Loading...
HomeMy WebLinkAboutAgenda Report - November 18, 2015 C-06TM CITY OF LODI COUNCIL COMMUNICATION AGENDA ITEM C-6 AGENDA TITLE: Adopt Resolution Authorizing City Manager to Execute Contract for Harney Lane Grade Separation Project, to DeSilva Gates Construction, LP, of Dublin, ($14,313,075), Approving the Extension of Cooperative Work Agreement, and Appropriating Funds ($16,875,182), Subject to Caltrans Approval of Disadvantaged Business Enterprise Documentation MEETING DATE: PREPARED BY: November 18, 2015 Public Works Director RECOMMENDED ACTION: Adopt resolution authorizing City Manager to execute contract for Harney Lane Grade Separation Project, to DeSilva Gates Construction, LP, of Dublin, in the amount of $14,313,075, approving the extension of Cooperative Work Agreement, and appropriating funds, in the amount of $16,875,182, subject to Caltrans approval of Disadvantaged Business Enterprise Documentation. BACKGROUND INFORMATION: The project consists of constructing, widening, and realigning Harney Lane, including the construction of a new three -span, cast- in-place, post - tensioned concrete box girder, approximately 248 feet long and 88 feet wide, to grade separate Harney Lane at the Union Pacific Rail Road track. Work includes signal modifications (temporary and permanent), drainage and utility installation, street lighting, landscaping, constructing raised medians, curbs, gutters and sidewalks, and other incidental and related work, in accordance with the plans and specifications. Plans and specifications for this project were approved on July 15, 2015. The City received the authorization to proceed from Caltrans on September 4, 2015. The City received the following nine bids for this project on October 29, 2015. Bidder Location Bid Engineer's Estimate $14,747,378.00 DeSilva Gates Construction, LP Dublin $14,313,074.75 Goodfellow Top Grade Construction, LLC Livermore $15,087,765.00 George Reed, Inc. Modesto $15,510,635.00 Bay Cities Paving & Grading, Inc. Concord $15,779,658.38 RGW Construction, Inc. Livermore $15,790,794.70 Viking Stephens Joint Venture Lodi $16,070,432.05 Teichert Construction Fowler $16,124,862.00 McGuire Hester Oakland $16,352,357.00 Brosamer & Wall, Inc. Walnut Creek $18,458,584.00 Regional Surface Transportation Program funds in the approximate amount of $600,000 have been allocated to the project and are scheduled to lapse on June 30, 2016. In order to preserve this funding source, it is necessary to request an extension of the associated Cooperative Working Agreement (CWA) with Caltrans Local Assistance that administers these federal funds. Staff recommends that Council award the project to the low bidder, DeSilva Gates Construction, LP, and authorize City Manager to execute contract within the appropriation, subject to Caltrans approval of Disadvantaged Business Enterprise documentation. Staff also recommends that Council extend the CWA. APPROVED: h`wa aue City Manager K:\WP\PROJECTS\STREETS\HarneyGradeSeparation\Project\CAward HLGS.doc 11/11/2015 Adopt Resolution Authorizing City Manager to Execute Contract for Harney Lane Grade Separation Project, to DeSilva Gates Construction, LP, of Dublin, ($14,313,075), Approving the Extension of Cooperative Work Agreement, and Appropriating Funds ($16,875,182), Subject to Caltrans Approval of Disadvantaged Business Enterprise Documentation November 18, 2015 Page 2 The requested appropriation covers the construction contract, construction management by City staff, testing and inspection services (contract to be approved by City