HomeMy WebLinkAboutAgenda Report - February 1, 2017 C-09CITY OF LODI COUNCIL COM MUNICATION AGENDA ITEM C-9 TM AGENDA TITLE: Adopt Resolution Authorizing City Manager to Execute Amendment No. 1 to Task Order No. 39 with West Yost & Associates ($57,680) MEETING DATE: February 1, 2017 PREPARED BY: Public Works Director RECOMMENDED ACTION: Adopt resolution authorizing City Manager to execute Amendment No. 1 to Task Order No. 39 with West Yost & Associates, in the amount of $57,680. BACKGROUND INFORMATION: On September 2, 2015, Council authorized staff to solicit statements of qualifications for engineering services to plan and design several needed improvements at White Slough Water Pollution Control Facility (WSWPCF). The improvements include corrosion repairs to exposed concrete process channels, installation of a coarse screen and septage receiving station, replacing the existing south electrical building, upgrading the existing supervisory control and data acquisition system, and other instrumentation and electrical related upgrades needed to bring this 50 -year-old facility up to current standards. On February 17, 2016, Council approved Task Order No. 39 with West Yost & Associates, in the amount of $469,300, for the WSWPCF 2016 Calendar Year Repairs and Improvement Engineering Design, and Construction Management Services. The scope of work included design, inspection, and construction management services related to the repair of corrosion damage to various elements of the facility. On June 16, 2016, Council awarded a contract to Western Water Constructors, Inc., for the WSWPCF 2016 Improvements Corrosion Repair Project, to perform repairs to and coating of existing concrete structures and process channels, and the replacement of various corroded hatches and piping components. This work commenced in July of 2016. The main elements of the corrosion repairs have been completed, however, there are a number of City requested items (listed below) that remain to be finished. The proposed Amendment No. 1 to Task Order No. 39 includes a scope of service to perform additional design and construction management services to facilitate work resulting from unforeseen conditions encountered during the contract as well as additional items requested by the City to install remote monitoring capability for the facility storage pond levels (required by the State), and internal digester temperatures, Digester No. 3 cleaning and interior coating, and the repair of a pipeline that feeds forced air to the aeration basins. The additional work extends the duration of the contract and expands the services needed from West Yost & Associates. Staff recommends authorizing the City Manager to execute Amendment No. 1 to Task Order No. 39 with West Yost & Associates for the WSWPCF 2016 Calendar Year Repairs and Improvement Engineering Design, and Construction Management Services, in the amount of $57,680. APPROVED: e:"" an Sc au er, City Manager K:\WP\COUNCIL\2017\CC WAY T039amendment1.doc 1/19/17 Adopt Resolution Authorizing City Manager to Execute Amendment No. 1 to Task Order No. 39 with West Yost & Associates ($57,660) February 1, 2017 Page 2 FISCAL IMPACT: The additional design and construction management services for this project are needed to facilitate completion of the corrosion repairs and to oversee additional work requested by the City for required improvements by the State and to improve operations and maintenance of the facility. FUNDING AVAILABLE: Funding for Amendment No. 1 is available in the Fiscal Year 2016/17 Wastewater Capital Outlay Fund (530): r" Susan Bjork ` U Supervising Budget Analyst Charles E. Swimley, Jr. Public Works Director Prepared by Charles E. Swimley, Jr., Public Works Director CES/CES/tdb Attachment K:\WP\COUNCIL\2017\CC WAY TO39 amendment 1 doc 1/19/17 AMENDMENT NO. 1 TASK ORDER NO. 39 WEST YOST ASSOCIATES, INC. THIS AMENDMENT NO. 1 TO TASK ORDER NO. 39, is made and entered this day of February, 2017, by and between the CITY OF LODI, a municipal corporation (hereinafter "CITY"), and WEST YOST ASSOCIATES, INC. (hereinafter "CONTRACTOR"). WITNESSETH 1. WHEREAS, CONTRACTOR and CITY entered into a Task Order No. 39 (the "Agreement") on March 1, 2016, attached hereto as Exhibit 1; and 2. WHEREAS, CITY requested to increase the fees by $57,680, for a total of $526,980 and amend the Scope of Service as set forth in Exhibit 2; and 3. WHEREAS, CONTRACTOR agrees to said amendment. NOW, THEREFORE, the parties agree to increase the fees