CITY OF LODI
COUNCIL COMMUNICATION
AGENDA ITEM C • 5
AGENDA TITLE: Adopt Resolution Awarding Contract for 2016 GrapeLine Bus Stop Accessibility
and Shelter Improvements to A. M. Stephens Construction Company, Inc., of Lodi
($396,088)
MEETING DATE: June 15, 2016
PREPARED BY: Public Works Director
RECOMMENDED ACTION: Adopt resolution awarding contract for 2016 GrapeLine Bus Stop
Accessibility and Shelter Improvements to A. M. Stephens Construction
Company, Inc., of Lodi, in the amount of $396,088.
BACKGROUND INFORMATION: This project consists of removing accessibility barriers near nine
GrapeLine bus stops, installing 16 curb ramps, and associated
Americans with Disabilities Act (ADA) compliant paths of travel to
the bus stop locations that lack accessibility. The project will also be installing advertisement compatible
shelters at seven bus stop locations, five standard shelters, and 10 benches at existing bus stop
locations. Each new shelter will include lighting, a bench, and a trash can.
Plans and specifications for this project were approved on May 4, 2016. The City received the following
three bids for this project on May 25, 2016.
Bidder Location Bid
Engineer's Estimate $ 308,544.00
A.M. Stephens Construction Lodi $ 396,087.90
Taylor Backhoe Services Merced $ 428,104.00
FBD Vanguard Construction Livermore $ 488,979.00
The engineer's estimate was low due to increased demolition costs (compared to previous projects)
This increase is likely due to high construction activity and contractors being busier than in the past.
FISCAL IMPACT: There will be a slight increase in the long-term maintenance costs
associated with these improvements, which will be included in future Transit
Operations budgets.
FUNDING AVAILABLE: This project will be funded by Federal Transit Administration (FTA) /
Transportation Development Act (TDA) (60199000).
ServicessDirector A
-ui K—
I SeE. Su�mley, Jr.
Public Works irector
Jordan Ayers
Deputy City Managed
Prepared by Sean Nathan, Associate Civil Engineer
CES/SN/tdb
Attachment
cc: Transportation Manager
APPROVED:
K:\WP\PROJECTS\TRANSIT\2016 Grapeline Bus S
tephen Schwabauer, Gity Manager
cccessibllity and Shelter Improvements\CAward.doc
6/1/16
2016 GRAPELINE BUS STOP ACCESSIBILITY
AND SHELTER IMPROVEMENTS
VARIOUS LOCATIONS
CONTRACT
CITY OF LODI, CALIFORNIA
THIS CONTRACT made by and between the CITY OF LODI, State of California, herein
referred to as the "City," and A. M. STEPHENS CONSTRUCTION COMPANY, INC.,
herein referred to as the "Contractor."
WITNESSETH
That the parties hereto have mutually covenanted and agreed, and by these presents do
covenant and agree with each other, as follows:
The complete Contract consists of the following documents which are incorporated
herein by this reference, to -wit:
Notice Inviting Bids
Information to Bidders
Certifications and Forms
General Provisions
Federal Requirements
Special Provisions
Bid Proposal
Contract
Contract Bonds
Federal Minimum Wage Rates
Plans
Addenda
The July 1992 Edition,
Standard Specifications,
State of California,
Business and Transportation Agency,
Department of Transportation
All of the above documents, sometimes hereinafter referred to as the "Contract
Documents," are intended to cooperate so that any work called for in one and not
mentioned in the other is to be executed the same as if mentioned in all said
documents.
ARTICLE I - That for and in consideration of the payments and agreements hereinafter
mentioned, to be made and performed by the City and under the condition expressed in
the two bonds bearing even date with these presents and hereunto annexed, the
Contractor agrees with the City, at Contractor's cost and expense, to do all the work and
furnish all the materials except such as are mentioned in the specifications to be
furnished by the City, necessary to construct and complete in a good workmanlike and
substantial manner and to the satisfaction of the City the proposed improvements as
shown and described in the Contract Documents which are hereby made a part of the
Contract.
ARTICLE II - The City hereby promises and agrees with the Contractor to employ, and
does hereby employ, the Contractor to provide all materials and services not supplied by
the City and to do the work according to the terms and conditions for the price herein,
and hereby contracts to pay the same as set forth in Section 5.600, "Measurement,
Acceptance and Payment," of the General Provisions, in the manner and upon the
conditions above set forth; and the said parties for themselves, their heirs, executors,
CONTRACT doc
4.1
5/25/2016
administrators, successors and assigns, do hereby agree to the full performance of the
covenants herein contained.
