Loading...
HomeMy WebLinkAboutAgenda Report - April 6, 2016 C-09TM CITY OF LODI COUNCIL COMMUNICATION AGENDA TITLE: MEETING DATE: PREPARED BY: AGENDA ITEM 04•9 Accept Improvements Under Contract for Ham Lane Signal Modification Improvements 2015 - Vine, Tokay, and Lockeford Streets April 6, 2016 Interim Public Works Director RECOMMENDED ACTION: Accept improvements under contract for Ham Lane Signal Modification Improvements 2015 - Vine, Tokay, and Lockeford Streets. BACKGROUND INFORMATION: The contract was awarded to Tim Paxin's Pacific Excavation, Inc., of Elk Grove, in the amount of $331,934, on September 2, 2015. The contract has been completed in substantial conformance with the plans and specifications approved by City Council. This project consisted of modifying existing traffic signals to accommodate protected left turn movements on Ham Lane at Vine, Tokay, and Lockeford streets, as shown on Exhibit A. The work includes four new signal poles (two each at Vine and Tokay streets), new service pedestals, cabinet controller equipment, LED countdown pedestrian signals, and pedestrian push buttons at each of the three locations, as shown in Exhibit B. The contract completion date was February 12, 2016. The final contract price was $365,365.48. The difference between the contract amount and the final contract price is due to three change orders. Change Order No. 1 ($22,085) included the replacement of malfunctioning traffic detection loops at Cherokee Lane and Lockeford Street, Cherokee Lane and Victor Road, Lodi Avenue and Sacramento Street, and Century Boulevard and Hutchins Street intersections. Change Order No. 2 ($7,620.48) included rerouting the streetlight conduits due to a conflict with the new traffic signal pole foundation at Ham and Tokay streets. Change Order No. 3 ($3,726) included the costs associated with staff requesting an alternative LED pedestrian countdown signal manufacturer. Following acceptance by the City Council, as required by law, the City Engineer will file a Notice of Completion with the County Recorder's office. The notice serves to notify vendors and subcontractors that the project is complete and begins their 30 -day period to file a stop notice requiring the City to withhold payments from the prime contractor in the event of a payment dispute. FISCAL IMPACT: FUNDING AVAILABLE: There will be a slight increase in the long term maintenance costs associated with these improvements. This project was funded by Gas Tax (30299000.77020). Prepared Dorothy Kam, Assistant Traffic Engineer CES/DK/tdb Attachments cc: Interim City Engineer/Deputy Public Works Director APPROVED: Charles E. Swimley, Jr. Interim Public Works Director tep en c er, City Manager K:\WP\PROJECTS\SIGNALS\Ham Lane Signal Modifications 2015\CAccept HamSignalMod doc 3/22/16 wOOdb, k, Rd I • • 1 4F Oil { r Turnerd=i =1 if F__ MOE r 1* -11791-4, lialF1- le 1 I— I.IU.Uiiu Lockeford LockeforSt.� - d �I■� e-■ e®IIM !■ �a1 ' Tokay=St:11111! VineSt- L'li g N" wm. OaY NT ...., li0 Winery RJ �Clarksdale Rd PROJECLOCATIO Taylor Rd. 0 0 J EXHIBIT A St. 0 Pine St. J 0 0 0 0 1 Kettleman Ln. Kettleman Ln. 2 OGS' Harney7Ln. ice�o�C J 0 t c t U o Century B.I'vd v IIEJ-le `... C 0 E Y 0 m w Scottsdale Rdj . Hogan Ln Ham Lane Signal Modification Improvements 2015 Location Map Ham Lane Signal Modification Improvements Project Acceptance Pictures EXHIBIT B Service Pedestal and Cabinet Controller Equipment LED Pedestrian Signal and Pedestrian Push Button Signal Mast Arm and Left Turn Signals