and amend the Scope of Service. All other terms and conditions of the Agreement remain unchanged. IN WITNESS WHEREOF, CITY and CONTRACTOR have executed this Amendment No. 1 on the date and year first above written. CITY OF LODI, a municipal corporation WEST YOST ASSOCIATES, INC. hereinabove called "CITY" hereinabove called "CONTRACTOR" STEPHEN SCHWABAUER W. FRANKLIN HELMICK City Manager Vice President Attest JENNIFER M. FERRAIOLO, City Clerk Approved as to Form: JANICE D. MAGDICH, City Attorney Exhibit 1 Task Order No. 39 City of Lodi White Slough WPCF 2016 Calendar Year Repairs and Improvement Engineering Design and Construction Management Services West Yost Job Number 213-18-16-35 In accordance with the Task Order Agreement between City of Lodi (Client) and West Yost Associates, Inc. (Consultant), dated January 13, 1999, Consultant is authorized to complete the work scope defined in this Task Order according to the schedule and budget defined herein. WORK SCOPE Consultant will provide engineering design, inspection, and construction management services related to: Repair of corrosion damage to the following concrete structures: • Headworks domestic influent channels • Headworks grit pump pit floor • Domestic and industrial pump discharge chambers • Primary sedimentation basin influent channel • Stairways and miscellaneous non -submerged concrete in the primary sedimentation basin • area • Primary sedimentation basin effluent channel • Influent channels between aeration basins No 1 & 2 and aeration basins No 3 & 4 In addition, this project will include the following improvements: • Surface preparation and coating of the 24 -inch diameter main aeration header • Programming necessary to incorporate recent modifications to Digesters 1 and 2 into the WPCF SCADA system These services are described in greater detail in Attachment A to this Task Order. BUDGET The costs for Consultant's services as defined herein shall not exceed $469,300. COMPENSATION Compensation shall be in accordance with the provisions of the Task Order Agreement between Client and Consultant and the billing rate schedule contained in Attachment B to this Task Order. The compensation limit for services performed under this task order shall not exceed $469,300. If additional funds are required to complete the services defined herein beyond this limit, Consultant shall notify Client in writing prior to reaching the authorized limit, and will not proceed with work in excess of the limit without the prior written approval of Client January 22, 2016 1 n\a\c\A-E\City of Lodi\T039 West Yost Task Order SCHEDULE We anticipate that that services will be performed in accordance with the following schedule: Milestone Approxiinate Date Complete Design Documents Complete Construction -Related Services April 2016 October 2016 WEST YOST ASSOCIATE , INC. Si nature F1 w r eel Printed Name Vic-a/1)25E Le\ Title afre71//4' Date CITY OF LODI 471 `3,1epLe, Printed Name Tk.r AkC;I/T.L 1, : -v (6 Date Approved 1s tp honk! ATTEST: City Attersloy N10Eit PERI(AIOLO 14, Clerk January 22, 2016 2 n\a\c1A-E\City of Lodi1T039 West Yost Task Order Attachment A - Scope of Work City of Lodi White Slough Water Pollution Control Facility 2016 Calendar Year Repairs and Improvements Engineering Design and Construction Management Services 1.1 BACKGROUND This Scope of Work addresses engineering services related to 2016 calendar year improvements to the City of Lodi's White Slough Water Pollution Control Facility (WPCF) that were described in the Statement of Qualifications, City of Lodi — Plant Assessment dated September 17, 2015 and as refined and modified by subsequent scoping meetings and discussion. 1.2 DESCRIPTION OF PROJECT This project involves repairing corrosion damage to the following concrete structures: • Headworks domestic influent channels • Headworks grit pump pit floor • Domestic and industrial pump discharge chambers • Primary sedimentation basin influent channel • Stairways and miscellaneous non -submerged concrete in the primary sedimentation basin area • Primary sedimentation basin effluent channel • Influent channels between aeration basins No 1 & 2 and aeration basins No 3 & 4 In addition, this project will include the following Improvements: • Surface preparation and coating of the 24 -inch diameter main aeration header • Programming necessary to incorporate recent modifications to Digesters 1 and 2 into the WPCF SCADA system Certain treatment process elements must be taken out of service