ARTICLE III - The Contractor agrees to conform to the provisions of Chapter 1, Part 7,
Division 2 of the Labor Code. The Contractor and any Subcontractor will pay the
general prevailing wage rate and other employer payments for health and welfare,
pension, vacation, travel time, and subsistence pay, apprenticeship or other training
programs. The responsibility for compliance with these Labor Code requirements is on
the prime contractor.
ARTICLE IV - And the Contractor agrees to receive and accept the following prices as
full compensation for furnishing all materials and for doing all the work contemplated
and embraced in this agreement; also for all loss or damage arising out of the nature of
the work aforesaid or from the action of the elements, or from any unforeseen difficulties
or obstructions which may arise or be encountered in the prosecution of the work until
its acceptance by the City, and for all risks of every description connected with the work;
also for all expenses incurred by or in consequence of the suspension or discontinuance
of work and for well and faithfully completing the work, and the whole thereof, in the
manner and according to the Plans and Contract Documents and the requirements of
the Engineer under them, to -wit:
This work consists of removing accessibility barriers near nine GrapeLine bus stops,
installing 16 curb ramps, and associated Americans with Disabilities Act (ADA)
compliant paths of travel to the bus stop locations that lack accessibility. The project will
also be installing advertisement compatible shelters at seven bus stop locations, five
standard shelters, and 10 benches at existing bus stop locations. Each new shelter will
include lighting, a bench, and a trash can. All work is as described in the specifications
for the above project.
For additional contract item descriptions refer to Section 6-07 "Description of Bid Items"
and Attachment "D".
CONTRACT ITEMS
Item
Description
Unit
Qty
Unit Price
Total
1
Misc. Clearing and Grubbing
LS
1
$ 3,500
$ 3,500
2
Remove Sidewalk / Ramp /Dwy /
Alley Approach
SF
3,841
$ 20
$ 76,820
3
4
Remove Curb / Curb and Gutter
LF
529
$ 47
$ 24,863
Furnish and Install New Sign Post and
Sleeve. Relocate Ex Sign.
EA
5
1 $ 250
$ 1,250
5
Remove and Salvage Ex Shelter and
Components
EA
4
$ 250
$ 1,000
6
Remove & Salvage Bench
EA
6
$ 250
$ 1,500
7
Install Concrete Pad / Sidewalk /
Ramp / Res. Dwy
SF
4,360
$ 12.30
$ 53,628
8
Install Curb / Curb and Gutter
LF
593
$ 44.50
$ 26,388.50
9
Install Asphalt Concrete Transition
LF
581
$ 26.40
$ 15,338.40
CONTRACT.doc
4.2
5/25/2016
Item
Description
Unit
Qty
Unit Price
Total
10
Furnish and Install Adv. Shelter,
Bench, Trash Can and Amenities
EA
7
$ 17,550
$ 122,850
11
Install Salvaged Shelter
EA
4
$ 250
$ 1,000
12
Install Salvaged Bench
EA
6
$ 250
$ 1,500
13
Furnish and Install Shelter, Bench,
Trash Can and Amenities
EA
1
$ 9,850
$ 9,850
14
Furnish and Install Bench
EA
5
$ 1,140
$ 5,700
15
Furnish (extra) Bench
EA
6
$ 1,040
$ 6,240
16
Furnish (extra) Trash Can
EA
6
$ 1,020
$ 6,120
17
Furnish and Install 24" Riser
EA
2
$ 500
$ 1,000
18
Furnish and Install SICB
EA
2
$ 1,250
$ 2,500
19
Install 12" Dia SD Lateral &
Connections
LF
24
$ 300
$ 7,200
20
Reset / Adjust Catch Basin Frame and
Cover
EA
1
$ 500
$ 500
21
Furnish and Install Truncated Domes
SF
270
$ 47
$ 12,690
22
Reset Monument
EA
2
$ 750
$ 1,500
23
Perform Root Surgery and Install Root
Barrier
EA
9
$ 1,350
$ 12,150
24
Provide 2 -Year Maintenance Bond
LS
1
$ 1,000
$ 1,000
TOTAL $396,087.90
ARTICLE V - By my signature hereunder, as Contractor, I certify that I am aware of the
provisions of Section 3700 of the Labor Code, which requires every employer to be
insured against liability for workers' compensation or to undertake self-insurance in
accordance with the provisions of that code, and I will comply with such provisions
before commencing the performance of the work of this contract.
ARTICLE VI - It is further expressly agreed by and between the parties hereto that,
should there be any conflict between the terms of this instrument and the Bid Proposal
of the Contractor, then this instrument shall control and nothing herein shall be
considered as an acceptance of the said terms of said proposal conflicting herewith.