Council at a later date), San Joaquin Council of Governments Incidental Take Minimization Measures Agreement, and project contingencies. FISCAL IMPACT: There will be a slight increase in the Tong -term maintenance of the streetlights, landscape, and streetscape, and a short-term decrease in street maintenance costs. FUNDING AVAILABLE: Requested appropriation: Regional Surface Transportation Program (30799000) $1,996,182 State Transportation Improvement Program (30799000) $12,100,000 Section 190 (30799000) $2,000,000 Union Pacific Railroad Contribution (30799000) $422,000 Regional Transportation Impact Fee (31499000) $330,000 Measure K (30399000) $27,000 Total $16,875,182 c Jordan Ayers Deputy City Manager/Internal Services Director Prepared by Gary Wiman, Construction Project Manager FWS/GW/tdb Attachment cc: Deputy Public Works Director/City Engineer Management Analyst DeSilva Gates Construction, LP F,ally S fdelin Public Works Director K:\WP\PROJECTS\STREETS\HarneyGradeSeparation\Project\CAward HLGS.doc 11/11/2015 GRADE SEPARATION HARNEY LANE AT UPRR CONTRACT STPL5154(040) CITY OF LODI, CALIFORNIA THIS CONTRACT made by and between the CITY OF LODI, State of California, herein referred to as the "City," and DESILVA GATES CONSTRUCTION L.P., herein referred to as the "Contractor." WITNESSETH: That the parties hereto have mutually covenanted and agreed, and by these presents do covenant and agree with each other, as follows: The complete GRADE SEPARATION HARNEY LANE AT UPRR Contract consists of the following documents which are incorporated herein by this reference, to -wit: Notice Inviting Bids Instruction to Bidders Bid Forms Contract Contract Bonds General Conditions General Requirements (Division 1) Technical Specifications Plans Addenda All of the above documents, sometimes hereinafter referred to as the "Contract Documents," are intended to cooperate so that any work called for in one and not mentioned in the other is to be executed the same as if mentioned in all said documents. ARTICLE I - That for and in consideration of the payments and agreements hereinafter mentioned, to be made and performed by the City and under the condition expressed in the two bonds bearing even date with these presents and hereunto annexed, the Contractor agrees with the City, at Contractor's cost and expense, to do all the work and furnish all the materials except such as are mentioned in the specifications to be furnished by the City, necessary to construct and complete in a good workmanlike and substantial manner and to the satisfaction of the City the proposed improvements as shown and described in the Contract Documents which are hereby made a part of the Contract. ARTICLE II - The City hereby promises and agrees with the Contractor to employ, and does hereby employ, the Contractor to provide all materials and services not supplied by the City and to do the work according to the terms and conditions for the price herein, and hereby contracts to pay the same as set forth Clauses 65 and 66 of the General Conditions, in the manner and upon the conditions above set forth; and the said parties for themselves, their heirs, executors, administrators, successors and assigns, do hereby agree to the full performance of the covenants herein contained. ARTICLE III - The Contractor agrees to conform to the provisions of Chapter 1, Part 7, Division 2 of the Labor Code. The Contractor and any Subcontractor will pay the general prevailing wage rate and other employer payments for health and welfare, pension, vacation, travel time, and