HomeMy WebLinkAboutAgenda Report - September 7, 2016 C-04CITY OF LODI
COUNCIL COMMUNICATION
AGENDA ITEM
C-4
TM
AGENDA TITLE: Approve Specifications and Authorize Advertisement for Bids for Beckman Park
Storm Water Pump Station Improvement Project
MEETING DATE: September 7, 2016
PREPARED BY: Public Works Director
RECOMMENDED ACTION: Approve specifications and authorize advertisement for bids for
Beckman Park Storm Water Pump Station Improvement Project.
BACKGROUND INFORMATION: Approximately half of the City's storm drainage system discharges
into the Woodbridge Irrigation District (WID) canal at the Beckman
Park Storm Water Pump Station, located at 1426 West Century
Boulevard. Currently the pump station is designed to discharge 40 cubic feet per second (cfs) of storm
water into the WID canal.
Since master planned storm drain facilities serving this area are not yet available, the conditions of
approval for The Vine at Vintner's Square subdivision requires the developer to fund minor modifications
to the City's existing storm drain system to accommodate the additional storm water volume generated
by the subdivision improvements.
One of the required improvements is to modify the outfall structure at the Beckman Park Storm Water
Pump Station. The modification is needed to increase the discharge capacity from 40 cfs to 60 cfs.
This project will consist of replacing the existing Parshall flume with a new Parshall flume that has a
discharge capacity of 60 cfs. The specifications are on file in the Public Works Department. The planned
bid opening date is September 28, 2016. The project estimate is $60,000.
FISCAL IMPACT: The long term fiscal impact is negligible.
FUNDING AVAILABLE: All project costs will be paid by the developer of The Vine subdivision per its
improvement agreement.
Prepared by Sean Nathan, Senior Civil Engineer
CES/SN/tb
cc: Utility Manager
Deputy Public Works Director/City Engineer
APPROVED:
Charles E. Swimley, Jr
Public Works Director
Sep en Sc • a ab- . -r, City Manager
K:\WP\PROJECTS\STORMDRN\Beckman Park Pump Station\Parshall Flume Replacement ProjectlCSA_LC.doc
8/29/16