this chapter. Chapter 4 Transportation - Identifies the proposed roadway network in the community and establishes guidelines for vehicular, bicycle and pedestrian circulation. Chapter 5 Implementation & Phasing - Discusses project phasing, future development applications, and amendment procedures. Van Ruiten Ranch 3 1 1 1.1.2 Context & Setting The Van Ruiten Ranch (the "project") neighborhood is located on a 74 -acre site in the City of Lodi. The project is located in the southwestern portion of the incorporated city, generally bounded by Lower Sacramento Road to the east, Kettleman Lane to the north, future development and Harney Lane to the south, and the existing Lodi City Limits (2008) to the west. (Figure 1) Extensions of existing Century Boulevard and Westgate Drive will provide access through the proposed neighborhood. Surrounding land uses consist of existing residential neighborhoods and the planned DeBenedetti Community Park to the east; agricultural land and a commercial corridor along Kettleman Lane and Lower Sacramento Road the north; and agricultural land and tree orchards to the south and west. Figure 1: Location Map PD STANDARDS & GUIDELINES The project site currently consists of four parcels of undeveloped land. The site is utilized for agricultural row crops and is currently planted with vineyards. One residence and a series of farming -related structures are located along Lower Sacramento Road, north of the Century Boulevard intersection. The requirements of CEQA have been met for the Project by the certification of the Lodi Annexation Environmental Impact Report (Westside) [EIR-05-01] and adoption of Findings and Statement of Overriding Considerations for the Project by City Council Resolution in March, 2007. Subsequently, the City of Lodi 2010 General Plan identified consistent land use designations for the project site and the General Plan Final EIR, including comments and responses to comments, was certified by the City Council on April 7, 2010. W. Turner Rd. W. Sargent Rd. VAN RUITEN RANCH W. Harney Ln. i v E `CW`p Z „j W. Kettleman Ln. Saci W. Lodi Ave. E. Turner Rd. J m 4.S1"t.s _.._.._.. S. Cherokee 1 4 j ti} , ii., 2 1 1 ui E. Harney Ln. 1 L.. .1 Van Ruiten Ranch 4 1.1.3 Relationship to Existing Plans The Van Ruiten Ranch Planned Development (PD) is a guiding document to insure a quality community and coordinated implementation and phasing. The intent of these guidelines is to implement the goals and policies of the City of Lodi 2010 General Plan and create community - specific goals and development standards unique to Van Ruiten Ranch neighborhood. The standards provided in this document are intended to supplement the City of Lodi Development Code. As a Planned Development, the Van Ruiten Ranch PD can establish unique or more specific standards to create design flexibility in achieving project goals. Where these Guidelines are silent or unspecified, the Lodi Development Code shall apply. Amendments to these Guidelines and the standards herein are subject to administrative review and approval. The Van Ruiten Ranch site is currently planned for development in the City of Lodi 2010 General Plan and is designated with a mix of uses: Low, Medium, and High Density Residential, Public/Quasi-Public, and Open Space. The site is zoned for Planned Development, Public Quasi Public, and Open Space on the City of Lodi Zoning Map. The entitlement application for the Van Ruiten Ranch project is consistent with the policy and zoning documents in place. 1.2 COMMUNITY FRAMEWORK The 74 -acre Van Ruiten Ranch Master Plan is a compact residential neighborhood with a mix of residential densities. Designed as a reflection of Lodi's historic neighborhoods, the community features tree -line streets and architecture that relate to the surrounding character and context. The diversity of housing types and sophisticated palette of high quality architectural finishes provides a vibrant streetscape. The mix of varying single-family lot sizes and housing types encourages a diverse community with various income levels and lifestyle options within the neighborhood. At the confluence of Century Boulevard and Westgate Drive is a 5 -acre park that creates a unique sense of place and provides recreation opportunities within walking distance to residents. The design of the Van Ruiten Ranch neighborhood will create a seamless extension of PD STANDARDS & GUIDELINES the surrounding established community: variety of architecture, grid of streets (walkable), pedestrian connections, and a network of parks and open spaces. 1.2.1 Vision & Objectives The vision for the Van Ruiten Ranch neighborhood is to create a new community inspired by the elements that make traditional small towns desirable places to live: a diverse mix of quality homes in different shapes, sizes, materials and colors located near public spaces, schools, open spaces, parks, and neighboring shopping opportunities—a place of readily accessible amenities, attractive neighborhoods and a strong sense of place throughout. This mixed use, pedestrian friendly, compact community is expected to be a positive addition to the City of Lodi because it is one that embraces and implements the City's core values as expressed in the 2010 General Plan. To that end, the following objectives are proposed for the project: • Protect adjacent farmland and the existing urban edge; • Promote a mixed-use, compact development pattern linked to regional transportation systems; • Promote a balance of uses—housing, schools, parks and recreation—that support a healthy community; • Create livable, walkable, and safe environments with a distinct community identity and sense of place; • Encourage an efficient use of energy and resources through sustainable design practices; • Provide a diversity of recreational opportunities; • Create friendly and inviting streetscapes through landscaping and design elements that reflect a high quality development; • Encourage high quality architecture and urban design; • Provide a diversity of housing choices—streets, paths and links to public transit; and • Create safe and accessible links between neighborhoods and community facilities to adjacent shopping areas and the surrounding community. Van Ruiten Ranch 5 1.2.2 The Plan The Van Ruiten Ranch project proposes a variety of housing choices in close proximity to employment and services. The project includes approximately 288 residential units, ranging from conventional single family homes to apartments. The park, school, and network of sidewalks create a walkable neighborhood with a strong sense of place. A 15 -acre school site is located along the western edge of the Van Ruiten Ranch neighborhood. This planned facility is consistent with the City of Lodi 2010 General Plan. Should the School District decide in the future not to purchase this land, Figure 2A: PD Schematic Plan PD STANDARDS & GUIDELINES an alternative site plan with 65 single-family residential units has been approved as part the entitlement application. The PD Schematic Plan and School Site Alternative depicts the arrangement of uses (Figure 2A & B), and Table 1 summarizes the land uses and calculates the proposed densities. LAND USE nisTRICTS tow [iermrlY Rr-sx1-0s3:1 Me.7urn Ditrree keshienllnl rPfi D rdiry Feiidunlidl 54MX.1 Purls; Open Spore Van Ruiten Ranch 6 PD STANDARDS & GUIDELINES Figure 2B: PD Schematic Plan with School Site Alternative LAND USE DISTRICTS tow t7enuti Rrsderhtil Malum DmIree keshienIk11 lir{�i Dartliry Fei,,i r IkJl 54h701 lurk I Open 3p7re Y BOULEVARD Table 1: Land Use Summary • e ' s r c LDR 010 General Plan / oning Designations LDR / LDR (PD) Acres (N) 31.3 Units 145 Densi (du/ac) 5 Use Single Family Residential Low Density Residential Medium Density Residential MDR MDR / MDR (PD) Single Family Residential 7.0 55 8 High Density Residential HDR HDR / HDR (PD) Multi -Family Residential 4.2 88 21 Public Quasi Public RMX PQP / PQP (PD) School 13.8 65* 5 Open Space P/OS MDR / R -1A (PD) Parks, Open Space & Detention 9.4 - - Roadway 8.7 Total 74.4 288/353* 7 avg./6 *Alternative site plan with 65 additional units if school site does not develop in the future. Van Ruiten Ranch 7 Chapter 2: RESIDENTIAL USES 2.1 OVERVIEW The purpose of the guidelines and standards for the Residential District is to ensure a complete and high quality community, with consistency of design and compatibility across housing types. The guidelines that follow provide clear standards for the development of a community that sustains a high quality of life. This section provides design standards and criteria intended to encourage creative and unique neighborhood solutions that enhance connectivity and create a cohesive community that is an asset to the City and its residents. These guidelines and standards address the following issues: • Development Standards • Architectural Guidelines • Site Design 2.2 RESIDENTIAL DISTRICTS (RD) The Van Ruiten Ranch neighborhood proposes a mix of residential densities by creating three residential districts: low, medium, and high density residential. These three districts have a comprehensive range of housing options that emulate the neighborhoods of Old Lodi and Eastside, providing homes for a diverse community. The mix of residential densities allows for flexibility that is necessary to create unique and innovative homes for the neighborhood. The residential districts are organized to facilitate phasing, in an effort to support efficient development. The City of Lodi General Plan allows for a density range of 2 to 8 dwelling units per acre in Low -Density Residential (LDR) areas, 8 to 20 dwelling units per acre in Medium -Density Residential (MDR) areas, and 15 to 35 dwelling units per acre in High -Density Residential (HDR) areas. The RD Districts established herein are consistent with the above General Plan density ranges. PD STANDARDS & GUIDELINES The Residential Districts will be developed in accordance with the City of Lodi's Zoning Standards, and these PD Guidelines. The RD allows for some non-residential uses, namely park and open space uses, consistent with the City of Lodi Development Code. 2.3 DEVELOPMENT STANDARDS This section offers development standards for a broad range of housing types and lot configurations that fall within each of the three (3) residential districts. The variety of housing and lot configurations listed herein provides for future flexibility based on market demand and economic conditions; although new entitlements may be necessary to implement some housing types, the PD Standards and Guidelines shall apply to future proposals and in most cases without requiring a PD amendment. The location of and juxtaposition of homes is paramount to attaining the vision for the community. The development and dimensional standards are a significant part of creating a pleasing streetscape and determining the proper functioning of the home on the lot and the relationship between homes and the surrounding environment. To follow are standards for each of the three Residential Districts. 2.3.1 Low Density Residential (LDR) The Low Density Residential District is envisioned to be located on the west end of the community surrounding the school site. This District provides a variety of single -story and two-story homes, and is designed to seamlessly integrate with the neighborhoods located to the North and South. The different possible lot configurations for the LDR district are conventional front -loaded and rear -loaded alley accessed lots. Van Ruiten Ranch s Figure 3 depicts a typical front -loaded low density lot layout. Dimensional and density standards for the LDR District are provided in Table 2. 2.3.2 Medium Density Residential (MDR) The Medium Density Residential District is located centrally, with advantageous proximity to the park. Compact in nature, homes will contribute to a vibrant streetscape within the Van Ruiten Ranch community. These housing types are envisioned to maintain Lodi's historically compact form, and contribute to its small-town character. The different possible housing types for the MDR district are: • Front -loaded • Alley Accessed • Cluster Housing (I -Court, T -Court) • Small lots, attached or detached Figure 4A and Figure 4B depict a typical attached and detached medium density lot configuration. Dimensional and density standards for the MDR District are provided in Table 2. 2.3.3 High Density Residential (HDR) The High Density Residential District is designed to increase the variation of housing types, and accommodate for Lodi's increasingly diverse population. These housing types are envisioned to be located along the east side of the project boundary. The range of high density homes possible include, but are not limited to, the following housing types: • Fourplexes • Duplexes • Halfplexes • Cluster Housing • Condominiums • Apartments • Townhomes • Small lots, attached or detached PD STANDARDS & GUIDELINES Figure 5 depicts an example of the types of housing intended for the HDR district. Dimensional and density standards for the HDR District are provided in Table 2. Van Ruiten Ranch 9 Figure 3: Low Density Residential Lot Typical (Conventional Front -Loaded) A Figure 4A: Medium Density Residential Lot Typical (Small Lot) A PD STANDARDS & GUIDELINES Figure 4B: Medium Density Residential Lot Typical (Detached) A — — um — a i[ J 1 i. I JI Rio RoP ._� MENlib III et r 1 _ . lip iii Figure 5: High Density Residential Lot Typical (Attached) For conceptual planning purposes only. Actual lot dimensions and housing types may vary pending future submittals. Van Ruiten Ranch 10 Table 2: Residential Dimensional Standards * PD STANDARDS & GUIDELINES 1 Coverage Exceptions: An additional 100 square feet of accessory structure(s) may be built on the lot as long as the maximum lot coverage is not exceeded. 2 Side -facing garage does not front onto public street and shall have the "to living area" setback. 3 Projections, including roof overhangs, fire places, bay windows, media nooks, and architectural details, may encroach up to 2.5' into front, side, and rear setbacks, as long as there is consistency with the Building Code. * Residential and Dimensional Standards provide for future flexibility by allowing a variety of housing and lot configurations; entitlements may be necessary to implement some housing types. Van Ruiten Ranch 11 Detache ached Density 2 - 8 du/ac. 8 - 20 du/ac. 15 - 35 du/ac. Minimum Lot Area (Square Feet) 5,000 3,000 N/A N/A Maximum Lot Coverage 1 60% 65% 65% 70% A Minimum Lot Width (Feet) 40 30 N/A N/A Minimum Lot Depth (Feet) 75 70 N/A N/A Minimum Lot Frontage along Public Streets (Feet) 30 20 N/A N/A Minimum Front Setbacks - From Public Street (Feet) 3 B To living area 15 10 10 10 C To porch or entry 12.5 10 10 10 D To garage 202 182 18 2 N/A Minimum Front Setbacks - From Private Drive (Feet) 3 To living area N/A N/A 4 4 To porch or entry N/A N/A 4 4 To garage N/A N/A 4 N/A To second story living area N/A N/A 2 N/A Minimum Side Setbacks (Feet) 3 E Interior lots 5 3 3 5 F To public street 10 10 10 10 To open space 5 5 5 N/A Zero lot line 5/0 4/0 4/0 4/0 Minimum Rear Setbacks (Feet) 3 G To living area 10 10 10 5 To recessed garage N/A 5 3 N/A To detached garage 5 5 5 5 H To garage from alley 5 5 5 5 1 Setback from living area to garage 5 3 N/A N/A Maximum Building Height 35 35 35 45 J Minimum Distance between Buildings 6 6 6 6 Parking Standards (off-street) Dimensions AS DEFINED IN THE LODI DEVELOPMENT CODE Spaces required per unit 2, covered I 1, covered PD STANDARDS & GUIDELINES 1 Coverage Exceptions: An additional 100 square feet of accessory structure(s) may be built on the lot as long as the maximum lot coverage is not exceeded. 2 Side -facing garage does not front onto public street and shall have the "to living area" setback. 3 Projections, including roof overhangs, fire places, bay windows, media nooks, and architectural details, may encroach up to 2.5' into front, side, and rear setbacks, as long as there is consistency with the Building Code. * Residential and Dimensional Standards provide for future flexibility by allowing a variety of housing and lot configurations; entitlements may be necessary to implement some housing types. Van Ruiten Ranch 11 2.4 ARCHITECTURAL GUIDELINES The architectural vision for the Van Ruiten Ranch community is inspired by the small-town character and diversity of architecture found in Lodi's historic neighborhoods. The community proposes a variety of architectural styles and general guidelines that encourage variation in building forms and flexibility of design solutions. The following architectural guidelines are formed out of a specific design philosophy inspired by the desire of the residents to live in a safe, comfortable, and inviting community that promotes a sense of identity and fosters social interaction. 2.4.1 Design Philosophy The core of the Van Ruiten Ranch community design philosophy is the idea of balanced, liveable homes. The community design philosophy was developed to allow for the creation of innovative, unique homes that possess modern amenities with traditional style. The following elements of the design philosophy will be the framework for the community's design aesthetic: a. Livability • The purpose of all design elements of the community shall be to ensure a high quality of life for its future residents. • Building and floor plan design shall not only be aesthetically pleasing, but also designed for the express purpose of creating a relaxing and enjoyable home. • High quality, spacious floor plans are always encouraged over compact plans that forgo a balanced home in an effort to increase the quantity of bedrooms. • Floor plans that allow for a "bonus room" to be used for recreation and/or leisure are encouraged. PD STANDARDS & GUIDELINES b. Indoor/Outdoor Integration All homes are encouraged to maximize the connection between the home and the surrounding environment as the climate is part of Lodi's unique identity. • Integration of the outdoor environment with homes can be achieved through the design of outdoor kitchens and dining areas as well as through patios, balconies, screened porches, and window design. Van Ruiten Ranch 12 c. Quality of Design and Design Compatibility • The high quality design of the Van Ruiten Ranch community is crucial to its establishment of a cohesive community identity. • All entries into the Van Ruiten Ranch neighborhood shall exhibit high quality design and materials that welcomes residents and visitors. • Enhancing the design of corner lots to reflect the design philosophy is encouraged. Due to the high visibility of corner lots, the community as a whole is largely impacted by their design. The quality of corner lot design reinforces the character of the Van Ruiten Ranch neighborhood. • All homes are encouraged to contain the highest quality modern amenities that promote ease and flexibility for the residents. Although homes have contemporary features, a more traditional style should be employed to allow the community to blend well with Lodi's established communities. 