HomeMy WebLinkAboutAgenda Report - April 6, 2016 C-04CITY OF LODI
COUNCIL COMMUNICATION
AGENDA ITEM
C•4
TM
AGENDA TITLE: Approve Plans and Specifications and Authorize Advertisement for Bids for Alley
Improvement Project - Phase 5
MEETING DATE: April 6, 2016
PREPARED BY: Interim Public Works Director
RECOMMENDED ACTION: Approve plans and specifications and authorize advertisement for
bids for Alley Improvement Project — Phase 5.
BACKGROUND INFORMATION: This City has reconstructed various alleys over the past six years.
The projects have typically included between one and two alleys per
year, depending on funding levels. Specific projects are
selected based on a citywide alley condition assessment list and are rated based on the pavement
condition and drainage problems. Alley projects located in future phases of the water meter program are
either improved concurrently with the specific water meter phase or are deferred until after it is
completed, to prevent new alley improvements from being disturbed.
The alley selected for Phase 5 is located east of School Street, from De Force Avenue to Daisy Avenue,
as shown on Exhibit A. The project includes approximately 7,700 square feet of full pavement removal
and replacement, 700 square feet of new alley approach concrete, 265 feet of storm drain extension, and
other incidental and related work.
The plans and specifications are on file in the Public Works Department. The planned bid opening date
is April 27, 2016. The project estimate is $125,000.
FISCAL IMPACT: The project will reduce maintenance costs in the reconstructed alleys.
FUNDING AVAILABLE: The City will be using Community Development Block Grant (CDBG) funds.
Specific account information will be identified at project award.
Charles E.
Interim Public
Prepared by Sean Nathan, Associate Civil Engineer
CES/SN/jr
Attachment
cc: Neighborhood Services Manager
ey, Jr
orks Director
otv
APPROVED: '
nSchwab -a er,
City Manager
K:\WP\PROJECTS\STREETS\Alley Improvement Project Phase 5 (2016)\CPSA doc
3/28/16
Legend
Alley Improvement Project - Phase 5
Exhibit A
Project Location
602
518
516
601
519
515
511
507
N N 501
Olive Ct.
co csi 439
434
126
433
600
516
Daisy Ave.
s
0 100 200 400
Feet
425
423
40!
1
Lawrence Av.
350
346
O (0
De Force Av.
1,16
314
312
3
3:
3:
3:3
32
32:
31E
31:3
309
J