HomeMy WebLinkAboutAgenda Report - November 18, 2015 C-05CITY OF LODI COUNCIL COMMUNICATION TM AGENDA TITLE: Adopt Resolution Rejecting Non -Responsive Bid and Awarding Contract for Salas Park - Sports Lighting Improvements (Phase 1), to Modesto Executive Electric, Inc., of Modesto ($75,502) MEETING DATE: November 18, 2015 AGENDA ITEM C-5 PREPARED BY: Public Works Director RECOMMENDED ACTION: Adopt resolution rejecting non-responsive bid and awarding contract for Salas Park - Sports Lighting Improvements (Phase 1), to Modesto Executive Electric, Inc., of Modesto, in the amount of $75,502. BACKGROUND INFORMATION: Salas Park is Lodi's primary sports facility for youth baseball, softball, soccer and football. Currently, there are eight wood light poles that due to age, condition and height must be replaced with new, metal poles with upgraded fixtures and components. At the March 4, 2015 meeting, Council approved the purchase of the new lighting fixtures and components from Musco Corporation and the cost was included in Fiscal Year 2014/15 budget ($160,429). The new lighting fixtures and components are stored at Musco Corporation and will be delivered to Salas Park for installation once the contract is fully executed. The project will remove eight existing, 40 -foot wood Tight poles and install the City -furnished Musco lighting fixtures and components, including eight 70 -foot steel poles and concrete foundations, 41 lamps, pole -top assemblies, wiring, controller and monitoring system, conduit and conductor, a switchboard panel cabinet and other incidental and related work, as shown on the plans and specifications for the above project. Plans and specifications for this project were approved on April 1, 2015. The City received the following bids for this project on October 14, 2015. Bidder Location Bid Engineer's Estimate $ 73,800.00 Big Valley Electric Stockton $ 72,050.00 Modesto Executive Electric, Inc. Modesto $ 75,501.60 Bockmon & Woody Electric Co., Inc. Stockton $ 93,958.00 Eco Energy Solutions, Inc., dba High Volt Electric Chatsworth $ 112,454.00 Tennyson Electric, Inc. Livermore $ 118,570.00 The bid received from the lowest bidder, Big Valley Electric, did not contain the addendum receipt and is being rejected as non-responsive. Staff recommends awarding the contract to the second -lowest bidder, Modesto Executive Electric, Inc., of Modesto. APPROVED: (� , ep en chi vaha er, City Manager K:\WP\PROJECTS\PARKS\Salas Park Sports Lighting\CAward Salas Park Lighting.doc 11/9/2015 Adopt Resolution Rejecting Non -Responsive Bid and Awarding Contract for Salas Park - Sports Lighting Improvements (Phase 1), to Modesto Executive Electric, Inc., of Modesto ($75,502) November 18, 2015 Page 2 FISCAL IMPACT: FUNDING AVAILABLE: Jeff Hood Parks, Recre II'► ►:"►►�l0 if/ 1'' n & Cultur.1 Services Director The new sports lighting system will decrease maintenance and operations costs in the park's sports lighting system. Park Capital (43299000.77020) CA09-6-t0-At Jordan Ayers Deputy City Manager/Internal Services Director Prepared by Dorothy Kam, Assistant Engineer FWS/DK/tb cc: City Engineer/Deputy Public Works Director Parks, Recreation and Cultural Services Director F. Wally : ndelin Public Works Director K:\WP\PROJECTS\PARKS\Salas Park Sports Lighting\CAward Salas Park Lighting.doc 11/9/2015 SALAS PARK — SPORTS LIGHTING IMPROVEMENTS (PHASE 1) CONTRACT 2001 South Stockton Street CITY OF LODI, CALIFORNIA THIS CONTRACT made by and between the CITY OF LODI, State of California, herein referred to as the "City," and MODESTO EXECUTIVE ELECTRIC, INC., herein referred to as the "Contractor." WITNESSETH: That the parties hereto have mutually covenanted and agreed, and by these presents do covenant and agree with each other, as follows: The complete Contract consists of the following documents which are incorporated herein by this reference, to -wit: Notice Inviting Bids Information to Bidders General Provisions Special Provisions Bid Proposal Contract Contract Bonds Plans The July 1992 Edition, Standard Specifications, State of California, Business and Transportation Agency, Department of Transportation All of the above documents, sometimes hereinafter referred to as the "Contract Documents," are intended to cooperate so that any work called for in one and not mentioned in the other is to be executed the same as if mentioned in all said documents. ARTICLE I - That for and in consideration of the payments and agreements hereinafter mentioned, to be made