subsistence pay, apprenticeship or other training programs. The responsibility for compliance with these Labor Code requirements is on the prime contractor. ARTICLE IV - And the Contractor agrees to receive and accept the following prices as full compensation for furnishing all materials and for doing all the work contemplated and embraced in this agreement; also for all loss or damage arising out of the nature of the work aforesaid or from the action of the elements, or from any unforeseen difficulties or obstructions which may arise or be encountered in the prosecution of the work until its acceptance by the City, and for all risks of every description connected with the work; also for all expenses incurred by or in consequence of the suspension or discontinuance of work and for well and faithfully completing the work, and the whole thereof, in the manner and according to the Plans and Contract Documents and the requirements of the Engineer under them, to -wit: Perform the work necessary to construct widening and realignment Harney Lane including the construction of a new three -span, cast in place, post tensioned concrete box girder approximately 248 feet long and 88 feet wide to grade separate Harney Lane at the Union Pacific Rail Road track. Work includes signal modifications (temporary & permanent), drainage and utility installation, street lighting, landscaping, construction of raised medians, curb gutter and sidewalk, and other incidental and related work, in accordance with Plans and Specifications for GRADE SEPARATION HARNEY LANE AT UPRR. BID ITEMS Item Description Unit Qty Unit Cost Total Cost Roadway Items 1 Construction Notifications LS 1 $2,000 $2,000 2 Excavation Safety LS 1 $10,000 $10,000 3 Storm Water Pollution Prevention Plan and Construction Site Monitoring and Reporting Plan LS 1 $5,000 $5,000 4 Potholing LS 1 $20,000 $20,000 5 Progress Schedule (Critical Path Method) LS 1 $5,000 $5,000 6 Temporary Fence (Type CL -6) with Privacy Slats LF 440 $12 $5,280 7 Temporary Fence (Type CL -6) LF 2880 $12 $34,560 8 Construction Site Management LS 1 $20,000 $20,000 9 Street Sweeping LS 1 $10,000 $10,000 10 Move-in/Move-out Temporary Erosion Control EA 2 $650 $1,300 11 Temporary Erosion Control Blanket SY 6,200 $4 $24,800 12 Temporary Fiber Roll LF 32,700 $3 $98,100 13 Temporary Silt Fence LF 210 $4 $840 14 Temporary Concrete Washout Facility EA 6 $2,500 $15,000 15 Temporary Construction Entrance EA 8 $2,500 $20,000 16 Temporary Drainage Inlet Protection EA 38 $300 $11,400 17 Erosion Control (Hydroseed) SF 146,000 $0.10 $14,600 18 Temporary Check Dam EA 35 $40.00 $1,400 19 Construction Area Signs LS 1 $20,000 $20,000 20 Traffic Control System LS 1 $90,000 $90,000 21 Type II Barricade EA 6 $50 $300 22 Type III Barricade EA 23 $100 $2,300 23 Temporary Traffic Stripe (Tape) LF 1,000 $2.00 $2,000 24 Temporary Pavement Marking (Paint) SF 670 $3 $2,010 25 Temporary Traffic Stripe (Paint) LF 25,700 $0.75 $19,275 26 Channelizer (Surface Mounted) EA 206 $35 $7,210 27 Traffic Plastic Drum EA 462 $50 $23,100 28 Temporary Pavement Marker EA 515 $5 $2,575 29 Portable Changeable Message Sign EA 4 $7,500 $30,000 30 Temporary Railing (Type K) LF 4,120 $20 $82,400 31 Alternative Temporary Crash Cushion EA 9 $3,000 $27,000 32 Temporary Retaining Wall SF 6,000 $25 $150,000 33 Abandon Septic Tank LS 1 $3,000 $3,000 34 Abandon Leach Field LS 1 $2,000 $2,000 35 Abandon 10" Water Line LF 270 $30 $8,100 36 Abandon Culvert LF 440 $35 $15,400 37 Abandon Drainage Inlet EA 1 $1,000 $1,000 38 Relocate Boulder EA 13 $200 $2,600 39 Remove