Loading...
HomeMy WebLinkAboutAgenda Report - December 16, 2015 C-15CITY OF LODI COUNCIL COMMUNICATION AGENDA ITEM G15 TM AGENDA TITLE: Adopt Resolution Appropriating Funds ($200,000) for the Lodi Lake Park — Boat Launch Facility Improvements and Receive Update on Bid Results MEETING DATE: December 16, 2015 PREPARED BY: Interim Public Works Director RECOMMENDED ACTION: Adopt resolution appropriating funds, in the amount of $200,000, for the Lodi Lake Park — Boat Launch Facility Improvements and receive update on bid results. BACKGROUND INFORMATION: In 2014, the City was awarded a grant from the California Division of Boating and Waterways (DBW), in the amount of $710,000, for improvements to the boat ramp at Lodi Lake. The grant agreement requires the project to be completed by March 1, 2016 (an extension is pending). The Public Works and Parks, Recreation, and Cultural Services departments have worked together to expedite the project, however, delays associated with the DBW plan review have significantly impacted the schedule. To account for the delays, on November 4, 2015, Council authorized the City Manager to award the contract to the lowest responsive bidder, in an amount not to exceed $900,000. The City received the following six bids for this project on November 12, 2015. Bidder Location Bid PBM Construction Rocklin, CA $ 893,989.00 AM Stephens Lodi, CA $ 908,143.00 Grade Tech, Inc. Castro Valley, CA $ 1,010,958.46 F&H Construction Lodi, CA $ 1,049,000.00 George Reed, Inc. Modesto, CA $ 1,102,011.00 Diede Construction Lodi, CA $ 1,107,863.18 Engineer's Estimate $ 735,465.00 The City Manager has awarded the contract to PBM Construction for $ 893,989. The contract documents are currently being processed and construction is scheduled to begin in January. Council has appropriated a total of $920,000 for the project (including the $710,000 in grant funding from the DBW) leaving insufficient funding available ($26,011) to account for construction contingencies and anticipated non -construction costs, such as construction inspection, testing, and construction management. Staff recommends appropriating an additional $200,000 to cover these costs. APPROVED: t ph Sch a au , City Manager K:\WP\PROJECTS\PARKS\LODILAKE\Boat Ramp\C-Appropriate doc 12/02/2015 Adopt Resolution Appropriating Funds ($200,000) for the Lodi Lake Park — Boat Launch Facility Improvements and Receive Update on Bid Results December 16, 2015 Page 2 FISCAL IMPACT: The long term fiscal impact is negligible. FUNDING AVAILABLE: Requested Appropriation: Parks Capital Unreserved (432.32205) Parks Impact Mitigation Fee (437.32205) cmtstpfry-e,L,,, Jordan Ayers Deputy City Manager/Internal Services Director C,U TQQ__ Charles E. Swimley, Jr. Interim Public Works Director Jeff Hood Parks, Re Prepared by Sean Nathan, Associate Civil Engineer CES/SN/tdb Attachment cc: Parks, Recreation & Cultural Services Director r k] fir 111 f' -ton, an Cultural Services Director $125,000 $ 75,000 $200,000 K:\WP\PROJECTS\PARKS\LODILAKE\Boat Ramp\C-Appropriate.doc 12/02/2015 LODI LAKE PARK — BOAT LAUNCH FACILITY IMPROVEMENTS 1101 West Turner Road CONTRACT CITY OF LODI, CALIFORNIA THIS CONTRACT made by and between the CITY OF LODI, State of California, herein referred to as the "City," and PBM CONSTRUCTION, INC., herein referred to as the "Contractor." WITNESSETH: That the parties hereto have mutually covenanted and agreed, and by these presents do covenant and agree with each other, as follows: The complete Contract consists of the following documents which are incorporated herein by this reference, to -wit: Notice Inviting Bids Information to Bidders General Provisions Special Provisions Bid Proposal Contract Contract Bonds Plans The July 1992 Edition, Standard Specifications, State of California, Business and Transportation Agency, Department of Transportation All of the above documents, sometimes hereinafter referred to as the "Contract Documents," are intended to cooperate so that any work called for in one and not mentioned in the other is to be executed the same as if mentioned in all