HomeMy WebLinkAboutAgenda Report - June 15, 2016 C-06TM CITY OF LODI COUNCIL COMMUNICATION AGENDA ITEM C IO AGENDA TITLE: Adopt Resolution Awarding Contract for 2016 Storm Drainage Improvements to Mozingo Construction, Inc., of Oakdale ($359,715) MEETING DATE: June 15, 2016 PREPARED BY: Public Works Director RECOMMENDED ACTION: Adopt resolution awarding contract for 2016 Storm Drainage Improvements to Mozingo Construction, Inc., of Oakdale, in the amount of $359,715. BACKGROUND INFORMATION: This project consists of various improvements to the City's storm drainage system. The improvements include replacing approximately 1,630 feet of 8 -inch storm drain pipe with new 12 -inch pipe in School Street (Lockeford Street to Forrest Avenue), extending 220 feet of storm drain pipe into the alley off School Street (south of Olive Court), and extending 320 feet of storm drain pipe in Lee Street (north of Oak Street). The pipe replacement is necessary to address severely damaged pipe and to improve system performance. The pipe extensions are necessary to drain low spots in the public right-of-way that exceed four inches in depth. Plans and specifications for this project were approved on May 4, 2016. The City received the following three bids for this project on May 25, 2016. Bidder Engineer's Estimate Mozingo Construction Martin General Engineering Knife River Construction FISCAL IMPACT: FUNDING AVAILABLE: Location Oakdale Rancho Cordova Stockton Bid $ 393,870.00 $ 359, 715.00 $ 375,581.00 $ 447,065.00 These improvements will decrease maintenance related to the failing pipe and the pavement deterioration at the low spots. This project will be funded by Wastewater Capital (531). Jordan Ayers / Deputy City Manager/Internal Services Director Prepared by Sean Nathan, Associate Civil Engineer CES/SN/tdb Attachment cc: Utility Manager Charles E. Swimley, Jr. Public Works Director APPROVED: K:\WP\PROJECTS\STORMDRN\School Street Storm Stephen Schwabauer, Gy Manager Inage Improvements\CAward.dac 5/31/2016 2016 STORM DRAINAGE IMPROVEMENTS School St, Alley S/ Olive Ct, and Lee St CONTRACT CITY OF LODI, CALIFORNIA THIS CONTRACT made by and between the CITY OF LODI, State of California, herein referred to as the "City," and MOZINGO CONSTRUCTION, INC., herein referred to as the "Contractor." WITNESSETH: That the parties hereto have mutually covenanted and agreed, and by these presents do covenant and agree with each other, as follows: The complete Contract consists of the following documents which are incorporated herein by this reference, to -wit: Notice Inviting Bids Information to Bidders General Provisions Special Provisions Bid Proposal Contract Contract Bonds Plans The July 1992 Edition, Standard Specifications, State of California, Business and Transportation Agency, Department of Transportation All of the above documents, sometimes hereinafter referred to as the "Contract Documents," are intended to cooperate so that any work called for in one and not mentioned in the other is to be executed the same as if mentioned in all said documents. ARTICLE I - That for and in consideration of the payments and agreements hereinafter mentioned, to be made and performed by the City and under the condition expressed in the two bonds bearing even date with these presents and hereunto annexed, the Contractor agrees with the City, at Contractor's cost and expense, to do all the work and furnish all the materials except such as are mentioned in the specifications to be furnished by the City, necessary to construct and complete in a good workmanlike and substantial manner and to the satisfaction of the City the proposed improvements as shown and described in the Contract Documents which are hereby made a part of the Contract. ARTICLE II - The City hereby promises and agrees with the Contractor to employ, and does hereby employ, the Contractor to provide all materials and services not