Fence LF 3,210 $1 $3,210 40 Remove Wall LF 70 $60 $4,200 41 Remove Bollard EA 1 $250 $250 42 Remove Traffic Stripe LF 8,120 $1 $8,120 43 Remove Pavement Marking SF 550 $3 $1,650 44 Remove Roadside Sign EA 8 $50 $400 45 Reset Roadside Sign EA 3 $150 $450 46 Remove Concrete Curb LF 420 $10 $4,200 47 Remove Concrete SF 3,670 $5 $18,350 48 Remove Culvert LF 190 $50 $9,500 49 Remove Drainage Inlet EA 5 $1,000 $5,000 50 Remove K -rail LF 210 $10 $2,100 51 Relocate Mailbox EA 1 $150 $150 52 Relocate Fire Hydrant EA 1 $5,000 $5,000 53 Relocate 10" Water Line LF 60 $100 $6,000 54 Remove Base and Surfacing CY 220 $10 $2,200 55 Relocate Roadside Sign EA 13 $150 $1,950 56 Relocate Sliding Gate EA 1 $2,000 $2,000 57 Relocate Sign Structure (Valley Iron Works) EA 1 $5,000 $5,000 58 Adjust Manhole to Grade (Std Plan 123) EA 9 $700 $6,300 59 Adjust Utility Cover to Grade (Std Plan 123) EA 26 $500 $13,000 60 Install Manhole (AT&T) EA 4 $6,000 $24,000 61 Install Electric Vault (LE) EA 6 $6,000 $36,000 62 Cold Plane Asphalt Concrete Pavement SY 2,400 $2 $4,800 63 Clearing and Grubbing LS 1 $190,000 $190,000 64 Clearing and Grubbing (Vineyard) LS 1 $15,000 $15,000 65 Remove Tree EA 316 $85 $26,860 66 Develop Water Supply LS 1 $30,000 $30,000 67 Roadway Excavation CY 14,320 $20 $286,400 68 Imported Borrow CY 150,340 $16.70 $2,510,678 69 Redwood Header Board LF 90 $10 $900 70 Aggregate Base (Class 2) CY 15,850 $46 $729,100 71 Hot Mix Asphalt (Type A) TN 12,980 $80 $1,038,400 72 Hot Mix Asphalt (Type B) TN 90 $125 $11,250 73 Slurry Seal (Type II) TN 165 $240 $39,600 74 HMA Dike (Type A) LF 110 $15 $1,650 75 Pavement Reinforcing Fabric SY 5,630 $1.00 $5,630 76 16" Cast -in -drill-hole Concrete Piling (Sound Wall) LF 2,450 $68 $166,600 77 Structural Concrete (Sound Wall) CY 132 $700 $92,400 78 Masonry Block (Sound Wall) SF 15,600 $36 $561,600 79 Roadside Sign - One Post EA 21 $200 $4,200 80 Install Sign (Strap And Saddle Bracket Method) EA 31 $80 $2,480 81 Joint Trench Excavation / Bedding / Backfill and Restore LF 2,260 $30 $67,800 82 2" Schedule 40 PVC Conduit (LE) LF 9,600 $8 $76,800 83 6" Schedule 40 PVC Conduit (LE) LF 4,800 $10 $48,000 84 4" Type C PVC Conduit (AT&T) LF 9,600 $9 $86,400 85 Jacked 16" Welded Steel Pipe Casing (AT&T) (UPRR Crossing) LF 140 $500 $70,000 86 Jacked 18" Welded Steel Pipe Casing (LE) (UPRR Crossing) LF 140 $500 $70,000 87 Jacked 14" Welded Steel Pipe Casing (UPRR Crossing) LF 140 $500 $70,000 88 Irrigation Crossover (4" Schedule 40 PVC) LF 820 $45 $36,900 89 6" PVC Pipe (C900) (DR14) (Water Line) LF 110 $60 $6,600 90 10" PVC Pipe (C900) (DR14) (Water Line) LF 690 $60 $41,400 91 10" PVC Pipe (C900) (DR18) (Recycled Water Line) LF 3,540 $60 $212,400 92 6" Gate Valve (Std Plan 402) EA 3 $1,500 $4,500 93 10" Gate Valve (Std Plan 402) EA 10 $2,000 $20,000 94 10" Butterfly Valve (Recycled Water Line) EA 2 $2,500 $5,000 95 1" Air Release Valve EA 2 $3,500 $7,000 96 4" Blow -off Valve (Std Plan 404) EA 2 $3,000 $6,000 97 Temporary 4" Blow -off Valve (Std Plan 409) EA 2 $3,000 $6,000 98 12" PVC Pipe LF 490 $75 $36,750 99 12" Reinforced Concrete Pipe (Class III) LF 520 $80 $41,600 100 12" Ductile Iron Pipe LF 90 $80 $7,200 101 18" Reinforced Concrete Pipe (Class III) LF 1,770 $90 $159,300 102 12" Concrete Flared End Section EA 1 $2,500 $2,500 103 18" Concrete Flared End Section EA 3 $3,000 $9,000 104 Drainage Inlet - Type GO EA 9 $4,500 $40,500 105 Drainage Inlet - Type G1 EA 1 $4,500 $4,500 106 Drainage Inlet - Type OCP EA 1 $4,500 $4,500 107 Drainage Inlet - Side Inlet Catch Basin (Std Plan 303) EA 8 $3,500 $28,000 108 Drainage Inlet - Drop Inlet Catch Basin (Std Plan 304) EA 2 $3,500 $7,000 109 48" Manhole (Std Plan 301) EA 11 $3,500 $38,500 110 Wastewater Service (Std Plan 203) EA 1 $1,500 $1,500 111 1" Water Service (Std Plan 403) EA 2 $2,000 $4,000 112 Fire Hydrant (Std Plan 401) EA 2 $4,500 $9,000 113 Rock Slope Protection (Facing, Method B)113 CY 8 $500 $4,000 114 Rock Slope Protection Fabric SY 20 $25 $500 115 Minor Concrete (Backfill) CY 19 $235 $4,465 116 Minor Concrete - Curb Type "A1-6" LF 680 $20 $13,600 117 Minor Concrete - Curb Type "Al -LF Mod" 6,780 $35 $237,300 118 Minor Concrete - Rolled Curb & Gutter (Std Plan 136) LF 90 $20 $1,800 119 Minor Concrete - Vertical Curb & Gutter (Std Plan 135) LF 5,300 $20 $106,000 120 Minor Concrete - Sidewalk SF 25,360 $4 $101,440 121 Minor Concrete - Commercial Driveway (Std Plan 114) SF 5,840 $6 $35,040 122 Minor Concrete - Misc Areas SF 3,660 $6 $21,960 123 Minor Concrete - Residential Driveway (Std Plan 135) SF 550 $4 $2,200 124 Minor Concrete - Texture Paving SF 11,550 $6 $69,300 125 Minor Concrete (Curb Ramp) EA 13 $800 $10,400 126 Concrete Ditch LF 490 $40 $19,600 127 Pipe Gate EA 3 $3,000 $9,000 128 Chain Link Fence (Type CL -6) LF 1,320 $12 $15,840 129 Chain Link Fence (Type CL -6 MOD) LF 1,500 $15 $22,500 130 Chain Link Gate (Dual 12' - Type CL -6) EA 4 $2,000 $8,000 131 Chain Link Gate (Dual 16' - Type CL -6 MOD) EA 2 $1,500 $3,000 132 Chain Link Gate (Dual Automatic 12' CL -6) EA 2 $7,500 $15,000 133 Access Road Automatic Sliding Gate (50') EA 1 $40,000 $40,000 134 Object Marker (Type N-1) EA 2 $50 $100 135 Object Marker (Type K-1) EA 6 $50 $300 136 Dead -End Barricade (Swk) (Std Plan 128) EA 8 $400 $3,200 137 Thermoplastic Traffic Stripe LF 25,100 $0.50 $12,550 138 Thermoplastic Pavement Marking SF 2,550 $3 $7,650 139 Pavement Marker EA 500 $5 $2,500 140 UPRR Flagging DAY 120 $1,400 $168,000 141 Mobilization/Demobilization LS 1 $1,430,000 $1,430,000 Structure Items 142 Structure Excavation (Bridge) CY 1,411 $40 $56,440 143 Structure Backfill (Bridge) CY 820 $80 $65,600 144 24" CIDH Concrete Piling LF 3,996 $42 $167,832 145 Prestressing Cast In Place Concrete LS 1 $70,000 $70,000 146 Structural Concrete, Bridge Footing CY 410 $400 $164,000 147 Structural Concrete, Bridge CY 1,849 $700 $1,294,300 148 StructuralConcrete, Approach Slab Type N) CY 196 $700 $137,200 149 Drill and Bond Dowel LF 138 $30 $4,140 150 Joint Seal (MR 2") LF 172 $100 $17,200 151 Bar Reinforcing Steel (Bridge) LB 677,409 $0.75 $508,056.75 152 24" Welded Steel Pipe Casing (Bridge) LF 158 $115 $18,170 153 Slope Paving (Concrete) CY 101 $600 $60,600 154 Minor Concrete (Bridge Median) CY 45 $600 $27,000 155 Miscellaneous Metal (Bridge) LB 684 $3 $2,052 156 Chain Link Railing (Type 6 Modified) LF 553 $100 $55,300 157 Concrete Barrier (Type 26 Modified) LF 555 $160 $88,800 Landscape Items 158 Irrigation System LS 1 $250,000 $250,000 159 Import Top Soil, Soil Preparation, Amendments & Fine Grading LS 1 $25,000 $25,000 160 2" Bark Mulch CY 510 $60 $30,600 161 Root Control Barriers EA 840 $20 $16,800 162 Trees (15 Gal.) EA 195 $75 $14,625 163 Shrubs (5 Gal.) EA 1,359 $18 $24,462 164 Shrubs (1 Gal.) EA 1,979 $6 $11,874 165 Plant Establishment Period (730 Calendar Day) LS 1 $40,000 $40,000 Electrical Items 166 Traffic Signal Modification - Hutchins Street LS 1 $200,000 $200,000 167 Traffic Signal Modification - Stockton Street LS 1 $125,000 $125,000 168 LED Street Lighting Installation LS 1 $200,000 $200,000 169 Future SIC and Utility Conduit LS 1 $50,000 $50,000 170 Opticom Emitters EA 3 $1,000 $3,000 171 Temp Lighting LS 1 $50,000 $50,000 172 Traffic Signal (Temporary) LS 1 $200,000 $200,000 173 All Other Items LS 1 $75,000 $75,000 Total Amount $14,313,074.75 ARTICLE V - By my signature hereunder, as Contractor, I certify that I am aware of the provisions of Section 3700 of the Labor Code, which requires every employer to be insured against liability for workers' compensation or to undertake self-insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the work of this contract. ARTICLE VI - It is further expressly agreed by and between the parties hereto that, should there be any conflict between the terms of this instrument and the Bid Proposal of the Contractor, then this instrument shall control and nothing herein shall be considered as an acceptance of the said terms of said proposal conflicting herewith. ARTICLE VII - The City is to furnish the necessary rights-of-way and easements and to establish lines and grades for the work as specified under the Technical Specifications. All labor or materials not mentioned specifically as being done by the City will be supplied by the Contractor to accomplish the work as outlined in the specifications. ARTICLE VIII - The Contractor agrees to commence work pursuant to this contract on the date stipulated in the Notice to Proceed and to diligently prosecute to completion within 535 CALENDAR DAYS. This Agreement provides for liquidated damages in the amount of $6,700 per day for each day the work is not completed by the Contractor beyond the time specified in this Article. WHEN SIGNING THIS CONTRACT, THE CONTRACTOR AGREES THAT THE TIME OF COMPLETION FOR THIS CONTRACT IS REASONABLE AND THE CONTRACTOR AGREES TO PAY THE CITY LIQUIDATED DAMAGES AS SET FORTH ABOVE. CONTRACTOR AGREES THAT THIS AMOUNT MAY BE DEDUCTED FROM THE AMOUNT DUE THE CONTRACTOR UNDER THE CONTRACT. IN WITNESS WHEREOF, the parties to these presents have hereunto set their hands the year and date written below. CONTRACTOR: CITY OF LODI By: Stephen Schwabauer City Manager By: Date: Title (CORPORATE SEAL) Attest: Jennifer M. Ferraiolo City Clerk Approved As To Form Janice D. Magdich City Attorney 1. AA# 2. JV# CITY OF LODI APPROPRIATION ADJUSTMENT REQUEST TO: Internal Services Dept. - Budget Division ACCOUNT # 3. FROM: Rebecca Areida-Yadav 5. DATE: 11/9/2015 4. DEPARTMENT/DIVISION: Public Works 30700000 6. REQUEST ADJUSTMENT OF APPROPRIATION AS LISTED BELOW FUND # BUS. UNIT # ACCOUNT # ACCOUNT TITLE AMOUNT A. SOURCE OF FINANCING 307 30700000 56402 Other Federal Grants $ 16,518,182.00 303 30300000 56037 Reimb-Measure K $ 27,000 00 314 32205 Fund Balance $ 330,000.00 B. USE OF FINANCING 307 30799000 77020 Capital Projects $ 16,518,182.00 303 30399000 77020 Capital Projects $ 27.000.00 314 31499000 77020 Capital Projects $ 330,000.00 7. REQUEST IS MADE TO FUND THE FOLLOWING PROJECT NOT INCLUDED IN THE CURRENT BUDGET Please provide a description of the project, the total cost of the project, as well as justification for the requested adjustment. If you need more space, use an additional sheet and attach to this form. Construction contract, staff time, inspection contract and contingencies for Harney Lane Grade Separation project. If Council has authorized the appropriation adjustment, complete the following: Meeting Date: Department Head Signature: Res No: Attach copy of resolution to this form. 8. APPROVAL SIGNATURES Deputy City Manager/Internal Services Manager Date Submit completed form to the Budget Division with any required documentation. Final approval will be provided in electronic copy