2.4.2 Guidelines The architectural guidelines are crafted to create an intimate neighborhood with a strong sense of place and a pedestrian - oriented streetscape. The following guidelines are provided to create a framework within which developers, builders and designers can have flexibility to create unique homes. a. Form & Orientation • Variable building and garage orientations are encouraged along the streets to create visual diversity and interesting streetscapes. The same house plan, or closely similar elevation, may not be placed on two adjacent or consecutive lots. • Use of roof overhangs, porches, balconies, trellises, patios, and low walls are encouraged to add interest to the streetscape. PD STANDARDS & GUIDELINES b. Elevations & Projections • All visible elevations shall be made interesting by means of articulation of facades, varied roof lines, window placement and shape, and variety in exterior colors, finishes, and detailing. Enhanced side and rear elevations shall be required whenever those elevations face a public or private street, park, or other public space. Rear and side elevations must match front elevations in terms of window treatments, roof lines and materials • Roof lines may be made interesting by use of gables, hips, dormers, and roof planes that create variations in planes. • Roof pitch, elevation styles, and materials should be consistent with the architectural style of the building. c. Materials • Use of high quality materials such as stucco, brick, stone, and wood is encouraged. • Accent materials may include stone veneer, painted wood trim, and shutters. • T-111 siding is prohibited. • Roofing material shall be concrete tile or composition shingle, and should be consistent with the architectural style of the building. d. Colors • Color selection should match the overall neighborhood design theme palette, and be consistent with the building's architectural style. • Buildings should be painted with a variety of color palettes to provide diversity, visual interest and to make each individual building unique. Van Ruiten Ranch 13 PD STANDARDS & GUIDELINES e. Garages • Three car and tandem garages shall be encouraged to provide maximum flexibility for future residents. • Variety in garage configurations is encouraged to avoid a garage -dominant streetscape. • Garage configurations may include attached, detached, recessed, and side -loaded. f. Trash Storage • All trash, recycling, and green waste containers shall be screened from view of public streets. 2.4.3 Styles Inspired by the architecture of Old Lodi and Eastside neighborhoods, the homes of Van Ruiten Ranch represent the next generation of distinctive design. Borrowing from the heritage of the past and looking to the future, Van Ruiten Ranch strives to create a timeless and seamless integration of the nearby desirable neighborhoods. An array of styles will be carefully positioned throughout the site; the styles are a mix of historic and current design ideas. The illustrations, photos, and graphics shown in this section are not meant to be prescriptive. Rather, they are meant to demonstrate typical examples of the variety of footprints, elevations, and design elements possible while indicating minimum architectural design characteristics that capture the character envisioned for the neighborhood. Alternative architectural styles are subject to administrative review and approval. Van Ruiten Ranch 14 a. Italian Figure 6: Italian Style Pattern Design Italian architecture descends from a rich history of finding art and beauty in the built form. Influenced by ancient Greek and Roman architecture, Italian style architecture is based on classical forms—arches, columns, domes—and strong symmetry. Characterized by rich texture and warm earth -tones, this rustic, informal style embodies the elements of the design philosophy: livability and balance of indoor/outdoor living. The Italian architecture found in Van Ruiten Ranch is a 215' century interpretation, combining Italian and Tuscan styles. The following architectural elements will apply to Italian style homes within Van Ruiten Ranch: • Low pitched or flat roof • Tall appearance with overhanging eaves • Natural textures and colors • Recessed entryways • Arched windows and doors • Stone and wrought iron decorative accents • Wall materials of stucco or brick • Tuscan columns or arcades • Traditional or Juliette balconies • Balanced, often symmetrical, shape DETAILS PD STANDARDS & GUIDELINES COLOR & TEXTURE Van Ruiten Ranch 15 PD STANDARDS & GUIDELINES b. Spanish Figure 7: Spanish Style Pattern Diagram The Spanish style of architecture developed out of a desire to compliment the Mediterranean climate and topography. This style emphasizes the indoor -outdoor relationship through its use of balconies, windows, and courtyards. The Spanish style in Van Ruiten Ranch will encompass elements of both Spanish and Monterey architectural style. Characterized by its two-story design with porches, tiled roofs, and wood detailed balconies, this style emulates an open plan to capture views of the surrounding environment, taking full advantage of the mild climate. The following architectural elements will apply to Spanish homes within Van Ruiten Ranch: • Simple massing and volumes • Shallow and moderately pitched roof with little to no overhang • Flat concrete tile, "S" tile, or barrel tile roof materials • Stucco or brick exterior • Decorative wrought -iron accents • Classically -inspired arched porches • Decorative shutters with head or sill trim • Cantilevered balconies (Monterey) • Exposed rafter tails • Open floor plans DETAILS 11'41%1411111 COLOR & TEXTURE Van Ruiten Ranch 16 c. Craftsman The Craftsman style became part of the California vernacular as the gold rush brought new people, cultures, and economic success to the state. The style is best recognized for its large front porches with square columns and a hipped or gabled roof. The Van Ruiten Ranch Craftsman style is a hybrid design including elements of bungalow—both inspired by the high quality materials and craftsmanship. The design will include updated lines and simplified forms, while reflecting vernacular qualities of established Lodi neighborhoods. The following architectural elements will apply to Craftsman homes within Van Ruiten Ranch: • Low pitched, gabled or hipped roof • Thick, square and/or tapered columns • Horizontal siding detail • Multi -pane windows • Decorative shutters • Brick or stone accents • Exaggerated eaves • Prominent and spacious front porches • Exposed brackets • Decorative wood shutters DETAILS PD STANDARDS & GUIDELINES Figure 8: Craftsman Style Pattern Diagram COLVK 6, ICAIUNE r T Van Ruiten Ranch 17 d. Farmhouse Farmhouse architecture formed as early settlers brought architectural themes from their old world cultures to the west. Characteristic elements such as covered porches and dormer windows were inspired by Cape Cod, Greek Revival, New England Salt box architecture. Farmhouse architecture is reflective of Lodi's agriculture The Farmhouse style in the Van Ruiten Ranch community is a modern take on the quintessential farmhouse, and reflective of Lodi's the agricultural heritage. Drawing from a rich material palette, the style provides all the warmth and character innately found within the vernacular while modifying its rustic roots through precise lines and forms, resulting in a more versatile, fresh aesthetic. An appropriate mix of the following elements shall apply to Farmhouse homes within Van Ruiten Ranch: • Flat tile or composition roofing material • Gable roof forms • Metal roof element over porch • Stucco exterior • Board and Batten accents • Dormer elements • Porch element • Stone or Brick accents DETAILS PD STANDARDS & GUIDELINES Figure 9: Farmhouse Style Pattern Diagram COLOR & TEXTURE Van Ruiten Ranch 18 PD STANDARDS & GUIDELINES 2.5 SITE DESIGN 2.5.1 Parking Private parking is provided on each residential lot at a minimum of two covered spaces per unit for the front -loaded low and medium residential lot types and a minimum of 1.33 spaces for the high density residential lot type. Covered parking must be a garage or carport, either attached to or detached from the home. The minimum dimensions for a private garage or carport is 10 -ft by 20 -ft. Driveway lengths vary depending on unit type and shall be consistent with Table 2, Dimensional Standards. Public and guest parking is provided by on -street, parallel parking consistent with the City of Lodi standard residential street section. 2.5.2 Landscaping On individual single-family lots, the builder shall provide front yard landscaping and irrigation. Front yard landscaping should consist of at least one deciduous tree a minimum of 15 -gallons in size. This will achieve a cohesive, tree -lined pedestrian friendly realm that is inviting and visually pleasing to residents and visitors alike. Van Ruiten Ranch 19 Chapter 3: PARKS, OPEN SPACE & COMMUNITY FACILITIES 3.1 PARK & OPEN SPACE OVERVIEW The Van Ruiten Ranch community provides park and open space areas intended to create a variety of recreational opportunities, with both active and passive spaces, to cater to a wide range of users. This system will create a cohesive outdoor environment that complements the surrounding neighborhood form and plays an integral role in shaping the community as a whole. The amenities provided in the park and open space district will enhance the educational, recreational, and cultural life of residents and promote interaction within the neighborhood and the surrounding Lodi community. Three park and open space elements define the Van Ruiten Ranch community: • A 5 -acre neighborhood park, envisioned with a variety of outdoor amenities for the community; • A system of open space areas, including a detention basin, landscaped to create prominent entry features and respite areas throughout the community; and • A network of sidewalks and on -street, shared bicycle lanes that provide connection throughout the community and to the surrounding neighborhoods. PD STANDARDS & GUIDELINES The parks and open space system will greatly enhance the visual nature, quality of life, housing desirability, and the overall community image. To follow are standards and guidelines for each of the park and open space features. 3.1.1 Neighborhood Park The Neighborhood Park is intended for use of all residents within the neighborhood and the community at large. The park should be easily accessed by the pedestrian and bicycle circulation network from all areas within the neighborhood. The City currently has a parkland, open space and storm drainage requirement goal of eight acres per thousand persons, of which 5 acres must be constructed for park and recreation uses only (City of Lodi 2010 General Plan). Parkland dedication may be met through on-site dedication, payment of a fee in lieu of dedication, or a combination of the two. The Van Ruiten Ranch total dedication obligation is 7.2 acres (assuming maximum build -out and school site conversion to residential) of combined park, open space and storm drainage. Based on the park acreage minimums defined by General Plan Policy P -P2, the Van Ruiten Ranch neighborhood must provide for a 5 -acre park and recreation facility. Van Ruiten Ranch 20 The Van Ruiten Ranch community provides 5.0 acres of unencumbered parkland at the confluence of Century Boulevard and Westgate Drive. As envisioned by the 2010 General Plan, the Neighborhood Park within the Van Ruiten Ranch community is the northern portion of a larger park, shared by the future community located to the south. Although the park located within the project area must be designed and constructed as a stand-alone park, it also must function as part of the larger whole. Figure 10 illustrates how the Neighborhood Park may be designed and how the two separate facilities may function together to become one larger, cohesive park. The Neighborhood Park is envisioned to provide social gathering and respite areas in close proximity to homes. The park provides for the relaxation and recreational needs of the community and may also include more active recreational facilities such as basketball courts or horseshoe pits. Neighborhood Parks provide for the aesthetic needs at this major intersection in the community, creating inviting and engaging landscape features that welcome residence and visitors to the community. PD STANDARDS & GUIDELINES Figure 10: Park Illustrative Plan Basketball Court (Typ.) Tennis Court (Typ.) Ball Court (Typ.) Tot tot Picnic Area (Typ.) Baseball Diamond Soccer Field For conceptual planning purposes only. Actual design and layout may vary pending future submittals. I I I I Van Ruiten Ranch 21 The design of the Neighborhood Park shall be consistent with the following standards and guidelines: • Provide a range of active and passive facilities consistent with Table 6-3 in the City of Lodi 2010 General Plan. These park amenities may including but not limited to, basketball court, bocce ball court, horseshoe pit, sitting areas, picnic areas, plazas and other gathering areas, game and event lawn, gazebo and other garden features; • Landscape structures, such as gazebos, arbors and orchard -style plantings, landscaping, are encouraged to create focus and a sense of place; • A variety of small public plazas and gathering and event spaces should be provided within the Neighborhood Park; • Pedestrian and bicycle linkages should connect parks to the surrounding neighborhood and the adjacent future community to the south; • A consistent landscape palette should be employed within the Neighborhood Park. Refer to the City's tree ordinance and plant list for acceptable trees, shrubs and groundcover; and • Refer to Section 3.3 for lighting and furniture standards. PD STANDARDS & GUIDELINES 3.1.2 Open Space / Detention Basin The open space network provides continuity and a consistent backdrop to the amenities, features and built environment of the community. Common open space areas include landscaped buffers and detention facilities. These open space and detention areas will be dedicated to the City; once dedicated, maintenance of these areas will be the responsibility of the City of Lodi. The design of these various open space features shall be consistent with the following standards and guidelines: • All landscape areas should be designed and landscaped consistent with park standards (contained herein) as to create a cohesive outdoor environment throughout the community; • Provide landscaped areas adjacent to adjacent roadways; • Detention facilities, located along the southern project boundary, should be attractively landscaped and maintained as an amenity to the community. Walking trails should be provided around these facilities, where feasible; • Pedestrian and bicycle linkages should connect open spaces to surrounding parks and neighborhoods; • A consistent landscape palette should be employed within open space and detention facilities. Refer to the City's tree ordinance and plant list for acceptable trees, shrubs and groundcover; and • Refer to Section 3.3 for lighting and furniture standards. Van Ruiten Ranch 22 3.2 LANDSCAPING STANDARDS The intent of the landscape design within each district is to provide continuity throughout the community. Landscaping guidelines specify standards for streetscapes and public spaces. Through the use of deciduous and evergreen plant material, year round interest will be given to the site with an evenly layered plant design. This layered plant design helps to frame views and highlight special features, and can also screen or diminish adverse views and utilities. The streetscape within the Van Ruiten Ranch community is unified through a consistent palette of ground cover, shrubs, and street trees. The street trees create a canopy along all public streets to increase aesthetics of the neighborhood while providing shade, a walkable environment, and emulating the established historic neighborhoods of Lodi. All street trees should be a minimum of 15 gallons in size at the time of planting, and centered in the parkway strip or behind the sidewalk. A mix of evergreen and deciduous trees is encouraged as primary and accent tree options. Refer to the City's tree ordinance and plant list for acceptable trees, shrubs and groundcover. The landscaping of public spaces should be carefully considered to attract visitors. Trees with a consistent canopy should be used in areas where shade is desirable. In general, the landscaping of public spaces should complement the other features and amenities of the area, becoming a backdrop to pedestrian activities. The following landscape guidelines and standards apply to the Van Ruiten Ranch community: • Landscaping should be used to define outdoor spaces, softening and complementing structures, and should also be used for utilitarian qualities; • Provide landscaping to screen parking, loading, storage and equipment areas; • Provide landscaping to shade and enhance the streetscape, parking areas, and outdoor gathering places; PD STANDARDS & GUIDELINES • Detention facilities should be planted to create the appearance of natural vegetation, with careful consideration of plant selection to ensure survival and compatibility of a proper functioning drainage system; • Landscaping shall be designed to meet the Water Efficient Landscape Requirements defined by Section 17.30.070 in the City of Lodi Development Code; and • Where feasible and desirable, landscape strips and median islands should be landscaped and programmed for the treatment and conveyance of storm water run-off. 3.3 LIGHTING & FURNITURE Lighting is an important element in the landscape and should be used to contribute to a safe and attractive environment. Lighting is also used to reinforce the community's overall design theme and create a consistent sense of place by adding a common, thematic element that is repeated along roadways, or within parks and open spaces. Site furniture is encouraged within the parks and open space system, both within programmed public spaces and within more passive landscaped lots. The driving goal for the use of landscape elements is to create enjoyable outdoor spaces and furnish comfortable amenities for relaxation and leisure. Site furniture visible from public streets, plazas, and pedestrian linkages should be of compatible style and design. Fixtures and furniture may vary in style, color, and materials from this standard design if they are used in enclosed courtyards, or other locations where land uses require unique appeal. The following guidelines and standard apply to lighting and site furniture throughout the community: • Ornamental street lights, similar to those found in historic Lodi, shall be located along public streets; • Exterior lighting, including in parks and open space areas, should be architecturally integrated with the style of the buildings and colors and materials used; Van Ruiten Ranch 23 • Architectural lighting may be used to highlight special features on or around the building, or to illuminate key entrances or other areas of access; • All lighting should utilize cut-off type fixtures to minimize glare and visibility from adjacent areas, and should be the appropriate size and height given the activities for which they are designed; • Where feasible and desirable, public landscaped areas should employ pedestrian amenities, such as benches, drinking fountains, lighting, and trash receptacles; and • The design of lighting and site furniture should be compatible throughout the community. PD STANDARDS & GUIDELINES 3.4 ENTRIES & MONUMENTATION Entry features and monumentation create an identity or "sense of place" for a community. Entries provide a rhythm to the streetscape, acting as a defining element that reinforces the overall architectural and landscape design theme. Located at Century Boulevard and Lower Sacramento Road, the entry feature for Van Ruiten Ranch is a combination of plant material, hardscape elements, and signage. (Figure 11) The following guidelines and standards apply to entry features and monumentation: • Project identification signage or thematic logos may be incorporated into pilasters or low walls; • Street corners may incorporate hardscape elements including enhanced paving, pilasters, walls, raised planters and pedestrian gateways; • Groupings of evergreen and deciduous flowering trees shall be used to highlight each entry; • Thematic landscaping material consistent with Section 3.2 will set the tone for the Van Ruiten Ranch community; and • Must not interfere with vehicular sight lines. Van Ruiten Ranch 24 Figure 1 1: Entry Monument @ Century Boulevard ENTRY - ELEVATION (North & South side of Century