Loading...
HomeMy WebLinkAboutAgenda Report - October 19, 2016 C-06TM CITY OF LODI COUNCIL COMMUNICATION AGENDA ITEM Gb AGENDA TITLE: Accept Improvements Under Contract for 2016 Storm Drainage Improvements MEETING DATE: October 19, 2016 PREPARED BY: Public Works Director RECOMMENDED ACTION: Accept improvements under contract for 2016 Storm Drainage Improvements. BACKGROUND INFORMATION: This project consisted of various improvements to the City's storm drainage system. The improvements included replacing approximately 1,630 feet of eight -inch storm drain pipe with new 12 -inch pipe in School Street (Lockeford Street to Forrest Avenue), extending 220 feet of storm drain pipe into the alley off School Street (south of Olive Court), and extending 320 feet of storm drain pipe in Lee Street (north of Oak Street). The pipe replacement was necessary to address severely damaged pipe and to improve system performance. The pipe extensions were necessary to drain low spots in the public right-of-way that exceeded four inches in depth. The project was awarded to Mozingo Construction, Inc., of Oakdale, on June 15, 2016, in the amount of $359,715. The contract has been completed in substantial conformance with the specifications approved by City Council. The contract was completed within the original contract schedule. The final cost of the project was $377,366. The difference between the contract amount and the final contract price was primarily due to unknown conditions resulting in additional excavation and haul -off in School Street to remove a five -inch thick concrete section located beneath the asphalt. The project locations are shown in Exhibit A and photos of construction are shown in Exhibit B. Following acceptance by the City Council, as required by law, the City Engineer will file a Notice of Completion with the County Recorder's office. The notice serves to notify vendors and subcontractors that the project is complete and begins their 30 -day period to file a stop notice requiring the City to withhold payments from the prime contractor in the event of a payment dispute. FISCAL IMPACT: These improvements will decrease maintenance related to the failing pipe and the pavement deterioration at the low spots. FUNDING AVAILABLE: This project was funded by Wastewater Capital (531). Charles E. Swimley, Jr. Public Works Director Prepared by Sean Nathan, Senior Civil Engineer CES/SN/tdb Attachments cc: PW Management Analyst, Utility Manager, Mozingo Construction APPROVED: CA/lQ.�^Grir—� Stephen Schwabauer, City Manager K:\WP\PROJECTS\STORMDRN\School Street Storm Dra ge Improvements\CAccept 2016 SD Imp.doc 10/3/16 Legend Exhibit A 2016 Storm Drainage Improvements Project Locations ««rii71 111 LU4v.T I111111111 1111 1 Louie, �co=• Falls Av. 0 ■11111111 b - II0� is ForrestAv F-. H Daisy_Ave Olive Ct. UU -IIWWWEEE1IIuuuu' 111E " Mk' zu 404.1m 44 %I 11 1 C . • _. C: NENE NM IN NNW MIME NNE 11 s 0 250 500 1,000 Feet ( 1 1 1 1 1 1 1 Fig = Lockef_ordTSt� I IT II ,1L i h 11111! O T I TF :II - ,_ i IJI I�I I JI 11 al 11111: Tr, En1=1 ori HIM - r Oak St. 111= 1r 1l� 0111131 Urn iiari❑ 11IIIIE111 FLE1 Ell MTEI n Exhibit B