ARTICLE VII - The City is to furnish the necessary rights-of-way and easements and to
establish lines and grades for the work as specified under the Special Provisions. All
labor or materials not mentioned specifically as being done by the City will be supplied
by the Contractor to accomplish the work as outlined in the specifications.
ARTICLE VIII - The Contractor agrees to commence work pursuant to this contract
within 15 calendar days after the City Manager has executed the contract and to
diligently prosecute to completion within 60 CALENDAR DAYS.
ARTICLE IX - State of California Senate Bill 854 requires the following:
• No contractor or subcontractor may be listed on a bid proposal for a public works
project unless registered with the Department of Industrial Relations pursuant to
CONTRACT doc
4.3
05/25/16
Labor Code section 1725.5 [with limited exceptions from this requirement for bid
purposes only under Labor Code section 1771.1(a)].
• No contractor or subcontractor may be awarded a contract for public work on a
public works project unless registered with the Department of Industrial Relations
pursuant to Labor Code section 1725.5.
• This project is subject to compliance monitoring and enforcement by the
Department of Industrial Relations.
WHEN SIGNING THIS CONTRACT, THE CONTRACTOR AGREES THAT THE TIME
OF COMPLETION FOR THIS CONTRACT IS REASONABLE AND THE
CONTRACTOR AGREES TO PAY THE CITY LIQUIDATED DAMAGES AS SET
FORTH IN SECTION 6-04.03 OF THE SPECIAL PROVISIONS. CONTRACTOR
AGREES THAT THIS AMOUNT MAY BE DEDUCTED FROM THE AMOUNT DUE THE
CONTRACTOR UNDER THE CONTRACT.
IN WITNESS WHEREOF, the parties to these presents have hereunto set their hands
the year and date written below.
CONTRACTOR: CITY OF LODI, a municipal corporation
By:
STEPHEN SCHWABAUER
City Manager
By: Date:
Title
Attest:
JENNIFER M. FERRAIOLO
City Clerk
(CORPORATE SEAL) Approved As To Form
CONTRACT doc
JANICE D. MAGDICH
City Attorney
4.4
05/25/16
RESOLUTION NO. 2016-107
A RESOLUTION OF THE LODI CITY COUNCIL AWARDING
THE CONTRACT FOR 2016 GRAPELINE BUS STOP
ACCESSIBILITY AND SHELTER IMPROVEMENTS TO
A. M. STEPHENS CONSTRUCTION COMPANY, INC., OF LODI
WHEREAS, this project consists of removing accessibility barriers near nine GrapeLine
bus stops, installing 16 curb ramps, and associated Americans with Disabilities Act (ADA)
compliant paths of travel to the bus stop locations that lack accessibility; and
WHEREAS, the project will also be installing advertisement compatible shelters at seven
bus stop locations, five standard shelters, and 10 benches at existing bus stop locations; and
WHEREAS, in answer to notice duly published in accordance with law and the order of
this City Council, sealed proposals were received and publicly opened on May 25, 2016, at
11:00 a.m., for the 2016 GrapeLine Bus Stop Accessibility and Shelter Improvements Project,
described in the plans and specifications therefore approved by the City Council on
May 4, 2016; and
WHEREAS, said bid has been checked and tabulated and a report thereof filed with the
City Manager as follows:
Bidder Location Bid
A. M. Stephens Construction Lodi $396,087.90
Taylor Backhoe Services Merced $428,104.00
FBD Vanguard Construction Livermore $488,979.00
WHEREAS, staff recommends awarding the contract for the 2016 GrapeLine Bus Stop
Accessibility and Shelter Improvements to A. M. Stephens Construction Company, Inc., of Lodi,
in the amount of $396,087.90.
NOW, THEREFORE, BE IT RESOLVED that the Lodi City Council does hereby award
the contract for 2016 GrapeLine Bus Stop Accessibility and Shelter Improvements to
A. M. Stephens Construction Company, Inc., of Lodi, California, in the amount of $396,087.90;
and
BE IT FURTHER RESOLVED, that the City Manager is hereby authorized to execute the
contract on behalf of the City of Lodi.
Dated: June 15, 2016
I hereby certify that Resolution No. 2016-107 was passed and adopted by the City
Council of the City of Lodi in a regular meeting held June 15, 2016 by the following vote:
AYES: COUNCIL MEMBERS — Johnson, Kuehne, Nakanishi, and
Mayor Chandler
NOES: COUNCIL MEMBERS — Mounce
ABSENT: COUNCIL MEMBERS — None
ABSTAIN: COUNCIL MEMBERS — None
NNIFERiII FERRAIOLO
City Clerk
2016-107