said documents. ARTICLE I - That for and in consideration of the payments and agreements hereinafter mentioned, to be made and performed by the City and under the condition expressed in the two bonds bearing even date with these presents and hereunto annexed, the Contractor agrees with the City, at Contractor's cost and expense, to do all the work and furnish all the materials except such as are mentioned in the specifications to be furnished by the City, necessary to construct and complete in a good workmanlike and substantial manner and to the satisfaction of the City the proposed improvements as shown and described in the Contract Documents which are hereby made a part of the Contract. ARTICLE II - The City hereby promises and agrees with the Contractor to employ, and does hereby employ, the Contractor to provide all materials and services not supplied by the City and to do the work according to the terms and conditions for the price herein, and hereby contracts to pay the same as set forth in Section 5.600, "Measurement, Acceptance and Payment," of the General Provisions, in the manner and upon the conditions above set forth; and the said parties for themselves, their heirs, executors, administrators, successors and assigns, do hereby agree to the full performance of the covenants herein contained. ARTICLE III - The Contractor agrees to conform to the provisions of Chapter 1, Part 7, Division 2 of the Labor Code. The Contractor and any Subcontractor will pay the general 20151odilakeboatlaunchfacilitysec4. doc 4.1 11/12/15 prevailing wage rate and other employer payments for health and welfare, pension, vacation, travel time, and subsistence pay, apprenticeship or other training programs. The responsibility for compliance with these Labor Code requirements is on the prime contractor. ARTICLE IV - And the Contractor agrees to receive and accept the following prices as full compensation for furnishing all materials and for doing all the work contemplated and embraced in this agreement; also for all loss or damage arising out of the nature of the work aforesaid or from the action of the elements, or from any unforeseen difficulties or obstructions which may arise or be encountered in the prosecution of the work until its acceptance by the City, and for all risks of every description connected with the work; also for all expenses incurred by or in consequence of the suspension or discontinuance of work and for well and faithfully completing the work, and the whole thereof, in the manner and according to the Plans and Contract Documents and the requirements of the Engineer under them, to -wit: Perform the work necessary to remove and replace the boat ramp, the dock, fully reconstruct the parking lot, modify the lighting, add accessible parking stalls, improve the drainage, modify the landscaping and irrigation, and other incidental and related work, all as shown on the plans and specifications for the above project. CONTRACT ITEMS Item Description QTY Unit Unit Price Total 1 Mobilization, Permitting, Bonding, Temporary Facilities, and Demobilization 1 LS LS $13,462 $13,462 2 Demolition, Potholing, Clearing and Grubbing, and Grading 1 $112,723 $112,723 $17,741 3 Construct Concrete Curb 628 LF $28.25 4 Construct Concrete Curb & Gutter 1,453 LF $41 $59,573 5 Construct 4" Thick Concrete Sidewalk, ADA Ramp, and Flatwork 3,065 SF $7.50 $22,987.50 6 7 Construct 8" Thick Concrete Sidewalk and Gutter 129 SF $17 $2,193 Construct Concrete Accessible Parking Stall 1,270 SF $8.25 $10,477.50 8 Provide and Install Detectable Warnings (Truncated Domes) 136 SF $19 $2,584 9 Construct 4' Wide Concrete Valley Gutter 95 LF $48 $4,560 10 11 Construct 2' Wide Concrete Bioswale Gutter 47 LF $48 $2,256 Construct Pavement Section 58,266 SF $3.50 $203,931 12 Provide and Install Signage 1 LS $3,404 $3,404 13 Install Striping and Parking Bumpers 1 LS $5,693 $5,693 14 Custom Project Funding Sign and Concrete Footing 1 LS $15,518 $15,518 20151odilakeboatlaunchfacilitysec4.doc 4.2 11/12/15 Item 15 Description QTY Unit Unit Price Total Construct Reinforced Concrete