Loading...
HomeMy WebLinkAboutAgenda Report - November 4, 2015 C-07AGENDA ITEM Cis 7 RN CITY OF LODI COUNCIL COMMUNICATION TM AGENDA TITLE: Adopt Resolution Authorizing City Manager to Award Contract for Lodi Lake Park — Boat Launch Facility Improvements, to the Lowest Responsive Bidder, (Not to Exceed $900,000) and Appropriating Funds ($190,000) MEETING DATE: November 4, 2015 PREPARED BY: Public Works Director RECOMMENDED ACTION: Adopt resolution authorizing City Manager to award contract for Lodi Lake Park — Boat Launch Facility Improvements, to the lowest responsive bidder, in an amount not to exceed $900,000, and appropriating funds in the amount of $190,000. BACKGROUND INFORMATION: In 2014, the City was awarded a grant from the California Division of Boating and Waterways (DBW), in the amount of $710,000, for improvements to the boat ramp at Lodi Lake. The grant agreement calls for the project to be completed by March 1, 2016 (an extension is pending). The Public Works and Parks, Recreation, and Cultural Services departments (Departments) have worked together to expedite the project, however, external delays have significantly impacted the design and permitting schedule. Bids are currently scheduled to be received by the City on November 12, 2015. The construction of the ramp and the dock must be completed during the month of February when the lake is empty. If the 2016 February construction window is missed, the project would be postponed for a year, and would be at risk of losing the grant funds. Under normal circumstances, there are a number of procedural and contractual steps that must take place between the time bids are received, and issuance of the Notice to Proceed. These steps include obtaining DBW approval to award, sending contract documents to the contractor, receiving all required signed documents back from contractor (contract, insurance, bonds, etc.), holding a pre -construction meeting, and allowing the contractor time to schedule and mobilize their crew. By authorizing the City Manager to award the construction contract, the Notice to Proceed could be issued approximately three weeks earlier, allowing the project to easily start by February 1, 2016. As mentioned above, this project is being partially funded by a DBW grant. After the grant award, it became necessary to slightly expand the project scope in order to reconstruct the entire north parking lot, as well as adding some other minor items that are not covered by the grant (i.e. landscape and irrigation modifications). See Exhibit A for the grant funding boundary. The grant requires the City to budget and/or appropriate funds in excess of the grant amount for the cost of work outside of the original grant scope of work. The additional $190,000 appropriation request covers the additional costs reflected above along with a 10 -percent contingency. APPROVED- R� ��i�l.� �� — •� iSch abauer,•- K:\WP\PROJECTS\PARKS\LODILAKE\Boat Ramp\C-CM-Award.doc 10/19/2015 Adopt Resolution Authorizing City Manager to Award Contract for Lodi Lake Park — Boat Launch Facility Improvements, to the Lowest Responsive Bidder, (Not to Exceed $900,000) and Appropriating Funds ($190,000) November 4, 2015 Page 2 FISCAL IMPACT: FUNDING AVAILABLE: The new boat ramp and dock will decrease the on-going maintenance costs of the facility. Capital Fund — Boating & Waterways Grant (20599000) Requesting Appropriation: Parks Capital Unreserved (432.32205) Jordan Ayers Deputy City Manager/Internal Services Director Prepared by Sean Nathan, Associate Civil Engineer FWS/SN/tb Attachment cc: Deputy Public Works Director / City Engineer Parks, Recreation & Cultural Services Director F. Wally Sa elin Public Works Director $710,000 $190,000 �VA/ Jeff 1-196y/j/ Parks,LKecreation, and Cultural Services Director K:\WP\PROJECTS\PARKS\LODILAKE\Boat Ramp\C-CM-Award.doc 10/19/2015 EXHIBIT A 1 AA# 2. JV# CITY OF LODI APPROPRIATION ADJUSTMENT REQUEST TO: _ _ Internal Services Dept. -Budget Division 3. FROM: Rebecca Areida-yadav 15. DATE: 10/19/20.1.5 4. DEPARTMENT/DIVISION: Public Works S. REQUEST ADJUSTMENT OF APPROPRIATION AS LISTED BELOW FUND # BUS. UNIT # ACCOUNT # ACCOUNT TITLE AMOUNT A. 432 32205 Fund Balance $ 190,000.00 SOURCE OF FINANCING B. 432 43299000 77020 Parks Capital Projects $ 190,000.00 USE OF FINANCING 7. REQUEST IS MADE TO FUND THE FOLLOWING PROJECT NOT INCLUDED IN THE CURRENT BUDGET Please provide a description of the project, the total cost of the project, as well as justification for the requested adjustment. If you need more space, use an additional sheet and attach to this form. Contract for Lodi Lake Park boat launch facility project. If Council has authorized the appropriation adjustment, complete the following: Meeting Date: Res No: Attach copy PXof t' n to is form. i Department Head Signature: 4L -86'0L9- 18. APPROVAL SIGNATURES Deputy City Manager/Internal Services Manager Date Submit completed form to the Budget Division with any required documentation. Final approval will be provided in electronic copy format. RESOLUTION NO. 2015-188 A RESOLUTION OF THE LODI CITY COUNCIL AWARDING THE CONTRACT FOR THE LODI LAKE PARK — BOAT RAMP FACILITIES IMPROVEMENTS TO THE LOWEST RESPONSIVE BIDDER AND FURTHER APPROPRIATING FUNDS -.... WHEREAS, in 2014, the City was awarded a grant from the California Division of Boating and Waterways, in the amount of $710,000, for improvements to the boat ramp at Lodi Lake; and WHEREAS, bids are currently scheduled to be received by the City on November 12, 2015; WHEREAS, the construction of the ramp and dock must be completed during the month of February when Lodi Lake is empty; and WHEREAS, if the February 2016 construction window is missed, the project would be postponed for a year, and the City would run the risk of losing the grant funds; and WHEREAS, by authorizing the City Manager to award the construction contract, the Notice to Proceed could be issued approximately three weeks earlier, allowing the project to easily start by February 1, 2016; and WHEREAS, the grant agreement calls for the project to be completed by March 1, 2016; and WHEREAS, staff recommends that the City Council authorize the City Manager to award the contract for the Lodi Lake Park — Boat Launch Facility Improvements to the lowest responsive bidder, in an amount not to exceed $900,000, and appropriate funds in the amount of $190,000. NOW, THEREFORE, BE IT RESOLVED that the Lodi City Council does hereby authorize the City Manager to award the contract for the Lodi Lake Park — Boat Launch Facility Improvements to the lowest responsive bidder, in an amount not to exceed $900,000; and BE IT FURTHER RESOLVED that funds in the amount of $190,000 be appropriated for the project. Dated: November 4, 2015 I hereby certify that Resolution No. 2015-188 was passed and adopted by the City Council of the City of Lodi in a regular meeting held November 4, 2015, by the following vote: AYES: COUNCIL MEMBERS — Chandler, Kuehne, Mounce, Nakanishi, and Mayor Johnson NOES: COUNCIL MEMBERS — None ABSENT: COUNCIL MEMBERS — None ABSTAIN: COUNCIL MEMBERS — None ?Jj N4N1,FERy-FERRAIOLO Cerk 2015-188