HomeMy WebLinkAboutAgenda Report - May 4, 2016 C-08CITY OF LODI COUNCIL COMMUNICATION AGENDA ITEM cs TM AGENDA TITLE: Adopt Resolution Awarding Contract for Well 23 Granular Activated Carbon Replacement Project to Calgon Carbon Corporation, of Pittsburgh, Pennsylvania ($87,660) MEETING DATE: May 4, 2016 PREPARED BY: Public Works Director RECOMMENDED ACTION Adopt resolution awarding contract for Well 23 Granular Activated Carbon Replacement Project to Calgon Carbon Corporation, of Pittsburgh, Pennsylvania, in the amount of $87,660. BACKGROUND INFORMATION: Granular activated carbon (GAC) is utilized at certain well sites to adsorb dibromochloropropane (DBCP) contaminates in the drinking water. Over time, the carbon loses its adsorptive capacity and must be replaced. While replacement intervals vary depending upon the concentration of DBCP and well run times, staff anticipates one of the seven GAC facilities serving the water system to need carbon replacement each year. Well No. 23 is currently providing safe drinking water that meets all State and Federal drinking water requirements. However, recent test results indicate the GAC in the treatment system has lost its adsorptive capacity and is in need of replacement. Well No. 23 is located at 55 East Harney Lane. The GAC treatment system at this location has been in service since 1998. The well site contains two vessels with 30,000 pounds of GAC each. The total amount of GAC to be replaced is 60,000 pounds. Specifications for this project were approved on March 2, 2016. The City received the following two bids for this project on March 30, 2016. Bidder Location Bid Engineer's Estimate $132,000.00 Calgon Carbon Corporation Pittsburgh, PA $ 87,660.00 Carbon Activated Corp. Campton $160,440.00 Staff recommends awarding the contract to Calgon Carbon Corporation of Pittsburgh, Pennsylvania, in the amount of $87,660. APPROVED: Stephen Schwaba - , City Manager \\cvcfilv02\pubwks$\WP\PROJECTS\WATER\Well 23\GAC\CAward.doc 4/18/16 Adopt Resolution Awarding Contract for Well 23 Granular Activated Carbon Replacement Project to Calgon Carbon Corporation, of Pittsburgh, Pennsylvania ($87,660) May 4, 2016 Page 2 FISCAL IMPACT: Funding for this project was included in the 2015/16 Water Capital budget. FUNDING AVAILABLE: Water Capital Projects (56199000.77020) (AFL-- Jo AF —Joan Ayers Deputy City Manager/Internal Services Director Charles E. Swimley, Jr. Public Works Director Prepared by Lyman Chang, Interim City Engineer/Deputy Public Works Director CES/LC/tdb Attachment cc: Utilities Manager Calgon Carbon Corporation \\cvcfilv02\pu bwks$\W P\PROJECTS\WATER\Well 23\GAC\CAward.doc WELL 23 GAC REPLACEMENT PROJECT 55 E Harney Lane CONTRACT CITY OF LODI, CALIFORNIA THIS CONTRACT made by and between the CITY OF LODI, State of California, herein referred to as the "City," and CALGON CARBON CORPORATION, herein referred to as the "Contractor." WITNESSETH That the parties hereto have mutually covenanted and agreed, and by these presents do covenant and agree with each other, as follows: The complete Contract consists of the following documents which are incorporated herein by this reference, to -wit: Notice Inviting Bids Information to Bidders General Provisions Special Provisions Bid Proposal Contract Contract Bonds Plans The July 1992 Edition, Standard Specifications, State of California, Business and Transportation Agency, Department of Transportation All of the above documents, sometimes hereinafter referred to as the "Contract Documents," are intended to cooperate so that any work called for in one and not mentioned in the other is to be executed the same as if mentioned in all said documents. ARTICLE I - That for and in consideration of the payments and agreements hereinafter mentioned, to be made and performed by the City and under the condition expressed in the two bonds bearing even date with these presents and hereunto annexed, the Contractor agrees with the City, at Contractor's cost and expense, to do all the work and furnish all the materials except such as are mentioned in the specifications to be furnished by the City, necessary to construct and complete in a good workmanlike and substantial manner and to the satisfaction of the City the proposed improvements as shown and described in the Contract Documents which are hereby made a part of the Contract. ARTICLE II - The City hereby promises and agrees with the Contractor to employ, and does hereby employ, the Contractor to provide all materials and services not supplied by the City and to do the work according to the terms and conditions for the price herein, and hereby contracts to pay the same as set forth in Section 5.600, "Measurement, Acceptance and Payment," of the General Provisions, in the manner and upon the conditions above set forth; and the said parties for themselves, their heirs, executors, administrators, successors and assigns, do hereby agree to the full performance of the covenants herein contained. Contract doc 4.1 03/31/16 ARTICLE III - The Contractor agrees to conform to the provisions of Chapter 1, Part 7, Division 2 of the Labor Code. The Contractor and any Subcontractor will pay the general prevailing wage rate and other employer payments for health and welfare, pension, vacation, travel time, and subsistence pay, apprenticeship or other training programs. The responsibility for compliance with these Labor Code requirements is on the prime contractor. ARTICLE IV - And the Contractor agrees to receive and accept the following prices as full compensation for furnishing all materials and