HomeMy WebLinkAboutAgenda Report - November 2, 2016 C-08TM CITY OF LODI COUNCIL COMMUNICATION AGENDA ITEM C -S AGENDA TITLE: Accept Improvements Under Contract for Well 23 Granular Activated Carbon Replacement Project MEETING DATE: November 2, 2016 PREPARED BY: Public Works Director RECOMMENDED ACTION: Accept improvements under contract for Well 23 Granular Activated Carbon Replacement Project. BACKGROUND INFORMATION: Granular activated carbon (GAC) is utilized at certain well sites to adsorb dibromochloropropane (DBCP) contaminates in the drinking water. Over time, the carbon loses its adsorptive capacity and must be replaced. While replacement intervals vary depending upon the concentration of DBCP and well run times, staff anticipates one of the seven GAC facilities serving the water system to need carbon replacement each year. While Well No. 23 was providing safe drinking water that meets all State and federal drinking water requirements, test results indicated the GAC in the treatment system had lost its adsorptive capacity and needed replacement. Well No. 23 is located at 55 East Harney Lane. The GAC treatment system at this location had been in service since 1998. The well site contains two vessels with 30,000 pounds of GAC each. The total amount of GAC replaced was 60,000 pounds. The contract was awarded to Calgon Carbon Corporation of Pittsburgh, PA in the amount of $87,660 on May 4, 2016. The project completion date was October 7, 2016. The final contract price was $93,730. The difference between the original contract price and the final contract amount is due to City requested repairs to the carbon vessel internal liner. The area requiring repairs was discovered during the carbon change out and inspection process. Following acceptance by the City Council, as required by law, the City Engineer will file a Notice of Completion with the County Recorder's office. The notice serves to notify vendors and subcontractors that the project is complete and begins their 30 -day period to file a stop notice requiring the City to withhold payments from the prime contractor in the event of a payment dispute. FISCAL IMPACT: Not applicable. FUNDING AVAILABLE: This project was funded by Water Capital Projects (56199000.77020) Charles E. Swimiey, Jr. Public Works Director Prepared by Lyman Chang, Interim City Engineer/Deputy Public Works Director CES/LC/tdb cc: Utilities Manager Calgon Carbon Corporation Public Works Management Analyst APPROVED: ' c wabab -r C y Manager K:\WP\PROJECTS\WATER\Well 23\GAC\CAccept Well 23 GAC.doc 10/24/16