Boulevord} LOWER SACRAMENTO ROAD 111:40 ENTRY - PLAN North & South side of Century Boulevard} Accent trees Community icon plaque Themed accent plantings Raised planter sign Subdivision entry monument (see elevation) Low groundcover planting Paved graundcaver 0 Y & Q LU Lu Z W U0 co Accent trees Shrub and groundcover plantings For conceptual planning purposes only. Actual design and layout may vary pending future submittals. PD STANDARDS & GUIDELINES Van Ruiten Ranch 25 3.5 SIGNAGE Identification signage is permitted on all entry features, within parks and open spaces, and the recreation center. Sign text should only be permitted to identify the Van Ruiten Ranch neighborhood or other way -finding signs throughout the community. Entrance feature signage is regulated by Title 17, Chapter 17.34 of the City of Lodi Development Code, and is subject to the permitting requirements of the City. All sign elements should be consistent with the guidelines listed below, subject to the provisions of the City of Lodi Development Code and review and approval by the Planning Director: • Signage should maintain visual consistency throughout the community; • Color and material options for signs should always compliment the architectural style of the building; • Signage should be scaled appropriately for the given location; • Signage text should be kept to a minimum and scaled appropriately for placement and legibility purposes; • Wall signs, monument signs, and low -profile freestanding signs are encouraged; • Signage for pedestrian and bicycle way -finding is encouraged; • Lighting is allowed to illuminate signage at night, but should be designed appropriately to not create hazardous glare for pedestrians, bicyclists, and vehicles; • Neon signs are not permitted; and • At the entry areas, features and monument signs are encouraged to identify and enhance the community image, and create a sense of arrival. PD STANDARDS & GUIDELINES 3.6 FENCING & WALLS Walls and fences are intended to provide screening between adjacent uses, help to define edges of roadways, and provide privacy and security for private property. It is anticipated that there will be limited use of walls, except where needed for sound attenuation and where desired for entry features or for screening unsightly elements, such as trash areas. The material and design for the walls and fencing may vary throughout the community, depending on the need and the location. Masonry, wood, and wrought iron fences are permitted in the Van Ruiten Ranch neighborhood. (Figure 12) The following wall and fencing standards apply to the Van Ruiten Ranch community: • Walls and fences will not be permitted if they aren't deemed necessary for specific screening, gateway, aesthetic, security, or noise attenuation purposes; • Tall walls and fences are discouraged along internal roadways, as they diminish the street scene; • Walls and fences, used at property frontages or for screening, should be designed as an extension of the building's architecture; • Where long expanses of wall or fence are unavoidable, articulation in the form of wall offsets or landscaping should be implemented; and • Where security fencing is required, a combination of solid and open grill work is encouraged. Barged or razor wire fences are prohibited. Van Ruiten Ranch 26 Figure 12: Fence & Wall Design Pilaster with stucco and concrete cap Masonry Soundwall Design Decorative pilaster Low residential wall with cap Low Residential Wall Design PD STANDARDS & GUIDELINES Pilaster with stucco and concrete cap Enhanced Wood Fence Design Standard Wood Fence Design For conceptual planning purposes only. Actual design and layout may vary pending future submittals. —7/— a_ o m c -- o u ls? 6' U I v. -- '§ Van Ruiten Ranch 27 3.7 COMMUNITY FACILITIES Community facilities and services are necessary to serve the future population of the Van Ruiten Ranch neighborhood. This planned development will place new demands on City services, such as schools, fire and police protection, and other cultural facilities. To follow is a general description of the availability of these community facilities and a general indication of how these facilities may be affected by the Van Ruiten Ranch neighborhood. 3.7.1 Schools The Van Ruiten Ranch community is located within the Lodi Unified School District (LUSD). The development will contribute to growth -related demands for new schools within the District. Build -out of the neighborhood is expected to generate approximately 72 elementary school students, 20 middle school students, and 40 high school students (based on 289 residential homes). Van Ruiten Ranch provides a 15 -acre site for a new K-8 school, consistent with the City of Lodi 2010 General Plan and LUSD plans. 3.7.2 Fire Protection Fire protection services for the Van Ruiten Ranch community are currently provided by the Lodi Fire Department. Fire Station 3 is located in the southwest section of town and would serve the The Van Ruiten neighborhood. As of 2008, the Fire Department had 59 personnel, including 51 firefighters, company officers, or battalion chiefs. The City of Lodi has an Insurance Service Office (ISO) rating of Class 3. A Class 3 ISO rating indicates that the Fire Department is strategically placed throughout the City, and has adequate personnel, equipment, and expertise to serve the current population. The department met the National Fire Protection Association's response time criteria of 6 minutes for 90% of calls. (City of Lodi 2010 General Plan) PD STANDARDS & GUIDELINES As Lodi grows, fire capacity will have to be regularly evaluated to ensure sufficient personnel and appropriate location of stations in order to maintain acceptable levels of service. 3.7.3 Police Protection Police protection is provided by the Lodi Police Department. As of 2008, the Police Department had 118 full-time employees and 120 volunteers, with 78 sworn officers. (City of Lodi 2010 General Plan) As Lodi grows, police capacity will have to be regularly evaluated to ensure sufficient personnel and appropriate location of stations in order to maintain acceptable levels of service. 3.7.4 Cultural Facilities There are no current, or planned, cultural facilities located within the Van Ruiten Ranch neighborhood. Van Ruiten Ranch 28 Chapter 4: TRANSPORTATION 4.1 TRANSPORTATION NETWORK The Transportation Network is designed to provide for the efficient movement of goods and people, allowing for several modes of transportation including automobile, bicycle, and pedestrian. Circulation in Van Ruiten Ranch provides additional roadway, bicycle, and pedestrian linkages between the site and the surrounding neighborhoods, improving connectivity within this portion of the City. Figure 13: Circulation Network Diagram PD STANDARDS & GUIDELINES The Transportation Network is designed with a well-connected hierarchy of travel modes, allowing for efficient flow of vehicular traffic while encouraging and facilitating walking, biking, and other alternatives to single -occupancy vehicles. Streets are designed as a modified grid to keep with the character of Lodi's urban area. This chapter provides the requirements and guidelines for roadways, bikeways, and walkways. (Figure 13) � UIII I m F unman. 1_.. IInIlniIIIIIIIIIynlrn y ,....url+Inuurlllrtlr!. i FACILITY TYPES (kw II &krrrtrr 3'Sieirnoli IIIIPS CZ?Sa III P►ewliy l N. 9tlCw4k Cams III BikeNoy / a' Sale uak Van Ruiten Ranch 29 4.1.1 Vehicular Circulation The vehicular circulation network is designed to effectively link the entire community in a modified grid pattern that provides for multiple points of access to disperse automobile traffic and decrease potential congestion. Connections with existing roads and future extensions of existing roads allow for efficient access to local and regional locations. Points of entry from connector roads have been located to disperse traffic without inhibiting the efficient flow and functioning of major roads. Refer to Section 3.2 for more detailed information regarding landscaping and plant selection along public roadways. The proposed facilities include the following: Lower Sacramento Road forms the eastern boundary of the neighborhood. The General Plan proposes to widen this roadway to a 6 -lane arterial to accommodate future development in the area. Funding of improvements to Lower Sacramento Road will be the responsibility of the City. Century Boulevard is an extension of an existing roadway, providing access to the project from the east. As the primary entry to the neighborhood, Century Boulevard is envisioned to have entry monumentation at the intersection of Lower Sacramento Road. Within the community, Century Boulevard is a minor collector street that includes a 6' on -street, striped bicycle lane and a detached 5' pedestrian sidewalk. Parking is prohibited on Century Boulevard at the project entry, and is limited to the north side of the street adjacent to the school. (Figure 14) PD STANDARDS & GUIDELINES Westgate Drive provides access to the project from the north end of the community and terminates at the Neighborhood Park and Century Boulevard. Westgate Drive is designed as a minor collector street with a 6' on -street, striped bicycle lane and a 5'detached sidewalk. Parking is prohibited on both sides of the roadway. (Figure 15) Blossom Drive provides access from Century Boulevard to the future development located to the south. Blossom Drive is designed as a minor collector street with a 6' on -street, striped bicycle lane, parking along both sides of the street, and a 5'detached sidewalk. (Figure 15) Van Ruiten Drive is a minor collector street providing secondary north -south access through the site, connecting to future developments located north and south of the neighborhood. Van Ruiten Drive is designed with parking on both sides and an attached 5' sidewalk. (Figure 16) Local Residential Streets form a modified grid pattern within the Van Ruiten Ranch community. The neighborhood utilizes both a City of Lodi standard residential street section and a minor residential street section. Both of these facilities provide a parkway strip and detached 4' sidewalk. Street trees and other landscaping are paramount to the success of the streetscape program. (Figure 16) Van Ruiten Ranch 30 Figure 14: Century Boulevard Street Sections MEANDERING SIDEWALK SCHOOL PD STANDARDS & GUIDELINES MEANDERING SIDEWALK 8' MASONRY WALL S.W.5.5' BIKE14' LANE/ 1 TRAVEL ! TRAVEL 1 BIKE PARKING LANE LANE LANE 44' 15' 67' R/W CENTURY BOULEVARD (WEST LIMIT OF PROJECT TO VAN RUITEN WAY) R/W 15' 7/7/ ////i/////////////// /////// //// 14' 12' 12' 14' / BIKE LANE/ ( TRAVEL 1' TRAVEL 1' BIKE LANE/ PARKING LANE LANE PARKING 52' 15' 82' R/W CENTURY BOULEVARD (VAN RUITEN DRIVE TO HIBISCUS WAY) R/W MEANDERING SIDEWALK OPEN SPACE/ BASIN/PARK Van Ruiten Ranch 31 Figure 15: Westgate Drive & Blossom Drive Street Sections MEANDERING SIDEWALK 8' MASONRY WALL PD STANDARDS & GUIDELINES MEANDERING SIDEWALK 8' MASONRY WALL 15' 6' 1 16' 1 16' 1 6' BIKE 1 TRAVEL 1 TRAVEL 1 BIKE LANE LANE LANE LANE 44' 15' 1 74' 1 R/W WESTGATE DRIVE PARK RW MEANDERING SIDEWALK 5.5 14' 10.5' 1 10.5' 14' S.W. BIKE LANE/ 1 TRAVEL 1 TRAVEL 1 BIKE LANE/ PARKING LANE LANE PARKING 49' 1 65' R/W BLOSSOM DRIVE (SOUTH OF CENTURY BLVD.) R/W Van Ruiten Ranch 32 Figure 16: Van Ruiten Drive & Residential Street Sections PD STANDARDS & GUIDELINES 5.5' S.W. 8' 8' PRKG. LANE 14' 14' TRAVEL / TRAVEL LANE LANE 44' 8' PRKG. LANE 5.5' S.W. 8' 60' R/W VAN RUITEN DRIVE 4' 6' S.V, L.S. 10' 17.5' 17.5' TRAVEL LANE 35' TRAVEL LANE 6' 4' L.S. �.4✓ 10' 55' R/W PRIMROSE DRIVE R/W R/W 4' 6' 15' 15' 6' 4' S.4V L.S. 10' TRAVEL LANE 30' TRAVEL LANE L.S. 10' 50' R/W INTERIOR STREET R/W Van Ruiten Ranch 33 4.1 .2 Bicycle & Pedestrian Circulation A comprehensive system of bikeways and pedestrian walkways are provided throughout the Van Ruiten Ranch community. These facilities allow for convenient access within and to adjacent neighborhoods, thereby encouraging cycling and walking as an alternative mode of transportation. The Bikeway System for Van Ruiten Ranch is comprised of both Class II and Class III facilities. The Class II Bikeway on - street facility with a dedicated, striped travel lane is provided along Century Boulevard, Westgate Drive, and Blossom Drive south of Century Boulevard. This type of facility is provided on Century Boulevard, Westgate Drive, and Blossom Drive, consistent with the Bicycle Network envisioned by the City of Lodi 2010 General Plan. A Class III Bikeway facility is provided along Van Ruiten Drive. The pedestrian circulation system is a network of sidewalks along all public rights-of-way within the community. A 5 -foot sidewalk is provided along the park and school; a minimum 4 - foot sidewalk is provided on all local residential roads. This comprehensive network of pedestrian walkways will encourage walking to school, and allows convenient connections to the park and open space features within the community, as well as to other nearby destinations. PD STANDARDS & GUIDELINES 4.2 MULTI -MODAL GUIDELINES The Multi -Modal Guidelines outline standards which preserve the connectivity and safety of the Transportation Network, while enhancing the quality of the neighborhood and its aesthetic distinctiveness, as well as bicycle and pedestrian friendliness. To follow are guidelines and standards for community streets and trails within the Van Ruiten Ranch neighborhood: • Community streets should imbue a strong sense of place and establish a unique and distinctive neighborhood character; • Community streets should be designed for the safety of all users; • Encourage a multi -modal community through the design of streets and trails that accommodate safe movement of vehicles, bicycles, and pedestrians; • Streets should be designed on a modified grid to create maximum internal connection, encouraging an open and accessible network to improve the distribution of traffic throughout the Transportation Network; • Multiple points of access through the community is encouraged, to maximize the number of streets that carry traffic and the distribution of traffic loads from each development area; • Sidewalks and other off-street pedestrian linkages should be provided; • On -street bicycle paths should be provided, creating connections to the surrounding neighborhoods; • A consistent landscape palette should be employed on community streets; and • Coordinated street lights and street furniture (Section 3.3) should be implemented to create an attractive and inviting streetscape environment. Van Ruiten Ranch 34 Chapter 5: IMPLEMENTATION & PHASING 5.1 PHASING Development of the Van Ruiten Ranch community is expected to occur in phases to enable the developer to respond to market demand and to assure that the infrastructure is adequate to support the project. Construction of off-site and on-site infrastructure shall be phased in accordance with the Van Ruiten Ranch phasing plan and Conditions of Approval. Provisions for construction of roadways to Figure 17: Phasing Plan PD STANDARDS & GUIDELINES provide access to the development and the extension of necessary utilities and infrastructure such as roadways, water, sanitary sewer and storm drain facilities will be necessary in early phases of development. The Phasing Plan represents a logical estimate of the order in which areas will develop. Actual sequence of phasing may vary, and may be further delineated into sub -phases as determined by economic and market conditions. (Figure 17) Van Ruiten Ranch 35 5.2 FUTURE DEVELOPMENT APPLICATIONS 5.3 PD GUIDELINES AMENDMENTS The Planned Development (PD) standards and guidelines provided herein apply to all future development applications. Subsequent to the approval of the Van Ruiten Ranch PD, individual project applications will be reviewed to determine consistency with this document and other regulatory documents. Specific applications for individual residential tracts within the project shall be processed as follows: (1) The Planning Director shall review, and has the ability to approve, each individual application for consistency with the Van Ruiten Ranch PD Guidelines contained herein. Zoning, use and design standards shall be applied to each proposal to ensure consistency with the overall character envisioned for the PD; (2) if an application fails to meet the standards established in the Van Ruiten Ranch PD Guidelines, the application shall be processed at the Planning Commission level. This protocol is intended to facilitate streamlined application processing for proposals consistent with the Van Ruiten Ranch PD Guidelines. It also permits flexibility and Planning Commission oversight for non-traditional proposals, and proposals determined to substantially deviate from the standards prescribed in both documents. 5.2.1 Design Review These Guidelines implement the goals and policies of the City of Lodi 2010 General Plan while creating specific community goals and development standards unique to this project. The City of Lodi will use the standards established in these guidelines to review subsequent development proposals within the Van Ruiten Ranch community. Following approval of these guidelines, all development, including tentative and final maps, land use activity and maintenance plans must comply with the Van Ruiten Ranch PD Guidelines. Amendments to these Guidelines and the standards herein are subject to administrative review and approval. PD STANDARDS & GUIDELINES The procedures for development under, as well as amendments to, the PD Guidelines are set forth in the City of Lodi Municipal Code, Title 17, Chapter 17.28 Overlay Zoning District. Van Ruiten Ranch 36 CITY OF LODI PLANNING COMMISSION Staff Report MEETING DATE: December 14, 2016 APPLICATION NO: Subdivision Application: 2016-29 S Growth Management Allocation: 2016-29 GM REQUEST: Request for Planning Commission approval of: a) Growth Management Allocation for 67 Low Density Residential Lots; and b) A Vested Subdivision Map for the Villa Fiore Ranch Subdivision, a 13.7 acre, 67 unit subdivision; and c) Adopt Development Standards for the subdivision known as Villa Fiore / Van Ruiten Ranch Subdivision located within Planned Development 41 Zoning District. (Applicant: Sunset Tartesso, LLC / Elliot Homes; File #'s 2016-29 S and 2016-29 GM; CEQA Status: Project Environmental Impact Report, State Clearinghouse No. 2005092096, Certified on March 21, 2007) LOCATION: Lower Sacramento Road / Century Boulevard APN: 058-030-17 Lodi, CA 95240 APPLICANT: Sunset Tartesso, LLC Elliot Homes Mr. Price Walker 340 Palladio Parkway #521 Folsom, CA 95630 PROPERTY OWNER: Sunset Tartesso, LLC Elliot Homes Mr. Price Walker 340 Palladio Parkway #521 Folsom, CA 95630 RECOMMENDATION Staff recommends that the Planning Commission recommend to the City Council approval of the request of Sunset Tartesso, LLC / Elliot Homes for 67 growth management allocations and a vesting subdivision map for the proposed Villa Fiore / Van Ruiten Ranch Subdivision to be located at Lower Sacramento Road / Century Blvd., subject to conditions in the attached resolution. PROJECT/AREA DESCRIPTION General Plan Designation: Public / Quasi Public — holding place for potential school site Zoning Designation: Planned Development 41 (PD -41) Property Size: 13.7 acres 1 The adjacent zoning and land use characteristics: SUMMARY The proposed vesting subdivision map seeks to create 67 single family lots. The proposed use is consistent with the General Plan and Zoning designations. The project is accessed of the Century Boulevard extension with access points to the north and south. (Attachment A) BACKGROUND The project site was annexed into the City of Lodi as part of the Southwest Gateway area. The City of Lodi certified the project EIR, State Clearinghouse No. 2005092096, on March 21, 2006. The Project EIR was prepared as a program -level EIR, pursuant to Section 