HomeMy WebLinkAboutAgenda Report - February 17, 2016 C-07CITY OF LODI
COUNCIL COMMUNICATION
AGENDA ITEM
Cui7
TM
AGENDA TITLE: Adopt Resolution Awarding Contract for Central Plume — Mid Plume PCE/TCE
Groundwater Treatment Project, to Water Rock Construction Corporation, of
Alameda ($445,000)
MEETING DATE: February 17, 2016
PREPARED BY: Interim Public Works Director
RECOMMENDED ACTION:
Adopt resolution awarding contract for Central Plume — Mid Plume
PCE/TCE Groundwater Treatment Project, to Water Rock
Construction Corporation, of Alameda, in the amount of $445,000.
BACKGROUND INFORMATION: The Central Plume is one of four areas within the City contaminated
with tetrachloroethene (PCE) and/or trichloroethylene (TCE). The
chemicals were prominently used in the dry cleaning and printing
industries. The City negotiated settlements with various parties and initiated a remediation program
under direction of the State of California. This project is part of the remediation program.
The Central TCE/PCE Plume is bound by Pine Street to the north, Stockton Street to the east, Pleasant
Avenue to the west, and Park Street to the south. Reports prepared by Treadwell & Rollo, the City's
PCE/TCE consultant, indicate that the PCE plume has migrated southerly toward the intersection of
Church Street and Tokay Street.
This project (Exhibit A) is intended to capture and contain the southerly plume migration, and consists of
a groundwater extraction well, granular activated carbon (GAC) treatment unit, a metal enclosure,
electrical and site work, and other incidental related work, all as shown on the plans and specifications for
the project. The Central Regional Water Quality Control Board has reviewed and concurs with the
proposed work plan and construction documents.
Staff has worked closely with Lodi Unified School District on this project. To minimize the impact to
Needham School, the GAC treatment unit will be constructed in a steel enclosure placed entirely inside
the public right-of-way. The project also includes an element of drought resistant landscaping to soften
the enclosure's appearance.
Plans and specifications for this project were approved on December 16, 2015. The City received the
following three bids for this project on January 21, 2016.
Bidder Location Bid
Engineer's Estimate $342,666.00
Water Rock Construction Corporation Alameda $445,000.00
Conco-West Incorporated Manteca $490,018.00
Diede Construction Woodbridge $500,913.00
APPROVED:
Stephefi Schwa s au r, City Manager
K:\WP\PROJECTS\WATER\PCE,TCE\Central\ExtractTreatSystem\Mid Plume Extraction System\CAward.doc 1/26/16
Adopt Resolution Awarding Contract for the Central Plume — Mid Plume PCE/TCE Groundwater Treatment Project, to Water Rock Construction Corporation, of
Alameda ($445,000)
February 17, 2016
Page 2
All funding will come from previous legal settlements with responsible parties and not ratepayer dollars.
The contractor has acknowledged the local hire and apprenticeship ordinance for the subject project.
The project cost is estimated to be $556,000, which includes the contract amount, construction
engineering and inspection, and construction contingencies.
FISCAL IMPACT:
FUNDING AVAILABLE:
There will be minor, on-going operations costs associated with the
maintenance and operation of this facility.
Central Plume Settlement Funds (590) Fiscal Year 2015/16: $556,000
Jordan Ayers
Deputy City Manager/Internal Services Director
Interim Public Works Director
Prepared by Lyman Chang, Interim City Engineer
CES/LC/tdb
Attachment
cc: City Attorney
Purchasing Officer
Management Analyst Areida-Yadav
Utility Manager
Water Rock Construction Corporation
K:\WP\PROJECTS\WATER\PCE,TCE\Central\ExtractTreatSystem\Mid Plume Extraction System\CAward.doc 1/26/16
M
FIBERGLASS GRATE
ENCLOSURE
0
DATE
EW
PRAWN MC/LC I DEMON LC
SCALE 1" = 5' I JCP MEADER
CHECKED DATE
APPROVED
RECORD DWG
DEPOT PLIELIC WCF1101 12111.7012 RCE NO. BM.. [YOE
PUBLIC WORKS DEPARTMENT
Central Plume (Mid Plume) Extraction Well
531 S Church Street
Exhibit A
Central Plume — Mid Plume PCE/TCE Groundwater Treatment Project
531 S Church Street CONTRACT
CITY OF LODI, CALIFORNIA
THIS CONTRACT made by and between the CITY OF LODI, State of California, herein
referred to as the "City," and WATER ROCK CONSTRUCTION CORPORATION, herein
referred to as the "Contractor."