for doing all the work contemplated and embraced in this agreement; also for all loss or damage arising out of the nature of the work aforesaid or from the action of the elements, or from any unforeseen difficulties or obstructions which may arise or be encountered in the prosecution of the work until its acceptance by the City, and for all risks of every description connected with the work; also for all expenses incurred by or in consequence of the suspension or discontinuance of work and for well and faithfully completing the work, and the whole thereof, in the manner and according to the Plans and Contract Documents and the requirements of the Engineer under them, to -wit: Perform the work necessary to remove and properly dispose the spent granular activated carbon (GAC) from the well site and inspect the vessels. After repairs are made by others (if needed), the contractor/supplier will furnish and install domestic virgin GAC into the vessels and provide other incidental and related work, all as described in the specifications for the above project. CONTRACT ITEMS Item Description Quantity Unit Unit Price Total Price 1 Removal of Spent Carbon 1 LS $ 11,100.00 $ 11,100.00 2 GAC Vessel Inspection 1 LS $ 240.00 $ 240.00 3 Supply of Virgin GAC 60,000 Pound $ 1.194 $ 71,640.00 4 Installation of Virgin GAC 1 LS $ 4,680.00 $ 4,680.00 TOTAL$ 87.660.00 ARTICLE V - By my signature hereunder, as Contractor, I certify that I am aware of the provisions of Section 3700 of the Labor Code, which requires every employer to be insured against liability for workers' compensation or to undertake self-insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the work of this contract. ARTICLE VI - It is further expressly agreed by and between the parties hereto that, should there be any conflict between the terms of this instrument and the Bid Proposal of the Contractor, then this instrument shall control and nothing herein shall be considered as an acceptance of the said terms of said proposal conflicting herewith. ARTICLE VII - The City is to furnish the necessary rights-of-way and easements and to establish lines and grades for the work as specified under the Special Provisions. All labor or materials not mentioned specifically as being done by the City will be supplied by the Contractor to accomplish the work as outlined in the specifications. Contract.doc 4.2 03/31/16 ARTICLE VIII - The Contractor agrees to commence work pursuant to this contract within 15 calendar days after the City Manager has executed the contract and to diligently prosecute to completion within 30 WORKING DAYS. Working day count will stop once the inspection of all vessels has been completed and will start again once any repairs have been completed and/or the vessels have been deemed ready for the new carbon. ARTICLE IX - State of California Senate Bill 854 requires the following: • No contractor or subcontractor may be listed on a bid proposal for a public works project unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)]. • No contractor or subcontractor may be awarded a contract for public work on a public works project unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5. • This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. WHEN SIGNING THIS CONTRACT, THE CONTRACTOR AGREES THAT THE TIME OF COMPLETION FOR THIS CONTRACT IS REASONABLE AND THE CONTRACTOR AGREES TO PAY THE CITY LIQUIDATED DAMAGES AS SET FORTH IN SECTION 6-04.03 OF THE SPECIAL PROVISIONS. CONTRACTOR AGREES THAT THIS AMOUNT MAY BE DEDUCTED FROM THE AMOUNT DUE THE CONTRACTOR UNDER THE CONTRACT. IN WITNESS WHEREOF, the parties to these presents have hereunto set their hands the year and date written below. CONTRACTOR: CITY OF LODI By Stephen Schwabauer City Manager By: Date: Attest Contract doc Title City Clerk (CORPORATE SEAL) Approved As To Form Janice D. Magdich City Attorney 4.3 03/31/16 RESOLUTION NO. 2016-69 A RESOLUTION OF THE LODI CITY COUNCIL AWARDING THE CONTRACT FOR WELL NO. 23 GRANULAR ACTIVATED CARBON REPLACEMENT PROJECT TO CALGON CARBON CORPORATION, OF PITTSBURGH, PENNSYLVANIA WHEREAS, in answer to notice duly published in accordance with law and the order of this City Council, sealed bids were received and publicly opened on March 30, 2016, at 11:00 a.m., for the Well No. 23 Granular Activated Carbon (GAC) Replacement Project described in the specifications therefore approved by the City Council on March 2, 2016; and WHEREAS, said bids have been checked and tabulated and a report thereof filed with the City Manager as follows: Bidder Bid Calgon Carbon Corporation $ 87,660 Carbon Activated Corp. $160,440 WHEREAS, staff recommends awarding the contract for the Well No. 23 Granular Activated Carbon Replacement Project to Calgon Carbon Corporation, of Pittsburgh, Pennsylvania, in the amount of $87,660. NOW, THEREFORE, BE IT RESOLVED that the Lodi City Council does hereby award the contract for the Well No. 23 Granular Activated Carbon Replacement Project to Calgon Carbon Corporation, of Pittsburgh, Pennsylvania, in the amount of $87,660; and BE IT FURTHER RESOLVED that the City Manager is hereby authorized to execute the contract on behalf of the City of Lodi. Dated: May 4, 2016 I hereby certify that Resolution No. 2016-69 was passed and adopted by the City Council of the City of Lodi in a regular meeting held May 4, 2016 by the following vote: AYES: COUNCIL MEMBERS — Johnson, Kuehne, Mounce, Nakanishi, and Mayor Chandler NOES: COUNCIL MEMBERS — None ABSENT: COUNCIL MEMBERS — None ABSTAIN: COUNCIL MEMBERS — None NNIFE M. FERRAIOLO City Clerk 2016-69