Loading...
HomeMy WebLinkAboutAgenda Report - September 16, 2015 C-03AGENDA ITEM C40 3 CITY OF LODI COUNCIL COMMUNICATION TM AGENDA TITLE: Accept Improvements Under Contract for Downtown Sidewalk Paver Maintenance MEETING DATE: September 16, 2015 PREPARED BY: Public Works Director RECOMMENDED ACTION: Accept improvements under contract for Downtown Sidewalk Paver Maintenance. BACKGROUND INFORMATION: The project was awarded to Emert Construction, Inc., of Stockton, in the amount of $64,133. The contract was executed on April 16, 2015 and has been completed in substantial conformance with the specifications approved by City Council. The purpose of this project was to eliminate tripping hazards in the downtown area. Public Works staff performed a survey of the downtown area pavers and identified 100 separate locations totaling approximately 1,900 square feet of pavers needing adjustment. This project removed the existing pavers, re -compacted the base below the pavers, and then re -installed the pavers. During the project, additional locations were identified that needed adjustment at the Transit Station. The contract completion date was May 27, 2015, and the actual completion date was July 31, 2015. The final contract price was $83,210. The difference between the contract and the final price and completion dates were due to the additional work added at the Transit Station and the emergency work needed at Lodi Avenue and Stockton Street related to a sink hole. Following acceptance by the City Council, as required by law, the City Engineer will file a Notice of Completion with the County Recorder's office. The notice serves to notify vendors and subcontractors that the project is complete and begins their 30 -day period to file a stop notice requiring the City to withhold payments from the prime contractor in the event of a payment dispute. FISCAL IMPACT: This project will minimize the tripping hazards in downtown and the related potential liability. FUNDING AVAILABLE: This project was funded through the General Liability Fund. Jordan Ayers Deputy City Manager/Internal Services Director J F. Wally6tarridelin Public Works Director Prepared by: Sean Nathan, Associate Civil Engineer FWS/SN/tb cc: Utilities Superintendent APPROVED: ]`4- t pfren Scnvral�a�, r, City Manager K:\WP\PROJECTS\STREETS\Downtown Paver Maintenance Project\CAccept Downtown PaverMaint.doc 8/31/2015