15168 of the CEQA Guidelines (Title 14, California Code of Regulations, Sections 15000 et seq.). Subsequently, the City of Lodi adopted the Lodi General Plan in April 2010. This land use document utilizes the same land use designations as the previous annexation documents. The Lodi Zoning/Development Code was adopted in March 2013. On June 17, 2013, Bennett Homes submitted an application for the Van Ruiten Ranch Subdivision project, which included a Vesting Tentative Subdivision Map and review of the development standards for the Planned Development Unit. The Planning Commission approved this project on April 9, 2014. (Attachment B) As part of the approved Van Ruiten Ranch project, a 13.7 acre school site was identified and was consistent with the request of the Lodi Unified School District and the facilities master plan at the time. Subsequently, the school district updated the facilities master plan and determined that a school site was not necessary in the Van Ruiten subdivision or the entire Southwest Gateway area. The applicant has proposed to subdivide the former school site into residential lots, consistent with the surrounding development. The Planned Development Guidelines from 2014 provided a detail of what the school site would look like if it was lotted for single family development. The project is essentially an in -fill project within an approved subdivision. (Attachment C, D and E) ANALYSIS Existing Conditions: The applicant has removed the previous vineyard / grapevine and completed some mass grading along with backbone infrastructure for roads, waterlines, storm water and sewer lines. Vesting Subdivision Map: The proposed Vesting Tentative Map would subdivide the project parcel into 67 low density residential single-family lots and associated public roadways. The applicant has requested the vesting map in order to protect against potential future changes in policy and design requirements by the state or other agencies. The applicant has provided a letter 2 ADJACENT ZONING DESIGNATIONS AND LAND ZONING CLASSIFICATION USES EXISTING LAND USE GENERAL PLAN North Low Density Residential, Planned Development 41 (PD -41) Vacant Land South Low Density Residential Planned Development 41 (PD -41) Vacant Land East Low Density Residential Planned Development 41 (PD -41) Vacant Land West San Joaquin County San Joaquin County Agricultural use SUMMARY The proposed vesting subdivision map seeks to create 67 single family lots. The proposed use is consistent with the General Plan and Zoning designations. The project is accessed of the Century Boulevard extension with access points to the north and south. (Attachment A) BACKGROUND The project site was annexed into the City of Lodi as part of the Southwest Gateway area. The City of Lodi certified the project EIR, State Clearinghouse No. 2005092096, on March 21, 2006. The Project EIR was prepared as a program -level EIR, pursuant to Section 15168 of the CEQA Guidelines (Title 14, California Code of Regulations, Sections 15000 et seq.). Subsequently, the City of Lodi adopted the Lodi General Plan in April 2010. This land use document utilizes the same land use designations as the previous annexation documents. The Lodi Zoning/Development Code was adopted in March 2013. On June 17, 2013, Bennett Homes submitted an application for the Van Ruiten Ranch Subdivision project, which included a Vesting Tentative Subdivision Map and review of the development standards for the Planned Development Unit. The Planning Commission approved this project on April 9, 2014. (Attachment B) As part of the approved Van Ruiten Ranch project, a 13.7 acre school site was identified and was consistent with the request of the Lodi Unified School District and the facilities master plan at the time. Subsequently, the school district updated the facilities master plan and determined that a school site was not necessary in the Van Ruiten subdivision or the entire Southwest Gateway area. The applicant has proposed to subdivide the former school site into residential lots, consistent with the surrounding development. The Planned Development Guidelines from 2014 provided a detail of what the school site would look like if it was lotted for single family development. The project is essentially an in -fill project within an approved subdivision. (Attachment C, D and E) ANALYSIS Existing Conditions: The applicant has removed the previous vineyard / grapevine and completed some mass grading along with backbone infrastructure for roads, waterlines, storm water and sewer lines. Vesting Subdivision Map: The proposed Vesting Tentative Map would subdivide the project parcel into 67 low density residential single-family lots and associated public roadways. The applicant has requested the vesting map in order to protect against potential future changes in policy and design requirements by the state or other agencies. The applicant has provided a letter 2 (Attachment C), requesting the vesting protection, but also agreeing to pay whatever development fees are in place at the time of building permit review. Staff supports this request and recommends approval. The Planning Commission is empowered to review the vesting tentative map and recommend approval or denial of the vesting map to the City Council. If the Commission approves, a Final Map for a subdivision of five or more parcels must be prepared, filed, processed and recorded as set forth in Chapter 17.54 (Parcel Maps and Final Maps), to complete the subdivision. The City Council has a final say on the approval or disapproval of the vesting tentative map. In accordance with Lodi Municipal Code Section, 17.52.130, an approved Vesting Tentative Map is valid for 24 months after its effective date (Section 17.66.130). At the end of 24 months, the approval shall expire and become void unless, the applicant petitions the Planning Commission for an extension and the Commission grants an extension in accordance with Lodi Municipal Code Section 17.52.130 (B)(1). Access and Circulation: The project is accessed by the extension of Century Boulevard with access points to the north and south consistent with land use diagrams in the General Plan. The overall circulation pattern anticipates development to the north, south and west. Streets have detached sidewalks to create a tree canopy consistent with historical Lodi residential areas. General Plan Compliance: The project site is designated public — quasi public in the general plan and was identified as a place holder for a potential K- 6 school. The school district has identified that this school is no longer needed. The applicant is proposing to subdivide the property consistent with the surrounding area. Zoning Compliance: The project site is zoned Planned Development 41 (PD -41). Planned Development zoning designations provide flexibility in the application of development standards that will produce development projects of superior quality, including retention of unique site characteristics, creative and efficient project design, etc., than would have been achieved through strict application of the development standards required by the primary zoning district. The proposed project is divided into three distinct land uses areas; low density, medium density and high density. The project provides for a wide range of housing options for the community. Planned Development Guidelines: The applicant prepared the Van Ruiten Ranch Planned Development Standards and Guidelines. The organization of these guidelines is presented as a series of community design components that when combined create a comprehensive project design. The chapters highlight and articulate the various community design components, establishing specific development guidelines and standards for how the project will develop. As depicted in the development plans, the applicant is proposing to use several different elevation styles throughout the subdivision. The elevations use varying massing and architectural articulations. In addition, the subdivision is expected to allow custom homes and other builders to build homes at the project site, which will add architectural variations. Staff believes that the proposed design will provide not only an attractive streetscape, but interesting views from neighboring property owners as well. The project also includes a preliminary landscape plan that generally places one large street tree in each front yard among other accent landscaping including various shrubs, ground cover and lawn. The landscaping plan would have to comply with the requirements of the Lodi Municipal Code Section 17.03.070 which regulate landscape water efficiency. Growth Management Compliance: The applicant is requesting 67 Low Density Residential Units Allocations to construct the full project. 3 The allocation system gives priority through point assignments to projects that reduce impacts on services, infrastructure, and resources. The ordinance sets an annual growth limit of two percent of the City's population, compounded annually. Once the number of allocable units is figured, the City requires that the allocation units be distributed among housing types as follows; 44 percent low density, 28 percent medium density and 28 percent high density (GM -P4). The California Department of Finance sets the City population for January 1st of each year. The population has been as follows: 2012 — 62,575 2013 — 63,233 2014 — 63,651 2015 — 63,791 (62,772) 2016 — 63,219 Staff believes the drop in population is based upon how the state now counts temporary population and transient individuals. Growth Allocations for 2013 and 2014 were higher because the persons per household was lower. New Department of Finance numbers show Lodi at 2.85 persons per household in 2015 compared with 2.7 in the past. Growth allocations for 2016 are also lower because of a reduction in the City population. The following calculation explains the current City population of 63,219 as of January 1, 2016 and 443 units available for 2016: 1. Calculate two percent of the City's current population: 63,219 x 2% = 1,264.38 2. Divide 1,264 by the average number of persons per household 1,264 / 2.85 = 443.50 3. Divide the 443.50 (443 du) units into the 3 housing types: 44% low density = 195 units 28% medium density = 124 units 28% high density = 124 units. In 2013, the City Council expired allocations accumulated since 2008. In the five-year period since 2008, 2,235 allocations were added to the reserve. The Council eliminated 800 Low Density and 1,435 High Density allocations. This Council action created a new balance of 4,674 as detailed below in Table A. Table A: Growth Management Allocation History 2012 Density Base Total Available for 2012 Available Allocations 2% Allocations for 2013 Total Available for 2013 Low (0.1-7) 2,995 197 3,192 Medium (7.1-20) 557 126 683 High (20.1-30) TOTAL 1,122 4,674 125 448 1,247 5,122 4 Table B identifies the available Allocations in 2013, Allocations provided to projects in 2013 and those available for 2014. Table B: Growth Management Allocation for 2013 and 2014 Table C identifies the 2014 Total Allocations, the requested Allocations for projects, and the remaining overall Allocations. Table C: Growth Management Allocation for 2014 Density Available Allocations Total Available for 2013 Total Allocated in 2013 (Rose Gate) 2%Allocations for 2014 Total Available for 2014 Low (0.1-7) 3,192 - 232 (2960) 199 3,159 Medium (7.1-20) 683 - 0 (683) 127 810 High (20.1-30) 1,247 - 0 (1,247) 127 1,374 TOTAL 5,122 4,890 453 5,343 Table C identifies the 2014 Total Allocations, the requested Allocations for projects, and the remaining overall Allocations. Table C: Growth Management Allocation for 2014 Density Available Allocations Total Allocation for Available Van Ruiten for2014 Ranch Allocation for Remaining Reynolds Allocations for Ranch 1 2014 Total Remaining for2014 Low (0.1-7) 3,159 145 0 145 — 199 (54) 3,014 Medium (7.1-20) 810 55 227 282 — 127 (-155) 528 High (20.1-30) 1,374 88 330 418 — 127 (-291) 956 TOTAL 5,343 288 557 - 392 4,498 Table D identifies the 2015 Total Allocations, the requested Allocations for projects, and the remaining overall Allocations. Table D: Growth Management Allocation for 2015 Density Available Allocations Total 2%Allocations Remaining for 2015 for 2014 Total Available for 2015 Grupe — Taylor Road Total Remaining for 2015 Low (0.1-7) 3,014 197 3,211 22 3,189 Medium (7.1-20) High (20.1-30) TOTAL 528 956 4,498 125 125 447 653 1081 4,945 0 0 4,923 653 1081 4,923 5 Table E identifies the 2016 Total Allocations, the requested Allocations for projects, and the remaining overall Allocations. Table E: Growth Management Allocation for 2016 Density Available Allocations 2% Allocations for 2016 Total Available for 2016 Garfield Camper - Sac Harvest Crossing Rose Gate II Villa Fiore Total Remaining for 2016 Low (0.1-7) 195 3,384 777 1205 5,366 6 0 0 5,360 0 28 0 5,332 0 42 0 5,290 250 95 180 4,765 67 0 0 4,698 3,061 Medium (7.1-20) 124 612 High (20.1-30) 124 1,025 TOTAL 443 4,698 The Growth Management Ordinance includes a priority location area and a point system to assist the City with prioritizing issuance of growth management allocations. The priority location area designates lands available for development and provides development categories of one, two or three, with Priority Area 1 being the first priority area for development. The priority areas are based on availability of city services (e.g., water, wastewater, storm drains, streets, police, fire and parks). The proposed project site is classified as an in -fill project. For scoring purposes in -fill projects are considered Priority Area 1 projects. The point system was established to rate projects based on various project merits in order to determine if one project should be approved before another, particularly if there are more allocation requests than there are available allocations. However, because the City hasn't had growth management allocation requests since 2006, surplus allocations have been accumulated. Staff recommends approval of the growth allocations requested. Conclusion Staff sent a copy of the application to various City departments for review and comment. Their comments and requirements have been incorporated into the attached resolution. Staff believes that the Commission can make the findings in order to approve the proposed project, subject to conditions outlined in the attached resolution. The proposed vesting tentative map, as described in the code compliance sections above, is consistent with the current General Plan (2010). The proposed exclusively residential development aligns with the residential land use designations and densities assigned to site in the current General Plan. The site for the proposed subdivision is suitable for the density and type of development proposed in that it is a flat piece of land. Also the design of the subdivision and type of improvements would not conflict with easements, acquired by the public at large, for access through or use of the property within the proposed subdivision in that there are no existing public access easements on the site. Further, as stated in the code compliance sections above, the applicant has proposed development standards for this subdivision that are consistent with the historical development of the City. ENVIRONMENTAL ASSESSMENT The project is subject to the requirements of the California Environmental Quality Act (CEQA). All potentially significant environmental impacts were publicly disclosed and made available for comment via Lodi Annexation Environmental Impact Report, State Clearinghouse No. 2005092096, 6 dated April 2006, prior to any decisions to approve any part of the whole project. On March 21, 2007, the City Council adopted Lodi Annexation Environmental Impact Report, State Clearinghouse No. 2005092096, and Mitigation and Monitoring Plan that analyzed environmental impact aspects of the proposed project. Subsequently, the City Council, by Resolution No. 2010-41, which became effective on April 7, 2010, certified an Environmental Impact Report (EIR), State Clearinghouse No. 20009022075, for the City of Lodi General Plan. This General Plan designated the project site as, Public / Quasi Public holding site. PUBLIC HEARING NOTICE: Legal Notice for the Subdivision Map was published in the Lodi News Sentinel on Saturday, December 3 2016. Six (6) public hearing notices were sent to all property owners of record within a 300 -foot radius of the project site as required by California State Law §65091 (a) 3. Public notice also was mailed to interested parties who had expressed their interest of the project. RECOMMENDED MOTIONS Should the Planning Commission agree with staff's recommendation, the following motions are suggested: 1. "I move that the Planning Commission adopt a Resolution finding that the project has satisfied the requirements of the California Environmental Quality Act (CEQA) pursuant to Section 15153. The project is consistent with the findings of the previous environmental documents prepared for the Villa Fiore development and recommend the City Council approve the requested growth allocation for 67 low density lots and vesting tentative subdivision map, the vesting would not prevent increases in development impact fees." ALTERNATIVE PLANNING COMMISSION ACTIONS: • Approve the request with attached or alternate conditions • Deny the request • Continue the request. Respectfully Submitted, Concur, Craig Hoffman City Planner Stephen Schwabauer Community Development Director ATTACHMENTS: A. Vicinity / Aerial Map B. Van Ruiten Ranch Vesting Subdivision Map C. Letter requesting vesting map and to pay City fees D. Villa Fiore Vesting Subdivision Map E. Planned Development Standards F. Draft Resolution 7 RESOLUTION NO. 16-29 A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF LODI APPROVING THE REQUEST OF SUNSET TARTESSO, LLC / ELLIOT HOMES FOR APPROVAL OF VESTED SUBDIVISION MAP FOR VILLA FIORE SUBDIVISION, A 14 -ACRE, 67 UNIT SUBDIVISION AND 67 GROWTH MANAGEMENT ALLOCATION REQUEST AT LOWER SACRAMENTO ROAD AND CENTURY BLVD. WHEREAS, the Planning Commission of the City of Lodi has heretofore held a duly noticed public hearing, as required by law, on the requested Vested Subdivision application, in accordance with the Lodi Municipal Code, Section 17.74; and WHEREAS, the project site is located at Lower Sacramento Road / Century Boulevard, Lodi, CA 95240 (APN: 058-030-17); and WHEREAS, the applicant is Sunset Tartesso, LLC / Elliot Homes, Mr. Price Walker, 340 Palladio Parkway #521, Folsom, CA 95630; and WHEREAS, the applicant's agent is Sunset Tartesso, LLC / Elliot Homes, Mr. Price Walker, 340 Palladio Parkway #521, Folsom, CA 95630; and WHEREAS, the project properties owners of record are Sunset Tartesso, LLC / Elliot Homes, Mr. Price Walker, 340 Palladio Parkway #521, Folsom, CA 95630; and WHEREAS, the applicant, Sunset Tartesso, LLC / Elliot Homes, has filed the "Villa Fiore" Vested Subdivision Map and Growth Management Application with the City of Lodi; and WHEREAS, City Council Resolution No. 2010-41 adopted by the City Council on April 7, 2010, approved the land use designation as Public / Quasi Public — school holding site, for the project site; and WHEREAS, the City Council by Ordinance No. 1869, which became effective on March 21, 2013, granted Planned Development Zone P -D(41), to allow Low Density Residential, Medium Density Residential, High Density Residential, Public / Quasi Public and Open Space for the project area; and WHEREAS, the City Council by Resolution No. 2007-48, which became effective on March 21, , 2007, approved certified an Environmental Impact Report (EIR), State Clearinghouse No. 2005092096, for the annexation of the project site; and WHEREAS, a copy of the Environmental Impact Report (EIR), State Clearinghouse No. 2005092096, is kept on file for public review within the Community Development Department by the Community Development Director at 221 West Pine Street, Lodi, CA; and WHEREAS, the City Council by Resolution No. 2010-41, which became effective on April 7, 2010, certified an Environmental Impact Report (EIR), State Clearinghouse No. 20009022075, for the City of Lodi General Plan; and WHEREAS, a copy of the Environmental Impact Report (EIR), State Clearinghouse No. 20009022075, is kept on file for public review within the Community Development Department by the Community Development Director at 221 West Pine Street, Lodi, CA; and WHEREAS, the Lodi Unified School District identified this site as a potential school site during the General Plan process. In June of 2016 the school district released this site as a potential school location; and WHEREAS, the Vested Subdivision Map contains 14 acres, 67 -single family residential lots, and is located at Lower Sacramento Road / Century Boulevard and is consistent with the density ranges of the General Plan; and 1 WHEREAS, the Community Development Department did study and recommend approval of said request; and WHEREAS, after due consideration of the project, the Planning Commission did conditionally approve the project; and WHEREAS, the Planning Commission's recommendation is based upon the following findings and determinations: 1 The proposed design and improvement of the tentative subdivision, as conditioned, will conform to the standards and improvements mandated by the adopted City of Lodi Public Works Department Standards and Specifications, Zoning Ordinance, as well as all other applicable standards. 