in order to repair damaged concrete surfaces. This scope of work assumes that: • Process elements will be taken out of service between May and September of 2016, when the WPCF treated wastewater is used to irrigate the City's agricultural fields and treatment requirements are somewhat less stringent, • Concrete structures that must be taken out of service will be inspected and specific remediation measures will be stipulated by the design team during the May - September construction period. WEST YOST ASSOCIATES January 2016 m\m\c\lodl\Ip\lodl wwlp soq 1 City of Lodi Attachment A - Scope of Work City of Lodi White Slough Water Pollution Control Facility 2016 Calendar Year Repairs and Improvements Engineering Design and Construction Management Services 1.3 TASK DESCRIPTIONS 1.3.1 Task 1 — Design Design documents will define areas of work, work constraints, and detail procedures to be used to repair the various types of corrosion damage expected to be encountered. 1.3.1.1 Subtask 1.1 - Prepare 50% Complete Design Documents The design team will prepare and submit 50% complete design documents for the City's review. Anticipated design drawings are listed In Table 1. The design submittal will also include a preliminary construction cost estimate and preliminary "front-end" specifications. This scope of services assumes: • The City Building Department will not review and comment on the design documents, and therefore the design team will not be required to address such comments. • Digester operating points to be integrated into the facility's RSView system are limited to temperature and level for Digesters 1 and 2 only. A total of four analog inputs will thus be incorporated into the SCADA system HMI screens • No process control logic modifications are anticipated. That is, Integration work Is limited to presentation of the new points on the HMI Screens. Changes to PLC logic other than that necessary to scale the points for presentation at the HMI are not included. • Local I/O cabinet for monitoring digester operations has sufficient spare analog input points to accommodate the additional inputs. • Additional conduit and wire necessary for circuiting the analog variables will be implemented in the form of performance specifications. Table 1. Anticipated Design Drawings General Title Sheet Index of Drawings, Legends, General Notes & Abbreviations Overall Site Plan Civil Primary Influent Bypass Pumping Plan & Sections WEST YOST ASSOCIATES January 2016 ni\m\c\Iodl\Ip\Iodl wwlp soq 2 City of Lodi Attachment A - Scope of Work City of Lodi White Slough Water Pollution Control Facility 2016 Calendar Year Repairs and Improvements Engineering Design and Construction Management Services Table 1. Anticipated Design Drawings Headworks Work Area Plan & Sections Primary Influent Work Area Plan & Sections Primary Effluent Work Area Plan & Sections Aeration Basin Work Area Plan & Sections Coating Application Details 1 Coating Application Details 2 Structural General Structural Repair Notes Structural Repair Details 1 Structural Repair Details 2 Structural Repair Details 3 y = G a'� r� _tit _ la ati57 ,0„00q i, *I7 i�.9 t' ?, °��t! ttt-j.liwit R 'fid;L ���.' Y .a-z�W} 'n0m4Nn� 1.3.1.2 Subtask 1.2 — Preoare Final Design Documents We will finalize the Contract Documents by incorporating review comments from City staff and from the independent quality control check. �j�} yip _ � _ �' '; " ' _A gir Y!li iau S q1! 1v� illii '�'•r�Iiolocnitof 9A`lf' • o r4*. f, 1.3.1.3 Subtask 1.3 — Service during Bidding During the bidding period, WY will: • Attend the pre-bid meeting to describe the work and participate In a site walk. It is assumed that City staff will conduct this meeting and will describe pertinent contracting procedures. • Respond to bidder's inquiries during the bidding process. Responses will be closely coordinated through City staff. • If it becomes necessary, WY will develop addenda that may be needed to document responses to bidders' inquiries. Addenda will be prepared and delivered to the City for distribution to plan holders. WEST YOST ASSOCIATES January 2016 ni\m\c\lodl\Ip\lodl wwtp .oq 3 City of Lodi Attachment A - Scope of Work City of Lodi White Slough Water Pollution Control Facility 2016 Calendar Year Repairs and Improvements Engineering Design and Construction Management Services 1.3.1,4 Subtask 1.4 — Document Review and Safety Plan Before the initiation of corrosion assessment field work, V&A will review as -built drawings and prepare a Safety