format. RESOLUTION NO. 2015-201 A RESOLUTION OF THE LODI CITY COUNCIL AWARDING THE BID FOR THE HARNEY LANE GRADE SEPARATION PROJECT TO DESILVA GATES CONSTRUCTION, LP, OF DUBLIN, SUBJECT TO CALTRANS APPROVAL OF DISADVANTAGED BUSINESS ENTERPRISE DOCUMENTATION; APPROVING EXTENSION OF COOPERATIVE WORK AGREEMENT; APPROPRIATING FUNDS; AND FURTHER AUTHORIZING THE CITY MANAGER TO EXECUTE ALL CONTRACTS/AGREEMENTS ON BEHALF OF THE CITY OF LODI WHEREAS, in answer to notice duly published in accordance with law and the order of this City Council, sealed bids were received and publicly opened on October 29, 2015, at 11:00 a.m., for the Harney Lane Grade Separation Project, described in the plans and specifications therefore approved by the City Council on July 15, 2015; and WHEREAS, said bid has been checked and tabulated and a report thereof filed with the City Manager as follows: Bidder Bid DeSilva Gates Construction, LP $14,313,074.75 Goodfellow Top Grade Construction, LLC $15,087,765.00 George Reed, Inc. $15,510,635.00 Bay Cities Paving & Grading, Inc. $15,779,658.38 RGW Construction, Inc. $15,790,794.70 Viking Stephens Joint Venture $16,070,432.05 Teichert Construction $16,124,862.00 McGuire Hester $16,352,357.00 Brosamer & Wall, Inc. $18,458,584.00 WHEREAS, staff recommends awarding the bid for the Harney Lane Grade Separation Project to the low bidder, DeSilva Gates Construction, LP, of Dublin in the amount of $14,313,074.75, subject to Caltrans approval of Disadvantaged Business Enterprise documentation; and WHEREAS, Regional Surface Transportation Program funds in the approximate amount of $600,000 have been allocated to the project and are scheduled to lapse on June 30, 2016. In order to preserve this funding source, it is necessary to request an extension of the associated Cooperative Working Agreement with Caltrans Local Assistance that administers these federal funds; and WHEREAS, staff recommends that City Council approve the extension of the Cooperative Work Agreement; and WHEREAS, staff recommends that the City Council appropriate funds for the Harney Lane Grade Separation project in the amount of $16,875,182; and WHEREAS, staff recommends authorizing the City Manager to execute the contract, within the appropriation, subject to Caltrans approval of Disadvantaged Business Enterprise documentation. NOW, THEREFORE, BE IT RESOLVED that the Lodi City Council does hereby award the bid for the Harney Lane Grade Separation Project to the low bidder, DeSilva Gates Construction, LP, of Dublin, California, in the amount of $14,313,0.75, subject to Caltrans approval of Disadvantaged Business Enterprise documentation; and BE IT FURTHER RESOLVED that the Lodi City Council hereby approves the extension of the Cooperative Work Agreement; and BE IT FURTHER RESOLVED that the Lodi City Council does hereby appropriate funds for the Harney Lane Grade Separation Project in the amount of $16,875,182; and BE IT FURTHER RESOLVED that the City Manager is hereby authorized to execute all Contracts/Agreements for this project on behalf of the City of Lodi, subject to Caltrans approval of Disadvantaged Business Enterprise documentation. Dated: November 18, 2015 hereby certify that Resolution No. 2015-201 was passed and adopted by the City Council of the City of Lodi in a regular meeting held November 18, 2015, by the following vote: AYES: COUNCIL MEMBERS — Chandler, Kuehne, Mounce, Nakanishi, and Mayor Johnson NOES: COUNCIL MEMBERS — None ABSENT: COUNCIL MEMBERS — None ABSTAIN COUNCIL MEMBERS — None 4. NNIFER M. FERRAIOLO City Clerk 2015-201