2. The standard size, shape and topography of the site is physically suitable for residential development proposed in that the site is generally flat and is not within an identified natural hazard area. 3. The site is suitable for the density proposed by the tentative subdivision map in that the site can be served by all public utilities and creates design solutions for storm water, traffic and air quality issues. 4. The standard design of the proposed tentative subdivision and the proposed improvements are not likely to cause substantial environmental damage or injure fish or wildlife or their habitat in that the site has been previously disturbed by agricultural activities and no significant environmental issues or concerns were identified through the Initial Study prepared for this development. 5. The design of the proposed tentative subdivision and type of improvements are not likely to cause serious public health problems in that all public improvements will be built per City standards and all private improvements will be built per the California Building Code. 6. The design of the proposed tentative subdivision and the type of improvements will not conflict with easements acquired by the public at large for access through or use of property within the proposed tentative subdivision. 7. The vested subdivision is conditioned to construct public street improvements thereby insuring that an adequate Level of Service is maintained on the roadways within the area. 8. An Environmental Impact Reports and Mitigation Monitoring and Reporting Program, Environmental Impact Report (EIR), State Clearinghouse No. 2005092096, were prepared for this project in compliance with Public Resources Code section 21000 et seq, and were independently reviewed and certified by the City Council. All potentially significant environmental impacts were publicly disclosed and made available for comment prior to any decisions to approve any part of the whole project. On March 21, 2007, the City Council adopted an Environmental Impact Report and Mitigation Monitoring and Reporting Program for all aspects of the proposed project. all mitigation measures for the project identified in the initial study and accompanying studies are hereby incorporated into this approval. 9. The project is required to comply with all the mitigation measures outlined for the project in the Environmental Impact Report and in the Mitigation Monitoring and Report Program. 10. The vested subdivision map allows for the orderly growth of Lodi in that the Land Use and Growth Management Element allows for the development of Low Density Residential, on the project site. 11. Said Vested Subdivision map complies with the requirements of Article 5 of the Lodi Development Code, governing subdivision maps. NOW, THEREFORE, BE IT DETERMINED AND RESOLVED, by the Planning Commission of the City of Lodi hereby recommends that the City Council approve the Vested Subdivision Map, associated 2 Development Standards for the Villa Fiore / Van Ruiten Ranch Subdivision, and award Sunset Tartesso, LLC / Elliot Homes 67 low density growth management allocation units, subject to the following development conditions and standards: 1. The property owner and/or developer and/or successors in interest and management shall, at their sole expense, defend, indemnify and hold harmless the City of Lodi, its agents, officers, directors and employees, from and against all claims, actions, damages, losses, or expenses of every type and description, including but not limited to payment of attorneys' fees and costs, by reason of, or arising out of, this development approval. The obligation to defend, indemnify and hold harmless shall include, but is not limited to, any action to arbitrate, attack, review, set aside, void or annul this development approval on any grounds whatsoever. The City of Lodi shall promptly notify the developer of any such claim, action, or proceeding and shall cooperate fully in the defense. 2. This recommendation for approval by the Planning Commission shall not constitute an authorization to begin any construction. 3. The developer shall comply with all the applicable requirements of the City's Community Development Department including Planning and Building Divisions; Public Works, Fire and Electric Utility Departments; and all other applicable local, state and federal agencies. It is the responsibility of the applicant to check with each agency for requirements that may pertain to the project. 4. The Vesting Tentative Map shall expire within 24 months of Planning Commission approval or a time extension must be granted by the Planning Commission. 5. The Final Map shall be in substantial conformance to the approved Vesting Tentative Map, as conditioned, and that any future development shall be consistent with applicable sections of the Municipal Code. 6. The developer shall install, on each residence, minimum four-inch high block style numbers for address identification. The numbers shall be in color that is contrasting to the background surface to which they are adhered and shall be readily visible from the street during the day and night. The construction drawings for the house plans shall identify the location of the address boxes or numbers on the house fagades, along with a detail or keynote that describes how the house numbers will be illuminated or made identifiable from the street. 7. The developer shall submit detailed landscape and irrigation plans (concurrently with the improvement plans) for the review and approval of the Parks & Recreation Department. The landscape plan shall include, in addition to normal landscape and irrigation details, screening of any above ground utility vaults and anti-siphon water valves. 8. Meters, hydrants, poles, etc. shall be located clear of the sidewalk and driveways or as determined by the City Engineer. Final locations and the number of such facilities shall be determined at the time the improvement plans are reviewed. 9. A conceptual fencing/wall plan shall be submitted for the entire subdivision with the grading plan and a detailed fencing/wall plan shall be submitted with the improvement plans for each phase of development. The design, height, and location of walls shall be subject to approval of the Community Development Director prior to approval of improvement plans. Where fencing is adjacent to public parks and/or trails, plans shall be approved by the Recreation Commission at the time of park plan approval. When the adjacent area is sloped, the fence/wall design shall include a 4' bench (sloped no more than 2%) along the fence/wall for maintenance purposes, as determined by the Parks and Recreation and Cultural Services Department. 10. The project shall incorporate all applicable mitigation measures as specified in the adopted Final Revised Environmental Impact Report EIR-05-01 (State Clearinghouse No. 2005092096) for the project. 3 11. Pursuant to project Environmental Impact Report, State Clearinghouse No. 2005092096, prior to recordation of the final map(s) for homes adjacent to existing agricultural operations, the applicant shall submit a detailed wall and fencing plan for review and approval by the Community Development Department (Land Use Mitigation Measure 1). 12. Pursuant to project Environmental Impact Report, State Clearinghouse No. 2005092096, Agriculture Resources Mitigation Measures 2 and 3, the applicant shall provide and undertake a phasing and financing plan (to be approved by the City Council) for one of the following mitigation measures: a. Identify approximately 14 acres to protect for a period of time to be determined (but not less than 15 years) as an agricultural use in a location as determined appropriate by the City of Lodi in consultation with the Central Valley Land Trust; or b. Pay a fee equal to the value of 14 acres as determined by an independent qualified consultant retained by the City in consultation with the Central Valley Land Trust. The City will determine to whom the fee shall be paid. 13. Pursuant to project Environmental Impact Report, State Clearinghouse No. 2005092096, Biological Resources Mitigation Measures 1, 2, and 3, the applicant shall contact the San Joaquin County Council of Governments (SJCOG, Inc) for a pre-ground disturbance survey, to be performed by an SJMSCP biologist, to determine applicable Incidental Take Minimization Measures (ITMMS). The City shall not authorize any form of site disturbance until it receives an Agreement to Implement ITMMS from SJCOG, Inc. The City shall not issue a building permit for the proposed project until the San Joaquin County Council of Governments determine what, if any, Incidental Take Minimization Measures (ITMMS) apply to the project and until the San Joaquin County Council of Governments verifies all applicable ITMMs have been fully and faithfully implemented. 14. If archeological materials are uncovered during any construction or pre-construction activities on the site, all earthworks within one hundred feet (100') of these materials shall be stopped, the Community Development Department notified, and a professional archeologist, certified by the Society of California Archeology and/or the Society of Professional Archeology, shall be notified. Site work in this area shall not occur until the archeologist has had an opportunity to evaluate the significance of the find, and outline appropriate mitigation measures, if they are deemed necessary. 15. All stub end streets planned for future continuation and undeveloped cul-de-sacs shall be temporarily protected with warning barricades and redwood headers to be approved by the City Engineer. 16. The developer shall pay for and install all street name signs, traffic regulatory and warning signs, and any necessary street striping and markings required by the City Engineer. Street striping and markings shall be raised ceramic markers or thermoplastic material, as directed by the City Engineer. 17. Road or street names shall not duplicate any existing road or street name in the City, except where a new road or street is a continuation of an existing street. Road or street names that may be spelled differently but sound the same shall also be avoided. Road or street names shall be approved by the Fire Chief and the Community Development Director. 18. All improvements, public and private, shall be designed and constructed in accordance with the most recent edition of the City Plans and all applicable state and local ordinances, standards and requirements. Should a conflict arise, the governing specification shall be determined by the City Engineer. 19. The developer shall ensure finished pad elevations are at a minimum one foot above the 100 year base flood elevation as shown on the latest Federal Emergency Management Agency (FEMA) floodplain maps for San Joaquin County, California. The developer shall be responsible 4 for all necessary activities, applications, documentation and costs to amend floodplain maps for their development. 20. In accordance with the Growth Management and Infrastructure/Public Facilities Element of the City's General Plan, the environmental review prepared for this project, and the regulations of the applicable school districts, the Developer shall demonstrate that adequate provision is made for school facilities. To the extent permitted by law, this may include the payment of school facility mitigation fees adopted by the Lodi Unified School district, or alternative financial arrangements negotiated by agreement between the Developer and the applicable school districts. 21. A master street tree plan shall be approved by the Public Works Department for each phase of this vesting tentative subdivision map. A minimum of one street tree shall be provided for each lot within this subdivision. On corner lots, three street trees shall be provided; one on the shorter lineal frontage and two on the longer lineal frontage. Street trees shall be a species selected from the City's adopted tree list, shall be a minimum fifteen (15) gallon size, spaced at thirty (30) feet intervals, and planted as reflected in the Engineering Department's Standard Plans and Specifications, with branches above average eye level. The trees selected shall be deep rooted and drought tolerant. Location and species shall be to the approval of the Public Works Department. 22. The developer, in order to reduce tracking of mud throughout the City, shall be responsible for cleaning up or any expenses incurred by the City for cleaning up mud, debris, etc. from City streets that is attributed to this project during construction. 23. Construction activities shall be limited to the hours of 7:00 a.m. to 10:00 p.m. Monday through Sunday, consistent with the City's Ordinance. 24. All conditions of approval for this project shall be written by the project developer on all master building permit plan check sets submitted for review and approval. It is the responsibility of the developer to ensure that the project contractor is aware of, and abides by, all conditions of approval. If the subdivision is to be built out using master plans. Please follow City of Lodi, Community Development Department Policies and Procedures # B-[08]-[13] Plan Submittal - Residential Master Plans and # B-[08]-[14] Permit Processing — Production Homes. 25. No variance from any City of Lodi adopted code, policy or specification is granted or implied by this approval. CDD — Planning 26. The Developer shall notify all purchasers of homes or lots, either through the Department of Real Estate Subdivision Report or, if there is no Subdivision Report, through a statement signed by each buyer and submitted to the City, that the this subdivision is adjacent to an agricultural area, and as such, there are ground and aerial applications of chemicals, and early morning/night time farming operations which may create noise and dust, etc. In addition, all purchasers of homes or lots shall be made aware of the future possibility of oil and gas well exploration on surrounding and adjacent properties and that farm animals may be kept on adjacent properties that may be outside the City limits. The wording and format for notifying home buyers of this information is subject to approval by the Community Development Director. 27. The Van Ruiten Ranch / Villa Fiore project is required to provide for park land dedication based upon 5 acres of park land for every 1,000 residents. This may be accomplished by land dedication and park construction and a combination on in-lieu fees. The applicant will work with the Community Development Director and Parks and Recreation director to ensure that this condition is satisfied consistent with the General Plan requirements. 28. The City places a high value on quality design and materials in the construction of fencing and buffers for developments. Fencing is an integral design feature in residential developments and defines property ownership and boundaries. The City expects quality materials that will last and 5 maintain an appealing aesthetic within neighborhoods. This includes metal or pressure treated posts for fencing. 29. Although the project includes a Vesting Map approval, the applicant has agreed to pay the current development impact fees in place at time of building permit approval and occupancy. The vesting protects against any new fee categories. City of Lodi Fire Department 30. The developer shall comply with all applicable requirements of the California Fire Code and the adopted policies of the City of Lodi. 31. Fire apparatus access roads shall have an unobstructed width of not less than 24 feet, exclusive of shoulders, except for approved security gates in accordance with Section 503.6 of the California Fire Code and an unobstructed vertical clearance of not less than 13 feet 6 inches. (Ord. No. 1840, § 1, 11-17-2010) 32. Approved fire apparatus access roads shall be provided for every facility, building or portion of a building hereafter constructed or moved into or within the jurisdiction. The fire apparatus access road shall comply with the requirements of this section and shall extend within 150 feet (45,720 mm) of all portions of the facility and all portions of the exterior walls of the first story of the building as measured by an approved route around the exterior of the building or facility. 33. The developer shall install on-site and/or boundary water mains, fire hydrants and related services. Hydrants shall adhere to the City's standard details, with their location determined by the Fire District and City Engineer, and shall be installed and in service prior to any combustible construction on the site. Public fire hydrant spacing and distribution shall be determined as follows: a. At 300 feet spacing in high density, commercial, industrial zoning or high-value areas; b. At 500 feet spacing in low density residential areas; c. At 1000 feet spacing in residential reverse frontage; d. A fire hydrant shall be located within 200 feet of the radius point of all cul-de-sacs; e. Hydrants shall be required on both sides of the street whenever one or more of the following conditions exist: i. Streets have median center dividers that make access to hydrants difficult, cause time delays, or create undue hazards or both; ii. On major arterials where there is more than four lanes of traffic; iii. Width of street in excess of 88 feet; iv. The existing street being widened or having a raised median center divider in the future pursuant to the General Plan Roadway Improvement Plans for the City of Lodi. 34. An automatic sprinkler system installed in accordance with Section 903.3 shall be provided throughout all buildings with a Group R fire area. City of Lodi Public Works Department The following conditions of approval are required for the subject project per City codes and standards, all to be accomplished prior to, or concurrent with, final map filing unless noted otherwise: 35. Engineering and preparation of improvement plans and estimate are required per City Public Improvement Design Standards for all public improvements prior to final map filing. Plan submittal to include: a) Approved tentative map, signed by the Community Development Director. b) Storm drainage facilities shall conform to the Multi -Agency Post- Construction Stormwater Standards Manual (PCSP) as adopted by City Council on November 4, 2015, all state and federal requirements. 