and performed by the City and under the condition expressed in the two bonds bearing even date with these presents and hereunto annexed, the Contractor agrees with the City, at Contractor's cost and expense, to do all the work and furnish all the materials except such as are mentioned in the specifications to be furnished by the City, necessary to construct and complete in a good workmanlike and substantial manner and to the satisfaction of the City the proposed improvements as shown and described in the Contract Documents which are hereby made a part of the Contract. ARTICLE II - The City hereby promises and agrees with the Contractor to employ, and does hereby employ, the Contractor to provide all materials and services not supplied by the City and to do the work according to the terms and conditions for the price herein, and hereby contracts to pay the same as set forth in Section 5.600, "Measurement, Acceptance and Payment," of the General Provisions, in the manner and upon the conditions above set forth; and the said parties for themselves, their heirs, executors, administrators, successors and assigns, do hereby agree to the full performance of the covenants herein contained. ARTICLE III - The Contractor agrees to conform to the provisions of Chapter 1, Part 7, Division 2 of the Labor Code. The Contractor and any Subcontractor will pay the Contract.doc 4.1 10/20/15 general prevailing wage rate and other employer payments for health and welfare, pension, vacation, travel time, and subsistence pay, apprenticeship or other training programs. The responsibility for compliance with these Labor Code requirements is on the prime contractor. ARTICLE IV - And the Contractor agrees to receive and accept the following prices as full compensation for furnishing all materials and for doing all the work contemplated and embraced in this agreement; also for all loss or damage arising out of the nature of the work aforesaid or from the action of the elements, or from any unforeseen difficulties or obstructions which may arise or be encountered in the prosecution of the work until its acceptance by the City, and for all risks of every description connected with the work; also for all expenses incurred by or in consequence of the suspension or discontinuance of work and for well and faithfully completing the work, and the whole thereof, in the manner and according to the Plans and Contract Documents and the requirements of the Engineer under them, to -wit: Perform the work necessary providing all labor, materials and equipment to unload the city furnished Musco Lighting system components that are delivered to the project site. The Contractor shall also provide all labor, materials and equipment to remove existing lighting equipment, electrical switchboard cabinet and concrete pad and install (41) new fixtures, poletop luminaire assemblies, remote electrical component enclosures, pole length wiring harnesses, Control Link controller and monitoring system, electrical switchboard cabinet and concrete pad, (8) 70 foot galvanized steel poles, (8) pre -cast concrete foundation bases, trenching, backfill, compaction, conduit and conductor and other incidental and related work, all as shown on the plans and specifications for the above project. "Salas Park — Sports Lighting Improvements (Phase 1) ". ITEM NO. DESCRIPTION CONTRACT ITEMS EST'D. UNIT QTY UNIT PRICE TOTAL PRICE Furnish All Labor, Materials and Equipment to Unload and Secure City Furnished Sports Lighting Components LS 1 $3,000.00 $3,000.00 Furnish All Labor, Materials and Equipment to Remove and Dispose of the Existing Wood Poles, Fixtures and Luminaire Assemblies LS 1 $10,045.00 $10,045.00 Contract.doc 4.2 1 0/20/1 5 ITEM NO. DESCRIPTION EST'D. UNIT QTY UNIT PRICE TOTAL PRICE 3. Furnish All Labor, Materials and Equipment to Install (8) 70 Foot Steel Poles, 41 Fixtures, Luminaire Assemblies and (8) Pre Cast Concrete Foundation Bases LS 1 $26,000.00 $26,000.00 4. Furnish All Labor, Materials and Equipment to Install Control Link Lighting Controller and Monitoring System and Lighting Contactors LS 1 $2,555.00 $2,555.00 5. Furnish and Install 3 Inch Type DB Conduit w/ 1 - #2 AL Tri-Plex and 1 - #2 AL TW Conductor LF 230 $73.92 $17,001.60 6. Furnish and Install New Electrical Pull Boxes w/ Vandal Proof Metal Lids EA 6 $850.00 $5,100.00 7. Furnish All Labor Materials and Equipment to Remove and Salvage the Existing 400 AMP Electrical Switchboard Cabinet LS 1 $2,200.00 $2,200.00 Furnish All Labor