HomeMy WebLinkAboutAgenda Report - February 17, 2016 C-06TM
CITY OF LODI
COUNCIL COMMUNICATION
AGENDA ITEM
C-6
AGENDA TITLE: Adopt Resolution Awarding Contract for 2016 Pavement Crack Sealing, West Lodi
Avenue, to Telfer Pavement Technology, LLC, of McClellan ($42,891)
MEETING DATE: February 17, 2016
PREPARED BY: Public Works Director
RECOMMENDED ACTION: Adopt resolution awarding contract for 2016 Pavement Crack
Sealing, West Lodi Avenue, to Telfer Pavement Technology, LLC, of
McClellan, in the amount of $42,891.
BACKGROUND INFORMATION: This project consists of crack sealing approximately 580,000 square
feet of West Lodi Avenue, from Lower Sacramento Road to the
Union Pacific Railroad. The primary cause of asphalt failure is
water infiltration into the street subgrade. Crack sealing is one of the most basic and important
preventive street maintenance practices. This contract is intended to supplement work performed by
Street Division crews to maximize the street area sealed each year.
Plans and specifications for this project were approved on January 6, 2016. The City received the
following six bids for this project on January 27, 2016.
Bidder
Engineer's Estimate
Telfer Pavement Technologies
Bond Blacktop
Graham Contractors
United Pavement Maintenance
VSS International
Sunrise Grading & Paving
Location
McClellan
Union City
San Jose
San Jose
West Sacramento
Brentwood
Bid
$ 40,572.70
$ 42,891.14
$ 56,801.78
$ 60,859.05
$ 63,135.00
$ 69,553.20
$168,086.90
FISCAL IMPACT: The City's crack sealing effort extends the useful life of the City streets.
FUNDING AVAILABLE: Budgeted Fiscal Year 2015/16 Measure K (30399000.77020) - $50,000
CA) n—jZ-C 9-4. A --
Jordan Ayers
Deputy City Manager/Internal Services Director
Charles E. Swimley, Jr.
Interim Public Works Director
Prepared by Sean Nathan, Associate Civil Engineer
CES/SN/tdb
Attachment
cc: Utility Manager
APPROVED:
ch aba
Stephen B
uer, City Manager
K:\WP\PROJECTS\STREETS\2016 Crack Seal\CAward.doc 1/29/2016
2016 PAVEMENT CRACK SEALING SECTION 4
West Lodi Avenue
CITY OF LODI, CALIFORNIA
THIS CONTRACT made by and between the CITY OF LODI, State of California, herein
referred to as the "City," and TELFER PAVEMENT TECHNOLOGIES, LLC, herein referred to
as the "Contractor."
WITNESSETH:
That the parties hereto have mutually covenanted and agreed, and by these presents do
covenant and agree with each other, as follows:
The complete Contract consists of the following documents which are incorporated herein by
this reference, to -wit:
Notice Inviting Bids
Information to Bidders
General Provisions
Special Provisions
Bid Proposal
Contract
Contract Bonds
Plans
The July 1992 Edition,
Standard Specifications,
State of California,
Business and Transportation Agency,
Department of Transportation
All of the above documents, sometimes hereinafter referred to as the "Contract Documents,"
are intended to cooperate so that any work called for in one and not mentioned in the other is to
be executed the same as if mentioned in all said documents.
ARTICLE I - That for and in consideration of the payments and agreements hereinafter
mentioned, to be made and performed by the City and under the condition expressed in the two
bonds bearing even date with these presents and hereunto annexed, the Contractor agrees
with the City, at Contractor's cost and expense, to do all the work and furnish all the materials
except such as are mentioned in the specifications to be furnished by the City, necessary to
construct and complete in a good workmanlike and substantial manner and to the satisfaction
of the City the proposed improvements as shown and described in the Contract Documents
which are hereby made a part of the Contract.
ARTICLE II - The City hereby promises and agrees with the Contractor to employ, and does
hereby employ, the Contractor to provide all materials and services not supplied by the City and
to do the work according to the terms and conditions for the price herein, and hereby contracts
to pay the same as set forth in Section 5.600, "Measurement, Acceptance and Payment," of the
General Provisions, in the manner and upon the conditions above set forth; and the said parties
for themselves, their heirs, executors, administrators, successors and assigns, do hereby agree
to the full performance of the covenants herein contained.
ARTICLE III - The Contractor agrees to conform to the provisions of Chapter 1, Part 7, Division
2 of the Labor Code. The Contractor and any Subcontractor will pay the general prevailing
Contract doc
4.1
1/27/2016
wage rate and other employer payments for health and welfare, pension, vacation, travel time,
and subsistence pay, apprenticeship or other training programs. The responsibility for
compliance with these Labor Code requirements is on the prime contractor.
ARTICLE IV - And the Contractor agrees to receive and accept the following prices as full
compensation for furnishing all materials and for doing all the work contemplated and embraced
in this agreement; also for all loss or damage arising out of the nature of the work aforesaid or
from the action of the elements, or from any unforeseen difficulties or obstructions which may
arise or be encountered in the prosecution of the work until its acceptance by the City, and for
all risks of every description connected with the work; also for all expenses incurred by or in
consequence of the suspension or discontinuance of work and for well and faithfully completing
the work, and the whole thereof, in the manner and according to the Plans and Contract
Documents and the requirements of the Engineer under them, to -wit:
Perform the work necessary for thoroughly cleaning and sealing the existing transverse and
longitudinal cracks and joints and random cracks in bituminous pavement surfaces and includes
other incidental and related work as described in the specifications.
