HomeMy WebLinkAboutAgenda Report - December 16, 2015 C-04CITY OF LODI COUNCIL COMMUNICATION TM AGENDA TITLE: MEETING DATE: PREPARED BY: AGENDA ITEM C-4 Approve Plans and Specifications and Authorize Advertisement for Bids for Water Meter Program Phase 6 December 16, 2015 Interim Public Works Director RECOMMENDED ACTION: Approve plans and specifications and authorize advertisement for bids for Water Meter Program Phase 6. BACKGROUND INFORMATION: At the May 2, 2007 City Council meeting, the Water Meter Retrofit Policy was adopted. The primary objectives of the Water Meter Retrofit Policy were to accelerate the installation of residential water meters before the State's 2025 deadline and limit the time period during which some customers would be paying for water on flat rate and others on a usage basis. At the October 20, 2010 City Council meeting, a seven-year construction phasing was approved and the property owner meter payment was capped at $300 per parcel. The first of seven construction projects was awarded by Council in March 2011 and included the installation of 3,698 meters and the replacement of 4,220 feet of water main. The second construction project was awarded in March 2012 and included the installation of 2,111 meters and the replacement of 26,350 feet (five miles) of water main. The third construction project was awarded in March 2013 and included the installation of 1,465 meters and the replacement of 20,310 feet (3.8 miles) of water main. The fourth construction project was awarded in March 2014 and included the installation of 1,334 meters and the replacement of approximately 24,000 feet (4.5 miles) of water main. The fifth construction project was awarded in March 2015 and included the installation of 905 meters and the replacement of approximately 16,630 feet (3.1 miles) of water main. The Water Meter Program has been lengthened to an eight-year project by dividing Phase 7 into two phases. This was done to reduce construction impacts in the Phase 7 area and to preserve fund balance in the water utility. The project area for Phase 6 is presented in Exhibit A and includes the installation of 938 meters and the replacement of approximately 27,090 feet (5.1 miles) of water main. The estimated construction cost of $7.23 million (including the cost of the water meter assemblies, construction administration, inspection and contingencies) is in line with previous estimates. Construction is expected to begin in April and conclude in November 2016. Plans and specifications for the project are on file in the Public Works Department. The planned bid opening date is February 11, 2016. FISCAL IMPACT: Water main leak and service repairs will be reduced. No additional costs will be incurred for reading of the meters as they are automatically read concurrent with the reading of the electric meters. FUNDING AVAILABLE: Funding will be identified at project award. CLQ Charles E. Swimley, Jr. Interim Public Works Director CES/CES/tdb Attachment cc: Lance Roberts, Utilities Superintendent — Public Works Tony Valdivia, RMC Water and Environment APPROVED: phen K:\WP\PROJECTS\WATER\Meters\Water Meter Program Phase 6\CPSA_ doc auer, City Manager 12/7/2015 ("5 -Carolina m c 0 0 :1=11411 01111"911111 LocReford�St_ � i Lockeford St. 7 Ns 11111=1111111•1•1•111 rhp MI MO ploirird%M.11 agaLodi' Av. ■.----.�� i■■■■■1Ai.N.■1ceHIMj 1111111111111 1I==ij 1 -- __- r t)' Taylor Rd. 01 KristCt. - LC; x L Legend WMP Phase 6 EXHIBIT A Water Meter Project Boundary Phase 6 User: Ichang Path: K:\WP\PROJECTS\WATER\Meters\Water Meter Program Phase 6\Proj_Bdy.mxd N W E s