Abutment Wall 93 LF $308 $28,644 16 Construct Reinforced Concrete Boat Ramp with V -Groove 1 LS $27,212 $27,212 $19,840 $7,250 17 Provide and Install Articulating Concrete Block Mattress 320 SF $62 18 19 Provide and Install Aggregate Base Under Boat Ramp and Block Mattress 50 CY $145 Construct Fixed Timber Pier with Reinforced Concrete Caissons 1 LS $45,112 $45,112 20 Provide and Install Mesh Panel Guard Railing 48 LF $213 $10,224 21 Provide and Install Channel Drain System 22 LF $893 $19,646 22 Provide and Install 6" PVC Storm Drain Pipe 29 LF $83 $2,407 23 Provide and Install 8" Black Steel Storm Drain Pipe 78 LF $53 $4,134 24 Provide and Install 12" PVC Storm Drain Pipe 573 LF $52 $29,796 25 26 Provide and Install Caltrans Type "GO" Drainage Inlet 3 EA $4,008 $12,024 Construct 48" Manhole 3 EA $3,787 $11,361 27 Construct Lake Outlet 1 LS $2,072 $2,072 28 Provide and Install Bioswale Outlets 3 EA $3,009 $9,027 29 Provide and Install Discharge Inlet and In- Line Check Valve 1 LS $4,759 $4,759 30 Construct Bioswales 1 LS $42,386 $42,386 31 Provide and Install 8 -inch Water Pipe 142 LF $64 $9,088 32 Replace Blowoff with 2" Water Valve 1 LS $2,015 2,015 33 Replace Frame and Cover and Adjust Utilities to Grade 1 LS $1,833 $1,833 34 Provide and Install Lighting System 1 LS $41,701 $41,701 35 Landscaping and Irrigation Modifications 1 LS $62,081 $62,081 36 Install Benchmark and Survey Monuments 1 LS $638 $638 37 Modify Bathroom Plumbing and Install Drinking Fountain and Install Water Meter 1 LS LS LS $6,609 $6,609 38 Water and Environmental Pollution Control Implementation 1 1 $16,298 $16,298 39 Prepare and Submit As -Built Drawings $638 $638 20151odilakeboatlaunchfaci litysec4.doc 4.3 11/12/15 TOTAL: $893,898 ARTICLE V - By my signature hereunder, as Contractor, I certify that I am aware of the provisions of Section 3700 of the Labor Code, which requires every employer to be insured against liability for workers' compensation or to undertake self-insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the work of this contract. ARTICLE VI - It is further expressly agreed by and between the parties hereto that, should there be any conflict between the terms of this instrument and the Bid Proposal of the Contractor, then this instrument shall control and nothing herein shall be considered as an acceptance of the said terms of said proposal conflicting herewith. ARTICLE VII - The City is to furnish the necessary rights-of-way and easements and to establish lines and grades for the work as specified under the Special Provisions. All labor or materials not mentioned specifically as being done by the City will be supplied by the Contractor to accomplish the work as outlined in the specifications ARTICLE VIII - The Contractor agrees to commence work pursuant to this contract within 15 calendar days after the City Manager has executed the contract and to diligently prosecute to completion within 120 CALENDAR DAYS. ARTICLE IX - State of California Senate Bill 854 requires the following: • No contractor or subcontractor may be listed on a bid proposal for a public works project unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)]. • No contractor or subcontractor may be awarded a contract for public work on a public works project unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5. • This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. ARTICLE X — The Contractor and its subcontractors acknowledge and agree that the Department of Parks and Recreation, Division of Boating and Waterways and its agents may, at any and all reasonable times during the term of this agreement, enter the Project Area for the purpose of inspecting the Project Area. ARTICLE XI — The Contractor and its subcontractors shall not unlawfully discriminate, harass, or allow harassment against any employee who is employed in the work covered by such contracts or against any applicant for such employment because of sex, sexual orientation, race, color, ancestry, religious creed, national origin, physical disability (inclusing HIV and AIDS), mental disability, medical condition (cancer), age, marital status, and denial of family care leave, and that such provisions shall include, but not be limited to: employment, upgrading, promortion or transfer, recruitment advertising, layoff or termination, rates of pay or other forms of compensation, and selection for training including apprenticeship, . ARTICLE XII — The Contractor and its subcontractors shall comply with all air pollution and environmental control rules, regulations, ordinances and statutes which apply to the Project and any work performed pursuant to this Agreement. 