See Section 6-07 "Description of Bid Items" and Exhibits A and B for additional information.
CONTRACT ITEMS
Bid
Item Street Name
No.
1I
Crack Sealing and
Preparation - Lodi Avenue
Approximate
Street Area (SF)
579,610
Price per Square
Foot
Total Cost Per Street
$0.074 $42,891.14
TOTAL : $ 42,891.14
ARTICLE V - By my signature hereunder, as Contractor, I certify that I am aware of the
provisions of Section 3700 of the Labor Code, which requires every employer to be insured
against liability for workers' compensation or to undertake self-insurance in accordance with the
provisions of that code, and I will comply with such provisions before commencing the
performance of the work of this contract.
ARTICLE VI - It is further expressly agreed by and between the parties hereto that, should
there be any conflict between the terms of this instrument and the Bid Proposal of the
Contractor, then this instrument shall control and nothing herein shall be considered as an
acceptance of the said terms of said proposal conflicting herewith.
ARTICLE VII - The City is to furnish the necessary rights-of-way and easements and to
establish lines and grades for the work as specified under the Special Provisions. All labor or
materials not mentioned specifically as being done by the City will be supplied by the Contractor
to accomplish the work as outlined in the specifications.
ARTICLE VIII - The Contractor agrees to commence work pursuant to this contract within 15
calendar days after the City Manager has executed the contract and to diligently prosecute to
completion within 30 CALENDAR DAYS.
Contract.doc
4.2
1/27/2016
ARTICLE IX - State of California Senate Bill 854 requires the following:
• No contractor or subcontractor may be listed on a bid proposal for a public works project
unless registered with the Department of Industrial Relations pursuant to Labor Code
section 1725.5 [with limited exceptions from this requirement for bid purposes only
under Labor Code section 1771.1(a)].
• No contractor or subcontractor may be awarded a contract for public work on a public
works project unless registered with the Department of Industrial Relations pursuant to
Labor Code section 1725.5.
• This project is subject to compliance monitoring and enforcement by the Department of
Industrial Relations.
WHEN SIGNING THIS CONTRACT, THE CONTRACTOR AGREES THAT THE TIME OF
COMPLETION FOR THIS CONTRACT IS REASONABLE AND THE CONTRACTOR AGREES
TO PAY THE CITY LIQUIDATED DAMAGES AS SET FORTH IN SECTION 6-04.03 OF THE
SPECIAL PROVISIONS. CONTRACTOR AGREES THAT THIS AMOUNT MAY BE
DEDUCTED FROM THE AMOUNT DUE THE CONTRACTOR UNDER THE CONTRACT.
IN WITNESS WHEREOF, the parties to these presents have hereunto set their hands the year
and date written below.
CONTRACTOR: CITY OF LODI, a municipal corporation
By
STEPHEN SCHWABAUER
City Manager
By: Date:
Attest:
Contract.doc
Title
JENNIFER M. FERRAIOLO
City Clerk
(CORPORATE SEAL) Approved As To Form:
JANICE D. MAGDICH
City Attorney
4.3
1/27/2016
RESOLUTION NO. 2016-16
A RESOLUTION OF THE LODI CITY COUNCIL
AWARDING THE CONTRACT FOR 2016 PAVEMENT
CRACK SEALING, WEST LODI AVENUE, TO
TELFER PAVEMENT TECHNOLOGIES, LLC,
OF MCCLELLAN
WHEREAS, in answer to notice duly published in accordance with law and the order of
this City Council, sealed proposals were received and publicly opened on January 27, 2016, at
11:00 a.m., for 2016 Pavement Crack Sealing, West Lodi Avenue, as described in the plans and
specifications therefore approved by the City Council on January 6, 2016; and
WHEREAS, said bids have been checked and tabulated and a report thereof filed with
the City Manager as follows:
Bidder
Telfer Pavement Technologies
Bond Blacktop
Graham Contractors
United Pavement Maintenance
VSS International
Sunrise Grading & Paving
Bid
$ 42,891.14
$ 56, 801.78
$ 60, 859.05
$ 63,135.00
$ 69, 553.20
$ 168,086.90
WHEREAS, staff recommends awarding the contract to the low bidder, Telfer Pavement
Technologies, LLC, of McClellan, in the amount of $42,891.14.
NOW, THEREFORE, BE IT RESOLVED that the Lodi City Council does hereby award
the contract for 2016 Pavement Crack Sealing, West Lodi Avenue, to the low bidder,
Telfer Pavement Technologies, LLC, of McClellan, California, in the amount of $42,891; and
BE IT FURTHER RESOLVED that the City Manager is hereby authorized to execute the
contract on behalf of the City of Lodi.
Dated: February 17, 2016
I hereby certify that Resolution No. 2016-16 was passed and adopted by the City
Council of the City of Lodi in a regular/special joint meeting held February 17, 2016, by the
following vote:
AYES: COUNCIL MEMBERS — Kuehne, Mounce, Nakanishi, and Mayor Chandler
NOES: COUNCIL MEMBERS — None
ABSENT: COUNCIL MEMBERS — Johnson
ABSTAIN: COUNCIL MEMBERS — None
--,4W.y-/-___/_a_, v-12,,Y7A4,
PAMELA M. FARRIS
Deputy City Clerk
2016-16