WITNESSETH
That the parties hereto have mutually covenanted and agreed, and by these presents do
covenant and agree with each other, as follows:
The complete Contract consists of the following documents which are incorporated
herein by this reference, to -wit:
Notice Inviting Bids
Information to Bidders
General Provisions
Special Provisions
Bid Proposal
Contract
Contract Bonds
Plans
The July 1992 Edition,
Standard Specifications,
State of California,
Business and Transportation Agency,
Department of Transportation
All of the above documents, sometimes hereinafter referred to as the "Contract
Documents," are intended to cooperate so that any work called for in one and not
mentioned in the other is to be executed the same as if mentioned in all said
documents.
ARTICLE I - That for and in consideration of the payments and agreements hereinafter
mentioned, to be made and performed by the City and under the condition expressed in
the two bonds bearing even date with these presents and hereunto annexed, the
Contractor agrees with the City, at Contractor's cost and expense, to do all the work and
furnish all the materials except such as are mentioned in the specifications to be
furnished by the City, necessary to construct and complete in a good workmanlike and
substantial manner and to the satisfaction of the City the proposed improvements as
shown and described in the Contract Documents which are hereby made a part of the
Contract.
ARTICLE II - The City hereby promises and agrees with the Contractor to employ, and
does hereby employ, the Contractor to provide all materials and services not supplied by
the City and to do the work according to the terms and conditions for the price herein,
and hereby contracts to pay the same as set forth in Section 5.600, "Measurement,
Acceptance and Payment," of the General Provisions, in the manner and upon the
conditions above set forth; and the said parties for themselves, their heirs, executors,
administrators, successors and assigns, do hereby agree to the tuff performance of the
covenants herein contained.
ARTICLE III - The Contractor agrees to conform to the provisions of Chapter 1, Part 7,
Division 2 of the Labor Code. The Contractor and any Subcontractor will pay the
SECTION4.doc
4.1
01/21/16
general prevailing wage rate and other employer payments for health and welfare,
pension, vacation, travel time, and subsistence pay, apprenticeship or other training
programs. The responsibility for compliance with these Labor Code requirements is on
the prime contractor.
ARTICLE IV - And the Contractor agrees to receive and accept the following prices as
full compensation for furnishing all materials and for doing all the work contemplated
and embraced in this agreement; also for all loss or damage arising out of the nature of
the work aforesaid or from the action of the elements, or from any unforeseen difficulties
or obstructions which may arise or be encountered in the prosecution of the work until
its acceptance by the City, and for all risks of every description connected with the work;
also for all expenses incurred by or in consequence of the suspension or discontinuance
of work and for well and faithfully completing the work, and the whole thereof, in the
manner and according to the Plans and Contract Documents and the requirements of
the Engineer under them, to -wit:
Perform the work necessary to install a TCE/PCE groundwater extraction and treatment
system complete with a groundwater extraction well and granular activated carbon
treatment unit, a metal enclosure, electrical and site work, and other incidental and
related work, all as shown on the plans and specifications for "Central Plume — Mid
Plume PCE/TCE Groundwater Treatment Project".
CONTRACT ITEMS
ITEM EST'D.
NO. DESCRIPTION UNIT QTY UNIT PRICE TOTAL PRICE
1. Mobilization /
Demobilization LS 1 $40,000 $40,000
2. Traffic Control LS 1 $20,000 $20,000
3. Water Pollution Control LS 1 $5,000 $5,000
4. Clearing & Grubbing LS 1 $4,000 $4,000
5 Groundwater Extraction
Well LS 1 $82,550 $82,550
6. Granular Activated
Carbon System LS 1 $40,000 $40,000
SECTION4 doc
4.2
01/21/16
7. Electrical Service LS 1 $26,650 $26,650
On -Site Electrical and
Control Equipment
9. Treatment Unit Enclosure
LS 1 $78,650 $78,650
LS 1 $72,000 $72,000
10. Concrete Sidewalk /
Wheelchair Ramp SF 432 $18 $7,776
11. Concrete Curb & Gutter LF 80 $40 $3,200
12. Street Sign Post EA 1 $224 $224
13. Side Inlet Catch Basin EA 1 $2,500 $2,500
14. 1 -Inch Water Service EA 1 $12,500 $12,500
15. 4 -Inch Wastewater
Service EA 1 $8,300 $8,300
16. Pavement Repair SF 610 $10 $6,100
17. Chain Link Fence LF 26 $175 $4,550
18. Landscaping LS 1 $10,000 $10,000
19. Granular Activated
Carbon POUND 4,000 $1.75 $7,000
20. Equipment Startup and
Testing LS 1 $5,000 $5,000
21. Traffic Striping LS 1 $3,000 $3,000
22. Dispose Hazardous
Waste TON 10 $350 3,500
SECTION4.doc
4.3
01/21/16
23. Dispose Designated
Waste
TON 10 $250 $2,500
TOTAL $445,000
ARTICLE V - By my signature hereunder, as Contractor, I certify that I am aware of the
provisions of Section 3700 of the Labor Code, which requires every employer to be
insured against liability for workers' compensation or to undertake self-insurance in
accordance with the provisions of that code, and I will comply with such provisions
before commencing the performance of the work of this contract.