Plan outlining the procedures and specific hazards that will be encountered while conducting the condition assessment. An electronic copy draft will be provided to the City for review. Comments will be Incorporated and a final electronic copy submitted. V&A's documentation regarding health and safety training of its staff will be submitted with the Safety Plan. 1,3.1.5 Subtask 1.5 — Corrosion Repair Assessment The following assessment methods will be used to evaluate the structures and their appurtenances. It should be noted that the assessment of the structures will be limited to safely accessible areas. It is assumed that the assessment will be conducted during four separate mobilizations. Concrete pH Samples: Perform pH tests on the surfaces of the structures. The pH of concrete can substantiate the levels of concrete corrosion attack prevalent within the structures. Samples will only be taken where bare concrete is accessible, a sound coating or lining will not be removed to take a sample. Reinforcing Steel Measurements: Measure the thickness of concrete protecting the reinforcing steel using SPR (surface penetrating radar). The SPR will also be used to verify the spacing of the reinforcing steel in the walls. The measurements will be taken on the walkways of the structures and up to two (2) 0.5 -foot wide by 2 -foot long areas of the influent/effluent channels. Portable Zoom Camera: A portable zoom camera will be used on the two Aeration Basin Influent Channels if an entry is not possible. Penetration Measurements: Perform concrete penetration measurements at two (2) key locations in each structure, as accessed from topside, to find approximate depth to sound concrete. The concrete penetration measurements will be taken by striking the concrete with a handheld chipping hammer and measuring the maximum depth to sound concrete. Penetration measurements will only be taken where bare concrete is accessible, a sound coating or lining will not be removed to perform the test. Sounding: Conduct sounding evaluation on the concrete surfaces of the structures. Sounding a surface refers to tapping the structure surfaces with a chipping hammer and listening for discontinuities within the surface, Locations for sounding evaluation will be selected on the walls and slabs of the structures at the discretion of the evaluator conducting the assessment. WEST YOST ASSOCIATES January 2016 m\m\e\lodl\Ip\lodl wwlp eoq 4 City of Lodl Attachment A - Scope of Work City of Lodi White Slough Water Pollution Control Facility 2016 Calendar Year Repairs and Improvements Engineering Design and Construction Management Services Visual Evaluation: Visually assess and document the condition of the structures with digital photographs. Defects such as concrete cracks, spalls, exposed reinforcing steel, metal corrosion, and coating deterioration will be documented, 1.3.2 Subtask 1.5 — Corrosion Assessment Report After the condition assessment of the structures has been completed, a report will be prepared to document findings. The report will include photographic documentation of the existing conditions, field data, a summary of the evaluation data and necessary graphical and illustrative figures, as required, to present the information gathered during the assessment. The report will identify recommendations that were made to rehabilitate structures and appurtenances. D' Ilv'erab a:- Corrosion Assessment Report 1.3.3 Subtask 1.5 — Other Engineering Services during Construction 1,3.3.1 Submittal Review The design team will review submittals for compliance with the design concepts and specifications, certificates, samples, tests, methods, schedules, and manufacturers' installation and other instructions required to be submitted by the Contract Documents. 1 3.3.2 Interpretation and Clarification of Contract Documents The design team will prepare written interpretation and clarifications of the Contract Documents in response to written requests from the Contractor (RFI's). 1,3.3.3 Change Order Support We anticipate that there could be changes to the project. Some typical examples are: differences in conditions, Contractor suggestions approved by the City/engineer, additions to the work, changes in methods of construction, omissions, and Contract Document conflicts. As requested by the Construction Manager, WY and our sub -consultants will issue design engineer initiated clarifications (DEICs), prepare new or amend contract documents, and provide change order cost estimate input. 