20151odilakeboatlaunchfacilitysec4. doc 4.4 11/12/15 WHEN SIGNING THIS CONTRACT, THE CONTRACTOR AGREES THAT THE TIME OF COMPLETION FOR THIS CONTRACT IS REASONABLE AND THE CONTRACTOR AGREES TO PAY THE CITY LIQUIDATED DAMAGES AS SET FORTH IN SECTION 6-04.03 OF THE SPECIAL PROVISIONS. CONTRACTOR AGREES THAT THIS AMOUNT MAY BE DEDUCTED FROM THE AMOUNT DUE THE CONTRACTOR UNDER THE CONTRACT. IN WITNESS WHEREOF, the parties to these presents have hereunto set their hands the year and date written below. CONTRACTOR: CITY OF LODI, a municipal corporation By: STEPHEN SCHWABAUER City Manager By: Date: Attest: Title JENNIFER M. FERRAIOLO City Clerk (CORPORATE SEAL) Approved As To Form: 20151odi la keboatlau nchfacilitysec4.doc JANICE D. MAGDICH City Attorney 4.5 11/12/15 1 AA# 2 JV# CITY OF LODI APPROPRIATION ADJUSTMENT REQUEST TO: 3. FROM' 4. DEPARTMENT/DIVISION: Internal Services Dept. - Budget Division Rebecca Areida-Yadav 5 DATE: 11/23/2015 Public Works 6. REQUEST ADJUSTMENT OF APPROPRIATION AS LISTED BELOW FUND # BUS UNIT # ACCOUNT # ACCOUNT TITLE AMOUNT A. SOURCE OF FINANCING 432 32205 Fund Balance $ 125.000.00 437 32205 Fund Balance $ 75.000.00 B. USE OF FINANCING 432 43299000 77020 Parks Capital Projects $ 125,000.00 _ 437 43799000 77020 Parks Impact Fee Capital Projects $ 75,000.00 7. REQUEST IS MADE TO FUND THE FOLLOWING PROJECT NOT INCLUDED IN THE CURRENT BUDGET Please provide a description of the project, the total cost of the project, as well as justification for the requested adjustment. If you need more space, use an additional sheet and attach to this form. Contract for Lodi Lake Park boat launch facility project,this approrpriation will cover contingenices for the project. If Council has authorized the appropriation adjustment, complete the following: Meeting Date: Department Head Signature: Res No: Attach copy of resolution to this form. 8. APPROVAL SIGNATURES Deputy City Manager/Internal Services Manager Date Submit completed form to the Budget Division with any required documentation. Final approval will be provided in electronic copy format. RESOLUTION NO. 2015-228 A RESOLUTION OF THE LODI CITY COUNCIL APPROPRIATING FUNDS FOR LODI LAKE PARK — BOAT LAUNCH FACILITY IMPROVEMENTS WHEREAS, on November 4, 2015, Council authorized the City Manager to award the contract for the Lodi Lake Park — Boat Launch Facility Improvements to the lowest responsive bidder, in an amount not to exceed $900,000; and WHEREAS, the City Manager awarded the contract to PBM Construction for $893,989, and the contract documents are currently being processed and construction is scheduled to begin in January; and WHEREAS, Council previously approved and appropriated a total of $920,000 for the project; and WHEREAS, staff recommends appropriating an additional $200,000 to account for construction contingencies and anticipated non -construction costs, such as construction inspection, testing, and construction management. NOW, THEREFORE, BE IT RESOLVED that the Lodi City Council does hereby appropriate funds in the amount of $200,000 for the Lodi Lake Park — Boat Launch Facility Improvements. Dated: December 16, 2015 I hereby certify that Resolution No. 2015-228 was passed and adopted by the City Council of the City of Lodi in a regular meeting held December 16, 2015, by the following vote: AYES: COUNCIL MEMBERS — Johnson, Kuehne, Nakanishi, and Mayor Chandler NOES: COUNCIL MEMBERS — None ABSENT: COUNCIL MEMBERS — Mounce ABSTAIN: COUNCIL MEMBERS — None NNIFER . FERRAIOLO City Clerk 2015-228