Loading...
HomeMy WebLinkAboutAgenda Report - November 18, 2015 C-21CITY OF LODI COUNCIL COMMUNICATION TM AGENDA TITLE: MEETING DATE: PREPARED BY: AGENDA ITEM C -Zi Receive Update on Emergency Condition at White Slough Water Pollution Control Facility Digesters No. 1 and No. 2 November 18, 2015 Public Works Director RECOMMENDED ACTION: Receive update on emergency condition at White Slough Water Pollution Control Facility Digesters No. 1 and No. 2. BACKGROUND INFORMATION: White Slough Water Pollution Control Facility (WSWPCF) has four covered anaerobic digesters that serve the purpose of breaking down sewage sludge that enters the plant. On July 16, 2014, Council declared an emergency condition in response to concurrent roof failures on Digesters No. 1 and No. 2. Public contract code requires Council to review the emergency action at its next regularly -scheduled meeting and each regularly -scheduled meeting thereafter until the emergency is terminated. The completed Digester No. 2 became operational on April 6, 2015. The construction work to repair Digester No. 1 cover is complete. The digester was expected to become operational by August 27, 2015. Prior to commissioning, the contractor performed a leak test on the digester structure using clear water. The test determined a number of very small, non-structural leaks in the digester wall that must be repaired. The appropriate leak repair methods have been determined and the work is underway. The estimated cost to perform the leak repairs is $120,000. Expenditures to date for the repair of both digesters is $2,450,000. The total cost, including the leak repairs to Digester No. 1, will not exceed the original appropriation of $3,100,000. The procurement and construction schedule reflecting project milestones is provided below. It is expected that the leak repairs will be completed by January of 2016. Project Definition Meeting Issue Final Contract Documents Receive GMP Proposals Issue Notice to Proceed Complete Digester No. 2 Improvements Complete Digester No. 1 Improvements Digester No. 1 Leak Repairs Digester No. 1 Back in Service FISCAL IMPACT: FUNDING AVAILABLE: Not applicable. Not applicable. July 21, 2014 August 1, 2014 August 20, 2014 September 15, 2014 April 2, 2015 August 27, 2015 December 1, 2015 January 1, 2016 td., F. Wally Sandelin Public Works Director Prepared by Charlie Swimley, City Engineer / Deputy Public Works Director FWS/CES/tb cc: Associate Civil Engineer Nathan Charlie Swimley, City Engineer / Deputy Public Works Director Wastewater Plant Superintendent Construction Project Manager APPROVED: -ue , City Manager K:\WP\PROJECTS\SEWER\WSWPCF\DigesterRepairs\Council Updates\CUpdate111815.doc 10/29/2015