Loading...
HomeMy WebLinkAboutAgenda Report - February 17, 2016 C-06TM CITY OF LODI COUNCIL COMMUNICATION AGENDA ITEM C-6 AGENDA TITLE: Adopt Resolution Awarding Contract for 2016 Pavement Crack Sealing, West Lodi Avenue, to Telfer Pavement Technology, LLC, of McClellan ($42,891) MEETING DATE: February 17, 2016 PREPARED BY: Public Works Director RECOMMENDED ACTION: Adopt resolution awarding contract for 2016 Pavement Crack Sealing, West Lodi Avenue, to Telfer Pavement Technology, LLC, of McClellan, in the amount of $42,891. BACKGROUND INFORMATION: This project consists of crack sealing approximately 580,000 square feet of West Lodi Avenue, from Lower Sacramento Road to the Union Pacific Railroad. The primary cause of asphalt failure is water infiltration into the street subgrade. Crack sealing is one of the most basic and important preventive street maintenance practices. This contract is intended to supplement work performed by Street Division crews to maximize the street area sealed each year. Plans and specifications for this project were approved on January 6, 2016. The City received the following six bids for this project on January 27, 2016. Bidder Engineer's Estimate Telfer Pavement Technologies Bond Blacktop Graham Contractors United Pavement Maintenance VSS International Sunrise Grading & Paving Location McClellan Union City San Jose San Jose West Sacramento Brentwood Bid $ 40,572.70 $ 42,891.14 $ 56,801.78 $ 60,859.05 $ 63,135.00 $ 69,553.20 $168,086.90 FISCAL IMPACT: The City's crack sealing effort extends the useful life of the City streets. FUNDING AVAILABLE: Budgeted Fiscal Year 2015/16 Measure K (30399000.77020) - $50,000 CA) n—jZ-C 9-4. A -- Jordan Ayers Deputy City Manager/Internal Services Director Charles E. Swimley, Jr. Interim Public Works Director Prepared by Sean Nathan, Associate Civil Engineer CES/SN/tdb Attachment cc: Utility Manager APPROVED: ch aba Stephen B uer, City Manager K:\WP\PROJECTS\STREETS\2016 Crack Seal\CAward.doc 1/29/2016 2016 PAVEMENT CRACK SEALING SECTION 4 West Lodi Avenue CITY OF LODI, CALIFORNIA THIS CONTRACT made by and between the CITY OF LODI, State of California, herein referred to as the "City," and TELFER PAVEMENT TECHNOLOGIES, LLC, herein referred to as the "Contractor." WITNESSETH: That the parties hereto have mutually covenanted and agreed, and by these presents do covenant and agree with each other, as follows: The complete Contract consists of the following documents which are incorporated herein by this reference, to -wit: Notice Inviting Bids Information to Bidders General Provisions Special Provisions Bid Proposal Contract Contract Bonds Plans The July 1992 Edition, Standard Specifications, State of California, Business and Transportation Agency, Department of Transportation All of the above documents, sometimes hereinafter referred to as the "Contract Documents," are intended to cooperate so that any work called for in one and not mentioned in the other is to be executed the same as if mentioned in all said documents. ARTICLE I - That for and in consideration of the payments and agreements hereinafter mentioned, to be made and performed by the City and under the condition expressed in the two bonds bearing even date with these presents and hereunto annexed, the Contractor agrees with the City, at Contractor's cost and expense, to do all the work and furnish all the materials except such as are mentioned in the specifications to be furnished by the City, necessary to construct and complete in a good workmanlike and substantial manner and to the satisfaction of the City the proposed improvements as shown and described in the Contract Documents which are hereby made a part of the Contract. ARTICLE II - The City hereby promises and agrees with the Contractor to employ, and does hereby employ, the Contractor to provide all materials and services not supplied by the City and to do the work according to the terms and conditions for the price herein, and hereby contracts to pay the same as set forth in Section 5.600, "Measurement, Acceptance and Payment," of the General Provisions, in the manner and upon the conditions above set forth; and the said parties for themselves, their heirs, executors, administrators, successors and assigns, do hereby agree to the full performance of the covenants herein contained. ARTICLE III - The Contractor agrees to conform to the provisions of Chapter 1, Part 7, Division 2 of the Labor Code. The Contractor and any Subcontractor will pay the general prevailing Contract doc 4.1 1/27/2016 wage rate and other employer payments for health and welfare, pension, vacation, travel time, and subsistence pay, apprenticeship or other training programs. The responsibility for compliance with these Labor Code requirements is on the prime contractor. ARTICLE IV - And the Contractor agrees to receive and accept the following prices as full compensation for furnishing all materials and for doing all the work contemplated and embraced in this agreement; also for all loss or damage arising out of the nature of the work aforesaid or from the action of the elements, or from any unforeseen difficulties or obstructions which may arise or be