6 c) Irrigation plans and plantings shall conform to the Model Water Efficient Landscaping Ordinance (MWELO) per the Governor's Executive Order B-29-12 adopted on December 31, 2015. d) Approved detailed utility (water, wastewater, storm drainage, recycled water and circulation) master plans, including engineering calculations, for all phases of the development. Storm drainage facilities design shall conform to the City of Lodi Storm Water Development Design Standards. Plans must include recycled water (purple pipe) master plans. e) Current soils report. If the soils report was not issued within the past three (3) years, provide an updated soils report from a licensed geotechnical engineer. f) Grading, drainage and erosion control plan. g) Copy of Notice of Intent for NPDES permit, including storm water pollution prevention plan (SWPPP) and WDID number. h) Reverse frontage wall, landscaping and irrigation system. Minimum wall height shall be 6 feet above the adjacent pad and/or ground elevation or as required by Community Development Department to satisfy general plan requirements. i) Street tree planting plan for parkway strip along lot frontages. Requires approval of the Community Development Director and Public Works Director. j) All utilities, including street lights and electrical, gas, telephone and cable television facilities. k) Joint Trench plans. I) All street improvements within the development. m) Traffic striping plan for Century Boulevard. n) Signal modification plans in Century Boulevard at the Lower Sacramento Road intersection. A complete plan check submittal package, including all the items listed above plus the Map/Improvement Plan Submittal cover letter, Improvement Plan Checklist and engineering plan check fees, is required to initiate the Public Works Department plan review process for the engineered improvement plans. 36. Design and installation of public improvements shall be in accordance with City Master plans. Street, wastewater, storm drainage, water and non -potable water (purple pipe) master plans and design calculations will be required for the development. a) Street i) Install full width street improvements including curb, gutter, sidewalk and street lights along Century Boulevard from the intersection at Lower Sacramento Road to the west project boundary, including landscaping and irrigation. ii) Construct full width street improvements including curb, gutter, sidewalk and street lights along Van Ruiten Drive from the Century Boulevard to Tulip Way, including landscaping and irrigation. iii) Install reverse frontage walls, landscaping and irrigation improvements in Century Boulevard. Street trees shall be planted in the parkways in the public right-of-way within the subdivision boundaries. Frontage improvements and landscaping shall be constructed by the Developer at the Developer's expense to the approval of the Public Works Director and Community Development Director. iv) Provide all necessary traffic signs to serve the entire subdivision, including any necessary traffic signs needed along Westgate Drive and Century Boulevard. 7 v) Provide a wall easement for the public masonry wall footings along all parcels that will have a public masonry wall. Public, City maintained walls shall not be constructed from wood. vi) The development must conform to the General Plan Bike Master Plan. Provide a Class II bike route along Century Boulevard within the project limits as shown in the Master Plan. vii) Traffic striping modifications in Century Boulevard east of Lower Sacramento Road. viii) Traffic signal modifications at Century Boulevard and Lower Sacramento Road. b) Wastewater i) Use the 2012 City of Lodi Wastewater Master Plan design criteria for all calculations, pipeline sizing and pipeline locations. Revise the Westgate Trunk Line and the City's Wastewater outfall pipeline to match the pipe sizing shown in the Master Plans. The 48 - inch Domestic Outfall pipeline shall be resized to a 42 -inch pipe. ii) Abandon the existing 42 -inch wastewater pipeline in Lower Sacramento Road north of Century Boulevard and install new 42 -inch wastewater pipeline in Century Boulevard. The Developer shall pay all installation costs; however, pipe material costs will be reimbursed by City upon acceptance of the pipeline installation work. iii) The Domestic Outfall and Industrial Waste pipeline realignment shall intercept existing pipelines with manhole or vault structures upstream of existing diversion structure located at the westerly end of the development. No pipeline penetrations will be allowed in the existing diversion structure. iv) Wastewater infrastructure construction sequence shall not interfere with operations associated with the Domestic Outfall or Industrial Waste pipelines. Developer is responsible for preserving the integrity of the existing Domestic Outfall and Industrial Waste pipelines during all phases of Project construction prior to replacement/ relocation. v) Developer shall obtain a Public Utilities Easement from the adjacent property owner to the west of the project limits for the installation and maintenance of the domestic and industrial wastewater pipelines. vi) Extend the wastewater public main from the intersection of Century Boulevard and Lower Sacramento Road to the southwest end of the project site and from Lodi Shopping Center at Westgate Drive to Century Boulevard. vii) Install wastewater service stubs for the parcels adjacent to the west subdivision boundary, the south subdivision boundary and the north subdivision boundary. c) Storm Drainage i) Use the 2012 City of Lodi Storm Drainage Master Plan design criteria for all pipe sizing calculations and basin sizing calculations. Storm drain coefficient of runoff, C -factor, for low-density residential shall be a minimum of 0.4, medium -density residential shall be a minimum of 0.5 and high-density residential shall be a minimum of 0.5. The rainfall intensity used for design of the pipelines shall be based on a five-year, 48-hour rain event. Be sure all pipeline and basin locations follow the Master Plans. ii) An overland flood release pathway shall be incorporated into the streets and circulation design plan for each subarea. For example, when any particular catch basin is obstructed or overwhelmed with water, the street drainage design (high points and low points) for that subarea shall be calculated so that no water shall pond higher than the lowest right of way elevation without releasing the excess water toward the planned flood release point of the subarea. 8 iii) Extend the storm drainage public main from the intersection of Century Boulevard and Lower Sacramento Road to the west end of the project site and from Lodi Shopping Center at Westgate Drive to the north end of the development. iv) Install storm Drain service stubs for the parcels adjacent to the west subdivision boundary, the south subdivision boundary and the north subdivision boundary. d) Water i) Use the 2012 City of Lodi Water Master Plan design criteria for all calculations, pipeline sizes and pipeline locations. As shown in Appendix D, a 10 -inch water main shall be located on the western edge of the development for water circulation purposes, as shown in the City's Water Master Plan. Water line may follow proposed north/south street alignments that are located within 500 feet of the west limit of the project. ii) Provide a looped water systems, a minimum of two connections to the City's water system are required. iii) Add temporary blow -off valves per Standard Plan 409 (or temporary hydrants) to the ends of all dead-end water mains planned for future extension. iv) Provide locations of all water valves and fire hydrants within the development. All water valves and fire hydrants shall have a maximum spacing conforming to the City Design Standards section 4.501 and 4.502, respectively. v) Extend the water public main from the intersection of Century Boulevard and Lower Sacramento Road to the west end of the project site and from Lodi Shopping Center at Westgate Drive to the north end of the development. vi) Install water service stubs for the parcels adjacent to the subdivision boundaries. vii) Install water sampling stations at locations approved by the City Engineer. e) Recycled Water (Purple Pipe) i) Extend the recycled water (purple pipe) public main from Westgate Drive at Lodi Shopping Center to the intersection at Century Boulevard and along Century Boulevard to the intersection at Lower Sacramento Road. ii) Recycled water service stubs for the parcels adjacent to the west subdivision boundary, the south subdivision boundary and the north subdivision boundary. 37. All dead-end streets shall install barricades per City of Lodi Standard Plans 128. 38. Provide a slope easement or retaining wall along the boundary of the development for all grade differentials of one foot or greater. 39. All landscaping proposed within the development must conform to the City of Lodi Landscape Maintenance Ordinance. 40. Abandonment/removal of wells, septic systems and underground tanks in conformance with applicable City and County requirements and codes prior to approval of public improvement plans. 41. All public improvements to be installed within one year of final map filing under the terms of an improvement agreement to be approved by the City Council prior to final map filing. The Developer will be required to provide warranty security in the amount of 10% of the value of the public improvements. The warranty period will be two (2) years, commencing on the date of acceptance of the public improvements. 42. The project will install landscape areas along Century Boulevard. After the City accepts the landscape improvements, the Developer will be required to maintain the landscaping for two 9 years. Provide a two-year maintenance agreement and surety for the landscaping along Century Boulevard. 43. All project design and construction shall be in compliance with the Americans with Disabilities Act (ADA) and California Title 24. Project compliance with ADA standards is the Developer's responsibility. 44. The City of Lodi is a participant in the San Joaquin County Multi -Species Habitat Conservation and Open Space Plan (SJMSCP). An application for evaluation of the project site with respect to SJMSCP requirements shall be submitted to the San Joaquin Council of Governments (SJCOG) prior to commencement of any clearing, grading or construction activities on the project site. 45. The following improvements shall be constructed with the first phase of development: a) The water system shall have a minimum of two connections to the City system. The development shall extend and connect to the main in Westgate Drive south of Lodi Shopping Center and a connect to the main in Century Boulevard at Lower Sacramento Road. b) Realignment of the Domestic Outfall and Industrial Waste pipelines to the diversion structure. c) If the development is constructed in phases each phase shall be required to have a minimum of two connections to the City water system and two access points for traffic circulation. 46. Dedication of public utility easements as required by the various utility companies and the City of Lodi. 47. Acquisition of the following easements outside the limits of the map: a) Utility easements for the relocation of the Domestic and Industrial wastewater outfall pipeline and 10 -inch water pipeline to the approval of the Public Works Director. 48. All property dedicated to the City of Lodi shall be free and clear of all liens and encumbrances and without cost to the City of Lodi and free and clear of environmental hazards, hazardous materials or hazardous waste. Developer shall prepare and submit a hazardous materials report and shall indemnify the City against any and all hazardous materials and/or ground water contamination for all property/easements dedicated to the City. 49. This development has been annexed into the City of Lodi Community Facilities District No. 2007- 1 (Public Facilities). 50. Submit final map per City and County requirements including the following: a) Preliminary title report including copies of all referenced exception documents. b) Waiver of access rights at: i) All lots adjacent to Century Boulevard. c) Standard note regarding requirements to be met at subsequent date. 51. Payment of the following: a) Filing and processing fees and charges for services performed by City forces per the Public Works Fee and Service Charge Schedule. b) Development Impact Mitigation Fees per the Public Works Fee and Service Charge Schedule at the time of project acceptance. c) Regional Transportation Impact Fee (RTIF) at the time of building permit issuance. d) Stormwater compliance inspection fee prior to map filing or commencement of construction operations, whichever occurs first. e) Reimbursement fees per existing agreements: 10 i) Resolution No. 2007-52 — Reimbursement for Lower Sacramento Road (Kettleman Lane to Harney Lane) improvements. The above fees are subject to periodic adjustment as provided by the implementing ordinance/resolution. The fee charged will be that in effect at the time of collection indicated above. 52. In order to assist the City of Lodi in providing an adequate water supply, the Owner/Developer on behalf of itself, its successors and assigns, shall enter into an agreement with the City that the City of Lodi be appointed as its agent for the exercise of any and all overlying water rights appurtenant to the proposed Van Ruiten Ranch subdivision, and that the City may charge fees for the delivery of such water in accordance with City rate policies. In addition, the agreement shall assign all appropriative or prescriptive rights to the City. The agreement will establish conditions and covenants running with the land for all lots in the subdivision and provide deed provisions to be included in each conveyance. 53. Developer shall be responsible for the regular and ongoing maintenance and replacement of the landscaping and irrigation improvements and street trees in the parkways for one year until the first revenues are received by the City from the District. 54. Obtain the following permits: a) San Joaquin County well/septic abandonment permit. b) City of Lodi encroachment permit for work within City right-of-way. c) Construction General Permit for the SWPPP. Dated: December 14, 2016 I certify that Resolution No. 16-29 was passed and adopted by the Planning Commission of the City of Lodi at a regular meeting held on December 14, 2016 by the following vote: AYES: Commissioners: Cummins, Gomes, Kirst, Kirsten, Olson, Slater and Chair Hennecke NOES: Commissioners: None ABSENT: Commissioners: None ATTEST Secretary, Planning Commission 11 ENHANCED PATH (VILLA FIORE) LOOKING NORTH ENHANCED PATH (ROSE GATE II) LOOKING NORTH K:\WP\DEV_SERV\Developments\Lodi Westside\Rose Gate II Subdivision\Westgate_Enh_Path.dwg, Layoutl, 1/24/2017 1:38:37 PM, Ichang 0 ti )1OV13S} a2ivA3aIS LOOKING NORTH 0 pi, L OiD P N T 0 Cr) 1N31N3SV3 d`d3SaNV1 W 0 0) 0 2 0 0 Lu 0 z 2 z W LOOKING NORTH K:\WP\DEV_SERV\Developments\Lodi Westside\Rose Gate II Subdivision\Westgate_Enh_Path_V2.dwg, Layout', 2/15/2017 4:09:03 PM, Ichang RESOLUTION NO. 2017-21 A RESOLUTION OF THE LODI CITY COUNCIL APPROVING THE PLANNING COMMISSION'S RECOMMENDATION FOR THE 2016 GROWTH MANAGEMENT ALLOCATIONS FOR THE ELLIOT HOMES — VILLA FIORE RANCH SUBDIVISION NOW, THEREFORE, BE IT RESOLVED that the Lodi City Council does hereby approve the 2016 Growth Management Allocations for the Villa Fiore Ranch Subdivision as recommended by the Lodi Planning Commission, shown as follows: Requested Recommended 2016 Allocations 2016 Allocations Villa Fiore Ranch 67 Low -Density 67 Low -Density Villa Fiore Ranch 0 Medium -Density 0 Medium -Density Villa Fiore Ranch 0 High -Density 0 High -Density TOTAL 67 67 Dated: February 15, 2017 I hereby certify that Resolution No. 2017-21 was passed and adopted by the Lodi City Council in a regular meeting held February 15, 2017, by the following vote: AYES: COUNCIL MEMBERS — Chandler, Johnson, Mounce, Nakanishi, and Mayor Kuehne NOES: COUNCIL MEMBERS — None ABSENT: COUNCIL MEMBERS — None ABSTAIN: COUNCIL MEMBERS — None P1. (ua NNIFE . FERRA1OLO City Clerk 2017-21 RESOLUTION NO. 2017-22 A RESOLUTION OF THE LODI CITY COUNCIL APPROVING THE PLANNING COMMISSION'S RECOMMENDATION FOR SUNSET TARTESSO, LLC / ELLIOT HOMES FOR APPROVAL OF VESTED SUBDIVISION MAP FOR VILLA FIORE SUBDIVISION, A 14 -ACRE, 67 -UNIT SUBDIVISION AT LOWER SACRAMENTO ROAD AND CENTURY BOULEVARD WHEREAS, the City Council of the City of Lodi has heretofore held a duly -noticed public hearing, as required by law, on the requested Vested Subdivision application, in accordance with Lodi Municipal Code Section 17.74; and WHEREAS, the project site is located at Lower Sacramento Road / Century Boulevard, Lodi, CA, 95240 (APN: 058-030-17); and WHEREAS, the applicant is Sunset Tartesso, LLC / Elliot Homes, Mr. Price Walker, 340 Palladio Parkway, No. 521, Folsom, CA, 95630; and WHEREAS, the applicant's agent is Sunset Tartesso, LLC / Elliot Homes, Mr. Price Walker, 340 Palladio Parkway, No. 521, Folsom, CA, 95630; and WHEREAS, the project properties owners of record are Sunset Tartesso, LLC / Elliot Homes, Mr. Price Walker, 340 Palladio Parkway, No. 521, Folsom, CA, 95630; and WHEREAS, the applicant, Sunset Tartesso, LLC / Elliot Homes, has filed the "Villa Fiore" Vested Subdivision Map and Growth Management Application with the City of Lodi; and WHEREAS, the Lodi City Council adopted Resolution No. 2010-41 at their meeting held April 7, 2010, approving the land use designation as Public / Quasi Public — school holding site, for the project site; and WHEREAS, the City Council by Ordinance No. 1869, which became effective on March 21, 2013, granted Planned Development Zone P -D(41), to allow Low -Density Residential, Medium -Density Residential, High -Density Residential, Public / Quasi Public and Open Space for the project area; and WHEREAS, the City Council by Resolution No. 2007-48, which became effective on March 21, 2007, certified an Environmental Impact Report (EIR), State Clearinghouse No. 2005092096, for the annexation of the project site; and WHEREAS, a copy of the Environmental Impact Report (EIR), State Clearinghouse No. 2005092096, is kept on file for public review within the Community Development Department by the Community Development Director at 221 West Pine Street, Lodi, CA; and WHEREAS, the City Council by Resolution No. 2010-41, which became effective on April 7, 2010, certified an Environmental Impact Report (EIR), State Clearinghouse No. 20009022075, for the City of Lodi General Plan; and 1 WHEREAS, a copy of the Environmental Impact Report (EIR), State Clearinghouse No. 20009022075, is kept on file for public review within the Community Development Department by the Community Development Director at 221 West Pine Street, Lodi, CA; and WHEREAS, the Lodi Unified School District identified this site as a potential school site during the General Plan process. In June 2016, the school district released this site as a potential school location; and WHEREAS, the Vested Subdivision Map contains 14 acres, 67 single-family residential lots, and is located at Lower Sacramento Road / Century Boulevard and is consistent with the density ranges of the General Plan; and WHEREAS, the Community Development Department did study and recommend approval of said request; and WHEREAS, after due consideration of the project, the Planning Commission did recommend approval of the project to the City Council; and WHEREAS, the City Council's recommendation is based upon the following findings and determinations: 1. The proposed design and improvement of the tentative subdivision, as conditioned, will conform to the standards and improvements mandated by the adopted City of Lodi Public Works Department Standards and Specifications, Zoning Ordinance, as well as all other applicable standards. 