1.3.4 Task 2 - Construction Management and Inspection Services West Yost would provide a part time Construction Manager and part time Inspector coordinating with the treatment plant 0&M staff, contractor and design team. The level of effort assumed for the fee estimate is an average of one day a week for the CM and an average of two days a week for the Inspector over the three month project duration. Contract administration and inspection procedures WEST YOST ASSOCIATES January 2016 ni\m\c\Iodl\Ip\Iodl wwlp soq 5 City of Lodi Attachment A - Scope of Work City of Lodi White Slough Water Pollution Control Facility 2016 Calendar Year Repairs and Improvements Engineering Design and Construction Management Services would be based upon use of West Yost standards augmented by City standard procedures and forms as appropriate, 1.3,4.1 Subtask 2.1 — Preconstruction Activities This subtask would include CM team familiarization with the contract documents and preparing the preconstruction meeting agenda, conducting the meeting and preparing meeting minutes. 1.3 4.2 Subtask 2.2 — Construction Management and Inspection This subtask would Include performing construction contract administration and inspection. The document tracking system and field office files would be established. Preconstruction photos and video would be taken. Contract administration functions would include conducting biweekly progress meetings, submittal and RFI processing, and progress payment and change order processing. Inspection procedures would include preparing a daily construction progress report, testing logs and taking digital photos. Using West Yost's System Outage Request Procedure (SOR) West Yost's inspector would coordinate upcoming work with the treatment plant O&M staff and contractor, Deficient work would be tracked and corrected using West Yost's non -complying work system. 1.3.4,3 Subtask 2.3 - Protect Closeout The CM and Inspector would conduct a final inspection walkthrough with the City and design team. A final punch list would be prepared adding items from preliminary punch lists and any remaining non- compliant work for correction by the contractor. A lien release letter would be obtained from the contractor. The CM would assist the City In filing the Notice of Completion and processing the final progress payment. Hard and electronic copies (on flash drive) of all field files would be provided to the City. 1.3.5 Task 3 - Project Management, Meetings, QAJQC 1.3.5.1 Subtask 3.1 - Project Management WY's project manager will conduct regular meetings with the lead designers to monitor progress, and will coordinate quality control review procedures, The project manager will be aware of progress, problems, and information needs for the Project, and will work to keep City representatives and staff informed. This structure is not, however, intended to limit beneficial interaction between the lead designers and City staff or representatives as design concepts and details are developed. WEST YOST ASSOCIATES January 2016 n \m\c\lodl\Ip\led! wwfp soq 6 City of Lodi Attachment A - Scope of Work City of Lodi White Slough Water Pollution Control Facility 2016 Calendar Year Repairs and Improvements Engineering Design and Construction Management Services 1.3.5.2 Subtask 3.2 - Meetings Design Progress Meetings: The design team will attend regular progress meetings with City representatives and staff to discuss interim products and to appraise Client regarding the progress of the work. In addition, the design team will attend interim meetings with City representatives and staff to discuss technical issues as appropriate including interim design review meetings. WY will prepare meeting minutes to document design decisions. Construction Progress Meetings: A WY representative will attend periodic progress meetings with City staff, the Construction Manager, and Contractor's representatives. Design subconsultant representative(s) will also attend on an as -needed basis. In addition, at the Construction Manager's request WY and sub -consultant representatives will visit the project site to provide advice and assistance, or to answer any questions that may arise concerning design Intent. Anticipated design and construction progress meetings are listed in Table 3. Table 3. Anticipate Meetings Meeting `. Primary Discussion Topics . Ant cipated'Date Design Progress Meetings Design Kick -Off Mtg PM Plan, SharePoint Site, Schedule, Communication 02/22/16 Progress Mtg #1 50% Complete