Materials and Equipment to Remove and Dispose of the Existing Electrical Switchboard Concrete Pad LS 1 $2,600.00 $2,600.00 Contract.doc 4.3 10/20/15 ITEM NO. DESCRIPTION EST'D. UNIT QTY UNIT PRICE TOTAL PRICE 9. Furnish All Labor, Materials and Equipment to Install New City Furnished 400 AMP Electrical Switchboard Cabinet with New Concrete Pad LS 1 $7,000.00 $7,000.00 TOTAL BID $75,501.60 ARTICLE V - By my signature hereunder, as Contractor, I certify that I am aware of the provisions of Section 3700 of the Labor Code, which requires every employer to be insured against liability for workers' compensation or to undertake self-insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the work of this contract. ARTICLE VI - It is further expressly agreed by and between the parties hereto that, should there be any conflict between the terms of this instrument and the Bid Proposal of the Contractor, then this instrument shall control and nothing herein shall be considered as an acceptance of the said terms of said proposal conflicting herewith. ARTICLE VII - The City is to furnish the necessary rights-of-way and easements and to establish lines and grades for the work as specified under the Special Provisions. All labor or materials not mentioned specifically as being done by the City will be supplied by the Contractor to accomplish the work as outlined in the specifications. ARTICLE VIII - The Contractor agrees to commence work pursuant to this contract within 15 calendar days after the City Manager has executed the contract and to diligently prosecute to completion within 25 WORKING DAYS. WHEN SIGNING THIS CONTRACT, THE CONTRACTOR AGREES THAT THE TIME OF COMPLETION FOR THIS CONTRACT IS REASONABLE AND THE CONTRACTOR AGREES TO PAY THE CITY LIQUIDATED DAMAGES AS SET FORTH IN SECTION 6-04.03 OF THE SPECIAL PROVISIONS. CONTRACTOR AGREES THAT THIS AMOUNT MAY BE DEDUCTED FROM THE AMOUNT DUE THE CONTRACTOR UNDER THE CONTRACT. Contract.doc 4.4 1 0/20/1 5 IN WITNESS WHEREOF, the parties to these presents have hereunto set their hands the year and date written below. CONTRACTOR: CITY OF LODI By: Stephen Schwabauer City Manager By: Date: Title Attest City Clerk (CORPORATE SEAL) Approved As To Form Janice D. Magdich City Attorney Contract.doc 4.5 10/20/15 RESOLUTION NO. 2015-200 A RESOLUTION OF THE LODI CITY COUNCIL REJECTING NON-RESPONSIVE BID, AWARDING THE CONTRACT FOR THE SALAS PARK — SPORTS LIGHTING IMPROVEMENTS (PHASEI) PROJECT TO MODESTO EXECUTIVE ELECTRIC, INC., OF MODESTO, AND FURTHER AUTHORIZING. THE CITY_MANAGER TO EXECUTE THE CONTRACT WHEREAS, in answer to notice duly published in accordance with law and the order of this City Council, sealed bids were received and publicly opened on October 14, 2015, at 11:00 a.m., for the Salas Park - Sports Lighting Improvements (Phase 1) Project, described in the plans and specifications therefore approved by the City Council on April 1, 2015; and WHEREAS, said bid has been checked and tabulated and a report thereof filed with the City Manager as follows: Bidder Bid Big Valley Electric Modesto Executive Electric, Inc. Bockmon & Woody Electric Co, Inc. Eco Energy Solutions, Inc., dba High Volt Electric Tennyson Electric, Inc. $ 72,050.00 (Non -Responsive) $ 75,501.60 $ 93,958.00 $ 112,454.00 $ 118,570.00 WHEREAS, the lowest bidder, Big Valley Electric, failed to submit the addendum receipt with their bid and is considered non-responsive; and WHEREAS, staff recommends that the City Council reject the non-responsive bid and award the contract for Salas Park - Sports Lighting Improvements (Phase 1) Project to the lowest responsive bidder, Modesto Executive Electric, Inc., in the amount of $75,501.60. NOW, THEREFORE, BE IT RESOLVED that the Lodi City Council does hereby reject the non-responsive bid and award the contract for Salas Park - Sports Lighting Improvements (Phase 1) Project to the lowest responsive bidder, Modesto Executive Electric, Inc., of Modesto, California, in the amount of $75,501.60; and BE IT FURTHER RESOLVED that the City Council hereby authorizes the City Manager to execute the contract. Dated: November 18, 2015 I hereby certify that Resolution No. 2015-200 was passed and adopted by the City Council of the City of Lodi in a regular meeting held November 18, 2015, by the following vote: AYES: COUNCIL MEMBERS — Chandler, Kuehne, Mounce, Nakanishi, and Mayor Johnson NOES: COUNCIL MEMBERS — None ABSENT: COUNCIL MEMBERS — None ABSTAIN: COUNCIL MEMBERS — None h �4� ZER. FERRAIOLO City Clerk 2015-200