2. The standard size, shape and topography of the site is physically suitable for residential development proposed in that the site is generally flat and is not within an identified natural hazard area. 3. The site is suitable for the density proposed by the tentative subdivision map in that the site can be served by all public utilities and creates design solutions for storm water, traffic, and air quality issues. 4. The standard design of the proposed tentative subdivision and the proposed improvements are not likely to cause substantial environmental damage or injure fish or wildlife or their habitat in that the site has been previously disturbed by agricultural activities and no significant environmental issues or concerns were identified through the Initial Study prepared for this development. 5. The design of the proposed tentative subdivision and type of improvements are not likely to cause serious public health problems in that all public improvements will be built per City standards and all private improvements will be built per the California Building Code. 6. The design of the proposed tentative subdivision and the type of improvements will not conflict with easements acquired by the public at large for access through or use of property within the proposed tentative subdivision. 7. The vested subdivision is conditioned to construct public street improvements thereby insuring that an adequate Level of Service is maintained on the roadways within the area. 2 8. An Environmental Impact Reports and Mitigation Monitoring and Reporting Program, Environmental Impact Report (EIR), State Clearinghouse No. 2005092096, were prepared for this project in compliance with Public Resources Code section 21000 et seq, and were independently reviewed and certified by the City Council. All potentially significant environmental impacts were publicly disclosed and made available for comment prior to any decisions to approve any part of the whole project. On March 21, 2007, the City Council adopted an Environmental Impact Report and Mitigation Monitoring and Reporting Program for all aspects of the proposed project. All mitigation measures for the project identified in the initial study and accompanying studies are hereby incorporated into this approval. 9. The project is required to comply with all the mitigation measures outlined for the project in the Environmental Impact Report and in the Mitigation Monitoring and Report Program. 10. The vested subdivision map allows for the orderly growth of Lodi in that the Land Use and Growth Management Element allows for the development of Low -Density Residential, on the project site. 11. Said Vested Subdivision map complies with the requirements of Article 5 of the Lodi Development Code, governing subdivision maps. NOW, THEREFORE, BE IT DETERMINED AND RESOLVED by the City Council of the City of Lodi, the Vested Subdivision Map and associated Development Standards for the Villa Fiore / Van Ruiten Ranch Subdivision is approved subject to the following development conditions and standards: 1. The property owner and/or developer and/or successors in interest and management shall, at their sole expense, defend, indemnify and hold harmless the City of Lodi, its agents, officers, directors and employees, from and against all claims, actions, damages, losses, or expenses of every type and description, including but not limited to payment of attorneys' fees and costs, by reason of, or arising out of, this development approval. The obligation to defend, indemnify and hold harmless shall include, but is not limited to, any action to arbitrate, attack, review, set aside, void or annul this development approval on any grounds whatsoever. The City of Lodi shall promptly notify the Developer of any such claim, action, or proceeding and shall cooperate fully in the defense. 2. This approval by the City Council shall not constitute an authorization to begin any construction. 3. The Developer shall comply with all the applicable requirements of the City's Community Development Department including Planning and Building Divisions; Public Works, Fire, and Electric Utility Departments; and all other applicable local, state, and federal agencies. It is the responsibility of the applicant to check with each agency for requirements that may pertain to the project. 4. The Vesting Tentative Map shall expire within 24 months of City Council approval or a time extension must be granted by the City Council. 5. The Final Map shall be in substantial conformance to the approved Vesting Tentative Map, as conditioned, and that any future development shall be consistent with applicable sections of the Municipal Code. 3 6. The Developer shall install, on each residence, minimum four -inch high block style numbers for address identification. The numbers shall be in color that is contrasting to the background surface to which they are adhered and shall be readily visible from the street during the day and night. The construction drawings for the house plans shall identify the location of the address boxes or numbers on the house facades, along with a detail or keynote that describes how the house numbers will be illuminated or made identifiable from the street. 7. The Developer shall submit detailed landscape and irrigation plans (concurrently with the improvement plans) for the review and approval of the Parks, Recreation and Cultural Department. The landscape plan shall include, in addition to normal landscape and irrigation details, screening of any above -ground utility vaults and anti -siphon water valves. 8. Meters, hydrants, poles, etc., shall be located clear of the sidewalk and driveways or as determined by the City Engineer. Final locations and the number of such facilities shall be determined at the time the improvement plans are reviewed. 9. A conceptual fencing/wall plan shall be submitted for the entire subdivision with the grading plan and a detailed fencing/wall plan shall be submitted with the improvement plans for each phase of development. The design, height, and location of walls shall be subject to approval of the Community Development Director prior to approval of improvement plans. Where fencing is adjacent to public parks and/or trails, plans shall be approved by the Recreation Commission at the time of park plan approval. When the adjacent area is sloped, the fence/wall design shall include a 4 -foot bench (sloped no more than 2 percent) along the fence/wall for maintenance purposes, as determined by the Parks, Recreation and Cultural Services Department. 10. The project shall incorporate all applicable mitigation measures as specified in the adopted Final Revised Environmental Impact Report EIR-05-01 (State Clearinghouse No. 2005092096) for the project. 11. Pursuant to project Environmental Impact Report, State Clearinghouse No. 2005092096, prior to recordation of the final map(s) for homes adjacent to existing agricultural operations, the applicant shall submit a detailed wall and fencing plan for review and approval by the Community Development Department (Land Use Mitigation Measure 1). 12. Pursuant to project Environmental Impact Report, State Clearinghouse No. 2005092096, Agriculture Resources Mitigation Measures 2 and 3, the applicant shall provide and undertake a phasing and financing plan (to be approved by the City Council) for one of the following mitigation measures: a. Identify approximately 14 acres to protect for a period of time to be determined (but not less than 15 years) as an agricultural use in a location as determined appropriate by the City of Lodi in consultation with the Central Valley Land Trust; or b. Pay a fee equal to the value of 14 acres as determined by an independent qualified consultant retained by the City in consultation with the Central Valley Land Trust. The City will determine to whom the fee shall be paid. 13. Pursuant to project Environmental Impact Report, State Clearinghouse No. 2005092096, Biological Resources Mitigation Measures 1, 2, and 3, the applicant shall contact the 4 San Joaquin County Council of Governments (SJCOG, Inc.) for a pre-ground disturbance survey, to be performed by a San Joaquin Multi-Species Habitat Conservation and Open Space Plan (SJMSCP) biologist, to determine applicable Incidental Take Minimization Measures (ITMMS). The City shall not authorize any form of site disturbance until it receives an Agreement to Implement ITMMS from SJCOG, Inc. The City shall not issue a building permit for the proposed project until the San Joaquin County Council of Governments determine what, if any, Incidental Take Minimization Measures (ITMMS) apply to the project and until the San Joaquin County Council of Governments verifies all applicable ITMMs have been fully and faithfully implemented. 14. If archeological materials are uncovered during any construction or pre-construction activities on the site, all earthworks within one hundred (100) feet of these materials shall be stopped, the Community Development Department notified, and a professional archeologist, certified by the Society of California Archeology and/or the Society of Professional Archeology, shall be notified. Site work in this area shall not occur until the archeologist has had an opportunity to evaluate the significance of the find, and outline appropriate mitigation measures, if they are deemed necessary. 15. All stub end streets planned for future continuation and undeveloped cul-de-sacs shall be temporarily protected with warning barricades and redwood headers to be approved by the City Engineer. 16. The Developer shall pay for and install all street name signs, traffic regulatory and warning signs, and any necessary street striping and markings required by the City Engineer. Street striping and markings shall be raised ceramic markers or thermoplastic material, as directed by the City Engineer. 17. Road or street names shall not duplicate any existing road or street name in the City, except where a new road or street is a continuation of an existing street. Road or street names that may be spelled differently but sound the same shall also be avoided. Road or street names shall be approved by the Fire Chief and the Community Development Director. 18. All improvements, public and private, shall be designed and constructed in accordance with the most recent edition of the City Plans and all applicable state and local ordinances, standards and requirements. Should a conflict arise, the governing specification shall be determined by the City Engineer. 19. The Developer shall ensure finished pad elevations are at a minimum one foot above the 100-year base flood elevation, as shown on the latest Federal Emergency Management Agency (FEMA) floodplain maps far San Joaquin County, California. The Developer shall be responsible for all necessary activities, applications, documentation and costs to amend floodplain maps for their development. 20. In accordance with the Growth Management and Infrastructure/Public Facilities Element of the City's General Plan, the environmental review prepared for this project, and the regulations of the applicable school districts, the Developer shall demonstrate that adequate provision is made for school facilities. To the extent permitted by law, this may include the payment of school facility mitigation fees adopted by the Lodi Unified School District, or alternative financial arrangements negotiated by agreement between the Developer and the applicable school districts. 5 21. A master street tree plan shall be approved by the Public Works Department for each phase of this vesting tentative subdivision map. A minimum of one street tree shall be provided for each lot within this subdivision. On career Tots, three street trees shall be provided; one on the shorter lineal frontage and two on the longer lineal frontage. Street trees shall be a species selected from the City's adopted tree list, shall be a minimum fifteen (15) gallon size, spaced at thirty (30) feet intervals, and planted as reflected in the Engineering Department's Standard Plans and Specifications, with branches above average eye level. The trees selected shall be deep rooted and drought tolerant. Location and species shall be to the approval of the Public Works Department. 22. The Developer, in order to reduce tracking of mud throughout the City, shall be responsible for cleaning up or any expenses incurred by the City for cleaning up mud, debris, etc., from City streets that is attributed to this project during construction. 23. Construction activities shall be limited to the hours of 7:00 a.m. to 10:00 p.m., Monday through Sunday, consistent with the City's Ordinance. 24. All conditions of approval for this project shall be written by the project developer on all master building permit plan check sets submitted for review and approval. It is the responsibility of the Developer to ensure that the project contractor is aware of, and abides by, all conditions of approval. If the subdivision is to be built out using master plans, please follow City of Lodi, Community Development Department Policies and Procedures No. B-[08]-[13] Plan Submittal - Residential Master Plans and No. B-[08]-[14] Permit Processing — Production Homes. 25. No variance from any City of Lodi adopted code, policy or specification is granted or implied by this approval. City of Lodi Community Development Department — Planning: 26. The Developer shall notify all purchasers of homes or Tots, either through the Department of Real Estate Subdivision Report or, if there is no Subdivision Report, through a statement signed by each buyer and submitted to the City, that this subdivision is adjacent to an agricultural area, and as such, there are ground and aerial applications of chemicals, and early morning/night time farming operations which may create noise and dust, etc. In addition, all purchasers of homes or lots shall be made aware of the future possibility of oil and gas well exploration on surrounding and adjacent properties and that farm animals may be kept on adjacent properties that may be outside the City limits. The wording and format for notifying home buyers of this information is subject to approval by the Community Development Director. 27. The Van Ruiten Ranch / Villa Fiore project is required to provide for park land dedication based upon 5 acres of park land for every 1,000 residents. This may be accomplished by land dedication and park construction and a combination on in-lieu fees. The applicant will work with the Community Development Director and Parks, Recreation and Cultural Services Director to ensure that this condition is satisfied consistent with the General Plan requirements. 28. The City places a high value on quality design and materials in the construction of fencing and buffers for developments. Fencing is an integral design feature in residential developments and defines property ownership and boundaries. The City expects quality 6 materials that will last and maintain an appealing aesthetic within neighborhoods. This includes metal or pressure -treated posts for fencing. 29. Although the project includes a Vesting Map approval, the applicant has agreed to pay the current development impact fees in place at time of building permit approval and occupancy. The vesting protects against any new fee categories. City of Lodi Fire Department: 30. The Developer shall comply with all applicable requirements of the California Fire Code and the adopted policies of the City of Lodi. 31. Fire apparatus access roads shall have an unobstructed width of not less than 24 feet, exclusive of shoulders, except for approved security gates in accordance with Section 503.6 of the California Fire Code and an unobstructed vertical clearance of not less than 13 feet 6 inches. (Ord. No. 1840, § 1, 11-17-2010) 32. Approved fire apparatus access roads shall be provided for every facility, building or portion of a building hereafter constructed or moved into or within the jurisdiction. The fire apparatus access road shall comply with the requirements of this section and shall extend within 150 feet (45,720 mm) of all portions of the facility and all portions of the exterior walls of the first story of the building as measured by an approved route around the exterior of the building or facility. 33. The Developer shall install on-site and/or boundary water mains, fire hydrants and related services. Hydrants shall adhere to the City's standard details, with their location determined by the Fire Department and City Engineer, and shall be installed and in service prior to any combustible construction on the site. Public fire hydrant spacing and distribution shall be determined as follows: a. At 300 feet spacing in high-density, commercial, industrial zoning or high-value areas; b. At 500 feet spacing in low-density residential areas; c. At 1,000 feet spacing in residential reverse frontage; d. A fire hydrant shall be located within 200 feet of the radius point of all cul-de-sacs; e. Hydrants shall be required on both sides of the street whenever one or more of the following conditions exist: i. Streets have median center dividers that make access to hydrants difficult, cause time delays, or create undue hazards or both; ii. On major arterials where there is more than four lanes of traffic; iii. Width of street in excess of 88 feet; 7 iv. The existing street being widened or having a raised median center divider in the future pursuant to the General Plan Roadway improvement Plans for the City of Lodi. 34. An automatic sprinkler system installed in accordance with Section 903.3 shall be provided throughout all buildings with a Group R fire area. City of Lodi Public Works Department The following conditions of approval are required for the subject project per City codes and standards, all to be accomplished prior to, or concurrent with, final map filing unless noted otherwise: 35. Engineering and preparation of improvement plans and estimate are required per City Public Improvement Design Standards for all public improvements prior to final map filing. Plan submittal to include: a) Approved tentative map, signed by the Community Development Director. b) Storm drainage facilities shall conform to the Multi -Agency Post -Construction Stormwater Standards Manual (PCSP) as adopted by City Council on November 4, 2015, all state and federal requirements. c) Irrigation plans and plantings shall conform to the Model Water Efficient Landscaping Ordinance (MWELO) per the Governor's Executive Order 6-29-12 adopted on December 31, 2015. d) Approved detailed utility (water, wastewater, storm drainage, recycled water and circulation) master plans, including engineering calculations, for all phases of the development. Storm drainage facilities design shall conform to the City of Lodi Storm Water Development Design Standards. Plans must include recycled water (purple pipe) master plans. e) Current soils report. If the soils report was not issued within the past three (3) years, provide an updated soils report from a licensed geotechnical engineer. Grading, drainage and erosion control plan. Copy of Notice of Intent for NPDES permit, including storm water pollution prevention plan (SVVPPP) and WDID number. h) Reverse frontage wall, landscaping and irrigation system. Minimum wall height shall be 6 feet above the adjacent pad and/or ground elevation or as required by Community Development Department to satisfy general plan requirements. i) Street tree planting plan for parkway strip along lot frontages. Requires approval of the Community Development Director and Public Works Director. All utilities, including street lights and electrical, gas, telephone and cable television facilities. f) g) j) 8 k) Joint Trench plans. I) All street improvements within the development. m) Traffic striping plan for Century Boulevard. n) Signal modification plans in Century Boulevard at the Lower Sacramento Road intersection. A complete plan check submittal package, including all the items listed above plus the Map/Improvement Plan Submittal cover letter, Improvement Plan Checklist and engineering plan check fees, is required to initiate the Public Works Department plan review process for the engineered improvement plans. 