Design Documents 03/14/16 Progress Mtg #2 100% Complete Design Documents 04/25/16 Construction Related Meetings Pre -Bid Mtg Early May 2016 Construction Kick -Off Mtg Late May 2016 Monthly Progress Meetings June -Sept 2016 Subtask 3.3 - Quality Control/Quality Assurance WY will perform quality assurance, inter -discipline coordination, and bulldability reviews of all formal project submittals. Design documents will be reviewed at the interim and final design completion stages. WY will perform a general quality assurance control review of all documents prior to submission. WY will perform detailed quality assurance, inter -disciple coordination, and buildability review of the interim design submittals concurrently with the review of these documents by City staff. WEST YOST ASSOCIATES 7 January 2016 m\m\e\Iodl\Ip\led! wwtp soq City of Lodi Attachment A - Scope of Work City of Lodi White Slough Water Pollution Control Facility 2016 Calendar Year Repairs and Improvements Engineering Design and Construction Management Services 1.4 ANTICIPATED SCHEDULE It is anticipated that services will be performed in accordance with the following schedule. Table 4. Anticipated Project Milestones Milestone Approximate Date Complete Design Documents Complete Construction -Related Services April 2016 October 2016 1.5 ESTIMATED FEE Services will be performed on a time and materials basis in accordance with West Yost's standard rates at the time the services are performed. West Yost's 2016 rate schedule is shown is Attachment B. The estimated fee for each task is shown in Table 5. We will not exceed the Total Estimated Fee without prior authorization from City. Table 5. Estimated Fee by Task Task No. Task Estimated Fee, dollars 1 - Design 1,01 50% Design Submittal 105,600 1.02 Final Design Submittal 81,650 1.03 Services during Bidding 9,500 1,04 Document Review and Safety Plan 14,750 1.05 Corrosion Repair Assessment 48,700 1.06 Condition Assessment Report 29,950 1.07 , Technical Assistance during Construction 37,150 Design Subtotal 327,300 2 - CM/Inspection 2.01 Preconstruction Activities 2,150 2.02 CM and Inspection 64,750 2.03 Project Closeout 1,000 CM/Inspection Subtotal 67,900 3 - Project Management, Meetings, QA/QC WEST YOST ASSOCIATES January 2016 \lodl\Ip\lodl wwlp sop 8 City of Lodl Attachment A - Scope of Work City of Lodi White Slough Water Pollution Control Facility 2016 Calendar Year Repairs and Improvements Engineering Design and Construction Management Services Table 5. Estimated Fee by Task Task No. Task Estimated Fee, dollars 3.01 3.02 3.03 Project Management Meetings (including meetings during construction) QA/QC 25,300 44,100 4,700 Project Management, Meetings, QAIQC Subtotal 74,100 WEST YOST ASSOCIATES January 2016 ni\m\c\loth\Ip\loci! wwlp soq TOTAL — ALL TASKS 469,300 9 City of Lodi WEST YOST ASSOCIATES Consufnng Bngbiecn Attachment B 2016 Billing Rate Schedule (Effective January 1, 2016 through December 31, 2016)' ENGINEERING Position Labor Charges (dollars,per hour) PrinclpalMce President Engineering/Scientist/Geologist Manager II Engineering/Scientist/Geologist Manager I Principal Engineer/Scientist/Geologist II Principal Engineer/Scientist/Geologist I Senior Engineer/Scientist/Geologist II Senior Engineer/Scientist/Geologist I Associate Engineer/Scientist/Geologist II Associate Engineer/Scientist/Geologist I Engineer/Scientist/Geologist II Engineer/Scientist/Geologist I Senior GIS Analyst GIS Analyst CAD Supervisor Senior CAD Designer CAD Designer Engineering Aide Technical Specialist IV Technical Specialist III Technical Specialist II Technical Specialist I Administrative IV Administrative III Administrative II Administrative I 249 239 229 222 209 196 187 177 166 155 134 183 172 145 126 112 76 142 126 109 91 114 104 86 68 Technology and Communication charges including general and CAD computer, software, telephone, routine in-house coples/prints, postage, miscellaneous supplies, and other incidental project expenses will be billed at 6% of West Yost labor. • Outside Services such as vendor reproductions, prints, shipping, and major West Yost reproduction efforts, as well as Engineering Supplies, Travel, etc. will be billed at actual cost plus 15%. • Mileage will be billed at the current Federal Rate. • Subconsultants will be billed at actual cost plus 10%. • Expert witness, research, technical review, analysis, preparation and meetings billed at 150% of standard hourly rates. Expert witness testimony and depositions billed at 200% of