Loading...
HomeMy WebLinkAboutAgenda Report - December 16, 2015 C-12CITY OF LODI COUNCIL COMMUNICATION AGENDA ITEM C-12 TM AGENDA TITLE: Accept Improvements Under Contract for 2015 Pavement Surface Treatment Project MEETING DATE: December 16, 2015 PREPARED BY: Interim Public Works Director RECOMMENDED ACTION: Accept improvements under contract for 2015 Pavement Surface Treatment Project. BACKGROUND INFORMATION: The contract was awarded to VSS International, Inc., of West Sacramento, in the amount of $932,000, on June 3, 2015, and has been completed in substantial conformance with the plans and specifications. The project consisted of rehabilitating and resurfacing various City streets with rubberized asphalt cape seal (a combination of rubberized chip seal and slurry seal), and fiberized slurry seal (slurry seal with glass fiber added). The rubberized asphalt cape seal was applied to streets with more surface defects while fiberized slurry seal was applied to streets with fewer surface defects (Exhibit A). The contract completion date was August 21, 2015 and the final contract price was $986,592.23. The difference between the original contract amount and the final contract price is due to an adjustment of final bid item quantities and two contract change orders. Change Order No.1 was issued to correct an unsuitable subgrade deficiency at Woodlake Court that was encountered during pavement repair. Change Order No. 2 was issued to install Type II slurry seal on Evergreen Drive from Elm Street to Paradise Drive. Both change orders were requested by the City. Following acceptance by the City Council, as required by law, the City Engineer will file a Notice of Completion with the County Recorder's office. The notice serves to notify vendors and subcontractors that the project is complete and begins their 30 -day period to file a stop notice requiring the City to withhold payments from the prime contractor in the event of a payment dispute. FISCAL IMPACT: The project will reduce maintenance costs in the project areas. FUNDING AVAILABLE: Prop 1B (31599000) $ 44,430 TDA Streets (30599000) $400,000 Measure K (30399000) $186,593 Gas Tax (30299000) $355,570 Total $986,593 Charles E. Swimley, Jr. Interim Public Works Director Prepared Lyman Chang, Interim City Engineer/Deputy Public Works Director CES/LC/tdb Attachment cc: Utility Superintendent Management Analyst VSS International, Inc. APPROVED: Step' Sc a• -uer, City Manager K:\WP\PROJECTS\STREETS\2015 Pavement Surface Treatment\CAccept 2015 Cape Seal (2).doc 12/2/2015 2015 Pavement Surface Treatment Project Photo Murray Street Evergreen Drive 2015 Pavement Surface Treatment Project Photo Eilers Lane Pioneer Drive