supplied by the City and to do the work according to the terms and conditions for the price herein, and hereby contracts to pay the same as set forth in Section 5.600, "Measurement, Acceptance and Payment," of the General Provisions, in the manner and upon the conditions above set forth; and the said parties for themselves, their heirs, executors, administrators, successors and assigns, do hereby agree to the full performance of the covenants herein contained. ARTICLE III - The Contractor agrees to conform to the provisions of Chapter 1, Part 7, Division 2 of the Labor Code. The Contractor and any Subcontractor will pay the CONTRACT.doc 4.1 05/25/16 general prevailing wage rate and other employer payments for health and welfare, pension, vacation, travel time, and subsistence pay, apprenticeship or other training programs. The responsibility for compliance with these Labor Code requirements is on the prime contractor. ARTICLE IV - And the Contractor agrees to receive and accept the following prices as full compensation for furnishing all materials and for doing all the work contemplated and embraced in this agreement; also for all loss or damage arising out of the nature of the work aforesaid or from the action of the elements, or from any unforeseen difficulties or obstructions which may arise or be encountered in the prosecution of the work until its acceptance by the City, and for all risks of every description connected with the work; also for all expenses incurred by or in consequence of the suspension or discontinuance of work and for well and faithfully completing the work, and the whole thereof, in the manner and according to the Plans and Contract Documents and the requirements of the Engineer under them, to -wit: Perform the work necessary to complete the various improvements to the City's storm drainage system. The improvements include replacing approximately 8 -inch storm drain pipe with new 12 -inch pipe in School Street (Lockeford Street to Forrest Avenue), extending 10 -inch storm drain pipe into the alley off School Street (south of Olive Court), and extending 12 -inch storm drain pipe in Lee Street (north of Oak Street). The improvements are as shown on the plans and specifications for the above project. See Section 6-07 "Description of Bid Items" and the Exhibits for additional information. CONTRACT ITEMS Location Item Description Qty Unit Unit Price Total All 1 2 Mobilization / Clearing and Grubbing / Potholing / Traffic Control 1 LS $ 34,000 $ 34,000 Alley S/ Olive Ct. School St. Replace Ex 8" Pipe with 12" Storm Drain Pipe 1,640 LF $ 72 $ 118,080 3 Backfill and Trench Patch 1,640 LF $ 40 $ 65,600 4 Manhole Modifications 6 EA $ 3,000 $ 18,000 5 Install Storm Drain Manhole 1 EA $ 3,500 $ 3,500 6 Construct Separation Manhole 1 EA $ 9,500 $ 9,500 7 Install 10" DI Storm Drain Pipe 224 LF $ 92 $ 20,608 8 Construct DICB 2 EA $ 1,600 $ 3,200 9 Backfill and Trench Patch 224 LF $ 40 $ 8,960 10 Remove and Replace Alley Approach Concrete 202 SF $ 56 $ 11,312 a) 11 Connect to Existing Storm Drain Manhole 1 EA $ 4,500 $ 4,500 12 Install 12" Storm Drain Pipe 295 LF $ 109 $ 32,155 13 Install Storm Drain Manhole 1 EA $ 3,500 $ 3,500 14 Construct SICB 1 EA $ 3,200 $ 3,200 15 Remove and Replace Curb and Gutter g LF $ 225 $ 1,800 16 Remove and Replace Sidewalk 40 SF $ 250 $ 10,000 17 Backfill and Trench Patch 295 LF $ 40 $ 11,800 CONTRACT.doc 4.2 05/25/16 TOTAL $359 715 ARTICLE V - By my signature hereunder, as Contractor, I certify that I am aware of the provisions of Section 3700 of the Labor Code, which requires every employer to be insured against liability for workers' compensation or to undertake self-insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the work of this contract. ARTICLE VI - It is further expressly agreed by and between the parties hereto that, should there be any conflict between the terms of this instrument and the Bid