standard hourly rates. • A Finance Charge of 1.5% per month (an Annual Rate of 18%) on the unpaid balance will be added to invoice amounts if not pald within 45 days from the date of the invoice. Continuos on following page *This schedule is updated annually Lahor Charges• (dollars per hour) Biling Rate (dollars per week) WEST YOST hiO''.4111 ASSOCIATES Consulting E1181,1t11.1 2016 Billing Rate Schedule (Effective January 1, 2016 through December 31, 2016)' CONSTRUCTION MANAGEMENT Position Labor Charges (dollars per hour) Senior Construction Manager Construction Manager IV Construction Manager III Construction Manager II Construction Manager I Resident Inspector (Prevailing Wage — Group 1) Resident Inspector (Prevailing Wage — Group 2) Resident Inspector (Prevailing Wage — Group 3) Resident Inspector (Prevailing Wage — Group 4) Apprentice Inspector CM Administrative 11 CM Administrative 1 SURVEYING 237 206 165 155 144 161 155 139 125 113 82 62 Position GPS, 3 -Person GPS, 2 -Person GPS, 1 -Person Survey Crew, 2 -Person Survey Crew, 1 -Person EQUIPMENT CHARGES 376 326 253 276 208 Billing Rate (dollars per days DO Meter pH Meter Automatic Sampler Transducer/Data Logger Hydrant Pressure Gage Hydrant Pressure Recorder (HPR) Hydrant Wrench Well Sounder Ultrasonic Flow Meter Vehicle Velocity Meter Water Quality Multimeter "This schedule is updated annually 18 86 5 27 135 740 43 214 12 52 214 5 34 30 139 280 92 463 12 68 183 1003 Exhibit 2 WEST YOST ASSOCIATES Cnnsull oig Engmccrs December 12, 2016 Project No.: 213-18-16-35 SENT VIA: EMAIL Mr. Charles Swimley P.E. Public Works Director City of Lodi 221 W. Pine Street Lodi CA 95240 SUBJECT: White Slough WPCF 2016 Repair and Miscellaneous Improvements Project Dear Mr. Swim ley: As you are aware, changes during the construction of the subject project have impacted the services that West Yost Associates (West Yost) and our subconsultants are providing. These changes were made to improve the reliability of the treatment plant, and we have endeavored to complete our services within our original staffing budgets, however we have concluded that this is not feasible. Following are descriptions of these changes and their impacts to our services, and estimates of the additional budget necessary to complete our services on this project. ADDITIONAL SERVICES While some contract change orders during construction were anticipated (the additional repairs to the headworks area and repairs to the industrial pipeline are examples), this project has included a number of major changes that significantly impact the duration of construction and our level of effort. These improvements are briefly described below. • Storage Pond Level Monitoring — This change order involves constructing improvements necessary to: (a) monitor water levels in storage ponds 1, 2, 3 and 4; and (b) transmit this information to an existing local control panel at the pond recirculation pump station. West Yost has completed the design of these improvements, obtained a proposal from the Contractor to construct the improvements, and processed a change order for this work. Future work by West Yost includes review of contractor's submittals, construction management/inspection, programming necessary to incorporate monitoring data into the plant's SCADA system, and record drawing preparation. • Digester Temperature Monitoring — This potential change order involved constructing improvements necessary to: (a) monitor temperatures of sludge in recirculation lines from Digesters 1, 2, 3, and 4: and (b) transmit this information to an existing local control panel in the digester control building. West Yost has completed the design of these improvements, obtained a proposal from the Contractor to construct the improvements, and processed a change order for this work. No additional services are anticipated. Mr. Charles Swimley December 12, 2016 Page 2 • Digester No, 3 Cleaning and Coating — This work involved two change orders, one to clean the digester and the second to demolish the existing mixing system and coat the interior cover of the digester. West Yost has inspected the digester cover interior, and has prepared documents necessary to obtain proposals from the Contractor to complete the work. Future work by West Yost includes a review of contractor's proposal and submittals, and construction management/inspection. • Main Aeration Pipe — Leaks have been observed in the existing 24 -inch -diameter steel Air Main pipe between the foundation of the