encountered in the prosecution of the work until its acceptance by the City, and for all risks of every description connected with the work; also for all expenses incurred by or in consequence of the suspension or discontinuance of work and for well and faithfully completing the work, and the whole thereof, in the manner and according to the Plans and Contract Documents and the requirements of the Engineer under them, to -wit: Perform the work necessary for thoroughly cleaning and sealing the existing transverse and longitudinal cracks and joints and random cracks in bituminous pavement surfaces and includes other incidental and related work as described in the specifications. See Section 6-07 "Description of Bid Items" and Exhibits A and B for additional information. CONTRACT ITEMS Bid Item Street Name No. 1I Crack Sealing and Preparation - Lodi Avenue Approximate Street Area (SF) 579,610 Price per Square Foot Total Cost Per Street $0.074 $42,891.14 TOTAL : $ 42,891.14 ARTICLE V - By my signature hereunder, as Contractor, I certify that I am aware of the provisions of Section 3700 of the Labor Code, which requires every employer to be insured against liability for workers' compensation or to undertake self-insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the work of this contract. ARTICLE VI - It is further expressly agreed by and between the parties hereto that, should there be any conflict between the terms of this instrument and the Bid Proposal of the Contractor, then this instrument shall control and nothing herein shall be considered as an acceptance of the said terms of said proposal conflicting herewith. ARTICLE VII - The City is to furnish the necessary rights-of-way and easements and to establish lines and grades for the work as specified under the Special Provisions. All labor or materials not mentioned specifically as being done by the City will be supplied by the Contractor to accomplish the work as outlined in the specifications. ARTICLE VIII - The Contractor agrees to commence work pursuant to this contract within 15 calendar days after the City Manager has executed the contract and to diligently prosecute to completion within 30 CALENDAR DAYS. Contract.doc 4.2 1/27/2016 ARTICLE IX - State of California Senate Bill 854 requires the following: • No contractor or subcontractor may be listed on a bid proposal for a public works project unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)]. • No contractor or subcontractor may be awarded a contract for public work on a public works project unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5. • This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. WHEN SIGNING THIS CONTRACT, THE CONTRACTOR AGREES THAT THE TIME OF COMPLETION FOR THIS CONTRACT IS REASONABLE AND THE CONTRACTOR AGREES TO PAY THE CITY LIQUIDATED DAMAGES AS SET FORTH IN SECTION 6-04.03 OF THE SPECIAL PROVISIONS. CONTRACTOR AGREES THAT THIS AMOUNT MAY BE DEDUCTED FROM THE AMOUNT DUE THE CONTRACTOR UNDER THE CONTRACT. IN WITNESS WHEREOF, the parties to these presents have hereunto set their hands the year and date written below. CONTRACTOR: CITY OF LODI, a municipal corporation By STEPHEN SCHWABAUER City Manager By: Date: Attest: Contract.doc Title JENNIFER M. FERRAIOLO City Clerk (CORPORATE SEAL) Approved As To Form: JANICE D. MAGDICH City Attorney 4.3 1/27/2016 RESOLUTION NO. 2016-16 A RESOLUTION OF THE LODI CITY COUNCIL AWARDING THE CONTRACT FOR 2016 PAVEMENT CRACK SEALING, WEST LODI AVENUE, TO TELFER PAVEMENT TECHNOLOGIES, LLC, OF MCCLELLAN WHEREAS, in answer to notice duly published in accordance with law and the order of this City Council, sealed proposals were received and publicly opened on January 27, 2016, at 11:00 a.m., for 2016 Pavement Crack Sealing, West Lodi Avenue, as described in the plans and specifications therefore approved by the City Council on January 6, 2016; and WHEREAS, said bids have been checked and tabulated and a report thereof filed with the City Manager as follows: Bidder Telfer Pavement Technologies Bond Blacktop Graham Contractors United Pavement Maintenance VSS International Sunrise Grading & Paving Bid $ 42,891.14 $ 56, 801.78 $ 60, 859.05 $ 63,135.00 $ 69, 553.20 $ 168,086.90 WHEREAS, staff recommends awarding the contract to the low bidder, Telfer Pavement Technologies, LLC, of McClellan, in the amount of $42,891.14. NOW, THEREFORE, BE IT RESOLVED that the Lodi City Council does hereby award the contract for 2016 Pavement Crack Sealing, West Lodi Avenue, to the low bidder, Telfer Pavement Technologies, LLC, of McClellan, California, in the amount of $42,891; and BE IT FURTHER RESOLVED that the City Manager is hereby authorized to execute the contract on behalf of the City of Lodi. Dated: February 17, 2016 I hereby certify that Resolution No. 2016-16 was passed and adopted by the City Council of the City of Lodi in a regular/special joint meeting held February 17, 2016, by the following vote: AYES: COUNCIL MEMBERS — Kuehne, Mounce, Nakanishi, and Mayor Chandler NOES: COUNCIL MEMBERS — None ABSENT: COUNCIL MEMBERS — Johnson ABSTAIN: COUNCIL MEMBERS — None --,4W.y-/-___/_a_, v-12,,Y7A4, PAMELA M. FARRIS Deputy City Clerk 2016-16