Proposal of the Contractor, then this instrument shall control and nothing herein shall be considered as an acceptance of the said terms of said proposal conflicting herewith. ARTICLE VII - The City is to furnish the necessary rights-of-way and easements and to establish lines and grades for the work as specified under the Special Provisions. All labor or materials not mentioned specifically as being done by the City will be supplied by the Contractor to accomplish the work as outlined in the specifications. ARTICLE VIII - The Contractor agrees to commence work pursuant to this contract within 15 calendar days after the City Manager has executed the contract and to diligently prosecute to completion within 45 CALENDAR DAYS. ARTICLE IX - State of California Senate Bill 854 requires the following: • No contractor or subcontractor may be listed on a bid proposal for a public works project unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)]. • No contractor or subcontractor may be awarded a contract for public work on a public works project unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5. • This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. CONTRACT doc 4.3 05/25/16 WHEN SIGNING THIS CONTRACT, THE CONTRACTOR AGREES THAT THE TIME OF COMPLETION FOR THIS CONTRACT IS REASONABLE AND THE CONTRACTOR AGREES TO PAY THE CITY LIQUIDATED DAMAGES AS SET FORTH IN SECTION 6-04.03 OF THE SPECIAL PROVISIONS. CONTRACTOR AGREES THAT THIS AMOUNT MAY BE DEDUCTED FROM THE AMOUNT DUE THE CONTRACTOR UNDER THE CONTRACT. IN WITNESS WHEREOF, the parties to these presents have hereunto set their hands the year and date written below. CONTRACTOR: CITY OF LODI, a municipal corporation By STEPHEN SCHWABAUER City Manager By Date: Title Attest: JENNIFER M. FERRAIOLO City Clerk (CORPORATE SEAL) Approved As To Form: CONTRACT.doc JANICE D. MAGDICH City Attorney 4.4 05/25/16 RESOLUTION NO. 2016-94 A RESOLUTION OF THE LODI CITY COUNCIL AWARDING THE CONTRACT FOR THE 2016 STORM DRAINAGE IMPROVEMENTS TO MOZINGO CONSTRUCTION, INC., OF OAKDALE WHEREAS, this project consists of improvements including replacing approximately 1,630 feet of 8 -inch storm drain pipe with new 12 -inch pipe in School Street (Lockeford Street to Forrest Avenue), extending 220 feet of storm drain pipe into the alley off of School Street (south of Olive Court), and extending 320 feet of storm drain pipe in Lee Street (north of Oak Street); and WHEREAS, in answer to notice duly published in accordance with law and the order of this City Council, sealed bids were received and publicly opened on May 25, 2016, at 11:00 a.m., for the 2016 Storm Drainage Improvements Project, described in the plans and specifications therefore approved by the City Council on May 4, 2016; and WHEREAS, said bids have been checked and tabulated and a report thereof filed with the City Manager as follows: Bidder Location Bid Mozingo Construction Oakdale $ 359,715 Martin General Engineering Rancho Cordova $ 375,581 Knife River Construction Stockton $ 447,065 WHEREAS, staff recommends awarding the contract for the 2016 Storm Drainage Improvements to Mozingo Construction, Inc., of Oakdale, in the amount of $359,715. NOW, THEREFORE, BE IT RESOLVED that the Lodi City Council does hereby award the contract for the 2016 Storm Drainage Improvements to Mozingo Construction, Inc., of Oakdale, California, in the amount of $359,715; and BE IT FURTHER RESOLVED, that the City Manager is hereby authorized to execute the contract on behalf of the City. Dated: June 15, 2016 I hereby certify that Resolution No. 2016-94 was passed and adopted by the City Council of the City of Lodi in a regular meeting held June 15, 2016 by the following vote: AYES: COUNCIL MEMBERS — Johnson, Kuehne, Mounce, Nakanishi, and Mayor Chandler NOES: COUNCIL MEMBERS — None ABSENT: COUNCIL MEMBERS — None ABSTAIN: COUNCIL MEMBERS — None NIFER M) FERRAIOLO City Clerk 2016-94