blower building and exterior wall of the aeration basin pipe gallery. West Yost has been asked to implement the replacement of this pipe by change order. West Yost has completed a preliminary design of these improvements, however field explorations are necessary to complete the design. Future work by West Yost includes completing the design, reviewing contractor's submittals, construction management/inspection, and record drawing preparation. SCHEDULE Originally, the contract documents for these improvements required construction to be completed within 110 calendar days (by the end of October 2016), and our estimate of the effort required to perform inspection and construction management services was based on this schedule. As a result of the additional improvements described above, construction is expected to continue through the later part of January 2017, take a three-month hiatus, and then continue through May and June 2017 (a total active duration of about 260 calendar days). ADDITIONAL BUDGET REQUESTED Table 1 summarizes our estimate of the additional costs that West Yost and our subcontractor will incur as a result of the additional services and construction duration described above. WEST YOST ASSOCIATES n\c\413\IB.16.35\wp\111116LAdditIonBudget Table 1. Additional Budget Requested Service Estimated Additional Costs, dollars Design 15,600 Submittal Review 3,610 Programming 2,170 Record Drawing Preparation 2,580 r Inspection 28,220 Construction Management , 5,500 Total $57,680 WEST YOST ASSOCIATES n\c\413\IB.16.35\wp\111116LAdditIonBudget Mr. Charles Swimley December 12, 2016 Page 3 We appreciate the continued opportunity to work with you to implement this important project. Please call me if you require additional information or wish to discuss this request. Sincerely, WEST YOST ASSOCIATES LL, David J. Anderson Engineering Manager RCE #27659 DJA:lh WEST YOST ASSOCIATES n\c\213\1B•16.35\wp\1111161AddltlonBudpet RESOLUTION NO. 2017-08 A RESOLUTION OF THE LODI CITY COUNCIL AUTHORIZING THE CITY MANAGER TO EXECUTE AMENDMENT NO. 1 TO TASK ORDER NO. 39 WITH WEST YOST & ASSOCIATES WHEREAS, on February 17, 2016, Council approved Task Order No. 39 with West Yost & Associates, in the amount of $469,300, for the White Slough Water Pollution Control Facility 2016 Calendar Year Repairs and Improvement Engineering Design, and Construction Management Services; and WHEREAS, on June 16, 2016, Council awarded a contract to Western Water Constructors, Inc., for the White Slough Water Pollution Control Facility 2016 Improvements Corrosion Repair Project, to perform repairs to and coating of existing concrete structures and process channels, and the replacement of various corroded hatches and piping components; and WHEREAS, the proposed Amendment No. 1 to Task Order No. 39 includes a scope of service to perform additional design and construction management services to facilitate work resulting from unforeseen conditions encountered during the contract as well as additional items requested by the City to install remote monitoring capability for the facility storage pond levels (required by the State), and internal digester temperatures, Digester No. 3 cleaning and interior coating, and the repair of a pipeline that feeds forced air to the aeration basins. The additional work extends the duration of the contract and expands the services needed from West Yost & Associates; and WHEREAS, staff recommends that the City Council authorize the City Manager to execute Amendment No. 1 to Task Order No. 39 with West Yost & Associates for the White Slough Water Pollution Control Facility 2016 Calendar Year Repairs and Improvement Engineering Design, and Construction Management Services, in the amount of $57,680. NOW, THEREFORE, BE IT RESOLVED that the Lodi City Council does hereby authorize the City Manager to execute Amendment No. 1 to Task Order No. 39 with West Yost & Associates for the White Slough Water Pollution Control Facility 2016 Calendar Year Repairs and Improvement Engineering Design, and Construction Management Services, in the amount of $57,680. Dated: February 1, 2017 I hereby certify that Resolution No. 2017-08 was passed and adopted by the City Council of the City of Lodi in a regular meeting held February 1, 2017 by the following vote: AYES: COUNCIL MEMBERS — Chandler, Johnson, Mounce, and Mayor Kuehne NOES: COUNCIL MEMBERS — None ABSENT: COUNCIL MEMBERS — Nakanishi ABSTAIN: COUNCIL MEMBERS — None vim,, �YY��vtr f NNIF� FERRAIOLO City Clerk 2017-08