36. Design and installation of public improvements shall be in accordance with City Master plans. Street, wastewater, storm drainage, water and non -potable water (purple pipe) master plans and design calculations will be required for the development. a) Street i) Install full -width street improvements, including curb, gutter, sidewalk and street lights along Century Boulevard from the intersection at Lower Sacramento Road to the west project boundary, including landscaping and irrigation. ii) Construct full -width street improvements, including curb, gutter, sidewalk and street lights along Van Ruiten Drive from Century Boulevard to Tulip Way, including landscaping and irrigation. iii) Install reverse frontage walls, landscaping and irrigation improvements in Century Boulevard. Street trees shall be planted in the parkways in the public right-of-way within the subdivision boundaries. Frontage improvements and landscaping shall be constructed by the Developer at the Developer's expense to the approval of the Public Works Director and Community Development Director. iv) Provide all necessary traffic signs to serve the entire subdivision, including any necessary traffic signs needed along Westgate Drive and Century Boulevard. v) Provide a wall easement for the public masonry wall footings along all parcels that will have a public masonry wall. Public City -maintained walls shall not be constructed from wood. vi) The development must conform to the General Plan Bike Master Plan. Provide a Class II bike route along Century Boulevard within the project limits, as shown in the Master Plan. vii) Traffic striping modifications in Century Boulevard east of Lower Sacramento Road. viii)Traffic signal modifications at Century Boulevard and Lower Sacramento Road. 9 b) Wastewater i) Use the 2012 City of Lodi Wastewater Master Plan design criteria for all calculations, pipeline sizing and pipeline locations. Revise the Westgate Trunk Line and the City's Wastewater outfall pipeline to match the pipe sizing shown in the Master Plans. The 48 -inch Domestic Outfall pipeline shall be resized to a 42 -inch pipe. ii) Abandon the existing 42 -inch wastewater pipeline in Lower Sacramento Road north of Century Boulevard and install new 42 -inch wastewater pipeline in Century Boulevard. The Developer shall pay all installation costs; however, pipe material costs will be reimbursed by City upon acceptance of the pipeline installation work. iii) The Domestic Outfall and Industrial Waste pipeline realignment shall intercept existing pipelines with manhole or vault structures upstream of existing diversion structure located at the westerly end of the development. No pipeline penetrations will be allowed in the existing diversion structure. iv) Wastewater infrastructure construction sequence shall not interfere with operations associated with the Domestic Outfall or Industrial Waste pipelines. Developer is responsible for preserving the integrity of the existing Domestic Outfall and Industrial Waste pipelines during all phases of Project construction prior to replacement/ relocation. v) Developer shall obtain a Public Utilities Easement from the adjacent property owner to the west of the project limits for the installation and maintenance of the domestic and industrial wastewater pipelines. vi) Extend the wastewater public main from the intersection of Century Boulevard and Lower Sacramento Road to the southwest end of the project site and from the Lodi Shopping Center at Westgate Drive to Century Boulevard. vii) Install wastewater service stubs for the parcels adjacent to the west subdivision boundary, the south subdivision boundary, and the north subdivision boundary. c) Storm Drainage i) Use the 2012 City of Lodi Storm Drainage Master Plan design criteria for all pipe sizing calculations and basin sizing calculations. Storm drain coefficient of runoff, C -factor, for low-density residential shall be a minimum of 0.4, medium -density residential shall be a minimum of 0.5, and high-density residential shall be a minimum of 0.5. The rainfall intensity used for design of the pipelines shall be based on a five-year, 48-hour rain event. Be sure all pipeline and basin locations follow the Master Plans. ii) An overland flood release pathway shall be incorporated into the streets and circulation design plan for each subarea. For example, when any particular catch basin is obstructed or overwhelmed with water, the street drainage design (high points and low points) for that subarea shall be calculated so that no water shall pond higher than the lowest right-of-way elevation without releasing the excess water toward the planned flood release point of the subarea. 10 iii) Extend the storm drainage public main from the intersection of Century Boulevard and Lower Sacramento Road to the west end of the project site and from the Lodi Shopping Center at Westgate Drive to the north end of the development. iv) Install storm drain service stubs for the parcels adjacent to the west subdivision boundary, the south subdivision boundary, and the north subdivision boundary. d) Water i) Use the 2012 City of Lodi Water Master Plan design criteria for all calculations, pipeline sizes and pipeline locations. As shown in Appendix D, a 10 -inch water main shall be located on the western edge of the development for water circulation purposes, as shown in the City's Water Master Plan. Water line may follow proposed north/south street alignments that are located within 500 feet of the west limit of the project. ii) Provide a looped water systems. A minimum of two connections to the City's water system are required. iii) Add temporary blow -off valves per Standard Plan 409 (or temporary hydrants) to the ends of all dead-end water mains planned for future extension. iv) Provide locations of all water valves and fire hydrants within the development. All water valves and fire hydrants shall have a maximum spacing conforming to City Design Standards section 4.501 and 4.502, respectively. v) Extend the water public main from the intersection of Century Boulevard and Lower Sacramento Road to the west end of the project site and from the Lodi Shopping Center at Westgate Drive to the north end of the development. vi) Install water service stubs for the parcels adjacent to the subdivision boundaries. vii) Install water sampling stations at locations approved by the City Engineer. e) Recycled Water (Purple Pipe) i) Extend the recycled water (purple pipe) public main from Westgate Drive at the Lodi Shopping Center to the intersection at Century Boulevard and along Century Boulevard to the intersection at Lower Sacramento Road. ii) Recycled water service stubs for the parcels adjacent to the west subdivision boundary, the south subdivision boundary, and the north subdivision boundary. 37. All dead-end streets shall install barricades per City of Lodi Standard Plan 128. 38. Provide a slope easement or retaining wall along the boundary of the development for all grade differentials of one foot or greater. 39. All landscaping proposed within the development must conform to the City of Lodi Landscape Maintenance Ordinance. 11 40. Abandonment/removal of wells, septic systems, and underground tanks in conformance with applicable City and County requirements and codes prior to approval of public improvement plans. 41. All public improvements to be installed within one year of final map filing under the terms of an improvement agreement to be approved by the City Council prior to final map filing. The Developer will be required to provide warranty security in the amount of 10 percent of the value of the public improvements. The warranty period will be two (2) years, commencing on the date of acceptance of the public improvements. 42. The project will install landscape areas along Century Boulevard. After the City accepts the landscape improvements, the Developer will be required to maintain the landscaping for two years. Provide a two-year maintenance agreement and surety for the landscaping along Century Boulevard. 43. All project design and construction shall be in compliance with the Americans with Disabilities Act (ADA) and California Title 24. Project compliance with ADA standards is the Developer's responsibility. 44. The City of Lodi is a participant in the San Joaquin County Multi -Species Habitat Conservation and Open Space Plan (SJMSCP). An application for evaluation of the project site with respect to SJMSCP requirements shall be submitted to the San Joaquin Council of Governments (SJCOG) prior to commencement of any clearing, grading or construction activities on the project site. 45. The following improvements shall be constructed with the first phase of development: a) The water system shall have a minimum of two connections to the City system. The development shall extend and connect to the main in Westgate Drive south of the Lodi Shopping Center and connect to the main in Century Boulevard at Lower Sacramento Road. b) Realignment of the Domestic Outfall and Industrial Waste pipelines to the diversion structure. c) If the development is constructed in phases, each phase shall be required to have a minimum of two connections to the City water system and two access points for traffic circulation. 46. Dedication of public utility easements as required by the various utility companies and the City of Lodi. 47. Acquisition of the following easements outside the limits of the map: a) Utility easements for the relocation of the Domestic and Industrial wastewater outfall pipeline and 10 -inch water pipeline to the approval of the Public Works Director. 48. All property dedicated to the City of Lodi shall be free and clear of all liens and encumbrances and without cost to the City of Lodi and free and clear of environmental hazards, hazardous materials, or hazardous waste. Developer shall prepare and submit a hazardous materials report and shall indemnify the City against any and all hazardous 12 materials and/or ground water contamination for all property/easements dedicated to the City. 49. This development has been annexed into the City of Lodi Community Facilities District No. 2007-1 (Public Facilities). 50. Submit final map per City and County requirements including the following: a) b) c) Preliminary title report including copies of all referenced exception documents. Waiver of access rights at: i) All Tots adjacent to Century Boulevard. Standard note regarding requirements to be met at subsequent date. 51. Payment of the following: a) Filing and processing fees and charges for services performed by City forces per the Public Works Fee and Service Charge Schedule. b) Development Impact Mitigation Fees per the Public Works Fee and Service Charge Schedule at the time of project acceptance. c) d) e) Regional Transportation Impact Fee (RTIF) at the time of building permit issuance. Stormwater compliance inspection fee prior to map filing or commencement of construction operations, whichever occurs first. Reimbursement fees per existing agreements: i) Resolution No. 2007-52 — Reimbursement (Kettleman Lane to Harney Lane) improvements. The above fees are subject to periodic adjustment ordinance/resolution. The fee charged will be that indicated above. for Lower Sacramento Road as provided by the implementing in effect at the time of collection 52. In order to assist the City of Lodi in providing an adequate water supply, the Owner/Developer on behalf of itself, its successors and assigns, shall enter into an agreement with the City that the City of Lodi be appointed as its agent for the exercise of any and all overlying water rights appurtenant to the proposed Van Ruiten Ranch subdivision, and that the City may charge fees for the delivery of such water in accordance with City rate policies. In addition, the agreement shall assign all appropriative or prescriptive rights to the City. The agreement will establish conditions and covenants running with the land for all lots in the subdivision and provide deed provisions to be included in each conveyance. 53. Developer shall be responsible for the regular and ongoing maintenance and replacement of the landscaping and irrigation improvements and street trees in the parkways for one year until the first revenues are received by the City from the District. 13 54. Obtain the following permits: a) San Joaquin County well/septic abandonment permit. b) City of Lodi encroachment permit for work within City right-of-way. c) Construction General Permit for the SWPPP. Dated: February 15, 2017 hereby certify that Resolution No. 2017-22 was passed and adopted by the City Council of the City of Lodi in a regular meeting held February 15, 2017, by the following vote: AYES: COUNCIL MEMBERS — Chandler, Johnson, Mounce, Nakanishi, and Mayor Kuehne NOES: COUNCIL MEMBERS — None ABSENT: COUNCIL MEMBERS — None ABSTAIN: COUNCIL MEMBERS — None _CLTh7Y). 12 -AA -10-< ',4010 J t4NIFER M. RRAIOLO try Clerk 2017-22 14 Villa Fiore Subdivision Subdivision Application: 2016-29 Growth Management Allocation: 2016-29 (Applicant: Elliot Homes) Represented by Price Walker Request for Planning Commission approval of: • Growth Management Allocation for 67 Low Density Residential Lots; and • A Vested Subdivision Map for the Villa Fiore Ranch Subdivision, a 13.7 acre, 67 unit subdivision; and • Adopt Development Standards for the subdivision known as Villa Fiore / Van Ruiten Ranch Subdivision located within Planned Development 41 Zoning District. 1 mi:WRIMiii City Council VisV Maggi:@n. i00441, p 0, arewiew } L P,e^t0I5 art Meaduwsifk CIairaramtey VICINITY MAP City Council Low Derurly Fetrspie ihd ern LI rU17r kr•sldenlrnl r kph DrrEll'y I .itunIkJI chr}r}I VPS RUITEN RANCH City Council P1•V% 1 1 II•i won 44% R=1 111141,,,411 gym 1.1 iU0* MO* • • 1111111111111111111 LAND E Pas.TIOcks Invdnerroty R'esecnhral kieckinn F]cnvly ke Jdtnlrnl 4i 1 DEQ Rr idarIIirll *, Mrr,}I nark./ Open Space. wan* • r VPS RUITEN RANCH City Council PROP 77 17 19 111 a 20 UI a4 Uxi1 02 ID' 04 s 05 66 58 °f ss = 115 6A' 6 - dl' 6r 50- 51 52 53 U 54 55 I ao 4 58 °f ss = 115 120 CNTUR? 121 172 1 BLVD, 123 1101 93 Vestin• Ma• City Council 17 d.1 1 L—e 1 • alpEm 1 West Side Trail City Council C i5 t4 I 3cA1e._Le1' SCHOOL SITE 15.22+ RCS-GRCISS J3,76± ACS -NET VA ACS -CRIES ii iz, - � � 4241' ACS -I[1 I I i _ _rsma..as� i' 64'' ` 1 J I WSPs• — Ur 6E-Fiegi 4.9•1 r f l 1'- ani n' ri7f} E1LV7L0.i Ina VS iE !Yiy,l{F WA - itl: KS: } 1 II Rli< RI IPF = 41 YAIF4 911FAf.F a = 1LS,1 %S: r�/7 IIB QPIH = WWI YhIER [PIN • ILY 1 11 b i.¢ mcsa�rea; +N.�PAWIlXE 2e Ac-rr REWIRED �?YSS n[dT. I I . nu oemoCPIPAT i UV 1 7A a.Vg-1.- r Villa Fiore Trail City Council Qroa 01N3ftdOVS a3A01 4.00 t --a— 12.00 74.00 40.00 12.00 •4 ENHANCED PATH (VILLA FIORE) LOOKING NORTH Villa Fiore Trail City Council Table E: Growth Management Allocation for 2016 Density Available Allocations 2% Allocation for 2016 Total Available for 2016 Garfield Camper - Sac Harvest Crossing Rose Gate 11 Villa Fiore Total Remain for 2016 Low (0.1-7) 195 3,384 6 0 0 250 67 3,061 Medium (7.1-20) 124 777 0 28 42 95 0 612 High (20.1-30) 124 1205 0 0 0 180 0 1,025 TOTAL 443 5,366 5,360 5,332 5,290 4,765 4,698 4,698 GROWTH ALLOCATION City Council Please immediately confirm receipt of this fax by calling 333-6702 CITY OF LODI P. O. BOX 3006 LODI, CALIFORNIA 95241-1910 ADVERTISING INSTRUCTIONS SUBJECT: CONTINUED PUBLIC HEARING TO CONSIDER ADOPTING RESOLUTION APPROVING THE PLANNING COMMISSION'S RECOMMENDATION TO AUTHORIZE 67 LOW-DENSITY RESIDENTIAL GROWTH MANAGEMENT ALLOCATIONS AND APPROVE A VESTING SUBDIVISION MAP FOR THE VILLA FIORE RANCH SUBDIVISION, A 13.7 -ACRE, 67 -UNIT SUBDIVISION PUBLISH DATE: SATURDAY, FEBRUARY 4, 2017 LEGAL AD TEAR SHEETS WANTED: One (1) please SEND AFFIDAVIT AND BILL TO: LNS ACCT. #0510052 JENNIFER M. FERRAIOLO, CITY CLERK City of Lodi P.O. Box 3006 Lodi, CA 95241-1910 DATED: THURSDAY, FEBRUARY 2, 2017 ORDERED BY: JENNIFER M. FERRAIOLO CITY CLERK PAMELA M. FARRIS DEPUTY CITY CLERK ELIZABETH BURGOS ADMINISTRATIVE CLERK Verify Appearance of this Legal in the Newspaper — Copy to File Emailed to the Sentinel at dianer@lodinews.com at /I). /". time) on x/0//7 (date) (pages) LNS Phoned to confirm receipt of all pages at (time) _EB PMF (initials) forms\advins.doc DECLARATION OF POSTING NOTICE OF CONTINUED PUBLIC HEARING TO CONSIDER ADOPTING A RESOLUTION APPROVING THE PLANNING COMMISSION'S RECOMMENDATION TO AUTHORIZE 67 LOW-DENSITY RESIDENTIAL GROWTH MANAGEMENT ALLOCATIONS AND APPROVE A VESTING SUBDIVISION MAP FOR THE VILLA FIORE RANCH SUBDIVISION On Thursday, February 2, 2017, in the City of Lodi, San Joaquin County, California, a Notice of Continued Public Hearing to consider adopting a resolution approving the Planning Commission's recommendation to authorize 250 Low -Density Residential, 95 Medium -Density Residential, and 180 High -Density Residential Growth Management Allocations for the Rose Gate II Subdivision (attached and marked as Exhibit A) was posted at the following locations: Lodi City Clerk's Office Lodi City Hall Lobby Lodi Carnegie Forum WorkNet Office I declare under penalty of perjury that the foregoing is true and correct. Executed on February 2, 2017, at Lodi, California. ORDERED BY: JENNIFER M. FERRAIOLO CITY CLERK 123-71 (172 A./U-6:C) PAMELA M. FARRIS ELIZABETH BURGOS DEPUTY CITY CLERK ADMINISTRATIVE CLERK N:\Administration\CLERK\Public Hearings \AFFADAVITS\DECPOSTCDD2.doc CITY OF LODI Carnegie Forum 305 West Pine Street, Lodi NOTICE OF CONTINUED PUBLIC HEARING Date: February 15, 2017 Time: 7:00 p.m. For information regarding this notice please contact: Jennifer M. Ferraiolo City Clerk Telephone: (209) 333-6702 EX 'BIT A NOTICE OF CONTINUED PUBLIC HEARING NOTICE IS HEREBY GIVEN that on Wednesday, February 15, 2017, at the hour of 7:00 p.m., or as soon thereafter as the matter may be heard, the City Council will conduct a continued public hearing at the Carnegie Forum, 305 West Pine Street, Lodi, to consider the following item: a) Adopting a resolution approving the Planning Commission's recommendation to authorize 67 Low -Density Residential Growth Management Allocations and approve a vesting subdivision map for the Villa Fiore Ranch Subdivision, a 13.7 -acre, 67 -unit subdivision. Information regarding this item may be obtained in the Community Development Department, 221 West Pine Street, Lodi, (209) 333-6711. All interested persons are invited to present their views and comments on this matter. Written statements may be filed with the City Clerk, City Hall, 221 West Pine Street, 2nd Floor, Lodi, 95240, at any time prior to the hearing scheduled herein, and oral statements may be made at said hearing. If you challenge the subject matter in court, you may be limited to raising only those issues you or someone else raised at the public hearing described in this notice or in written correspondence delivered to the City Clerk, 221 West Pine Street, at or prior to the close of the public hearing. By Order of the Lodi City Council: • -)n?rlAil_dtA6 ifer M. rraiolo ity Clerk Dated: February 1, 2017 Approved as to form: :tani'ce D. Magdich City Attorney AVISO: Para obtener ayuda interpretativa con esta noticia, por favor Ilame a la oficina de la Secretaria Municipal, a las (209) 333-6702. CLERK\PUBHEAR\NOTICES\notcdd2_continued.doc 1/27/17