Loading...
HomeMy WebLinkAboutAgenda Report - March 16, 2016 C-07CITY OF LODI COUNCIL COMMUNICATION AGENDA ITEM C17 TM AGENDA TITLE: Accept Improvements Under Contract for White Slough Water Pollution Control Facility Digesters No. 1 and No. 2 Emergency Repairs Project MEETING DATE: March 16, 2016 PREPARED BY: Interim Public Works Director RECOMMENDED ACTION: Accept improvements under contract for White Slough Water Pollution Control Facility Digesters No. 1 and No. 2 Emergency Repairs Project. BACKGROUND INFORMATION: At the meeting on July 16, 2014, Council declared an emergency condition to address damaged roof structures on two digesters at the White Slough Water Pollution Control Facility, authorized the City Manager to order required actions and execute the necessary contracts to replace the roof structures, and appropriated $3,100,000 for the work. Western Water Construction was awarded the contract on September 3, 2014. The contract has been completed in substantial conformance with the plans and specifications. The project included the replacement of existing, damaged roof structures on Digesters No. 1 and No. 2, adding new mixing equipment to Digester No. 1, and associated work such as piping and electrical modifications, as shown in Exhibit A. Digester No. 2 was placed back in service on April 6, 2015. Digester No. 1 was scheduled to be completed by August 2015. During the leak test, however, it was found that numerous small, non- structural cracks in the digester wall needed repair. The repairs were made and Digester No. 1 was placed back in service on January 20, 2016, the contract completion date. The final contract price was $2,159,113. The difference between the contract amount of $1,995,710 and the final contract price is due to one change order totaling $163,403. Change Order No. 1 includes rerouting of primary electrical service to the facility, repair of a six-inch gas line, installation of a new vehicle entrance gate, and coating the inside of Digester No. 1. Since the Contractor agrees to a maximum price of $1,995,710, an allowance of $100,000 was included in the proposal to reduce the contractor's financial risk associated with unknown structural and electrical work. The allowance is intended to be used only on these items and any unused portion is reduced from the contract amount. There is an unused allowance balance of $67,817 that is subtracted from the total guaranteed maximum price contract amount to obtain the final price of $2,059,374. The total project cost is $2,695,680, including consultant and staff time, which is $404,320 lower than the requested appropriation of $3,100,000. It is appropriate to acknowledge the outstanding work conducted by Western Water Constructors, Inc., the design consultant, West Yost Associates, and City staff. Due APPROVE i 1' ■. Stephen Schw , City Manager K:\WP\PROJECTS\SEWER\WSWPCF\DigesterRepairs\CAccept WSWPCF Digester 1 and 2 Repairs.doc 3/7/16 Accept Improvements Under Contract for White Slough Water Pollution Control Facility Digesters No. 1 and No 2 Emergency Repairs Project March 16, 2016 Page 2 to their effort, the City managed to complete this work substantially under original project estimates and without any regulatory violations resulting from the digesters being out of service. Following acceptance by the City Council, as required by law, the City Engineer will file a Notice of Completion with the County Recorder's office. The notice serves to notify vendors and subcontractors that the project is complete and begins their 30 -day period to file a stop notice requiring the City to withhold payments from the prime contractor in the event of a payment dispute. FISCAL IMPACT: Not applicable. FUNDING AVAILABLE: This project was funded by Wastewater Capital (531). Charles E. Swimley, Jr. Interim Public Works Director Prepared by: Gary Wiman CES/GW/tdb Attachment cc: Wastewater Plant Superintendent Utility Manager Western Water Constructors, Inc. K:\WP\PROJECTS\SEWER\WSWPCF\DigesterRepairs\CAccept WSWPCF Digester 1 and 2 Repairs doc 3/7/16 CITY COUNCIL MARK CHANDLER, Mayor DOUG KUEHNE, Mayor Pro Tempore BOB JOHNSON JOANNE MOUNCE ALAN NAKANISHI CITY OF LODI CITY HALL, 221 WEST PINE STREET P.O. BOX 3006 LODI, CALIFORNIA 95241-1910 (209) 333-6706 / FAX (209) 333-6710 EMAIL: pwdept@lodi.gov www.lodi.00v March 9, 2016 Western Water Constructors, Inc. 707 Aviation Blvd. Santa Rosa, CA 95403 STEPHEN SCHWABAUER City Manager JENNIFER M. FERRAIOLO City Clerk JANICE D. MAGDICH City Attorney CHARLES E. SWIMLEY, JR. Interim Public Works Director SUBJECT: Accept Improvements Under Contract for White Slough Water Pollution Control Facility Digesters No. 1 and No. 2 Emergency Repairs Project Enclosed is a copy of background information on an item on the City Council agenda of Wednesday, March 16, 2016. The meeting will be held at 7 p.m. in the City Council Chamber, Carnegie Forum, 305 West Pine Street. This item is on the consent calendar and is usually not discussed unless a Council Member requests discussion. The public is given an opportunity to address items on the consent calendar at the appropriate time. If you wish to write to the City Council, please address your letter to City Council, City of Lodi, P. O. Box 3006, Lodi, California, 95241-1910. Be sure to allow time for the mail. Or, you may hand -deliver the letter to City Hall, 221 West Pine Street. If you wish to address the Council at the Council Meeting, be sure to fill out a speaker's card (available at the Carnegie Forum immediately prior to the start of the meeting) and give it to the City Clerk. If you have any questions about communicating with the Council, please contact Jennifer M. Ferraiolo, City Clerk, at (209) 333-6702. If you have any questions about the item itself, please call Gary Wiman at (209) 333- 6706. Ch -ries E. Swimley, Jr. '14 Interim Public Works Director CES/tdb Enclosure cc: City Clerk