ARTICLE VI - It is further expressly agreed by and between the parties hereto that,
should there be any conflict between the terms of this instrument and the Bid Proposal
of the Contractor, then this instrument shall control and nothing herein shall be
considered as an acceptance of the said terms of said proposal conflicting herewith.
ARTICLE VII - The City is to furnish the necessary rights-of-way and easements and to
establish lines and grades for the work as specified under the Special Provisions. All
labor or materials not mentioned specifically as being done by the City will be supplied
by the Contractor to accomplish the work as outlined in the specifications.
ARTICLE VIII - The Contractor agrees to commence work pursuant to this contract
within 15 calendar days after the City Manager has executed the contract and to
diligently prosecute to completion within 90 CALENDAR DAYS.
ARTICLE IX - State of California Senate Bill 854 requires the following:
• No contractor or subcontractor may be listed on a bid proposal for a public works
project unless registered with the Department of Industrial Relations pursuant to
Labor Code section 1725.5 [with limited exceptions from this requirement for bid
purposes only under Labor Code section 1771.1(a)].
• No contractor or subcontractor may be awarded a contract for public work on a
public works project unless registered with the Department of Industrial Relations
pursuant to Labor Code section 1725.5.
• This project is subject to compliance monitoring and enforcement by the
Department of Industrial Relations.
SECTION4 doc
4.4
01/21/16
WHEN SIGNING THIS CONTRACT, THE CONTRACTOR AGREES THAT THE TIME
OF COMPLETION FOR THIS CONTRACT IS REASONABLE AND THE
CONTRACTOR AGREES TO PAY THE CITY LIQUIDATED DAMAGES AS SET
FORTH IN SECTION 6-04.03 OF THE SPECIAL PROVISIONS. CONTRACTOR
AGREES THAT THIS AMOUNT MAY BE DEDUCTED FROM THE AMOUNT DUE THE
CONTRACTOR UNDER THE CONTRACT.
IN WITNESS WHEREOF, the parties to these presents have hereunto set their hands
the year and date written below.
CONTRACTOR CITY OF LODI, a municipal corporation
By:
STEPHEN SCHWABAUER
City Manager
By: Date
Attest:
Title
JENNIFER M. FERRAIOLO
City Clerk
(CORPORATE SEAL) Approved As To Form:
SECTION4.doc
JANICE D. MAGDICH
City Attorney
4.5
01/21/16
RESOLUTION NO. 2016-17
A RESOLUTION OF THE LODI CITY COUNCIL AWARDING THE
CONTRACT FOR THE CENTRAL PLUME — MID PLUME PCE/TCE
GROUNDWATER TREATMENT PROJECT TO WATER ROCK
CONSTRUCTION CORPORATION, OF ALAMEDA
WHEREAS, in answer to notice duly published in accordance with law and the order of this
City Council, sealed bids were received and publicly opened on January 21, 2016, at 11:00 a.m., for
the Central Plume — Mid Plume PCEITCE Groundwater Treatment Project, described in the plans
and specifications therefore approved by the City Council on December 16, 2015; and
WHEREAS, said bid have been checked and tabulated and a report thereof filed with the
City Manager as follows:
Bidder Bid
Water Rock Construction Corporation $445,000
Conco-West, Incorporated $490,018
Diede Construction $500,913
WHEREAS, staff recommends that the City Council award the contract for Central Plume —
Mid Plume PCE/TCE Groundwater Treatment Project to Water Rock Construction Corporation, of
Alameda, in the amount of $445,000; and
WHEREAS, the total project costs are estimated at $556,000, which includes contract
amount, construction engineering and inspection, and construction contingencies.
NOW, THEREFORE, BE IT RESOLVED that the Lodi City Council does hereby award the
contract for Central Plume — Mid Plume PCE/TCE Groundwater Treatment Project to Water Rock
Construction Corporation, of Alameda, California, in the amount of $445,000; and
BE IT FURTHER RESOLVED that the City Manager is hereby authorized to execute the
contract on behalf of the City of Lodi.
Dated: February 17, 2016
I hereby certify that Resolution No. 2016-17 was passed and adopted by the City Council of
the City of Lodi in a regular/special joint meeting held February 17, 2016, by the following vote:
AYES: COUNCIL MEMBERS — Kuehne, Mounce, Nakanishi, and Mayor Chandler
NOES: COUNCIL MEMBERS — None
ABSENT: COUNCIL MEMBERS — Johnson
ABSTAIN: COUNCIL MEMBERS — None
--/-47,-,..ga, v224,__IA4..0
PAMELA M. FARRIS
Deputy City Clerk
2016-17